CN209760279U - Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure - Google Patents
Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure Download PDFInfo
- Publication number
- CN209760279U CN209760279U CN201920162264.5U CN201920162264U CN209760279U CN 209760279 U CN209760279 U CN 209760279U CN 201920162264 U CN201920162264 U CN 201920162264U CN 209760279 U CN209760279 U CN 209760279U
- Authority
- CN
- China
- Prior art keywords
- concrete foundation
- pipe
- bars
- concrete
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a turnover fast-assembly concrete foundation of a temporary building enclosure, relating to the technical field of building construction; the concrete foundation unit comprises concrete foundation bars, foundation bolts, a lapping pipe, a hoisting handle and a spraying pipe, wherein the spraying pipe comprises an outer layer pipe and an inner pipeline which is sleeved in the outer layer pipe; the concrete foundation units in the utility model can be transported to the construction site in batches for assembly, thereby simplifying the flow of the prior mode and solving the problem of longer construction period of the temporary construction; the width of the concrete foundation can be lapped by using the lapping pipes, and the concrete foundation units can be recycled after the enclosure is removed, so that the waste of resources is reduced; meanwhile, the utility model can not cause the work stop of earth and stone due to the haze requirement in winter, and the delay of the construction period is avoided; the time wasted by hardening the concrete is also saved; the running water type operation can be realized, the efficiency of erecting the enclosure is accelerated, and the cost is saved.
Description
Technical Field
the utility model discloses a face and build concrete foundation that can have enough to meet need fast assembly who encloses fender relates to construction technical field.
background
The bar concrete foundation for setting up of existing building site temporary construction enclosure has the following disadvantages:
1. the process is relatively complicated and low in efficiency;
2. When haze in winter requires the earth and stone operation to stop, the construction period is delayed for a long time;
3. The resource waste is serious, and the recovery utilization rate is low;
4. The construction period is longer.
The utility model provides a concrete foundation of temporary building enclosure capable of being circulated and rapidly assembled, which adopts an off-site prefabricated modular special-shaped bar foundation to be transported to a construction site in batches for assembly, thereby simplifying the flow of the prior mode; the problem of long construction period of temporary construction is solved; the abnormal foundation can be recycled, so that the waste of resources is reduced; the problem of delay of the construction period caused by stopping the earthwork operation required by haze in winter is solved; the time wasted by hardening the concrete is saved; the running water type operation can be realized, the efficiency of erecting the enclosure is accelerated, and the cost is saved.
SUMMERY OF THE UTILITY MODEL
the utility model discloses to prior art's problem, provide a face and build the concrete foundation that can have enough to meet need fast assembly who encloses the fender, have the commonality strong, implement characteristics such as simple and convenient, have wide application prospect.
the utility model provides a concrete scheme is:
A concrete foundation capable of being circulated and quickly assembled for an adjacent building enclosure comprises a concrete foundation unit, wherein the concrete foundation unit comprises concrete foundation bars, anchor bolts, a lapping pipe, a hoisting handle and a spraying pipe, the spraying pipe comprises an outer pipe and an inner pipe, the inner pipe is sleeved in the outer pipe,
The two concrete foundation bars are staggered in tandem and the side surfaces of the two concrete foundation bars are attached to form a main body of a concrete foundation unit, a lapping pipe penetrates through the top surface of one concrete foundation bar and penetrates out of the front surface of the other concrete foundation bar, each lifting handle is respectively connected with the two concrete foundation bars and is symmetrically distributed on the concrete foundation unit, spray pipes are embedded at the two ends of the concrete foundation bars, foundation bolts are embedded in the concrete foundation bars and are used for connecting a vertical rod base of an adjacent building enclosure,
The concrete foundation units are assembled through the concrete foundation bars with the staggered positions to form a concrete foundation of the temporary building enclosure.
The foundation bolts in the concrete foundation are symmetrically distributed on the two concrete foundation bars.
The inner side of the hoisting handle in the concrete foundation is an anti-skid surface.
The lapping pipe in the concrete foundation is made of deformed steel bars, penetrates out of the front of the concrete foundation bar and is 80-120mm away from the ground.
The utility model discloses an useful part is:
The utility model provides a circulating fast-assembling concrete foundation of temporary building enclosure, which comprises a concrete foundation unit, wherein the concrete foundation unit comprises a concrete foundation bar, a foundation bolt, a lapping pipe, a hoisting handle and a spray pipe, the spray pipe comprises an outer pipe and an inner pipe, and the inner pipe is sleeved in the outer pipe; the concrete foundation units in the utility model can be transported to the construction site in batches for assembly, thereby simplifying the flow of the prior mode and solving the problem of longer construction period of the temporary construction; the width of the concrete foundation can be lapped by using the lapping pipes, and the concrete foundation units can be recycled after the enclosure is removed, so that the waste of resources is reduced; meanwhile, the utility model can not cause the work stop of earth and stone due to the haze requirement in winter, and the delay of the construction period is avoided; the time wasted by hardening the concrete is also saved; the running water type operation can be realized, the efficiency of erecting the enclosure is accelerated, and the cost is saved.
Drawings
FIG. 1 is an enlarged schematic view of a concrete foundation unit;
fig. 2 is a schematic illustration of concrete foundation unit splicing.
Reference numerals:
1 concrete foundation bar, 2 lap joint pipes, 3 hoisting handles, 4 foundation bolts, 5 inner pipelines and 6 outer layer pipes.
Detailed Description
The present invention is further described with reference to the following drawings and specific embodiments so that those skilled in the art can better understand the present invention and can implement the present invention, but the embodiments are not to be construed as limiting the present invention.
A concrete foundation capable of being circulated and quickly assembled for an adjacent building enclosure comprises a concrete foundation unit, wherein the concrete foundation unit comprises concrete foundation bars 1, 4 foundation bolts 4, a lapping pipe 2, 2 hoisting handles 3 and 2 spraying pipes, each spraying pipe comprises an outer pipe 6 and an inner pipe 5, the inner pipe 5 is sleeved in the outer pipe 6,
The two concrete foundation bars 1 are staggered in tandem and the side surfaces of the two concrete foundation bars are attached to form a main body of a concrete foundation unit, the lap joint pipe 2 penetrates through the top surface of one concrete foundation bar 1 and penetrates out of the front surface of the other concrete foundation bar 1, the height from the ground is 80mm, each lifting handle 3 is respectively connected with the two concrete foundation bars 1, the lifting handles 3 are symmetrically distributed on the concrete foundation unit, 1 spray pipe is respectively embedded at the two ends of the concrete foundation bar 1, 4 foundation bolts 4 are embedded in the concrete foundation bars 1 and are symmetrically distributed on the two concrete foundation bars 1 and are used for connecting a vertical rod base of an adjacent building enclosure,
The concrete foundation units are assembled through the concrete foundations with the staggered positions 1 to form the concrete foundation of the temporary enclosure.
Embodiment 2 improves embodiment 1, and the top surface of taking over pipe 2 from a concrete foundation strip 1 penetrates by the preceding wear of another concrete foundation strip 1, and is 100mm apart from ground height, and the hoist and mount handle inboard can be dull polish antiskid face, and the hoist and mount handle can be pre-buried on concrete foundation strip 1, perhaps through bolted connection on concrete foundation strip 1.
Embodiment 3 is an improvement of embodiment 2, the lapping pipe 2 is made of deformed steel bar, and the lapping pipe 2 penetrates from the top surface of one concrete foundation strip 1 and penetrates out from the front surface of the other concrete foundation strip 1, and the height from the ground is 120 mm.
Table 1 illustrates one specification parameter for a concrete foundation unit for reference.
TABLE 1
The concrete foundation units can be manufactured, produced in batches off-site and bound according to the parameters in the table 1. The foundation bolt's position, foundation bolt position can be according to pole setting size adjustment base size, and the foundation bolt position needs to reserve according to the base size. After the concrete foundation units are prefabricated and transported to a construction site in batches, the construction process is measurement paying-off → foundation trench excavation → rechecking of the size of the foundation trench and the like → hoisting of the concrete foundation units, and the concrete foundation units are assembled one by one → the periphery of the foundation is treated, so that the construction of the flowing water enclosure can be realized, and the problem of long construction period of the temporary construction is solved; because the concrete foundation unit can be recycled, the waste of resources is reduced, and the cost is saved.
the above-mentioned embodiments are merely preferred embodiments for fully illustrating the present invention, and the scope of the present invention is not limited thereto. Equivalent substitutes or changes made by the technical personnel in the technical field on the basis of the utility model are all within the protection scope of the utility model. The protection scope of the present invention is subject to the claims.
Claims (4)
1. Temporary building enclosure concrete foundation capable of being circulated and quickly assembled and characterized in that temporary building enclosure concrete foundation
Comprises a concrete foundation unit, the concrete foundation unit comprises a concrete foundation bar, a foundation bolt, a lapping pipe, a hoisting handle and a spray pipe, the spray pipe comprises an outer pipe and an inner pipeline, the inner pipeline is sleeved in the outer pipe,
the two concrete foundation bars are staggered in tandem and the side surfaces of the two concrete foundation bars are attached to form a main body of a concrete foundation unit, a lapping pipe penetrates through the top surface of one concrete foundation bar and penetrates out of the front surface of the other concrete foundation bar, each lifting handle is respectively connected with the two concrete foundation bars and is symmetrically distributed on the concrete foundation unit, spray pipes are embedded at the two ends of the concrete foundation bars, foundation bolts are embedded in the concrete foundation bars and are used for connecting a vertical rod base of an adjacent building enclosure,
the concrete foundation units are assembled through the concrete foundation bars with the staggered positions to form a concrete foundation of the temporary building enclosure.
2. A concrete foundation according to claim 1 wherein the anchor bolts are symmetrically distributed on both of the concrete foundation bars.
3. A concrete foundation according to claim 1 or 2 wherein the inner sides of the lifting handles are non-slip surfaces.
4. a concrete foundation according to claim 3 wherein the lap joint pipe is of deformed steel bar and extends out of the front face of the concrete foundation bar at a height of 80-120mm from the ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920162264.5U CN209760279U (en) | 2019-01-30 | 2019-01-30 | Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920162264.5U CN209760279U (en) | 2019-01-30 | 2019-01-30 | Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209760279U true CN209760279U (en) | 2019-12-10 |
Family
ID=68750908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920162264.5U Active CN209760279U (en) | 2019-01-30 | 2019-01-30 | Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209760279U (en) |
-
2019
- 2019-01-30 CN CN201920162264.5U patent/CN209760279U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204984441U (en) | It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction | |
CN104405041B (en) | The prefabricated floor connector of steel building and mounting method thereof | |
CN108005084A (en) | The supporting of deep basal pit combined type and construction method | |
CN105625298B (en) | Using the continuous underground wall structure and its construction method of glass fiber-reinforced polymer lap joint sleeve milling | |
CN203080517U (en) | Steel formwork for combination of manual hole digging piles | |
CN204225277U (en) | The prefabricated floor connector of steel building | |
CN204825557U (en) | Job site interim construction road combination ground structure | |
CN105350559A (en) | Construction method suitable for emery structural ground of large factory building | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN209723033U (en) | Pipe jacking working well applicable to desert waterless sand layer area | |
CN203160254U (en) | Pit support structure | |
CN209760279U (en) | Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure | |
CN211286678U (en) | Concrete conveying pump reinforcing apparatus | |
CN209854770U (en) | Anti-impact rubber mat for concrete bottom plate of hydraulic drainage building | |
CN209323526U (en) | A kind of truss-like double-row pile foundation pit enclosure structure | |
CN104563497A (en) | Novel beam slab supported construction method | |
CN207630230U (en) | Precast beam combined steel structure mortar leakage prevention pedestal | |
CN207974027U (en) | A kind of shape-setting clamp for concrete guardrail skin patching | |
CN207228125U (en) | A kind of steel pipe support structure for exempting to tear support open | |
CN206338075U (en) | A kind of anti-internal water pressure composite shield section of jurisdiction | |
CN217378938U (en) | UHPC assembled soil nail wall structure | |
CN206600524U (en) | A kind of modularization assembling steel backrest | |
CN104746791A (en) | Wallboard manufactured by filling semi-rigid frame with recycled concrete and manufacturing method | |
CN202017197U (en) | Multi-section H-shaped reinforced concrete plate pile welding structure | |
CN210315651U (en) | Upward inclined concrete wall formwork supporting and reinforcing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |