CN205743923U - A kind of urgent support apparatus of tunnel excavation vault - Google Patents

A kind of urgent support apparatus of tunnel excavation vault Download PDF

Info

Publication number
CN205743923U
CN205743923U CN201620379838.0U CN201620379838U CN205743923U CN 205743923 U CN205743923 U CN 205743923U CN 201620379838 U CN201620379838 U CN 201620379838U CN 205743923 U CN205743923 U CN 205743923U
Authority
CN
China
Prior art keywords
arch bar
arc arch
concrete
arc
hairbrush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620379838.0U
Other languages
Chinese (zh)
Inventor
刘志胜
牛力强
范丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201620379838.0U priority Critical patent/CN205743923U/en
Application granted granted Critical
Publication of CN205743923U publication Critical patent/CN205743923U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of urgent support apparatus of tunnel excavation vault, including carrying vehicle and arc arch bar, loading on carrying vehicle and be provided with concrete Sheng slurry case and controller, arc arch bar is connected to above carrying vehicle by bracing frame, and concrete is contained slurry case and is provided with grouting pump;Arc arch bar is overall, and in arc shape, the upper surface at arc arch bar top is provided with the scraper plate of arcuate shape, and grouting pump is connected with Grouting Pipe, and the pulp mouth of pipe of Grouting Pipe is through arc arch bar and is positioned at arc arch bar top.The fast hardening concrete siccative contained in slurry case and water are transported on the upside of arc arch bar through Grouting Pipe by grouting pump by this utility model, and while concrete setting, scraper plate will carry out smooth process to the surface after initial set;Loosening granule can be cleared up by the hairbrush of arc front edge of board, increases protection intensity and construction quality;This utility model is more efficient, complete tunnel vault supporting timely, has reached to improve constructing tunnel speed, the purpose of guarantee construction safety.

Description

A kind of urgent support apparatus of tunnel excavation vault
Technical field
This utility model relates to field, highway engineering tunnel, particularly relates to a kind of tunnel excavation vault and promptly props up Protect equipment.
Background technology
Along with China's expanding economy, Transportation Infrastructure Construction develops rapidly, and highway construction is gradually to ground Deeply, vcehicular tunnel quantity grows with each passing day, and highway has crossed over mountain after mountain phenomenon in the region, the mountain ridge of reason position complexity Through the most universal.During constructing tunnel, vault construction is affected by geological conditions and is had different selections, Especially in soft stratum location, vault falls broken the most fairly obvious.At present, solve vault and fall broken conventional Method is tentatively to protect with gunite concrete after excavation, it is ensured that construction quality and practitioner's peace Entirely.The construction of gunite concrete is usually present problems with: (1) resilience problem, has certain speed Concrete ejection to after the vault excavated, part can be owing to momentum is too big or tack time is inadequate And kick down, use any measure to reduce rebound degree or a complex technical problem, existing execute Crew 5 is all difficult to hold;(2) can adhesion problem, ensure the closely knit of concrete itself and concrete Bonding closely knit problem with country rock, can this is related to concrete play predictive role.Concrete ejection is to arch Behind top, due to soft, the resilience in local so that concrete is difficult to closely knit in position greatly, does not reaches The purpose of vault supporting.Meanwhile, construction of shotcrete on-the-spot due to being scattered of slurry, ventilate, cause Construction environment is very poor, and the health of human body of practitioner is had bad impact.
For solving the problems referred to above, some units in charge of construction propose, the method manually plastered.Its advantage exists In: may determine that the practical situation of different keystone, it is ensured that the degree of compaction of concrete, improve concrete Adhesion strength with vault.But, its shortcoming becomes apparent from: speed of application is slow, and need to obtain employment in a large number people The long-time work high above the ground of member is bigger for construction speed and personnel attrition.Numerous line practitioners carry Go out the requirement of mechanical execution, but existing construction machinery does not the most possess and can prevent within the tunnel excavation short time The function protected, if the construction equipment of a kind of protection timely to constructing tunnel can be driven, for improving construction speed Degree, construction quality and saving human resources have great importance.
Utility model content
The weak point existed for prior art, the purpose of this utility model is to provide a kind of tunnel to open Dig the urgent support apparatus of vault, combine the feature of existing tunnel vault preliminary bracing, from mechanical feed, The technique that machinery is smeared is set out, and is developed for the equipment of the urgent supporting of tunnel excavation vault, more efficient, Complete tunnel vault supporting timely, to reach to improve constructing tunnel speed, it is ensured that the purpose of construction safety.
The purpose of this utility model is achieved through the following technical solutions:
A kind of urgent support apparatus of tunnel excavation vault, including carrying vehicle and arc arch bar, described carrying vehicle Upper loading is provided with concrete and contains slurry case and controller, and described arc arch bar is connected to carrying vehicle by bracing frame Top, described concrete is contained slurry case and is provided with the grouting pump being connected with concrete Sheng slurry box cavity, controls Having grouting pump switch module inside device, grouting pump electrically connects with the grouting pump switch module of controller;Institute Stating arc arch bar overall in arc shape, the upper surface at arc arch bar top is provided with the scraper plate of arcuate shape, Described grouting pump is connected with Grouting Pipe, and the pulp mouth of pipe of Grouting Pipe is through arc arch bar and is positioned at arc Plate top.
In order to this utility model is better achieved, the upper surface at described arc arch bar top is additionally provided with arc shape The hairbrush of shape, described hairbrush is arranged at the front end of arc arch bar, after described scraper plate is arranged at arc arch bar End, hairbrush is parallel with scraper plate to be arranged side by side in the upper surface at arc arch bar top.
Dust for the ease of falling tunnel vault adsorbs, between described carrying vehicle and arc arch bar Space in be provided with dedusting yarn, described dedusting yarn is mounted on bracing frame.
This utility model preferred hair brush structure technical scheme is: described hairbrush is Electric brush of bristles, controller Inside has hairbrush switch module, and hairbrush electrically connects with the hairbrush switch module of controller.
This utility model preferred support frame structure technical scheme is: support frame as described above is by several support bars Constituting, described support bar is expansion link, and described carrying vehicle is provided with the hydraulic cylinder corresponding with support bar, Hydraulic cylinder carries out elevating movement for driving the support bar of correspondence.
As preferably, support frame as described above is made up of eight support bars, and the diameter of support bar is more than 8cm;Institute Stating arc arch bar to be made up of curved plate, its thickness is 4~8mm.
As preferably, described scraper plate is made up of banded arc-shaped steel bar, and the width of scraper plate is more than 0.5cm.
As preferably, slurry case contained by described concrete is rectangular shape, and concrete is contained the top of slurry case and had The injection mouth of fast hardening concrete siccative, the top of concrete Sheng slurry case also has the injection mouth of water.
This utility model compared with the prior art, has the following advantages and beneficial effect:
(1) this utility model holds fast hardening concrete siccative and water in slurry case contained by concrete, by note The fast hardening concrete siccative contained in slurry case and water are transported on the upside of arc arch bar through Grouting Pipe, so by stock pump After solidify on the upside of arc arch bar, solidification while scraper plate will the surface after initial set be carried out smooth Process to improve protection quality;Arc front edge of board is provided with hairbrush, and arc arch bar rear end is provided with Scraper plate, loosening granule is cleared up by hairbrush, to ensure that the ground of fast hardening concrete and excavation is more encrypted Real contact, ensure that the scraper plate of arc arch bar rear end can carry out concrete table quickly and smoothly simultaneously The smooth process in face, increases protection intensity and construction quality;This utility model combines at the beginning of existing tunnel vault The feature of phase supporting, the technique smeared from mechanical feed, machinery, more efficient, complete timely Tunnel vault supporting, has reached to improve constructing tunnel speed, the purpose of guarantee construction safety.
(2) this utility model uses the lorry carrying vehicle as equipment of routine, can be in not synteny Move at random in interior tunnel, the advantage with conveniently moving;This utility model uses and props up in any two Both increase dedusting yarn between strut, effectively adsorb the dust during constructing tunnel, only need to be to removing Dirt yarn periodically carries out clearing up, the advantage with clean environment firendly;This utility model is arc in protection process Shape arch bar provides below a relatively large safe space, it is ensured that construction practitioner's personal safety, The advantage with construction safety.
Accompanying drawing explanation
Fig. 1 is the side block diagram of the urgent support apparatus of tunnel excavation vault;
Fig. 2 is the backsight structure chart of the urgent support apparatus of tunnel excavation vault.
Wherein, entitled corresponding to the reference in accompanying drawing:
1-carrying vehicle, 2-support bar, 3-arc arch bar, 4-concrete Sheng slurry case, 5-controller, 6-grouting pump, 7-scraper plate, 8-Grouting Pipe, 9-hairbrush, 10-dedusting yarn, 11-dome plate, 12 -tunnel rock.
Detailed description of the invention
Below in conjunction with embodiment, this utility model is described in further detail:
Embodiment
As shown in Fig. 1~Fig. 2, a kind of urgent support apparatus of tunnel excavation vault, including carrying vehicle 1 He Arc arch bar 3, carrying vehicle 1 of the present utility model selects two-axle truck, and power is more than 100 horsepowers, holds Carrying to load on car 1 and be provided with concrete Sheng slurry case 4 and controller 5, arc arch bar 3 is connected by bracing frame Above carrying vehicle 1, concrete is contained slurry case 4 and is provided with and the note of concrete Sheng slurry case 4 intracavity inter-connection Stock pump 6, controller 5 is internal has grouting pump switch module, grouting pump 6 and the grouting pump of controller 5 Switch module electrically connects;Fast hardening concrete siccative and water are transported to arc by grouting pump 6 by Grouting Pipe 8 Arch bar 3 top, controller 5 manipulates the opening and closing of grouting pump 6.Arc arch bar 3 entirety is cambered surface Shape, the upper surface at arc arch bar 3 top is provided with the scraper plate 7 of arcuate shape, the scraper plate 7 of the present embodiment Being made up of banded arc-shaped steel bar, the width of scraper plate 7 is more than 0.5cm, and scraper plate 7 is arranged in arc Rear part edge position on the upside of plate 3.Grouting pump 6 is connected with Grouting Pipe 8, the grout outlet of Grouting Pipe 8 Mouth is through arc arch bar 3 and is positioned at arc arch bar 3 top.
As it is shown in figure 1, the upper surface at arc arch bar 3 top is additionally provided with the hairbrush 9 of arcuate shape, hairbrush 9 front ends being arranged at arc arch bar 3, scraper plate 7 is arranged at the rear end of arc arch bar 3, hairbrush 9 with scrape Plate 7 is parallel to be arranged side by side in the upper surface at arc arch bar 3 top.Hairbrush 9 of the present utility model is electronic Hairbrush, controller 5 is internal has hairbrush switch module, hairbrush 9 and the hairbrush switch module of controller 5 Electrical connection.The hairbrush 9 of the present embodiment uses metal wheel brush, and the burr length of hairbrush 9 is according to smearing slurry thickness Choosing, hairbrush 9 is placed in the forward edge position on the upside of arc arch bar 3.The width of scraper plate 7 is more than 0.5cm, the peak height value of scraper plate 7 is less than the peak height value 2~5cm of hairbrush.
As in figure 2 it is shown, be provided with dedusting yarn 10, dedusting in space between carrying vehicle 1 and arc arch bar 3 Yarn 10 is mounted on bracing frame, the dedusting yarn 10 of the present embodiment be arranged at each two support bar 2 it Between.Dedusting yarn 10 of the present utility model uses existing patented technology, and its patent name is Dust-proof screen window, Its number of patent application is 201520004129.X.
As it is shown in figure 1, bracing frame is made up of several support bars 2, support bar 2 is expansion link, supports Bar 2 has the most telescopic hollow stem, and carrying vehicle 1 is provided with the hydraulic pressure corresponding with support bar 2 Cylinder, hydraulic cylinder carries out elevating movement for driving the support bar 2 of correspondence.This utility model is preferred Bracing frame is made up of eight support bars 2, and the diameter of support bar 2 is more than 8cm, the arc of the present embodiment Plate 3 is supported by eight support bars 2, point front two rows, often four support bars 2 of row;Arc arch bar 3 by Curved plate is made, and its thickness is 4~8mm, and the radian of arc arch bar 3 is according to tunnel appearance design figure Shape is adjusted.
Slurry case 4 contained by concrete of the present utility model is rectangular shape, and concrete is contained the top of slurry case 4 and opened Having the injection mouth of fast hardening concrete siccative, the top of concrete Sheng slurry case 4 also has the injection mouth of water.This Slurry case 4 contained by the concrete of embodiment can also adopt the following technical scheme that concrete contains slurry case 4 for rectangular Shape, concrete material is reserved on the top of concrete Sheng slurry case 4, and (concrete material includes rapid hardening coagulation Soil siccative and water) injection mouth;Injection mouth is divided into left and right two parts, and the injection mouth of left half holds rapid hardening Concrete drier, the injection mouth of right half holds water.
Know-why of the present utility model is as follows: the initial stage during tunnel excavation, and tunnel vault has office Portion loosens or local is concavo-convex, is cleaned by metal wheel brush, and the bonding increasing concrete and vault is strong Degree.For preventing in the cleaning process broken phenomenon of decline, expand concrete and smear work surface, by fast hardening concrete Siccative and water directly pump in the dome plate 11 of arc arch bar, make fast hardening concrete siccative and water at note Slurry pipe 8 course of conveying is sufficiently mixed, and enters solidification zone.During carrying vehicle 1 moves, scrape Plate 7 will carry out smooth process to the surface after initial set.Meanwhile, dust-proof yarn 10 is by tunnel excavation face Interior dust adsorbs so that the dust in tunnel reduces in a large number, other works after whole preventer Sequence has a preferable working environment during carrying out.
A kind of urgent method for protecting support of tunnel excavation vault, its method step is as follows:
A, in the arcuate walls of tunnel rock 12, construct dome plate 11, start carrying vehicle 1 and enter in tunnel, The height of all support bars of adjusted in concert 2, makes arc arch bar 3 and tunnel that all support bars 2 support jointly The dome plate 11 in road is at a distance of 2~5cm, and there is support bar 2 in then fixing or residence, location to keep arc Plate 3 is 2~5cm with the operating distance of dome plate 11;
Hairbrush 9 is opened and started to B, controller 5 by hairbrush switch module, and hairbrush 9 is by vault in tunnel Plate 11 or the irregular local of vault and loosening position clean;
C, to concrete contain slurry case 4 in be injected separately into fast hardening concrete siccative and water, controller 5 passes through Grouting pump 6 is opened and started to grouting pump switch module, and the rapid hardening in slurry case 4 contained by concrete by grouting pump 6 Concrete drier and water are transported in the dome plate 11 on arc arch bar 3 top by Grouting Pipe 8;
D, startup carrying vehicle 1 move forward with the speed of 0.5~2m/min, by arc arch bar 3 top Scraper plate 7 strike off process by the concrete of dome plate 11 or vault initial set is carried out surface.
Above-mentioned embodiment is a preferred embodiment of the present utility model, is not for limiting this reality By novel enforcement and interest field, all interior according to described in this utility model patent protection scope Hold the equivalence change made and approximation is replaced, all should fall in protection domain of the present utility model.

Claims (8)

1. the urgent support apparatus of tunnel excavation vault, it is characterized in that: include carrying vehicle (1) and arc arch bar (3), the upper loading of described carrying vehicle (1) is provided with concrete and contains slurry case (4) and controller (5), described arc arch bar (3) is connected to carrying vehicle (1) top by bracing frame, described concrete is contained slurry case (4) and is provided with and the grouting pump (6) of concrete Sheng slurry case (4) intracavity inter-connection, controller (5) is internal has grouting pump switch module, and grouting pump (6) electrically connects with the grouting pump switch module of controller (5);Described arc arch bar (3) is overall in arc shape, the upper surface at arc arch bar (3) top is provided with the scraper plate (7) of arcuate shape, described grouting pump (6) is connected with Grouting Pipe (8), and the pulp mouth of pipe of Grouting Pipe (8) is through arc arch bar (3) and is positioned at arc arch bar (3) top.
2. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 1, it is characterized in that: the upper surface at described arc arch bar (3) top is additionally provided with the hairbrush (9) of arcuate shape, described hairbrush (9) is arranged at the front end of arc arch bar (3), described scraper plate (7) is arranged at the rear end of arc arch bar (3), and hairbrush (9) is parallel with scraper plate (7) to be arranged side by side in the upper surface at arc arch bar (3) top.
3. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 1 or 2, it is characterised in that: being provided with dedusting yarn (10) in the space between described carrying vehicle (1) and arc arch bar (3), described dedusting yarn (10) is mounted on bracing frame.
4. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 2, it is characterized in that: described hairbrush (9) is Electric brush of bristles, controller (5) is internal has hairbrush switch module, and hairbrush (9) electrically connects with the hairbrush switch module of controller (5).
5. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 1 or 2, it is characterized in that: support frame as described above is made up of several support bars (2), described support bar (2) is expansion link, described carrying vehicle (1) is provided with the hydraulic cylinder corresponding with support bar (2), and hydraulic cylinder carries out elevating movement for driving the support bar (2) of correspondence.
6. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 5, it is characterised in that: support frame as described above is made up of eight support bars (2), and the diameter of support bar (2) is more than 8cm;Described arc arch bar (3) is made up of curved plate, and its thickness is 4~8mm.
7. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 1, it is characterised in that: described scraper plate (7) is made up of banded arc-shaped steel bar, and the width of scraper plate (7) is more than 0.5cm.
8. according to a kind of urgent support apparatus of tunnel excavation vault described in claim 1, it is characterized in that: slurry case (4) contained by described concrete is rectangular shape, the top of concrete Sheng slurry case (4) has the injection mouth of fast hardening concrete siccative, and the top of concrete Sheng slurry case (4) also has the injection mouth of water.
CN201620379838.0U 2016-04-30 2016-04-30 A kind of urgent support apparatus of tunnel excavation vault Expired - Fee Related CN205743923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620379838.0U CN205743923U (en) 2016-04-30 2016-04-30 A kind of urgent support apparatus of tunnel excavation vault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620379838.0U CN205743923U (en) 2016-04-30 2016-04-30 A kind of urgent support apparatus of tunnel excavation vault

Publications (1)

Publication Number Publication Date
CN205743923U true CN205743923U (en) 2016-11-30

Family

ID=57372713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620379838.0U Expired - Fee Related CN205743923U (en) 2016-04-30 2016-04-30 A kind of urgent support apparatus of tunnel excavation vault

Country Status (1)

Country Link
CN (1) CN205743923U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781587A (en) * 2016-04-30 2016-07-20 山西省交通科学研究院 Tunnel excavation vault emergency support equipment and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781587A (en) * 2016-04-30 2016-07-20 山西省交通科学研究院 Tunnel excavation vault emergency support equipment and method
CN105781587B (en) * 2016-04-30 2017-07-21 山西省交通科学研究院 A kind of urgent support apparatus of tunnel excavation vault and method

Similar Documents

Publication Publication Date Title
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN105781587B (en) A kind of urgent support apparatus of tunnel excavation vault and method
CN208518292U (en) Tool is filled up in a kind of cleaning of finishing brickwork joint
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN108049359A (en) A kind of snow shoveling machine convenient for processing snow drift
CN109267466A (en) A kind of water conservancy construction pitch high pressure joint filling device
CN205743923U (en) A kind of urgent support apparatus of tunnel excavation vault
KR101642483B1 (en) Dust reduction crusher by spray of steam and inorganic binder, and method for remove building using this same
CN208379658U (en) A kind of bull-dozer
CN206873521U (en) A kind of loading machine
CN213980792U (en) Tunnel repairing machine for coal mine
CN102704928A (en) Rotatable retractable cutting device for comprehensive mechanized stone head tunneling machine set
CN202767978U (en) Rotatable telescopic cutting device of comprehensive mechanical rock lane tunneling unit
CN107605494A (en) A kind of crushed zone soft-rock tunnel advance support technology
CN104646569A (en) Loader with hydraulic shear
CN206368383U (en) Loading shovel
CN105803873B (en) Self-propelled railway roadbed ballast excavates robot
CN211342757U (en) Environment-friendly road drilling construction equipment assembly
CN210977488U (en) Open-type outer shield tunneling device
CN106948839A (en) A kind of tunnel benching tunnelling method construction steel diaphragm and construction method
CN103174437A (en) Underground mine roadway wet-type shotcrete and rock bolt supporting method
CN204754943U (en) Concrete kick -backs and expects collection device for tunnel boring machine
CN208748658U (en) A kind of pneumatic machine-carried type dabbing machine
CN206987823U (en) Hydraulic rock breaking development machine
CN111501435A (en) Screen scarifier suitable for slope screen scarfing operation and slope operation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20190430