CN206769426U - A kind of working shed for construction site - Google Patents
A kind of working shed for construction site Download PDFInfo
- Publication number
- CN206769426U CN206769426U CN201720654799.5U CN201720654799U CN206769426U CN 206769426 U CN206769426 U CN 206769426U CN 201720654799 U CN201720654799 U CN 201720654799U CN 206769426 U CN206769426 U CN 206769426U
- Authority
- CN
- China
- Prior art keywords
- truss
- construction site
- working shed
- column
- plank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 238000004804 winding Methods 0.000 claims abstract description 5
- 238000004078 waterproofing Methods 0.000 claims description 3
- 238000010521 absorption reaction Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 230000003139 buffering effect Effects 0.000 description 3
- 239000011800 void material Substances 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model discloses a kind of working shed for construction site, including truss axisymmetricly, the column for sub-truss, the truss includes winding up, lower edge and is supported on the diagonal brace to wind up between lower edge, if the top laying dried layer plank that winds up, the top of top plank sets triangular roof truss, the top surface laying flashing board of the triangular roof truss, in addition to the fence around the triangular roof truss top surface;The column is provided with N number of, and the axis of all columns is respectively positioned in same level, and a symmetry axis of truss also is located in the plane, wherein N >=2.The purpose of this utility model is to provide a kind of working shed for construction site, and when having matter falling to top in the prior art with solution, steel construction working shed can integrally produce the problem of rocking by a relatively large margin, realize the purpose for the shaking amplitude for improving working shed.
Description
Technical field
It the utility model is related to working shed field, and in particular to a kind of working shed for construction site.
Background technology
In construction site, it is often necessary to set working shed to carry out blocking protection to personnel's material etc..Existing work
Canopy is mostly formed using structure steel fabrication, and the working shed of steel construction has good sun-rain-shading effect due to its intensity height.But
It is that the top plate of steel construction can be caused to produce fierceness when top junk is fallen on working shed top surface to rock, this is rocked can be by matter
The close steel in ground are quickly passed down to supporting leg and the anchoring position of working shed, cause working shed integrally to produce by a relatively large margin
On rock,
Utility model content
The purpose of this utility model is to provide a kind of working shed for construction site, to solve in the prior art
When having matter falling to top, steel construction working shed can integrally produce the problem of rocking by a relatively large margin, realize the rolling for improving working shed
The purpose of dynamic amplitude.
The utility model is achieved through the following technical solutions:
A kind of working shed for construction site, including truss axisymmetricly, the column for sub-truss, institute
Stating truss includes winding up, lower edge and is supported on the diagonal brace to wind up between lower edge, if the top laying dried layer wood that winds up
Plate, the top of top plank sets triangular roof truss, the top surface laying flashing board of the triangular roof truss, in addition to surrounds institute
State the fence of triangular roof truss top surface;The column is provided with N number of, and the axis of all columns is respectively positioned in same level, and purlin
A piece symmetry axis of frame also is located in the plane, wherein N >=2.
During for there is matter falling to top in the prior art, steel construction working shed can integrally produce asking of rocking by a relatively large margin
Topic, the utility model proposes a kind of working shed for construction site, including truss and column, truss axisymmetricly to tie
Structure, i.e., at least there is a symmetry axis.Truss includes winding up, lower edge and is supported on the diagonal brace to wind up between lower edge, wherein
Lower edge is directly connected with column, diagonal brace is used to strengthen bearing capacity.If wind up top laying dried layer plank, top plank it is upper
Side sets triangular roof truss.Using triangular roof truss structure be easy to rainwater drop down onto top when, can be voluntarily along triangular roof truss
Both sides hypotenuse flow downward.The top surface laying flashing board of triangular roof truss, for obstructing moisture, avoiding moisture attack to following
Plank on.If the utility model is provided with the plank of dried layer between truss and triangular roof truss, compared to traditional steel knot
Structure, the molecules align inside plank is very sparse, and internal void is a lot, has certain absorption for kinetic energy caused by vibrations
With buffering effect.If therefore utilizing the plank of dried layer, the shaking amplitude of working shed when junk falls to top is reduced.In addition, three
Angular roof truss top surface is also about being provided with a corral column, stops that junk slides by fence, avoids falling at the top of roof truss
Debris is slid to ground downwards along inclined-plane injures staff by a crashing object, so as to improve security performance of the present utility model.It is used as this reality
With another new inventive point, at least two root posts are also provided with, the axis of all columns is respectively positioned in same level, and purlin
A piece symmetry axis of frame also is located in the plane, be all columns along lineal layout, and the straight line parallel is in any of truss
A piece symmetry axis so that all columns are respectively positioned on the center line of truss.The working shed column of traditional structure is arranged at four angles
On falling, cause the object longer than working shed length not put into and local protection of blocking is carried out under working shed, and this practicality is new
The column of type is arranged at working shed center, therefore length also can locally place it more than the object of working shed length
Under working shed, so as to improve the practicality of working shed, improve use range.
Preferably, top plank is formed using the board making Jing Guo water-proofing treatment.Avoid rainwater after flashing board breakage
Lower drop causes to corrode to top plank, improves service life.
Preferably, two layers of the plank of top laying that wind up, per thickness degree 50mm.Plank number of plies excessive cost is higher, and two
Layer 50mm plank is preferred scheme, has splendid cost performance.
Further, the column is fixed on heel slab, and heel slab is fixed on ground by cast-in fixing bolt.By pre-buried
Heel slab is fixed crab-bolt, it is ensured that being stably connected between ground, it is ensured that the excellent enabling capabilities of working shed.
Further, two Auxiliary support posts are also associated with the column, one end of the Auxiliary support post passes through spiral shell
Tether and be connected on more than column central point, the other end is fixedly connected by bolt with the lower edge of truss.By two Auxiliary support posts,
Improve the enabling capabilities of column so that the utility model has more preferable stability.
Preferably, axisymmetrical of two Auxiliary support posts along column.Ensure that truss upper stress is evenly distributed, avoid stress
Situations such as inequality causes truss to be broken occurs.
Preferably, the flashing board is color steel.So that flashing board has enough intensity and waterproof ability.
Preferably, the column is bolted with truss.Be easy to after the completion of construction by truss and column take apart into
Row is carried.
Preferably, the fence surface sets drainage hole.Avoid rainwater from can not being flowed down by fence barrier, led to by draining
Hole is drained by the rainwater of accumulation.
The utility model compared with prior art, has the following advantages and advantages:
1st, a kind of working shed for construction site of the utility model, is provided between truss and triangular roof truss
If the plank of dried layer, compared to traditional steel construction, the molecules align inside plank is very sparse, and internal void is a lot, for
Kinetic energy caused by vibrations has certain absorption and buffering effect.If therefore utilizing the plank of dried layer, reduce junk and fall to
The shaking amplitude of working shed during top.In addition, triangular roof truss top surface is also about being provided with a corral column, stop to fall by fence
Thing slides, and the debris for avoiding falling on roof truss top is slid to ground downwards along inclined-plane injures staff by a crashing object, so as to improve
Security performance of the present utility model.
2nd, the working shed column of traditional structure is arranged on four corners, cause the object longer than working shed length without
Method put into carried out under working shed it is local block protection, and column of the present utility model is arranged at working shed center, because
Its part can be also placed under working shed by the object that this length is more than working shed length, so as to improve the reality of working shed
With property, improve use range.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, forms the one of the application
Part, the restriction to the utility model embodiment is not formed.In the accompanying drawings:
Fig. 1 is the sectional view of the utility model specific embodiment;
Fig. 2 is the structural representation of the utility model specific embodiment.
Mark and corresponding parts title in accompanying drawing:
1- winds up, 2- lower edges, 3- diagonal braces, 4- planks, 5- triangular roof trusses, 6- flashing boards, 7- fences, 8- columns, 9- posts
Sole, 10- Auxiliary support posts, 11- drainage holes, 12- cast-in fixing bolts.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, with reference to embodiment and accompanying drawing,
The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this
Utility model, it is not intended as to restriction of the present utility model.
Embodiment 1:
A kind of working shed for construction site as shown in Figures 1 and 2, including truss axisymmetricly, be used for
The column 8 of sub-truss, the truss include winding up 1, lower edge 2 and are supported on the diagonal brace 3 to wind up between 1 and lower edge 2, institute
1 two layers of the plank 4 of top laying that wind up is stated, the top of top plank 4 sets triangular roof truss 5, the top of the triangular roof truss 5
Lay flashing board 6, in addition to the fence 7 around the top surface of triangular roof truss 5 in face;The column 8 is provided with four, Suo Youli
The axis of post 8 is respectively positioned in same level, and a symmetry axis of truss also is located in the plane.Top plank 4 uses warp
The board making for crossing water-proofing treatment forms.1 two layers of the plank of top laying that wind up, per thickness degree 50mm.The column 8 is fixed
On heel slab 9, heel slab 9 is fixed on ground by cast-in fixing bolt 12.Two Auxiliary support posts are further fixed on the column 8
10, one end of the Auxiliary support post 10 is bolted more than the central point of column 8, and the lower edge 2 of the other end and truss is logical
Cross bolt connection.Axisymmetrical of two Auxiliary support posts 10 along column 8.The flashing board 6 is color steel.The column 8 with
Truss is bolted.The surface of fence 7 sets drainage hole 11.The present apparatus is set between truss and triangular roof truss 5
Plank 4 is put, compared to traditional steel construction, the molecules align inside plank is very sparse, and internal void is a lot, for vibrations
Caused kinetic energy has certain absorption and buffering effect.Therefore two layers of plank 4 is utilized, when reduction junk falls to top
The shaking amplitude of working shed.In addition, the top surface of triangular roof truss 5 is also about being provided with a corral column 7, junk is stopped by fence 7
Slide, the debris for avoiding falling on roof truss top is slid to ground downwards along inclined-plane injures staff by a crashing object, so as to improve this
The security performance of utility model.Also, column 8 is arranged at working shed center, therefore length is more than working shed length
Its part can be also placed under working shed by object, so as to improve the practicality of working shed, improve use range.
Above-described embodiment, the purpose of this utility model, technical scheme and beneficial effect are entered
One step describes in detail, should be understood that and the foregoing is only specific embodiment of the present utility model, is not used to limit
Determine the scope of protection of the utility model, it is all within the spirit and principles of the utility model, any modification for being made, equally replace
Change, improve, should be included within the scope of protection of the utility model.
Claims (9)
1. a kind of working shed for construction site, including truss axisymmetricly, the column (8) for sub-truss,
Characterized in that, the truss includes winding up (1), lower edge (2) and is supported on the diagonal brace to wind up (1) between lower edge (2)
(3), described to wind up (1) if top laying dried layer plank (4), the top of top plank (4) sets triangular roof truss (5), institute
State the top surface laying flashing board (6) of triangular roof truss (5), in addition to the fence (7) around the triangular roof truss (5) top surface;
The column (8) is provided with N number of, and the axis of all columns (8) is respectively positioned in same level, and a symmetry axis of truss also position
In in the plane, wherein N >=2.
A kind of 2. working shed for construction site according to claim 1, it is characterised in that top plank
(4) formed using the board making Jing Guo water-proofing treatment.
3. a kind of working shed for construction site according to claim 1, it is characterised in that described to wind up (1)
Two layers of plank is laid in top, per thickness degree 50mm.
A kind of 4. working shed for construction site according to claim 1, it is characterised in that the column (8)
It is fixed on heel slab (9), heel slab (9) is fixed on ground by cast-in fixing bolt (12).
A kind of 5. working shed for construction site according to claim 1, it is characterised in that the column (8)
On be also associated with two Auxiliary support posts (10), one end of the Auxiliary support post (10) is bolted in column (8)
More than heart point, the other end is fixedly connected by bolt with the lower edge (2) of truss.
A kind of 6. working shed for construction site according to claim 5, it is characterised in that two Auxiliary supports
Axisymmetrical of the post (10) along column (8).
A kind of 7. working shed for construction site according to claim 1, it is characterised in that the flashing board
(6) it is color steel.
A kind of 8. working shed for construction site according to claim 1, it is characterised in that the column (8)
It is bolted with truss.
A kind of 9. working shed for construction site according to claim 1, it is characterised in that the fence (7)
Surface sets drainage hole (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720654799.5U CN206769426U (en) | 2017-06-07 | 2017-06-07 | A kind of working shed for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720654799.5U CN206769426U (en) | 2017-06-07 | 2017-06-07 | A kind of working shed for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206769426U true CN206769426U (en) | 2017-12-19 |
Family
ID=60636744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720654799.5U Expired - Fee Related CN206769426U (en) | 2017-06-07 | 2017-06-07 | A kind of working shed for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206769426U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827700A (en) * | 2020-07-22 | 2020-10-27 | 山东鼎鲁建筑有限公司 | Safety device for construction |
-
2017
- 2017-06-07 CN CN201720654799.5U patent/CN206769426U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827700A (en) * | 2020-07-22 | 2020-10-27 | 山东鼎鲁建筑有限公司 | Safety device for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205637106U (en) | Building structure system of completely assembling formula steel construction | |
CN206769426U (en) | A kind of working shed for construction site | |
CN116591368A (en) | Structure slope finding overhead permeable roof with sport field and construction method | |
CN209976088U (en) | Assembled protection canopy | |
CN102235030B (en) | Extra-large-span cross-section-variable pre-stressed normally placed evacuating quadrangular pyramid space grid and manufacturing method thereof | |
CN102635061B (en) | Mountain stream river-crossing inclined zipper trestle and hoisting method thereof | |
CN208563560U (en) | The structural system of flatbed super high-rise building | |
CN201610632U (en) | Self-climbing construction platform | |
CN214246281U (en) | Anti wind snow additional strengthening of metal roofing | |
CN108342980A (en) | A kind of railway suspension bridge steel-truss deck bridge face structure | |
CN201722773U (en) | Super-long span variable cross-section prestress normally-placed evacuating quadrangular pyramid net rack | |
CN204539059U (en) | Photovoltaic bracing or strutting arrangement | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN208250916U (en) | A kind of steel structure bridge support frame | |
CN209523182U (en) | A kind of drain bar of cross hang rod structure | |
CN207633735U (en) | The tower soft platform of lighting roof | |
CN207244848U (en) | A kind of grid solid beam-string structure across X-type greatly | |
CN208167528U (en) | A kind of railway suspension bridge steel-truss deck bridge face structure | |
CN206360455U (en) | The huge square steel construction granulation tower tower mast system of lattice column | |
CN112696009A (en) | Supporting joist platform of dish knot formula support suitable for building engineering | |
CN106436574A (en) | Buckle hanging method of bridge | |
CN206513072U (en) | Tent hotel | |
CN205421316U (en) | Tower jack -up lattice column steel platform welding basis | |
CN206692240U (en) | A kind of tower crane rain-proof shelter | |
CN206616698U (en) | A kind of structural system of flatbed high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 |