CN206769363U - Interpolation type construction hanging basket, scaffold fastening apparatus - Google Patents

Interpolation type construction hanging basket, scaffold fastening apparatus Download PDF

Info

Publication number
CN206769363U
CN206769363U CN201720239869.0U CN201720239869U CN206769363U CN 206769363 U CN206769363 U CN 206769363U CN 201720239869 U CN201720239869 U CN 201720239869U CN 206769363 U CN206769363 U CN 206769363U
Authority
CN
China
Prior art keywords
hanging basket
construction hanging
fixed chuck
connecting piece
connection sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720239869.0U
Other languages
Chinese (zh)
Inventor
陈汝蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Original Assignee
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd filed Critical Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority to CN201720239869.0U priority Critical patent/CN206769363U/en
Application granted granted Critical
Publication of CN206769363U publication Critical patent/CN206769363U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of interpolation type construction hanging basket, scaffold fastening apparatus are the utility model is related to, including:Mobile dop and fixed chuck;Mobile dop is sleeved in fixed chuck;Fixed chuck one end is provided with flange, and the end hole wall setting vertically of the other end is fluted;Mandrel one end is threaded rod;Handle type nut is provided with threaded rod;The mandrel other end is in frustum, and end cross-sectional area accumulates more than inside cross-section, is set with connection sheet on fixed chuck outer circumference surface, connection sheet free end is connected by standing screw with wing nut.The utility model interpolation type construction hanging basket, scaffold fastening apparatus improve the connection reliability of construction hanging basket and project under construction entity, improve construction hanging basket stability, wind resistance ensures construction hanging basket construction safety;Convenient disassembly, using flexible, strong adaptability, construction hanging basket occur that when disconnected rope falls certain protective effect can be played, eliminate safe hidden trouble, ensure construction safety.

Description

Interpolation type construction hanging basket, scaffold fastening apparatus
Technical field
A kind of architectural furniture is the utility model is related to, is to be related to a kind of interpolation type construction hanging basket, pin hand specifically Frame fixing device.
Background technology
The construction hanging basket not no reliable rigid connection device with project under construction entity project at present, is simply hung down with top Four steel wire ropes come(Wherein two are done bearer cable, and two are done safety rope in addition)Fixed, construction hanging basket is in wind when running into high wind In the severity rocked, make during operating personnel is in extremely frightened and dangerous, and cause hanging basket with touching building entity project Hit, cause unnecessary loss.
Currently existing scaffold wall connecting piece mostly combines with building using scaffold tubes, built-in fitting, steel tube fastener The mode of entity project connection.The scaffold wall connecting piece so installed has that assembling and disassembling is time-consuming, take a lot of work, assembling and disassembling needs mostly It is immovable by instrument, and mostly, easily removed, cause privately by worker when carrying out exterior-wall heat insulation, plastered work Potential safety hazard.
Utility model content
For above-mentioned deficiency of the prior art, it is solid that the utility model provides a kind of interpolation type construction hanging basket, scaffold Determine device.
Technical solution adopted in the utility model is:
A kind of interpolation type construction hanging basket, scaffold fastening apparatus, it is characterised in that
Including:Mobile dop and fixed chuck;
Mobile dop is sleeved in fixed chuck;
Fixed chuck is sleeve, and sleeve one end is provided with flange, and hole wall is provided with vertically for the end of the sleeve other end Groove;
The mobile dop is a mandrel;
Described mandrel one end is threaded rod;Handle type nut is provided with threaded rod;
The mandrel other end is in frustum, and end cross-sectional area accumulates more than inside cross-section;
Connection sheet is set with fixed chuck outer circumference surface;
The connection sheet includes front connecting piece and rear connecting piece;
Front connecting piece is connected with rear connecting piece by connecting plate;
The connecting plate is in arc-shaped;
Connection sheet top is provided with connecting hole;Fixed chuck is sleeved in the connecting hole of connection sheet;
Screwed hole is provided with connecting plate, trip bolt is provided with screwed hole;
Front connecting piece and rear connecting piece free end are provided with fixing hole, and standing screw is provided with fixing hole;
Front connecting piece is connected with rear connecting piece free end by standing screw with wing nut.
The groove is radially symmetrical arranged;
The groove is along the circumferential direction uniformly arranged.
The mobile dop is provided with the internal diameter for being more than or equal to sleeve in one end end diameter of frustum.
A kind of interpolation type construction hanging basket, the application method of scaffold fastening apparatus, comprise the following steps:
Unscrew connection sheet fixing screws, mobile link piece adjusts fixed chuck length to suitable construction hanging basket and project under construction The normal operation distance of entity, tightens connection sheet fixing screws, connection sheet is fixed with fixed chuck;
Unscrew handle type nut, make to move dop and fixed chuck front opening everywhere in relaxed state, by mobile dop The split bolt hole built and left during engineering structure construction is inserted in fixed chuck front end, connection sheet will be leaned against with construction hanging basket and built The side rail top edge guard rail rod of engineering one keeps vertical;
Tighten handle type nut and squeezed so that moving dop front end conical head and strutting fixed chuck leading portion opening with hole wall Compress real;
Connection sheet is enclosed on construction hanging basket and leaned on the side rail top edge guard rail rod of project under construction one by adjustment hanging basket height, will be solid Determine screw rod insertion hanging basket connection sheet bottom two bolt hole, tighten wing nut, connection sheet is fixed with construction hanging basket;
Repeat above step, installed again on construction hanging basket an interpolation type construction hanging basket, scaffold fastening apparatus with Engineering wall is built to fix, and with having installed interpolation type construction hanging basket, scaffold fastening apparatus holding certain distance.
The beneficial effect of the utility model compared with the prior art:
The utility model interpolation type construction hanging basket, scaffold fastening apparatus, simple device, improve construction hanging basket with The connection reliability of engineering entity is built, improves construction hanging basket stability, wind resistance ensures construction hanging basket construction safety;This practicality is new Type installation, convenient disassembly, using flexible, strong adaptability, can arbitrarily be moved within the specific limits, ensure scaffold wall connecting piece not Arbitrarily removed, construction hanging basket occurs that when disconnected rope falls certain protective effect can be played, and eliminates safe hidden trouble, ensures construction Safety.
The utility model, which is particularly suitable for skin, to be had corresponding split bolt hole or allows under conditions of metope punching Use.
Brief description of the drawings
Fig. 1 is the utility model interpolation type construction hanging basket, the structural representation of scaffold fastening apparatus;
Fig. 2 is the utility model interpolation type construction hanging basket, the using state structure diagram of scaffold fastening apparatus;
Fig. 3 is Fig. 1 1-1 cross section structure diagrams;
Fig. 4 is Fig. 2 2-2 cross section structure diagrams;
Fig. 5 is Fig. 2 A mplifying structure schematic diagram;
Fig. 6 be the utility model interpolation type construction hanging basket, scaffold fastening apparatus connection sheet main structure diagram;
Fig. 7 be the utility model interpolation type construction hanging basket, scaffold fastening apparatus connection sheet side structure schematic view.
Critical piece symbol description in accompanying drawing:
In figure:
1st, mobile dop 2, fixed chuck
3rd, guardrail top edge guard rail rod 4, threaded rod
5th, wing nut
7th, groove 8, flange
10th, handle type nut 12, connection sheet
13rd, connecting plate 14, connecting hole
15th, trip bolt 16, standing screw
17th, wing nut
19th, fixing hole.
Embodiment
Referring to the drawings and the utility model is described in detail embodiment:
Knowable to accompanying drawing 1-7, a kind of interpolation type construction hanging basket, scaffold fastening apparatus,
Including:Mobile dop 1 and fixed chuck 2;
Mobile dop 1 is sleeved in fixed chuck 2;
Fixed chuck 2 is sleeve, and sleeve one end is provided with flange 8, and hole wall is set vertically for the end of the sleeve other end The end set of the fluted 7 i.e. sleeve other ends has opening;
The mobile dop 1 is a mandrel;
Described mandrel one end is threaded rod 4;Handle type nut 10 is provided with threaded rod 4;
The mandrel other end is in frustum, and end cross-sectional area accumulates more than inside cross-section;
Connection sheet 12 is set with the outer circumference surface of fixed chuck 2;
The connection sheet 12 includes front connecting piece 121 and rear connecting piece 122;
Front connecting piece is connected with rear connecting piece by connecting plate 13;
The connecting plate 13 is in arc-shaped;
The top of connection sheet 12 is provided with connecting hole 14;Fixed chuck 2 is sleeved in the connecting hole 14 of connection sheet;
Screwed hole is provided with connecting plate 13, trip bolt 15 is provided with screwed hole;
Front connecting piece and rear connecting piece free end are provided with fixing hole 19, and standing screw 16 is provided with fixing hole 19;
Front connecting piece is connected with rear connecting piece free end by standing screw 16 with wing nut 17.
The groove 7(Opening)Radially it is symmetrical arranged;
The groove 7(Opening)Along the circumferential direction it is uniformly arranged.
The mobile dop 2 is provided with the internal diameter for being more than or equal to sleeve in one end end diameter of frustum.
A kind of interpolation type construction hanging basket, the application method of scaffold fastening apparatus, comprise the following steps:
Unscrew connection sheet fixing screws, mobile link piece adjusts fixed chuck length to suitable construction hanging basket and project under construction The normal operation distance of entity, tightens connection sheet fixing screws, connection sheet is fixed with fixed chuck;
Unscrew handle type nut, make to move dop and fixed chuck front opening everywhere in relaxed state, by mobile dop The split bolt hole built and left during engineering structure construction is inserted in fixed chuck front end(Such as impact drill can be used without split bolt hole Punching), connection sheet will with construction hanging basket by the side rail top edge guard rail rod holding of project under construction one it is vertical;
Tighten handle type nut and squeezed so that moving dop front end conical head and strutting fixed chuck leading portion opening with hole wall Compress real;(It is consistent with expansion bolt fixation principle), make the present apparatus and project under construction entity fixed.
Connection sheet is enclosed on construction hanging basket and leaned on the side rail top edge guard rail rod 3 of project under construction one by adjustment hanging basket height, will Standing screw insertion hanging basket connection sheet bottom two bolt hole, tightens wing nut, connection sheet is fixed with construction hanging basket;
Repeat above step, installed again on construction hanging basket an interpolation type construction hanging basket, scaffold fastening apparatus with Engineering wall is built to fix, and with having installed interpolation type construction hanging basket, scaffold fastening apparatus holding certain distance.According to 2 points Straight line principle is determined, construction hanging basket is realized reliable fix with project under construction entity using the present apparatus to this.The present apparatus is used It is substantially identical with construction hanging basket in fixed scaffold principle, play a part of scaffold wall connecting piece.Simply notice that connection sheet is tried one's best It is connected on scaffold upright rod, is connected on cross bar and does not meet relevant regulations.
Fixed chuck(Outside link)It is straight that diameter of steel tube should be slightly less than the split bolt hole left during project under construction structure construction Footpath, typically in 14mm or so, wall thickness is not less than 1.5mm, and front opening part should have certain elasticity, be easy to reset.
Mobile dop(Draw-in bar)Using HRB235 (Q235) one-level reinforcement fabrication, before tapered segment maximum gauge with Outside link diameter is identical, and straight portion diameter is slightly less than outside link pipe diameter, but is not less than 10mm.
Connection sheet should be used and made not less than 2.5mm steel plates, ensure that its evidence has some strength.
It is described above, only it is preferred embodiment of the present utility model, not structure of the present utility model is made any Formal limitation.Every any simple modification made according to the technical essence of the utility model to above example, it is equal Change and modification, are belonged in the range of the technical solution of the utility model.

Claims (4)

1. a kind of interpolation type construction hanging basket, scaffold fastening apparatus, it is characterised in that
Including:Mobile dop and fixed chuck;
Mobile dop is sleeved in fixed chuck;
Fixed chuck is sleeve, and sleeve one end is provided with flange, and the end hole wall setting vertically of the sleeve other end is fluted;
The mobile dop is a mandrel;
Described mandrel one end is threaded rod;Handle type nut is provided with threaded rod;
The mandrel other end is in frustum, and end cross-sectional area accumulates more than inside cross-section;
Connection sheet is set with fixed chuck outer circumference surface;
The connection sheet includes front connecting piece and rear connecting piece;
Front connecting piece is connected with rear connecting piece by connecting plate;
The connecting plate is in arc-shaped;
Connection sheet top is provided with connecting hole;Fixed chuck is sleeved in the connecting hole of connection sheet;
Screwed hole is provided with connecting plate, trip bolt is provided with screwed hole;
Front connecting piece and rear connecting piece free end are provided with fixing hole, and standing screw is provided with fixing hole;
Front connecting piece is connected with rear connecting piece free end by standing screw with wing nut.
2. interpolation type construction hanging basket, scaffold fastening apparatus according to claim 1, it is characterised in that:The groove is along footpath To being symmetrical arranged.
3. interpolation type construction hanging basket, scaffold fastening apparatus according to claim 1, it is characterised in that:Groove edge circle Circumferential direction is uniformly arranged.
4. interpolation type construction hanging basket, scaffold fastening apparatus according to claim 1, it is characterised in that:The mobile dop It is provided with the internal diameter for being more than or equal to sleeve in one end end diameter of frustum.
CN201720239869.0U 2017-03-13 2017-03-13 Interpolation type construction hanging basket, scaffold fastening apparatus Active CN206769363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720239869.0U CN206769363U (en) 2017-03-13 2017-03-13 Interpolation type construction hanging basket, scaffold fastening apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720239869.0U CN206769363U (en) 2017-03-13 2017-03-13 Interpolation type construction hanging basket, scaffold fastening apparatus

Publications (1)

Publication Number Publication Date
CN206769363U true CN206769363U (en) 2017-12-19

Family

ID=60631890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720239869.0U Active CN206769363U (en) 2017-03-13 2017-03-13 Interpolation type construction hanging basket, scaffold fastening apparatus

Country Status (1)

Country Link
CN (1) CN206769363U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677518A (en) * 2017-03-13 2017-05-17 唐山曹妃甸二十二冶工程技术有限公司 Internally-inserted construction hanging basket and scaffold fixing device and application method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677518A (en) * 2017-03-13 2017-05-17 唐山曹妃甸二十二冶工程技术有限公司 Internally-inserted construction hanging basket and scaffold fixing device and application method thereof

Similar Documents

Publication Publication Date Title
CN106760472A (en) Fixture type construction hanging basket, scaffold fastening apparatus and its application method
CN206769363U (en) Interpolation type construction hanging basket, scaffold fastening apparatus
CN204282853U (en) Adjustable inner bearing type protective door for elevator shaft
CN206319575U (en) A kind of support attachment means
CN106013956A (en) Opposite-pull handles for tempered glass door
CN205531248U (en) Construction scaffolding component
CN205323047U (en) Perforation formula safety belt hanging device
CN206539000U (en) Fixture type construction hanging basket, scaffold fastening apparatus
CN106677518A (en) Internally-inserted construction hanging basket and scaffold fixing device and application method thereof
CN201428238Y (en) Expansion sleeve type scaffold connecting part
CN209799344U (en) Device for longitudinally connecting scaffold steel pipes
CN203663277U (en) Falling-prevention safety device for high-attitude air conditioner repair
CN205100529U (en) Concatenation guide rail
CN206667707U (en) A kind of construction scaffold of installation easy to disassemble
CN211396581U (en) Novel scaffold for building engineering device
CN203742263U (en) Fencing framework connection structure
CN205421892U (en) Even wall scaffold for building
CN202622700U (en) Hanger rod installation tool
CN208830694U (en) A kind of installing and connecting apparatus of construction safety protective net
CN219973868U (en) Cantilever frame connecting mechanism
CN204001673U (en) Expanded metal lath fastening devices
CN209799342U (en) Safety fastener for scaffold
CN212129736U (en) Railing is prevented to building engineering instrument formula stair
CN207847054U (en) A kind of multipurpose scaffold drawknot node device
CN219241806U (en) Safe hanging ladder for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant