CN206769093U - The attachment structure of wall - Google Patents
The attachment structure of wall Download PDFInfo
- Publication number
- CN206769093U CN206769093U CN201720526451.8U CN201720526451U CN206769093U CN 206769093 U CN206769093 U CN 206769093U CN 201720526451 U CN201720526451 U CN 201720526451U CN 206769093 U CN206769093 U CN 206769093U
- Authority
- CN
- China
- Prior art keywords
- wall
- attachment structure
- support
- keel
- truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010792 warming Methods 0.000 claims description 14
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 claims description 11
- 239000003063 flame retardant Substances 0.000 claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 239000007787 solid Substances 0.000 claims description 2
- 210000000988 bone and bone Anatomy 0.000 claims 1
- 239000004744 fabric Substances 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 239000011701 zinc Substances 0.000 description 2
- 229910052725 zinc Inorganic materials 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000011490 mineral wool Substances 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of attachment structure of wall, wherein the attachment structure of the wall includes main body, multiple truss located at the main body and multiple supports, each support includes two fittings being oppositely arranged and two connectors being oppositely arranged, the both ends of every a connection piece of each support are removably connected to two fittings respectively, two fittings and two connectors of each support surround a holding area jointly, and each truss or the part main body are placed in a holding area.The attachment structure of wall of the present utility model is easy to assembly quick, does not destroy main body or truss structure, and integrally-built steadiness is high.
Description
Technical field
Construction wall technical field is the utility model is related to, more particularly to a kind of attachment structure of wall.
Background technology
Current wall is in construction, it will usually in a manner of drilling or weld etc. in main body or truss fixed support, most
Shingle nail or decorative panel are laid on support afterwards.Make the installation inconvenience of support with this, and drill or weld in main body or truss
The overall structure of main body or truss can be damaged by connecing, and reduce the overall stability of wall.
Utility model content
Main purpose of the present utility model is to provide a kind of attachment structure of wall, it is intended to and it is easy to assembly quick, do not destroy
Main body or truss structure, integrally-built steadiness are high.
To achieve the above object, the utility model proposes a kind of attachment structure of wall, the attachment structure of the wall to include
Main body, multiple truss located at the main body and multiple supports, each support include two fittings and the phase being oppositely arranged
To two connectors of setting, the both ends of every a connection piece of each support are removably connected to two fittings respectively, each
Two fittings and two connectors of support surround a holding area jointly, and each truss or the part main body are placed in an institute
State in holding area.
Preferably, each support also includes an at least reinforcing member, and the both ends of each reinforcing member connect the two of a support respectively
Individual fitting.
Preferably, the attachment structure of the wall also includes keel shoe and multiple shingle nails, and the keel shoe is connected to described
The one end of multiple supports away from the truss, multiple shingle nail distributions are fixedly arranged on the keel shoe away from the multiple support
Surface.
Preferably, the wall body structure also includes multiple fasteners, and each fastener one end connects a shingle nail, and the other end connects
Connect the keel shoe.
Preferably, the keel shoe includes multiple spaced first keel and multiple spaced second keel,
Every bicarinate both ends connect two adjacent the first keel respectively.
Preferably, every one first keel and every surface flush with each other of one second keel away from the support.
Preferably, the attachment structure of the wall also includes the installed part of multiple fixed keel shoes, and each support is remote
One end of the truss is all connected with an installed part.
Preferably, each installed part both passes through the keel shoe, and is connected to a shingle nail.
Preferably, the wall body structure also includes multiple flame-retardant boards, and the flame-retardant board is layed in the keel shoe, the wall
Panel is covered in the flame-retardant board.
Preferably, the wall body structure also includes multiple warming plates, and the warming plate connects the keel shoe, the shingle nail
It is covered in the warming plate.
Technical solutions of the utility model are each by two fittings being oppositely arranged and two connectors being oppositely arranged
The both ends of every a connection piece of support are removably connected to two fittings, two fittings of each support and two companies respectively
Fitting surrounds a holding area jointly, and each truss or portion body are placed in a holding area, pass through the holding area with this
Support clamping is fixedly arranged in truss or main body, make the assembling more convenient and quicker of support, and need not be on truss or main body
Drilling or welding, do not destroy main body or truss structure, the steadiness of the attachment structure of the wall can be made higher.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to the structure shown in these accompanying drawings.
Fig. 1 is the structural representation of the embodiment of attachment structure one of the utility model wall;
Fig. 2 is the structural representation of another embodiment of attachment structure of the utility model wall.
Drawing reference numeral explanation:
Realization, functional characteristics and the advantage of the utility model purpose will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only part of the embodiment of the present utility model, rather than all
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belong to the scope of the utility model protection.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment
It is only used for explaining relative position relation under a certain particular pose (as shown in drawings) between each part, motion conditions etc., such as
When the fruit particular pose changes, then directionality instruction also correspondingly changes therewith.
In the utility model, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should do broad sense reason
Solution, for example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can mechanically connect, also may be used
Be electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be the connection of two element internals
Or the interaction relationship of two elements, limited unless otherwise clear and definite.For the ordinary skill in the art, can be with
Concrete meaning of the above-mentioned term in the utility model is understood as the case may be.
In addition, and it can not be managed in the utility model such as relating to the description of " first ", " second " etc. is only used for describing purpose
Solve to indicate or implying its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " the
One ", at least one this feature can be expressed or be implicitly included to the feature of " second ".In addition, the skill between each embodiment
Art scheme can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when technical scheme
With reference to occurring conflicting or will be understood that the combination of this technical scheme is not present when can not realize, also not in the utility model
It is required that protection domain within.
The utility model proposes a kind of attachment structure of wall.
Referring to Figures 1 and 2, in the embodiment of the utility model one, the attachment structure of the wall includes main body 10, located at master
The multiple truss 20 and multiple supports 30 of body 10, each support 30 include two fittings 31 being oppositely arranged and set relatively
Two connectors 32 put, the both ends of every a connection piece 32 of each support 30 are removably connected to two fittings 31 respectively,
Two fittings 31 and two connectors 32 of each support 30 surround a holding area 90 jointly, and each truss 20 or part are main
Body 10 is placed in a holding area 90.
Above-mentioned truss 20 is the structure being hinged each other at both ends by rod member, can make full use of the strong of material
Degree, material is saved than solid web girder when span is larger, mitigate deadweight and increase rigidity.Main body 10 may include have multiple intervals to set
The crossbeam and multiple spaced columns put, an at least column and at least a crossbeam mutually abuts, each of which truss 20
Both ends can connect two interface points of two adjacent columns, two crossbeams or column and crossbeam respectively, by truss 20 with
Strengthen the stability of the structure of main body 10.Connector 32 therein is preferably bolt, and the both ends of bolt can be respectively by nut with supporting
Fitting 31 is locked.Support 30 is preferably Zinc-coated angle steel, and accommodating area is formed by two connectors 32 and two fittings 31
Domain 90, each truss 20 or portion body 10 is placed in a holding area 90, be easy to support 30 to install.
Technical solutions of the utility model by two fittings 31 being oppositely arranged and two connectors 32 being oppositely arranged,
The both ends of every a connection piece 32 of each support 30 are removably connected to two fittings 31 respectively, and two of each support 30 support
Fitting 31 and two connectors 32 surround a holding area 90 jointly, and each truss 20 or portion body 10 are placed in a holding area
In 90, the clamping of support 30 is fixedly arranged in truss 20 or main body 10 by the holding area 90 with this, make the assembling of support 30 more
It is convenient and swift, and need not drill or weld on truss 20 or main body 10, main body 10 or the structure of truss 20 are not destroyed, can be made
The steadiness of the attachment structure of the wall is higher.
Preferably, each support 30 also includes an at least reinforcing member 33, and the both ends of each reinforcing member 33 connect one respectively
Two fittings 31 of frame 30.Above-mentioned reinforcing member 33 is preferably Zinc-coated angle steel, and the both ends of reinforcing member 33 can pass through welding, bolt
Deng two fittings 31 of connection, strengthen the overall stability of support 30 with this by reinforcing member 33.
Preferably, the attachment structure of the wall also includes keel shoe 40 and multiple shingle nails 50, and keel shoe 40 is connected to more
The individual one end of support 30 away from truss 20, multiple distributions of shingle nail 50 are fixedly arranged on surface of the keel shoe 40 away from multiple supports 30.
Above-mentioned shingle nail 50 is preferably plasterboard, gap can be provided between adjacent shingle nail two-by-two 50, to reduce wall
The overall alignment error of panel 50.Keel shoe 40 can be easy to shingle nail 50 to install, and make the attachment structure of wall more stable.Further
Ground, the wall body structure also include multiple fasteners (not indicating), and each fastener (does not indicate) one end and connects a shingle nail 50, separately
One end connects keel shoe 40.Connector (not indicating) therein can be screw, and shingle nail 50 is fixed using screw with keel shoe 40.
Screw length should match with the thickness of shingle nail 50, when shingle nail 50 is lamina, can use 25mm screws, work as shingle nail
50 use 35mm screws when being doubling plate, and the cap nut of screw can sink to the surface 1mm of shingle nail 50.
Preferably, keel shoe 40 includes multiple spaced first keel (not indicating) and multiple spaced second
Keel (do not indicate), and the both ends of every one second keel (not indicating) connect two adjacent the first keel (not indicating) respectively.On
The first keel (not indicating) and the second keel (not indicating) stated can be steel material, the two of every one second keel (not indicating)
End can be affixed by bolt or welding etc. and adjacent two the first keel (not indicating), can also carry out reinforcing company by corner brace etc.
Connect.Further, the surface of every one first keel (not indicating) and every one second keel (not indicating) away from support 30 is mutually flat
Together.It is easy to shingle nail 50 to be installed on keel shoe 40, the stability that enhancing shingle nail 50 is installed with this.
Preferably, the attachment structure of the wall also includes the installed part 60 of multiple fixed keel shoes 40, and each support 30 is remote
One end from truss 20 is all connected with an installed part 60.
Above-mentioned installed part 60 is preferably square through-pipe, can strengthen the contact area of keel shoe 40, enhancing by installed part 60
The stability that keel shoe 40 is installed, makes keel shoe 40 be installed on the more convenient and quicker of installed part 60.
Further, each installed part 60 both passes through keel shoe 40, and is connected to a shingle nail 50.
Shingle nail 50 is connected to by installed part 60, can make shingle nail 50 is not direct to be contacted with keel shoe 40, make shingle nail
50 positioning of being more convenient for are placed in installed part 60, improve the installation accuracy of shingle nail 50.
Preferably, the wall body structure also includes multiple flame-retardant boards 70, and flame-retardant board 70 is layed in keel shoe 40, shingle nail 50
It is covered in flame-retardant board 70.
One embodiment is that installed part 60 manifests keel shoe 40, when shingle nail 50 is connected to installed part 60 and is fixedly arranged on dragon
During skeleton 40, shingle nail 50 can be placed in this with outer surface of the keel shoe 40 away from truss 20 formed with idle area, flame-retardant board 70
In idle area, and flame-retardant board 70 manifests the height of keel shoe 40 not higher than installed part 60, makes flame-retardant board 70 not to afterwards
Cause to interfere when shingle nail 50 is installed, ensure the precision stability that shingle nail 50 is installed, the attachment structure of whole wall is made with this
It is more firm.
Preferably, the wall body structure also includes multiple warming plates 80, and warming plate 80 connects keel shoe 40, and shingle nail 50 covers
In warming plate 80.
Above-mentioned warming plate 80 is preferably rock wool, and warming plate 80 can be coordinated by gap to be closely connected with keel shoe 40, excellent
Selection of land, per two adjacent the first keel (not indicating) and two the second keel (not indicating) surround a holding area 90 jointly,
Each warming plate 80 is placed in a holding area 90.With this warming plate 80 can be made directly to be connected in holding area 90, make the wall
The spatial volume that body structure takes is smaller, and the installation of warming plate 80 is more simple and convenient.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model,
Every equivalent structure under utility model of the present utility model design, made using the utility model specification and accompanying drawing content
Conversion, or directly/be used in other related technical areas indirectly and be included in scope of patent protection of the present utility model.
Claims (10)
1. a kind of attachment structure of wall, it is characterised in that multiple truss including main body, located at the main body and multiple
Frame, each support include two fittings being oppositely arranged and two connectors being oppositely arranged, each company of each support
The both ends of fitting are removably connected to two fittings respectively, and two fittings and two connectors of each support surround jointly
One holding area, each truss or the part main body are placed in a holding area.
2. the attachment structure of wall as claimed in claim 1, it is characterised in that each support also includes an at least reinforcing member,
The both ends of each reinforcing member connect two fittings of a support respectively.
3. the attachment structure of wall as claimed in claim 1, it is characterised in that the attachment structure of the wall also includes keel shoe
With multiple shingle nails, the keel shoe is connected to the one end of the multiple support away from the truss, multiple shingle nails point
Cloth is fixedly arranged on surface of the keel shoe away from the multiple support.
4. the attachment structure of wall as claimed in claim 3, it is characterised in that the wall body structure also includes multiple fasteners,
Each fastener one end connects a shingle nail, and the other end connects the keel shoe.
5. the attachment structure of wall as claimed in claim 3, it is characterised in that the keel shoe includes multiple spaced
First keel and multiple spaced second keel, every bicarinate both ends connect two first adjacent dragons respectively
Bone.
6. the attachment structure of wall as claimed in claim 5, it is characterised in that every one first keel and every one second keel are remote
From the surface flush with each other of the support.
7. the attachment structure of wall as claimed in claim 3, it is characterised in that the attachment structure of the wall also includes multiple solid
If the installed part of the keel shoe, the one end of each support away from the truss is all connected with an installed part.
8. the attachment structure of wall as claimed in claim 7, it is characterised in that each installed part both passes through the keel shoe,
And it is connected to a shingle nail.
9. the attachment structure of the wall as described in claim 3-8 is any, it is characterised in that the wall body structure also includes multiple resistances
Plate is fired, the flame-retardant board is layed in the keel shoe, and the shingle nail is covered in the flame-retardant board.
10. the attachment structure of the wall as described in claim 3-8 is any, it is characterised in that the wall body structure also includes multiple
Warming plate, the warming plate connect the keel shoe, and the shingle nail is covered in the warming plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720526451.8U CN206769093U (en) | 2017-05-11 | 2017-05-11 | The attachment structure of wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720526451.8U CN206769093U (en) | 2017-05-11 | 2017-05-11 | The attachment structure of wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206769093U true CN206769093U (en) | 2017-12-19 |
Family
ID=60649755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720526451.8U Expired - Fee Related CN206769093U (en) | 2017-05-11 | 2017-05-11 | The attachment structure of wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206769093U (en) |
-
2017
- 2017-05-11 CN CN201720526451.8U patent/CN206769093U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775522B (en) | A kind of detachable house box | |
CN207776110U (en) | A kind of dismountable steel house | |
CN207484705U (en) | A kind of lightweight steel construction anti-pulling connector | |
CN215442527U (en) | Assembly type building wallboard connecting device that civil engineering used | |
CN206769093U (en) | The attachment structure of wall | |
CN107965161A (en) | A kind of packaging board house | |
CN204691235U (en) | Aluminium wood earth system | |
CN205557820U (en) | Reassembling type stand structure and sunshine room skeleton that has this structure | |
CN113585539B (en) | Partition wall connecting structure for steel structure building and mounting method | |
JP5945407B2 (en) | Solar cell panel laying structure and solar cell panel intermediate holding member | |
CN213682549U (en) | Pre-installation structure of assembled wallboard | |
CN212053450U (en) | Steel construction assembled wallboard | |
CN210621927U (en) | Simple and easy erection joint reinforced structure of building steel construction | |
CN210887854U (en) | Connecting structure of steel structure corner | |
CN209369096U (en) | Prefabricated laminated wood wall construction and log cabin structure | |
CN112459373A (en) | Fillet external corner fixing piece and mounting method thereof | |
CN217150640U (en) | Beam column node of rapid Assembly type steel structure | |
CN207892073U (en) | Wall body structure | |
JP5882704B2 (en) | Solar cell panel laying structure and solar cell panel fixing member | |
TWM568558U (en) | Modular support device | |
CN215211509U (en) | Assembled building frame construction | |
CN217325820U (en) | Box-type framework for building with excellent stability | |
CN207277725U (en) | A kind of glass guardrail | |
CN212896967U (en) | Assembled interior decoration wall body installation fixed knot constructs | |
CN211898926U (en) | House steel construction convenient to dismouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 |