CN206764749U - First in first out bin - Google Patents
First in first out bin Download PDFInfo
- Publication number
- CN206764749U CN206764749U CN201720680714.0U CN201720680714U CN206764749U CN 206764749 U CN206764749 U CN 206764749U CN 201720680714 U CN201720680714 U CN 201720680714U CN 206764749 U CN206764749 U CN 206764749U
- Authority
- CN
- China
- Prior art keywords
- bearing plate
- bin
- layer
- slideway
- slideway layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Harvester Elements (AREA)
Abstract
The utility model discloses a kind of first in first out bin, belongs to parts transhipment technical field.The described bin has multiple slideway layers, the multiple slideway layer is set gradually from top to bottom, the multiple slideway layer partly or entirely overlaps relative to the projected area on ground, adjacent slideway layer in the multiple slideway layer is downwardly inclined along relative direction respectively, and the mutually close end close position of adjacent slideway layer is respectively arranged with mobilizable bearing plate so that the bearing plate can be connected with adjacent slideway layer.The utility model between multiple slideway layers of bin by setting the bearing plate being rotatably connected, automatically controlling for first in first out can be carried out to the tote-box on multiple slideway layers, it is not only simple in structure, it is easy to operate, occupy little space, and compared to the first in first out bin of individual layer, the part tankage of bin is largely added, can be widely applied in part FIFO controls or supply work.
Description
Technical field
It the utility model is related to parts transhipment technical field, more particularly to a kind of first in first out bin.
Background technology
In automobile industry, the first in first out (that is, Fist In Fist Out hereinafter referred FIFO) for controlling part is one
The very important thing of part because the daily output of automobile is very big, may some time point part i.e. there occurs technology more
Change (part form, structure, function etc. change), if part is not carried out FIFO controls, then may cause to have changed
Parts error be arranged on vehicle on;This may cause part rejection, waste of time, stop platform, reprocesses, and more have complete vehicle quality risk
Hidden danger is recalled with quality;Therefore, FIFO controls are particularly important in automobile industry.
The storage of Xian Ge automobile factorys KLT (Turnover Box, standard container) part is the storage of standard bin, such as has a kind of standard
The caching KLT bins size of bin general assembly is 2250*1350*1600mm, and the bin size by line is 2500*1350*1600mm,
By taking plastic box (i.e. EU (Toyota sedan system) case 600*400*140mm) supply of material of standard as an example, it can be deposited in the maximum single channel of caching
5 casees (because current one side is entered, one side goes out to be considered as safest FIFO control modes) are stored up, if the high storage tank number of the part is
10 casees, then must be by the way of double case passage supplies of material or the stacking supply of material.The risk misused using binary channels then be present, can not
Fundamentally ensure the first in first out of two casees parts side by side, stacking then may can not realize (part matter be present on part
Measure risk).Therefore, it is badly in need of developing a kind of bin for solving the problems, such as this high reserves part FIFO.
Utility model content
In order to solve problem of the prior art, the utility model embodiment provides a kind of first in first out bin, can be right
Tote-box on multiple slideway layers carries out automatically controlling for first in first out, is not only simple in structure, easy to operate, occupies little space,
And the first in first out bin of individual layer is compared, largely add the part tankage of bin.The technical scheme is as follows:
There is provided a kind of first in first out bin, the bin has multiple slideway layers, and the multiple slideway layer is from top to bottom successively
Set, the multiple slideway layer partly or entirely overlaps relative to the projected area on ground, adjacent in the multiple slideway layer
Slideway layer is downwardly inclined along relative direction respectively, and the mutually close end close position of adjacent slideway layer be respectively arranged with it is movable
Bearing plate so that the bearing plate can be connected with adjacent slideway layer.
Preferably, the multiple slideway layer includes the first slideway layer, the second slideway layer and the 3rd slideway layer, the multiple cunning
Channel layer is Z-shaped in the cross section structure of vertical direction, and first slideway layer, the second slideway layer and the 3rd slideway layer are relative to ground
Projected area it is equal and all overlap, first slideway layer and the described second close end for slipping layer are provided with the first undertaking
Plate, second slideway layer and the 3rd close end for slipping layer are provided with the second bearing plate, first bearing plate around with
The rotatable predetermined angular of the vertical axis of paper so that the first end of first bearing plate and first slideway layer, second
Second end of slideway layer can be connected, and second bearing plate is around the axis rotatable predetermined angular vertical with paper so that
Second bearing plate can be connected with the 3rd end of second slideway layer, the 4th end of the 3rd slideway layer.
Preferably, first bearing plate, the second bearing plate are equipped with control device, the control device control described the
One bearing plate, the second bearing plate are in the predetermined angular range internal rotation.
Preferably, the control device include be arranged on the first bearing plate on the first rotary shaft, the first locking piece and
The second rotary shaft, the second locking piece on the second bearing plate, first locking piece, the second locking piece control institute respectively
The first bearing plate, the second bearing plate are stated in the predetermined angular range internal rotation.
Preferably, the control device includes gravity sensor.
Preferably, the control device include pedal below the bin, the lever construction that is connected with the pedal, with
And the pulley gear being connected with the lever construction, the pulley gear respectively with first bearing plate, the second bearing plate phase
Even.
Preferably, the pulley gear includes being located at the first fixed pulley of bin bottom, determined positioned at the second of bin top
Pulley and through first fixed pulley, the steel cable of the second fixed pulley, the first end of the steel cable and the lever construction phase
Even, the second end of the steel cable is connected with first bearing plate, and the 3rd end of the steel cable is connected with second bearing plate.
Preferably, the first bearing plate both sides are respectively equipped with high-strength spring, each one end of the high-strength spring
With being fixedly connected at the top of bin, the other end is connected with first bearing plate.
Preferably, first bearing plate, the both sides of the second bearing plate are respectively equipped with tensioning spring, first bearing plate
One end of tensioning spring be fixed on bin, the other end is connected with first bearing plate;The tensioning of second bearing plate
One end of spring is fixed on bin, and the other end is connected with second bearing plate.
Preferably, the bin bottom is provided with multiple universal wheels, and being each respectively disposed with for the multiple slideway layer is multiple
Roller, the first side plate, the second side plate, first bearing plate, second are respectively equipped with first bearing plate, the second bearing plate
The first side plate is respectively equipped with bearing plate, the second side plate is provided with shock absorbing foam.
The beneficial effect brought of technical scheme that the utility model embodiment provides is:
By providing such a first in first out bin:The bin has multiple slideway layers, and the multiple slideway layer is from upper
Set gradually under, the multiple slideway layer partly or entirely overlaps relative to the projected area on ground, the multiple slideway layer
In adjacent slideway layer be downwardly inclined respectively along relative direction, and the mutually close end close position of adjacent slideway layer is set respectively
There is mobilizable bearing plate so that the bearing plate can be connected with adjacent slideway layer, and such material frame structure is based on original list
Layer material frame structure, increases to multi-layer material frame for conveying structure, need not increase space in horizontal direction, the optional scope of an in the vertical direction
Interior increase height, had both added the part tankage of bin, and the undertaking of Undertaking effect is played due to being set respectively in adjacent layer
Plate so that the tote-box on bin meets the principle of first in first out in the supply of material, and the first in first out bin also has structure
Simply, it is easy to operate, be not take up the advantages that space, can be widely applied to FIFO parts control or supply work in.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model
Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings
Obtain other accompanying drawings.
Fig. 1 is the dimensional structure diagram for the first in first out bin that the utility model embodiment provides;
Fig. 2 is the side structure schematic diagram for the first in first out bin that the utility model embodiment provides;
Fig. 3 is the side structure schematic diagram for the first in first out bin that the utility model embodiment provides;
Fig. 4 is the operation principle schematic diagram for the first in first out bin that the utility model embodiment provides;
Fig. 5 is the partial structural diagram for the first in first out bin that the utility model embodiment provides;
Fig. 6 is the partial structural diagram for the first in first out bin that the utility model embodiment provides;
Fig. 7 is the partial structural diagram for the first in first out bin that the utility model embodiment provides.
Description of reference numerals:
The slideway layers of 1- first, the slideway layers of 2- second, the slideway layers of 3- the 3rd, the bearing plates of 4- first, the side plates of 41- first, 42- are high
Intensity spring, the bearing plates of 5- second, the side plates of 51- second, 52- supports, 53- slideway bottom plates, 6- pedals, 61- balance bases, 7-
One fixed pulley, the fixed pulleys of 8- second, 9- steel cables, 10- frameworks, 11- universal wheels, 12- rollers, L- tote-boxes.
Embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, implement below in conjunction with the utility model
Accompanying drawing in example, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that described reality
It is only the utility model part of the embodiment to apply example, rather than whole embodiments.Based on the embodiment in the utility model,
The every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, belongs to this reality
With novel protected scope.
It should be noted that the utility model description as described on the direction such as " top ", " bottom " is all based on accompanying drawing institute
The orientation that shows or the contextual definition of position, be for only for ease of description the utility model and simplify and describe, rather than instruction or
Imply that described device must be with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.Art
Language " first ", " second " are only used for describing purpose, and it is not intended that instruction or implying relative importance or implicit indicating institute
The quantity of the technical characteristic of instruction.Thus, " first " is defined, one can be expressed or be implicitly included to the feature of " second "
Or more this feature.In description of the present utility model, " multiple " are meant that two or more, unless otherwise clearly specific
Restriction.
The utility model embodiment provides a kind of first in first out bin, and the bin has multiple slideway layers, the multiple cunning
Channel layer is set gradually from top to bottom, and the multiple slideway layer partly or entirely overlaps relative to the projected area on ground, described more
Adjacent slideway layer in individual slideway layer is downwardly inclined along relative direction respectively, and the end close position that adjacent slideway layer is mutually close
It is respectively arranged with mobilizable bearing plate so that the bearing plate can be connected with adjacent slideway layer, and such material frame structure is based on
Original individual layer material frame structure, increase to multi-layer material frame for conveying structure, space need not be increased in horizontal direction, an in the vertical direction can
Increase height in the range of choosing, both add the part tankage of bin, and undertaking work is played due to being set respectively in adjacent layer
Bearing plate so that the tote-box on bin meets the principle of first in first out in the supply of material, and the first in first out bin is also
It is easy to operate, be not take up the advantages that space with simple in construction, it can be widely applied in the control of FIFO parts or supply work.
The first in first out bin provided below in conjunction with the accompanying drawings the utility model embodiment is described further.
Fig. 1 is the dimensional structure diagram for the first in first out bin that the utility model embodiment provides.Fig. 2 is that this practicality is new
The side structure schematic diagram for the first in first out bin that type embodiment provides.Fig. 3 is the advanced elder generation that the utility model embodiment provides
The side structure schematic diagram of discharge rack.
As shown in Figure 1 to Figure 3, the first in first out bin that the utility model embodiment provides includes the first slideway layer 1, second
The slideway layer 3 of slideway layer 2 and the 3rd, slideway layer surface here have the slideway knot for being available for the tote-box being placed on it to slide
Structure, it can exemplarily use aluminium alloy slideway.Three slideway layers are configured in this way:Three slideway layers are vertical
The cross section structure in direction is Z-shaped, and the first slideway layer 1, the second slideway layer 2 and the 3rd slideway layer 3 are relative to the perspective plane on ground
Product is equal and all overlaps, and the first slideway layer 1 and the second close end for slipping layer 2 are provided with the first bearing plate 4, the second slideway layer
2 are provided with the second bearing plate 5 with the 3rd close end for slipping layer 3, and the first bearing plate 4 can revolve around the axis vertical with paper
Turn predetermined angular so that the first bearing plate 4 can be connected with the first slideway layer 1 with the close end of the second slideway layer 2, the second bearing plate
5 around the axis rotatable predetermined angular vertical with paper so that the second bearing plate 5 and the second slideway layer 2 and the 3rd slideway layer 3
It can be connected close to end.
In a preferred scheme, the first bearing plate 4, the second bearing plate 5 are equipped with control device (not shown), control
Device controls the first bearing plate 4, the second bearing plate 5 in above-mentioned predetermined angular range internal rotation.
It is further preferred that control device include be arranged on the first bearing plate 4 on the first rotary shaft (not shown),
First locking piece (not shown) and the second rotary shaft (not shown) on the second bearing plate 5, the second lock
Determine part (not shown), the first locking piece, the second locking piece control the first bearing plate 4, the second bearing plate 5 above-mentioned pre- respectively
Determine angular range internal rotation.
In one embodiment, control device includes gravity sensor.Tote-box carries out first in first out confession on bin
During answering, when tote-box is reached on the first bearing plate 4 or the second bearing plate 5, it can be made by the effect of gravity sensor
First bearing plate 4 or the second bearing plate 5 are in above-mentioned predetermined angular range internal rotation, so as to realize that the first slideway layer 1, second slip
Being connected between layer 2 and the 3rd slideway layer 3, finally realize first in first out supply of the tote-box on bin.
In a preferred embodiment, control device includes the pedal 6 below bin, the lever being connected with pedal 6
Structure (not shown) and the pulley gear being connected with lever construction, pulley gear respectively with the first bearing plate 4, second
Bearing plate 5 is connected.Here bin utilizes semi-automatic design principle, simple in construction using lever pedal gear, operation side
Just, the labor intensity of picking end worker can effectively be reduced.It is further preferred that pulley gear includes first positioned at bin bottom
Fixed pulley 7, the second fixed pulley 8 positioned at bin top and through the first fixed pulley 7, the steel cable 9 of the second fixed pulley 8, steel cable 9
First end be connected with lever construction, the second end of steel cable 9 is connected with first bearing plate 4, the 3rd end and second of steel cable 9
Bearing plate 5 is connected.When stepping on pedal 6, by the lever construction and the steel cable 9 of pulley gear being connected with pedal 6, can control
First bearing plate 4 and the second bearing plate 5 so that the first bearing plate 4 and the second bearing plate 5 rotate in predetermined angular range, real
Existing first slideway layer 1, second slip being connected between layer 2 and the 3rd slideway layer 3, so as to finally realize that the tote-box of bin is advanced
First go out supply.Here, the first fixed pulley 7 positioned at bottom can use balance fixed pulley, can control the deviation angle of steel cable 9
Within 1 degree, hand labor load is reduced.
In a preferred scheme, the both sides of the first bearing plate 4 are respectively equipped with high-strength spring 42, the high-strength spring 42 it is every
Individual one end can be in 120 degree of angles with bin top horizontal position, effectively spring can be avoided to grow with being fixedly connected at the top of bin
Phase heavy-duty service and cause to fail, the other end is connected with the first bearing plate 4, and the high-strength spring 42 can effectively realize that first holds
The return after rotation of fishplate bar 4 or resilience.
In a preferred scheme, the first bearing plate 4, the both sides of the second bearing plate 5 are respectively equipped with tensioning spring and (not shown in figure
Go out), one end of the tensioning spring of the first bearing plate 4 is fixed on bin, and the other end is connected with first bearing plate 4;Second
One end of the tensioning spring of bearing plate 5 is fixed on bin, and the other end is connected with the second bearing plate 5.
Fig. 4 is the operation principle schematic diagram for the first in first out bin that the utility model embodiment provides.As shown in figure 4,
In one preferred embodiment, precondition is that bin provides advanced in high storage trunkful state, the utility model embodiment
The course of work of first discharge rack is as follows:
The first step:Picking personnel, outermost tote-box is taken away from the access section of the 3rd slideway layer 3, according to gravity principle,
Three layers of part can sequentially move forward the distance of one case, reserve last case room of third layer;
Second step:Step on pedal 6 to bottom, the bottom tote-box of the first slideway layer 1 and slide into the first bearing plate 4, with
Transition is waited between the second layer, while second layer bottom tote-box transits to the second bearing plate 5, then the first slideway layer 1
Other parts case (including the top tote-box L) moves downward successively, and similarly the other parts case of the second slideway layer 2 is also successively
Move downward;
3rd step:Pedal 6 is unclamped, the tote-box of the second bearing plate 5 slides into third layer, and the first bearing plate 4 casees slides into the
Two layers;Cyclic is to replenishing.
Fig. 5 is the partial structural diagram for the first in first out bin that the utility model embodiment provides.Fig. 6 is that this practicality is new
The partial structural diagram for the first in first out bin that type embodiment provides.As shown in figure 5, in a preferred scheme, second accepts
Plate 5 is made up of the second side plate 51, support 52 and slideway bottom plate 53.As shown in fig. 6, each slideway of slideway bottom plate 53 be disposed with it is more
Individual roller 12.
Fig. 7 is originally the partial structural diagram for the first in first out bin that utility model embodiment provides.As shown in fig. 7,
In one preferred scheme, bin also includes framework 10, and framework 10 surrounds the internal structure of bin, plays the whole bin of support or solid
Fixed, connection bin inner part effect.Preferably, balance base 61 is respectively equipped with the both sides of bin bottom, pedal 6, be used for
The balance of bin bottom is kept when pedal 6 is operated, so as to further improve the stability of whole bin.
In a preferred scheme, bin bottom is provided with multiple universal wheels 11, facilitates the movement of bin.Multiple slideway layers it is every
Individual to be respectively disposed with multiple rollers 12, roller structure as slideway layer is more convenient for slip of the tote-box on slideway layer.First
The first side plate 41, the second side plate 51 are respectively equipped with bearing plate 4, the second bearing plate 5, for being identified in addition above, prevents layer
Entanglement is obscured between layer, has further ensured that the tote-box on bin is supplied in strict accordance with first in first out.In addition,
Shock absorbing foam can be respectively equipped with first bearing plate 4, the second bearing plate 5, so as to effectively reduce the first bearing plate 4, second hold
Fishplate bar 5 closes caused collision noise.
Above-mentioned all optional technical schemes, alternative embodiment of the present utility model can be formed using any combination, herein
No longer repeat one by one.
In summary, the utility model embodiment is by providing such a first in first out bin:The bin has multiple
Slideway layer, the multiple slideway layer are set gradually from top to bottom, the multiple slideway layer relative to ground projected area part
Or all overlap, the adjacent slideway layer in the multiple slideway layer is downwardly inclined along relative direction respectively, and adjacent slideway layer phase
Close end close position is respectively arranged with mobilizable bearing plate so that and the bearing plate can be connected with adjacent slideway layer,
Such material frame structure is based on original individual layer material frame structure, increases to multi-layer material frame for conveying structure, need not increase in horizontal direction empty
Between, increase height, had both added the part tankage of bin in the optional scope of an in the vertical direction, and due in adjacent layer
The bearing plate for playing Undertaking effect is set respectively so that the tote-box on bin meets the principle of first in first out in the supply of material, and
And the first in first out bin also have it is simple in construction, it is easy to operate, be not take up the advantages that space, can be widely applied to FIFO parts
In control or supply work.
One of ordinary skill in the art will appreciate that hardware can be passed through by realizing all or part of step of above-described embodiment
To complete, by program the hardware of correlation can also be instructed to complete, described program can be stored in a kind of computer-readable
In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model
Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in
Within the scope of shield.
Claims (10)
1. a kind of first in first out bin, it is characterised in that the bin has multiple slideway layers, and the multiple slideway layer is from top to bottom
Set gradually, the multiple slideway layer partly or entirely overlaps relative to the projected area on ground, in the multiple slideway layer
Adjacent slideway layer is downwardly inclined along relative direction respectively, and be respectively arranged with can for the mutually close end close position of adjacent slideway layer
The bearing plate of activity so that the bearing plate can be connected with adjacent slideway layer.
2. bin according to claim 1, it is characterised in that the multiple slideway layer includes the first slideway layer, the second cunning
Channel layer and the 3rd slideway layer, the multiple slideway layer is Z-shaped in the cross section structure of vertical direction, first slideway layer, second
Slideway layer and the 3rd slideway layer it is equal relative to the projected area on ground and all overlap, first slideway layer and described second
The slip close end of layer is provided with the first bearing plate, and second slideway layer and the 3rd close end for slipping layer are provided with the
Two bearing plates, first bearing plate is around the axis rotatable predetermined angular vertical with paper so that first bearing plate with
The first end of first slideway layer, the second end of the second slideway layer can be connected, and second bearing plate is around vertical with paper
The rotatable predetermined angular of axis so that the 3rd end of second bearing plate and second slideway layer, the 3rd slideway layer
The 4th end can be connected.
3. bin according to claim 2, it is characterised in that first bearing plate, the second bearing plate are equipped with control
Device, the control device control first bearing plate, the second bearing plate in the predetermined angular range internal rotation.
4. bin according to claim 3, it is characterised in that the control device includes being arranged on the first bearing plate
First rotary shaft, the first locking piece and the second rotary shaft on the second bearing plate, the second locking piece, first lock
Determine part, the second locking piece controls first bearing plate respectively, the second bearing plate is in the predetermined angular range internal rotation.
5. bin according to claim 3, it is characterised in that the control device includes gravity sensor.
6. bin according to claim 3, it is characterised in that the control device include pedal below the bin,
The lever construction being connected with the pedal and the pulley gear being connected with the lever construction, the pulley gear respectively with
First bearing plate, the second bearing plate are connected.
7. bin according to claim 6, it is characterised in that the pulley gear includes determining positioned at the first of bin bottom
Pulley, the second fixed pulley positioned at bin top and through first fixed pulley, the steel cable of the second fixed pulley, the steel cable
First end be connected with the lever construction, the second end of the steel cable is connected with first bearing plate, the of the steel cable
Three ends are connected with second bearing plate.
8. the bin according to any one of claim 2 to 7, it is characterised in that the first bearing plate both sides are set respectively
There is high-strength spring, with being fixedly connected at the top of bin, the other end is accepted with described first for each one end of the high-strength spring
Plate connects.
9. the bin according to any one of claim 2 to 7, it is characterised in that first bearing plate, the second bearing plate
Both sides be respectively equipped with tensioning spring, one end of the tensioning spring of first bearing plate is fixed on bin, the other end and institute
State the connection of the first bearing plate;One end of the tensioning spring of second bearing plate is fixed on bin, the other end and described second
Bearing plate connects.
10. the bin according to any one of claim 2 to 7, it is characterised in that the bin bottom is provided with multiple universal
Wheel, the multiple slideway layer are each respectively disposed with multiple rollers, are respectively equipped with first bearing plate, the second bearing plate
First side plate, the second side plate, the first side plate is respectively equipped with first bearing plate, the second bearing plate, the second side plate is provided with and subtracted
Shake foam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720680714.0U CN206764749U (en) | 2017-06-07 | 2017-06-07 | First in first out bin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720680714.0U CN206764749U (en) | 2017-06-07 | 2017-06-07 | First in first out bin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206764749U true CN206764749U (en) | 2017-12-19 |
Family
ID=60637278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720680714.0U Active CN206764749U (en) | 2017-06-07 | 2017-06-07 | First in first out bin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206764749U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107160348A (en) * | 2017-06-07 | 2017-09-15 | 汽-大众汽车有限公司 | First in first out bin |
-
2017
- 2017-06-07 CN CN201720680714.0U patent/CN206764749U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107160348A (en) * | 2017-06-07 | 2017-09-15 | 汽-大众汽车有限公司 | First in first out bin |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5713477A (en) | Method and apparatus for controlling and operating a container crane or other similar cranes | |
CN206764749U (en) | First in first out bin | |
CN108545490B (en) | The Unitized logistics operating system and method for box car revolving platform, highway railway combined transport | |
WO1994005586A1 (en) | Process and device for controlling a portainer | |
US4153312A (en) | Mobile rack system | |
CN107160348A (en) | First in first out bin | |
CN204822704U (en) | Container | |
CN110310438A (en) | A kind of intellectual access system | |
CN206501269U (en) | A kind of mixing plant and its automatical feeding system | |
CN105293397A (en) | Manual hydraulic container overturn lifting tool | |
US3186568A (en) | Method for loading and unloading vehicles | |
KR100194563B1 (en) | Freight | |
CN207374520U (en) | Compartment is provided in a kind of automatic express delivery | |
KR102124388B1 (en) | Freight distribution cable robot system having a pulley and freight distribution method using it | |
US3514000A (en) | Mobile trucking equipment | |
CN209973348U (en) | High-speed railway commodity circulation informationization collection container of portable support formula | |
CN1712328A (en) | Multifunctional container | |
US4573850A (en) | Container and handling apparatus therefor | |
US20140341686A1 (en) | Lift unit for hoist | |
RU51377U1 (en) | SYSTEM FOR LOADING AND TRANSPORTATION OF FINE DISPERSED MATERIALS | |
CN211032556U (en) | Transverse V-shaped groove coiled material conveying device | |
RU25305U1 (en) | RAILWAY PLATFORM FOR CONTAINER TRANSPORTATION | |
RU2294889C1 (en) | System for loading and transportation finely divided materials | |
CN216424240U (en) | Hidden pedal structure | |
US11124371B2 (en) | Apparatus for efficiently loading bulk materials for sealed transport and a method for its use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |