CN206753082U - Assembled-type house inside and outside wall board erecting device - Google Patents
Assembled-type house inside and outside wall board erecting device Download PDFInfo
- Publication number
- CN206753082U CN206753082U CN201720490224.4U CN201720490224U CN206753082U CN 206753082 U CN206753082 U CN 206753082U CN 201720490224 U CN201720490224 U CN 201720490224U CN 206753082 U CN206753082 U CN 206753082U
- Authority
- CN
- China
- Prior art keywords
- outside wall
- assembled
- wall board
- erecting device
- type house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of assembled-type house inside and outside wall board erecting device, its drip irrigation device be include base, the column being fixed on base, the cantilever beam of outwards being encorbelmented by column top, the electric block being fixed on cantilever beam, be fixedly connected on electric block steel cord ends sucker and the air pump of source of the gas is provided for the sucker.When it is in the prior art 200mm for thickness of slab that the utility model device, which solves, or plate length is more than 3m, the problem of can not being installed when assembled inside and outside wall board can not manually be installed when installing or plate deadweight is larger.
Description
Technical field
The realm of building construction is the utility model is related to, in particular, it is related to a kind of prefabricated dwelling house inner-outer wall
Board mounting assembly.
Background technology
At present, as housing need is continuously increased, the fast development of assembled architecture technical system like the mushrooms after rain is raw
The socialization and scale of production require more and more higher, the effect more projecting device of assembled architecture standardization.State Council handles official business
Issued within 27th in September in 2016 in the Room《On greatly developing the instruction of assembled architecture》.Opinion is pointed out, is striven with 10 years
The time of left and right, assembled architecture is accounted for the ratio of new building and reach 30%, development assembled architecture is the great of mode of construction
Change, be the important measure for promoting supply side structural reform and new Urbanization Progress, be advantageous to the economize on resources energy, reduction
Construction pollution, lifting labor productivity and quality safety are horizontal, may advantageously facilitate construction industry and melt with informationization industrialization depth
Close, cultivate the new kinetic energy of NPD projects, promote neutralizing superfluous production capacity.
In traditional construction, main structure construction is finished, it is necessary to transport a large amount of building wastes, it is secondary build by laying bricks or stones after again
Building block is cut, pours collar tie beam, stem etc., transports many building wastes again, to decoration stage again by main body and secondary
Build the irrational dismounting of stage design by laying bricks or stones, produce many building wastes again.And assembled architecture reduces major project, two
Multiple links of secondary structure and fitting-out work, drastically reduce the area building waste, reduce energy consumption, reduce construction fugitive dust, subtract
Lack haze weather, so as to really reduce Amber Alert, the warning red frequency of occurrences, there is the number of clear sky in increase,
Advantageously in environmental protection, meet the requirement of energy-conserving and environment-protective.
But assembled wallboard deadweight is larger, and manpower transport is relied in work progress, it can not meet that wallboard is installed
Needs, especially for wallboard thickness be 200mm autoclave aerated concrete building block, deadweight it is very big, can not manually move peace
Dress, it is larger simultaneously for floor height, it when wall-plate level is more than 3m, manually can not also be installed, need to invent this installation dress for this
Put, to realize the installation of wallboard, it can significantly reduce the amount of labour of builder.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of assembled-type house inside and outside wall board
Erecting device, it significantly reduces the carrying amount of labour to assembled inside and outside wall board.
To achieve the above object, the utility model provides following technical scheme:A kind of assembled-type house inside and outside wall board peace
Assembling device, including base, be fixed on base column, by column top outwards cantilevered out cantilever beam, be fixed on cantilever beam
Electric block, be fixedly connected on electric block steel cord ends sucker and the air pump of source of the gas is provided for the sucker.
By using above-mentioned technical proposal, base plays firm effect to whole device, and column is to cantilever beam and cantilever beam
On object play a supportive role, cantilever beam plays a supportive role to electric block, and electric block can drive sucker by steel wire rope
Action, by sucker suction on the surface of assembled inside and outside wall board, and is constantly evacuated by air pump, when the reading that air gauge is shown
Number is enough to make sucker hold assembled inside and outside wall board, and inside and outside wall board is unlikely to fall down, even if assembled inside and outside wall board is by sucker
Securely fix, and realize that movement is transported to specified location and install in place under the drive of electric block.
Preferably, the counterweight being provided with the column for holding mass places support.
By using above-mentioned technical proposal, when base deadweight is not enough to firm whole device, can by with
Playback, which is put, places mass on support, so that the steadiness of whole device improves, so as to lift the dress for carrying bigger quality
With formula inside and outside wall board.
It is connected on the column and is positioned by detent mechanism preferably, the counterweight places support sliding.
By using above-mentioned technical proposal, counterweight can be adjusted and place height of the support on column, so as to adjust
The center of gravity of counterweight, and then the quality that can select to increase and decrease mass adjusts the steadiness of whole device.
Preferably, the detent mechanism includes the bolt being threadedly connected on the counterweight placement support and vertical row
Some positioning holes being distributed on column.
By using above-mentioned technical proposal, the cooperation of bolt and positioning hole counterweight can be placed support be fixed on it is vertical
On a certain position of post, positioning is realized.
Preferably, the column includes the sleeve being fixedly connected with base and is sheathed in sleeve to turn with what it was rotatablely connected
Lever, the cantilever beam are fixedly connected on the top of the rotating bar.
By using above-mentioned technical proposal so that rotating bar can be relative to sleeve and base rotation, so that cantilever
Beam can be around base rotation so that and the work station of electric block and sucker on cantilever beam can be adjusted, so as to
The wallboard at any position of building is installed, improves the flexibility of installation.
Preferably, the cantilever beam includes the fixed beam being fixedly connected with column and horizontally rotated to be connected to the fixed beam
The walking beam of the other end, the electric block are fixed on the walking beam.
By using above-mentioned technical proposal so that walking beam can horizontally rotate relative to fixed beam, so that movable
The work station of electric block and sucker on beam can be adjusted further, to reach the effect for further improving operation flexibility
Fruit.
Preferably, the fixed beam is provided with vertical turn hole relative to the other end of column, the walking beam relative to
One end of the fixed beam is provided with two pieces of grip blocks up and down, and turn being connected with the axis of rotation is provided with the grip block
Axle.
By using above-mentioned technical proposal, two pieces of grip blocks of walking beam one end can be to fixation in the case where not acted on by external force
One end of beam plays a part of to grip, and when regulated external force, walking beam phase can be achieved in rotating shaft and the cooperation of turn hole
For horizontally rotating for fixed beam.
Preferably, the outer end of the cantilever beam is provided with the directive wheel bypassed for the steel wire rope of electric block.
By using above-mentioned technical proposal so that the movement of steel wire rope is more smooth, and guidance quality is clearer and more definite, and then to inhale
The movement of disk is more accurate.
Preferably, the air pump is fixedly connected on the walking beam.
By using above-mentioned technical proposal, when walking beam rotates, electric block synchronous can rotate with air pump,
So be not in tracheae unrest snarling around the problem of.
Preferably, the base is provided with road wheel.
By using above-mentioned technical proposal so that the erecting device can be moved easily, and further improve the flexible of operation
Property.
In summary, the utility model has the advantages that compared to prior art:The utility model is applied to dress
During installation with formula inside and outside wall board, the amount of labour of operator can be mitigated significantly;And it can complete manually to carry motionless
The task of wallboard;Furthermore the flexibility of the device is high, operation is convenient.
Brief description of the drawings
Fig. 1 is embodiment working state schematic representation;
Fig. 2 is the working state schematic representation of another angle of embodiment;
Fig. 3 is the partial exploded view of embodiment.
In figure:1st, base;11st, road wheel;12nd, skewed horizontal load bar;2nd, column;21st, sleeve;211st, lower rotary table;212nd, bottom
Plate;22nd, rotating bar;221st, top rotary table;222nd, positioning hole;3rd, counterweight places support;31st, sliding block;311st, slide opening;312nd, screw thread
Hole;32nd, carrier bar;33rd, action bars;34th, bolt;4th, cantilever beam;41st, fixed beam;411st, skewed horizontal load beam;412nd, turn
Hole;42nd, walking beam;421st, grip block;422nd, rotating shaft;423rd, installing plate;424th, directive wheel;5th, electric block;51st, steel wire rope;
52nd, chain;6th, air pump;61st, tracheae;62nd, air gauge;7th, sucker;8th, prefabricated assembled inside and outside wall board.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment:A kind of assembled-type house inside and outside wall board erecting device, as shown in figure 1, including base 1, being fixed on base 1
On column 2, by the top of column 2 outwards cantilevered out cantilever beam 4, be fixed on cantilever beam 4 electric block 5, be fixedly connected on
The sucker 7 of the end of steel wire rope 51 of electric block 5 and the air pump 6 that source of the gas is provided for sucker 7.
Wherein, column 2 includes the sleeve 21 of bottom and the rotating bar 22 on top, and the bottom of sleeve 21 is fixedly welded with bottom plate
212, bottom plate 212 is located on base 1, and some skewed horizontal load bars 12 are connected between the top of sleeve 21 and base 1.In addition,
The bottom surface of base 1 is additionally provided with some road wheels 11, easy to remove.
With reference to Fig. 3, the middle part of rotating bar 22 is welded with top rotary table 221, and the top of corresponding sleeve 21 is welded with lower rotary table
211, the bottom insertion sleeve 21 of rotating bar 22 is interior and is rotatablely connected with it.In the position of top rotary table more than 221 of rotating bar 22 also
Vertical array has some positioning holes 222, and counterweight places support 3 and slides the position of top rotary table more than 221 for being connected to rotating bar 22.Its
In, counterweight placement support 3 includes the sliding block 31 being arranged with rotating bar 22 and two carrier bars for being fixedly connected on the both sides of sliding block 31
32, the slide opening 311 passed through for rotating bar 22 is provided with sliding block 31, and the screw thread connected with slide opening 311 is additionally provided with sliding block 31
Hole 312, the axial direction of screwed hole 312 is vertical with the axial direction of slide opening 311, and the axial direction and slide opening of screwed hole 312
311 radial direction is consistent.Two carrier bars 32 are respectively welded two action bars 33 relative to the other end of sliding block 31.
After counterweight placement support 3 is connected in rotating bar 22, counterweight can be adjusted by moving up and down sliding block 31
The height of support 3 is placed, and its positioning is realized through positioning hole 222 by bolt 34.When needing to make rotating bar 22 and set
When cylinder 21 relatively rotates, rotating bar 22 can be rotated by operator's hand holding operation bar 33.
Cantilever beam 4 includes the fixed beam 41 being fixedly connected with the top of rotating bar 22 and turned with the other end of fixed beam 41 level
The walking beam 42 of dynamic connection.Skewed horizontal load beam 411 is connected between fixed beam 41 and rotating bar 22, so as to improve fixed beam 41
Bearing capacity.Referring to Fig. 3, the other end of rotating bar 22 is provided with the vertical turn hole of axial direction in fixed beam 41
412。
Referring to Fig. 1 and Fig. 2, two pieces of grip blocks 421 above and below walking beam 42 is provided with relative to one end of fixed beam 41, two
The vertical rotating shaft 422 of axial direction is provided between grip block 421, fixed beam is realized by the cooperation of rotating shaft 422 and turn hole 412
41 with the rotation connection of walking beam 42.
Electric block 5 is fixedly installed on the top surface of walking beam 42, and the bottom surface of walking beam 42 is provided with installing plate 423, gas
Pump 6 is fixed on walking beam 42 by installing plate 423.Walking beam 42 is provided with directive wheel relative to the other end of fixed beam 41
424, the steel wire rope 51 of electric block 5 is connected with chain 52 around directive wheel 424, and two suckers 7 are connected on chain 52.And
And air pump 6 is respectively connecting to two suckers 7 by tracheae 61.
When carrying prefabricated assembled inside and outside wall board 8 using the erecting device:Walking beam 42 is adjusted first relative to fixation
The position of beam 41, in order to operation.Then placed according to the gravity for the prefabricated assembled inside and outside wall board 8 that need to be lifted, regulation counterweight
The height of support 3 and placement need the mass placed.Booster air pump 6 afterwards, by sucker 7 adsorb need lift it is prefabricated
The surface of assembled inside and outside wall board 8, during sucker 7 constantly pumping, the gas of sucker 7 is apparent from for the ease of worker
Press, in the present embodiment, air gauge 62 is connected with tracheae 61, so, when the reading that air gauge 62 is shown is enough to adsorb sucker 7
Firmly wallboard, and wallboard is unlikely to fall down, i.e., prefabricated assembled inside and outside wall board 8 is securely fixed by sucker 7.Then electronic calabash is started
Reed 5, under the drive of electric block 5, prefabricated assembled inside and outside wall board 8 is changed into vertical state from horizontality, now prefabricated dress
Hanging with formula inside and outside wall board 8, the work that can continue through electric block 5 selects the installation of prefabricated assembled inside and outside wall board 8 high
Degree.And rotating bar 22 can be rotated by hand-held bar 33, to adjust the level orientation of prefabricated assembled inside and outside wall board 8.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to
Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to
Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and
Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.
Claims (10)
- A kind of 1. assembled-type house inside and outside wall board erecting device, it is characterised in that:Including base (1), it is fixed on base (1) It is column (2), the cantilever beam (4) of outwards being encorbelmented by column (2) top, the electric block (5) being fixed on cantilever beam (4), solid Surely be connected to steel wire rope (51) end of electric block (5) sucker (7), for the sucker (7) provide source of the gas air pump (6) with And and air pump(6)It is connected for the air gauge for showing air pressure(62).
- 2. assembled-type house inside and outside wall board erecting device according to claim 1, it is characterised in that:On the column (2) It is provided with the counterweight for holding mass and places support (3).
- 3. assembled-type house inside and outside wall board erecting device according to claim 2, it is characterised in that:The counterweight places branch Frame (3) sliding is connected on the column (2) and positioned by detent mechanism.
- 4. assembled-type house inside and outside wall board erecting device according to claim 3, it is characterised in that:The detent mechanism bag Include be threadedly connected to the counterweight place the bolt (34) on support (3) and be arranged in vertically it is some fixed on column (2) Position hole (222).
- 5. assembled-type house inside and outside wall board erecting device according to claim 1, it is characterised in that:Column (2) bag Include the sleeve (21) being fixedly connected with base (1) and be sheathed on the interior rotating bar (22) being rotatablely connected with it of sleeve (21), it is described Cantilever beam (4) is fixedly connected on the top of the rotating bar (22).
- 6. assembled-type house inside and outside wall board erecting device according to claim 1, it is characterised in that:The cantilever beam (4) The walking beam of the fixed beam (41) other end is connected to including the fixed beam (41) being fixedly connected with column (2) and horizontally rotating (42), the electric block (5) is fixed on the walking beam (42).
- 7. assembled-type house inside and outside wall board erecting device according to claim 6, it is characterised in that:The fixed beam (41) The other end of column (2) is provided with vertical turn hole (412), the walking beam (42) is relative to the fixed beam (41) One end be provided with two pieces of grip blocks (421) up and down, be provided with the grip block (421) and the turn hole (412) rotated and connected The rotating shaft (422) connect.
- 8. assembled-type house inside and outside wall board erecting device according to claim 1, it is characterised in that:The cantilever beam (4) Outer end be provided with the directive wheel (424) bypassed for the steel wire rope (51) of electric block (5).
- 9. assembled-type house inside and outside wall board erecting device according to claim 6, it is characterised in that:The air pump (6) is solid Surely it is connected on the walking beam (42).
- 10. assembled-type house inside and outside wall board erecting device according to claim 1, it is characterised in that:The base (1) sets It is equipped with road wheel (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720490224.4U CN206753082U (en) | 2017-05-04 | 2017-05-04 | Assembled-type house inside and outside wall board erecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720490224.4U CN206753082U (en) | 2017-05-04 | 2017-05-04 | Assembled-type house inside and outside wall board erecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206753082U true CN206753082U (en) | 2017-12-15 |
Family
ID=60617371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720490224.4U Active CN206753082U (en) | 2017-05-04 | 2017-05-04 | Assembled-type house inside and outside wall board erecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206753082U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035524A (en) * | 2017-12-18 | 2018-05-15 | 刘静 | A kind of insulation polyurethane foam cement exterior wall cladding automated construction machinery |
CN110388064A (en) * | 2019-07-31 | 2019-10-29 | 重庆建筑工程职业学院 | A kind of prefabricated member location and installation equipment |
CN112727112A (en) * | 2020-12-26 | 2021-04-30 | 宁波市城展建设工程有限公司 | Prefabricated wallboard positioning device and method |
-
2017
- 2017-05-04 CN CN201720490224.4U patent/CN206753082U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035524A (en) * | 2017-12-18 | 2018-05-15 | 刘静 | A kind of insulation polyurethane foam cement exterior wall cladding automated construction machinery |
CN110388064A (en) * | 2019-07-31 | 2019-10-29 | 重庆建筑工程职业学院 | A kind of prefabricated member location and installation equipment |
CN112727112A (en) * | 2020-12-26 | 2021-04-30 | 宁波市城展建设工程有限公司 | Prefabricated wallboard positioning device and method |
CN112727112B (en) * | 2020-12-26 | 2022-02-18 | 宁波市城展建设工程有限公司 | Prefabricated wallboard positioning device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206753082U (en) | Assembled-type house inside and outside wall board erecting device | |
CN102505839A (en) | Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate | |
CN206427945U (en) | A kind of adjustable hanging apparatus for building | |
CN205555950U (en) | Portable architectural equipment hoist device that can rotate | |
CN102322138A (en) | The modular sliding formwork | |
CN202346636U (en) | Crane | |
CN204802839U (en) | Jacking equipment for building | |
CN115122063B (en) | Wheel disc type automatic pipeline installation robot | |
CN216690426U (en) | Simple device matched with ALC wallboard installation | |
CN206985567U (en) | A kind of construction site construction crane | |
CN206299163U (en) | Mobile reinforcement processes factory building | |
CN216141163U (en) | Indoor curtain wall glass installation construction equipment | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN213950475U (en) | Lifting machine for constructional engineering | |
CN213710435U (en) | Fragment of brick handling device for construction | |
CN210505314U (en) | Hoisting device for civil air defense equipment installation | |
CN212832425U (en) | Hoisting tool applied to building construction | |
CN212050421U (en) | Electromechanical mounting auxiliary frame | |
CN211004274U (en) | Municipal works hoisting equipment | |
CN211229781U (en) | Novel prefabricated hollow enclosure | |
CN201460245U (en) | Wall hanging frame | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN218088599U (en) | Detachable hydraulic lifting portal frame | |
CN215287760U (en) | Building material hoist device | |
CN206437795U (en) | A kind of quantitative hanging apparatus of prefabricated components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |