CN206750931U - Electric cable transporting equipment and its mechanical arm configuration - Google Patents

Electric cable transporting equipment and its mechanical arm configuration Download PDF

Info

Publication number
CN206750931U
CN206750931U CN201720624696.4U CN201720624696U CN206750931U CN 206750931 U CN206750931 U CN 206750931U CN 201720624696 U CN201720624696 U CN 201720624696U CN 206750931 U CN206750931 U CN 206750931U
Authority
CN
China
Prior art keywords
fixture
lever arm
cable
transporting equipment
gripper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720624696.4U
Other languages
Chinese (zh)
Inventor
莫文雄
王志军
罗健斌
梁国开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201720624696.4U priority Critical patent/CN206750931U/en
Application granted granted Critical
Publication of CN206750931U publication Critical patent/CN206750931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manipulator (AREA)

Abstract

The utility model discloses a kind of electric cable transporting equipment and its mechanical arm configuration, the mechanical arm configuration includes:Lever arm, the lever arm are movably arranged on the running gear of electric cable transporting equipment;Gripper, the gripper is on the lever arm, and the gripper includes the first fixture and the second fixture that are oppositely arranged;First driving means, the first driving means are with the gripper drive connection and for driving first fixture and second fixture opening or closure;Second drive device, second drive device and the lever arm drive connection, for driving the gripper closer or far from the support face for being placed with the coil of cable.The utility model can realize that cable loads the automation of work, reduce the manpower consumption of cable loading process, effectively improve operating efficiency.The utility model has the characteristics that easy to use, mechanicalness is good and practical so that cable laying work can be implemented easily and fast.

Description

Electric cable transporting equipment and its mechanical arm configuration
Technical field
Distribution network cable laying technology field is the utility model is related to, more particularly, to a kind of electric cable transporting equipment and its machinery Arm configuration.
Background technology
In power construction, in order to facilitate cable laying, it will usually using a kind of cable transporting truck come by electric cable transporting extremely Corresponding laying place.And before electric cable transporting, generally it is required for coil of cable (including wire spool and being loaded on wire spool Cable etc.) be loaded into corresponding running gear, and, it is necessary to which the coil of cable of sky is torn open after the cable on coil of cable drains The coil of cable for unloading and more renewing.In traditional design, the loading and unloading of coil of cable is manually to carry out, and expends more manpower, no Beneficial to the full-automation for realizing cable laying.Also, some coils of cable are heavy cable, volume is big and weight weight, to artificial behaviour Inconvenience is brought, reduces operating efficiency.
The content of the invention
Based on this, the defects of the utility model is to overcome prior art, there is provided a kind of electric cable transporting equipment and its machinery Arm configuration, it can capture or unload automatically coil of cable, without artificial loading, reduce manpower consumption, improve operating efficiency.
Its technical scheme is as follows:
A kind of mechanical arm configuration of electric cable transporting equipment, including lever arm, one end of the lever arm are movably arranged at cable On the running gear of transporting equipment;Gripper, the gripper are located at the one end of the lever arm away from the running gear, and The gripper includes the first fixture and the second fixture being oppositely arranged, and can be spelled between first fixture and second fixture Close the accommodating cavity for being formed and being matched with the center shape shaft of coil of cable;First driving means, the first driving means with it is described Gripper drive connection simultaneously is used to drive first fixture and second fixture to open or close;Second drive device, institute The second drive device is stated with the lever arm drive connection and make it that the gripper is close for driving the lever arm to move Or it is located remote from the support face of the coil of cable.
The mechanical arm configuration of electric cable transporting equipment described in the utility model embodiment, it can be controlled by first driving means Gripper crawl coil of cable or release coil of cable processed.And its second drive device can drive lever arm to move, the shifting of lever arm Dynamic path can be set according to being actually needed, so that lever arm can ensure the gripper of its end during movement Can be closer or far from the support face (generally ground) for being placed with coil of cable.For example, during coil of cable is loaded, activity Arm moves towards ground side so that gripper firmly grasps coil of cable close to ground, and lever arm is away from ground afterwards, for by cable Volume lifts;During coil of cable is unloaded, lever arm is again adjacent to ground, and gripper discharges coil of cable, afterwards lever arm Resetted away from ground.The utility model can realize that cable loads the automation of work, reduce in cable loading or unloading process Manpower consumption, effectively improve operating efficiency.The utility model has easy to use, mechanicalness good and the spy such as practical Point so that cable laying work can be implemented easily and fast.
Above-mentioned technical proposal is further described below:
In one of the embodiments, first fixture and second fixture are equipped with connection end and free end, institute State the connection end of the first fixture and the connection end of second fixture to be articulated with the lever arm, the first driving means For driving first fixture and second fixture to rotate, cause the free end and described second of first fixture simultaneously Mutually drawn close between the free end of fixture or remote.It follows that it can be achieved by the rotation of the first fixture and the second fixture The closure and opening of gripper.Specifically, when closure is mutually drawn close in the free end of the first fixture and the second fixture, you can realize Crawl to coil of cable;When the free end of the first fixture and the second fixture is separated from each other opening, you can realize to coil of cable Release.First driving means described in the utility model embodiment drive the first fixture and the second fixture towards the outside of lever arm simultaneously Or inner side rotates, and realizes the quick crawl and release of coil of cable.The utility model is reasonable in design, ingenious, the letter of its structure It is single, be easy to make, cost it is relatively low.
In one of the embodiments, it is flexible dynamic to include first connecting rod, second connecting rod and first for the first driving means Power component, one end of the first connecting rod are hinged with first fixture, and the other end of the first connecting rod is stretched with described first The movable end of contracting Power Component is hinged, and one end of the second connecting rod is hinged with second fixture, the second connecting rod it is another Movable end of the one end also with the described first flexible Power Component is hinged.First flexible Power Component described in the utility model embodiment First fixture is driven by first connecting rod, the second fixture is driven by second connecting rod.Stretched in the first flexible Power Component During first connecting rod and second connecting rod can be driven to deflect simultaneously, and then drive the first fixture and the second fixture to rotate.This The telescopic moving of flexible Power Component is effectively converted into the rotation of the first fixture and the second fixture by utility model.First drive Dynamic apparatus structure is simple, is easily achieved.
In one of the embodiments, the described first flexible Power Component is cylinder or fluid cylinder, simple in construction, and is run It is reliable and stable;Cavity is set in the lever arm, the described first flexible Power Component is built in the cavity so that the cable is transported The mechanical arm of transfer device is compact-sized.
In one of the embodiments, the lever arm is articulated with the running gear, the second drive device bag The second flexible Power Component is included, one end of the described second flexible Power Component is articulated with the running gear, the other end and institute Lever arm is stated to be hinged.During the second flexible Power Component is flexible, lever arm will be driven around it between running gear Jointed shaft rotate, so as to realize the upset of lever arm, and then gripper is rapidly achieved or remote support face ( Face).The utility model is reasonable in design, ingenious, it is easy to accomplish.
In one of the embodiments, the described second flexible Power Component is cylinder or fluid cylinder, and its is simple in construction, is easy to pacify Dress, and stable and reliable operation.
In one of the embodiments, the lever arm is included close to the first linking arm of the running gear and close to institute The second linking arm of gripper is stated, first linking arm is connected with second linking arm and cooperatively forms angle.Pass through The bending structure that cooperatively forms of one linking arm and the second linking arm causes the lever arm can be promptly during overturning Reach at coil of cable.
In one of the embodiments, first fixture and second fixture are in finger-shaped, and when described first When fixture and second fixture close, first fixture and second fixture are arranged in a crossed manner so that coil of cable captures more It is firm to add.
The technical program additionally provides a kind of electric cable transporting equipment, including control module and above-mentioned electric cable transporting equipment Mechanical arm configuration and running gear, the running gear, the first driving means and second drive device are and institute State control module electric connection.
Electric cable transporting equipment described in the utility model embodiment, the direction of travel of running gear is controlled by control module And walking path etc., and the upset of controllable lever arm, the opening of gripper and closure etc. so that the electric cable transporting equipment is real Existing automatic intelligent.
In one of the embodiments, the running gear is caterpillar chassis, can be steady, fast using crawler travel Speed, safely pass through various complex road conditions.Because crawler bearing area is big, so increasing logical on soft, muddy road surface Ability is crossed, reduces sinkage.
In one of the embodiments, in addition to remote control, the remote control are electrically connected with the control module.This reality The remote control to the electric cable transporting equipment is realized by remote control with new, under the control of remote control complete walking, turn and The actions such as coil of cable crawl, release so that the equipment is easy to control.
Brief description of the drawings
Fig. 1 is the first state schematic diagram of the electric cable transporting equipment described in the utility model embodiment;
Fig. 2 is the second view of the electric cable transporting equipment described in the utility model embodiment;
Fig. 3 is the structural representation of the mechanical arm configuration described in the utility model embodiment.
Description of reference numerals:
100th, running gear, 200, mechanical arm configuration, 210, gripper, the 211, first fixture, 2111, connection end, 2112, Free end, the 212, second fixture, 213, accommodating cavity, 220, lever arm, the 221, first linking arm, 2211, first end, 2212, Two ends, the 222, second linking arm, 2221, cavity, the 230, second drive device, the 231, second flexible Power Component, 240, first Drive device, the 241, first flexible Power Component, 242, first connecting rod, 243, second connecting rod, 300, coil of cable, 310, center Axle.
Embodiment
It is below in conjunction with accompanying drawing and specifically real for the purpose of this utility model, technical scheme and advantage is more clearly understood Mode is applied, the utility model is described in further detail.It should be appreciated that embodiment described herein Only to explain the utility model, the scope of protection of the utility model is not limited.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly anchored to another On element or another element can also be fixed on by element placed in the middle.When an element be known as " connection " another Element, it can be directly to another element or can also be connected to another yuan by element placed in the middle Part.In addition, unless otherwise indicated, the otherwise description such as the term in specification " first " and " second " is used only for distinguishing specification In each component, element, step etc., without the logical relation or suitable being intended to indicate that between each component, element, step Order relation etc..
As depicted in figs. 1 and 2, the electric cable transporting equipment described in the utility model embodiment, including running gear 100, machine Tool arm configuration 200, control module (accompanying drawing is not shown) and power module (accompanying drawing is not shown).Mechanical arm configuration 200 is located at described On running gear 100, for loading or unloading coil of cable 300.The running gear 100 and the mechanical arm configuration 200 with The control module is electrically connected with.Electric connection can be wired connection or wireless connection.It is the control that the power module, which is used for, Molding block, the running gear 100 and the mechanical arm configuration 200 provide power supply.The power module can be institute in the equipment There is power unit power supply so that the equipment enters any working region all can normal work.The power module is battery Group, itself and the control module are integrated in running gear 100 so that the electric cable transporting device structure is simple, compact, will not The exterior space of equipment is taken, it is reasonable in design.It should be noted that the utility model also can according to be actually needed save it is above-mentioned Power module, by power line is set in the electric cable transporting equipment and access the power supply of operation field can also realize walking and Grab, the action of payout volume 300 etc..
Wherein, the mechanical arm configuration 200 of the electric cable transporting equipment specifically includes gripper 210, lever arm 220, first drives The dynamic drive device 230 of device 240 and second.One end of the lever arm 220 is movably arranged on running gear 100, the activity The other end of arm 220 is connected with the gripper 210.It should be noted that the lever arm 220 can be hinged located at running gear On 100, it can also slide up and down on running gear 100.Incorporated by reference to Fig. 3, the gripper 210 includes first be oppositely arranged The fixture 212 of fixture 211 and second, capable assembling formation and coil of cable between first fixture 211 and second fixture 212 300 (the wire spools and be set around the coiling that coil of cable 300 is sheathed on central shaft 310 including central shaft 310, rotatably Cable on disk) the accommodating cavity 213 that matches of the shape of central shaft 310.The first driving means 240 and the gripper 210 drive connections simultaneously are used to drive first fixture 211 and second fixture 212 to open or close.Second driving Device 230 is with the drive connection of lever arm 220 and for driving the movement of lever arm 220 so that the gripper 210 leans on Close or remote from the support face (generally ground or other placement platform faces) for being placed with the coil of cable 300.First driving Device 240 and second drive device 230 are electrically connected with the control module.
The operation principle of above-mentioned mechanical arm configuration 200 is illustrated below:Machinery described in the utility model embodiment Arm configuration 200, coil of cable 300 or release coil of cable 300 can be captured by first driving means 240 come control machine machinery claw 210.And And its second drive device 230 can drive lever arm 220 to move, the mobile route of lever arm 220 can be carried out according to being actually needed Setting, so that lever arm 220 can ensure that the gripper 210 of its end can be closer or far from placement during movement There is the support face of coil of cable 300.For example, during coil of cable 300 is loaded, lever arm 220 moves towards ground side so that Gripper 210 firmly grasps coil of cable 300 close to ground, as shown in Figure 1;Lever arm 220 is away from ground afterwards, for by coil of cable 300 lift, as shown in Figure 2.During coil of cable 300 is unloaded, lever arm 220 is again adjacent to ground, and gripper 210 is by electricity The release of cable volume 300, lever arm 220 is away from ground reset afterwards.The utility model can realize that cable loads the automation of work, The manpower consumption in cable loading or unloading process is reduced, effectively improves operating efficiency.The utility model have it is easy to use, The features such as mechanicalness is good and practical so that cable laying work can be implemented easily and fast.
Please continue to refer to Fig. 3, first fixture 211 and second fixture 212 are equipped with connection end 2111 and freedom End 2112.The connection end 2111 of first fixture 211 and second fixture 212 is articulated with the lever arm 220.Institute First driving means 240 are stated to be used for while drive first fixture 211 and second fixture 212 rotates, so that described the Mutually drawn close between the free end 2112 of one fixture 211 and second fixture 212 or remote.Specifically, when the first fixture 211 When mutually being drawn close with the free end 2112 of the second fixture 212, you can realize the crawl to coil of cable 300;When the He of the first fixture 211 When the free end 2112 of second fixture 212 is separated from each other, you can realize the release to coil of cable 300.Driven by described first Dynamic device 240 drives the first fixture 211 and the second fixture 212 to be rotated towards the outside of lever arm 220 or towards lever arm 220 simultaneously Inner side rotates, and realizes the quick crawl and release of coil of cable 300.The utility model is reasonable in design, ingenious, the letter of its structure It is single, be easy to make, cost it is relatively low.
It is worth noting that, the split when drawing close of free end 2112 of first fixture 211 and second fixture 212 The accommodating cavity 213 for capturing the central shaft 310 of coil of cable 300 is formed, i.e., described gripper 210 is used to capture in coil of cable 300 Central shaft 310 on.Because coil of cable 300 rotates in unwrapping wire and take-up around the central shaft 310, gripper 210 grips in After coil of cable 300 is lifted on central shaft 310, supporting and positioning device during 300 retractable cable of coil of cable is may act as, does not interfere with electricity The rotation of cable volume 300.It should be noted that gripper 210 also can be gripped in coil of cable 300 by the utility model according to being actually needed Other positions on, it is not necessary that be on central shaft 310, the coiling plate edge of such as coil of cable 300 is first-class.
In addition, first fixture 211 and second fixture 212 are in finger-shaped, also, in the He of the first fixture 211 When second fixture 212 is drawn close, first fixture 211 and second fixture 212 are arranged in a crossed manner so that coil of cable 300 captures It is more firm.
Please continue to refer to Fig. 3, the first driving means 240 include first connecting rod 242, second connecting rod 243 and first is stretched Contracting Power Component 241.One end of the first connecting rod 242 and first fixture 211 are be hinged, the first connecting rod 242 it is another One end and the movable end of the described first flexible Power Component 241 are hinged;One end of the second connecting rod 243 and second fixture 212 is be hinged, and the other end of the second connecting rod 243 is also hinged with the described first movable end for stretching Power Component 241.First stretches Contracting Power Component 241 drives the first fixture 211 by first connecting rod 242, and the second fixture is driven by second connecting rod 243 212.During the first flexible Power Component 241 is flexible first connecting rod 242 and second connecting rod 243 can be driven inclined simultaneously Turn, and then drive the first fixture 211 and the second fixture 212 to rotate.The utility model is effectively by the flexible of flexible Power Component The mobile rotation for being converted into the first fixture 211 and the second fixture 212.First driving means 240 are simple in construction for this, are easily achieved.
Described first flexible Power Component 241 is cylinder or fluid cylinder, simple in construction, and stable and reliable operation.
In the present embodiment, as depicted in figs. 1 and 2, the lever arm 220 is articulated with the running gear 100.It is described Second drive device 230 includes the second flexible Power Component 231, and one end of the described second flexible Power Component 231 is articulated with institute State on running gear 100, the other end is be hinged with first linking arm 221.In the process that the second flexible Power Component 231 is flexible In, lever arm 220 will be driven to be rotated around its jointed shaft between running gear 100, so as to realize turning over for lever arm 220 Turn.Second drive device 230 described in the utility model is reasonable in design, ingenious, it is easy to accomplish.Described second flexible power packages Part 231 is cylinder or fluid cylinder, and its is simple in construction, is easily installed, and stable and reliable operation.
Specifically, it is as shown in Figure 1 the first state of the mechanical arm configuration 200, in the lever arm 220 towards the one of ground During side to overturn, the gripper 210 crosses the running gear 100 and for capturing the coil of cable 300 on ground;Such as Fig. 2 show the second state of the mechanical arm configuration of the electric cable transporting equipment, in the lever arm 220 towards away from the side on ground During upset, the gripper 210 turns to the top of the running gear 100, for coil of cable 300 to be lifted.
Incorporated by reference to Fig. 3, the lever arm 220 is included close to the first linking arm 221 of the running gear 100 and close to institute State the second linking arm 222 of gripper 210.First linking arm 221 is fixedly connected and matched somebody with somebody with second linking arm 222 Conjunction forms angle.One bending structure lever arm is cooperatively formed by the first linking arm 221 and the second linking arm 222 Can promptly it be reached at coil of cable 300 during 220 upsets.When in running order after coil of cable 300 lifts, second Linking arm 222 is in erectility, and coil of cable 300 is erected, so as to facilitate coil of cable 300 to rotate folding and unfolding cable.Described first Angle is preferably obtuse angle between linking arm 221 and second linking arm 222, such as 120 degree of angles or 150 degree of angles, avoids first Connection forms sharp angle between the linking arm 222 of linking arm 221 and second, and sharp angle easily occurs stress concentration and showed As influenceing the service life of lever arm 220.
In the present embodiment, first linking arm 221 be provided with the first end 2211 that is connected with the running gear 100 and The second end 2212 being connected with second linking arm 222.The width of first linking arm 221 is along the first end 2211 Gradually increase towards the direction at second end 2212.Realized and the second linking arm by larger-size second end 2212 222 be fixedly connected, so as to ensure to be connected firmly between the first linking arm 221 and the second linking arm 222, prevents lever arm 220 Released during upset between the first linking arm 221 and the second linking arm 222.Meanwhile first linking arm 221 be designed to chi Very little grading structure, be advantageous to mitigate the weight of lever arm 220, also reduce the space-consuming of the first linking arm 221, be other structures Installation avoiding space.
In addition, setting cavity 2221 in second linking arm 222, the described first flexible Power Component 241 is built in described In cavity 2221 so that the mechanical arm configuration 200 is compact-sized.
In a preferred embodiment, it is provided with two mechanical arm configurations 200 in each electric cable transporting equipment, two Mechanical arm configuration 200 is used for the both ends for capturing the central shaft 310 of coil of cable 300.
Fig. 1 and Fig. 2 are referred to, running gear 100 described in the utility model embodiment is caterpillar chassis, using crawler belt row Walk, can steadily, it is rapid, safely pass through various complex road conditions.Because crawler bearing area is big, thus increase it is soft, Handling capacity on muddy road surface, reduces sinkage.It should be noted that in another embodiment, it can also use roller Mobile device replaces caterpillar chassis.
The utility model embodiment also includes remote control (accompanying drawing is not shown), and the remote control and the control module are wireless Communication connection.The utility model realizes the remote control to the electric cable transporting equipment by remote control, complete under the control of remote control Into actions such as walking, turning and coil of cable crawl, releases so that the equipment is easy to control.It should be noted that the remote control Wired connection mode can be also used between the control module.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.

Claims (10)

  1. A kind of 1. mechanical arm configuration of electric cable transporting equipment, it is characterised in that including:
    Lever arm, one end of the lever arm are movably arranged on the running gear of electric cable transporting equipment;
    Gripper, the gripper is located at the one end of the lever arm away from the running gear, and the gripper includes phase To the first fixture and the second fixture of setting, capable assembling is formed and coil of cable between first fixture and second fixture The accommodating cavity that center shape shaft matches;
    First driving means, the first driving means are with the gripper drive connection and for driving first fixture Open or close with second fixture;
    Second drive device, second drive device is with the lever arm drive connection and for driving the lever arm to move It is dynamic to cause the gripper closer or far from the support face for being placed with the coil of cable.
  2. 2. the mechanical arm configuration of electric cable transporting equipment according to claim 1, it is characterised in that first fixture and institute State the second fixture and be equipped with connection end and free end, the connection end of the connection end of first fixture and second fixture is cut with scissors It is connected on the lever arm, the first driving means are used to driving first fixture and second fixture to rotate simultaneously, So that mutually being drawn close between the free end of first fixture and the free end of second fixture or remote.
  3. 3. the mechanical arm configuration of electric cable transporting equipment according to claim 2, it is characterised in that the first driving means Including the flexible Power Component of first connecting rod, second connecting rod and first, one end of the first connecting rod is hinged with first fixture, The movable end of the other end of the first connecting rod and the described first flexible Power Component is hinged, one end of the second connecting rod and institute State the second fixture to be hinged, the other end of the second connecting rod is also hinged with the described first movable end for stretching Power Component.
  4. 4. the mechanical arm configuration of electric cable transporting equipment according to claim 3, it is characterised in that the described first flexible power Component is cylinder or fluid cylinder;Cavity is set in the lever arm, the described first flexible Power Component is built in the cavity.
  5. 5. the mechanical arm configuration of electric cable transporting equipment according to claim 1, it is characterised in that the lever arm is articulated with On the running gear, second drive device includes the second flexible Power Component, and the one of the described second flexible Power Component End is articulated with the running gear, and the other end is hinged with the lever arm.
  6. 6. the mechanical arm configuration of electric cable transporting equipment according to claim 5, it is characterised in that the described second flexible power Component is cylinder or fluid cylinder.
  7. 7. the mechanical arm configuration of electric cable transporting equipment according to claim 5, it is characterised in that the lever arm includes leaning on First linking arm of the nearly running gear and the second linking arm close to the gripper, first linking arm and described the Two linking arms connect and cooperatively form angle.
  8. 8. the mechanical arm configuration of electric cable transporting equipment according to any one of claim 1 to 7, it is characterised in that described First fixture and second fixture are in finger-shaped, and when first fixture and second fixture close, and described the One fixture and second fixture are arranged in a crossed manner.
  9. 9. a kind of electric cable transporting equipment, it is characterised in that including control module and as any one of claim 1 to 8 Mechanical arm configuration and running gear, the running gear, the first driving means and second drive device are and institute State control module electric connection.
  10. 10. electric cable transporting equipment according to claim 9, it is characterised in that also including remote control, the remote control and institute State control module electric connection;The running gear is caterpillar chassis.
CN201720624696.4U 2017-05-31 2017-05-31 Electric cable transporting equipment and its mechanical arm configuration Active CN206750931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720624696.4U CN206750931U (en) 2017-05-31 2017-05-31 Electric cable transporting equipment and its mechanical arm configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720624696.4U CN206750931U (en) 2017-05-31 2017-05-31 Electric cable transporting equipment and its mechanical arm configuration

Publications (1)

Publication Number Publication Date
CN206750931U true CN206750931U (en) 2017-12-15

Family

ID=60621561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720624696.4U Active CN206750931U (en) 2017-05-31 2017-05-31 Electric cable transporting equipment and its mechanical arm configuration

Country Status (1)

Country Link
CN (1) CN206750931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502654A (en) * 2018-03-15 2018-09-07 沧州华海风电设备科技技术开发有限公司 A kind of crawler belt collection cable car

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502654A (en) * 2018-03-15 2018-09-07 沧州华海风电设备科技技术开发有限公司 A kind of crawler belt collection cable car

Similar Documents

Publication Publication Date Title
CN106972420B (en) Cable laying equipment
CN106829298B (en) It is a kind of intelligently to become rail shuttle and Automatic Warehouse
CN209193466U (en) A kind of elevator with platform extension function
CN107221874B (en) A kind of vehicular with hanging wire unmanned plane independently upper coil inserting apparatus and method
CN205498712U (en) Robot movement system and flexible elevating gear thereof
JP2005527739A (en) Method for handling wind turbine blades, method for attaching said blades to a wind turbine, and system and gripping device for handling wind turbine blades
CN206878389U (en) Self-traveling cable laying equipment
CN205652368U (en) Unmanned vehicles for transportation
CN107196232B (en) A kind of hot line robot autonomous upper coil inserting apparatus of vehicular
CN206750931U (en) Electric cable transporting equipment and its mechanical arm configuration
CN112606732A (en) Battery replacement system
CN217048324U (en) Battery replacing device and battery replacing vehicle
CN113928203A (en) Trade trolley
CN205932443U (en) Self -balancing shaped steel conveyer for building
CN106976721A (en) Cable pick-and-place machinery arm configuration and electric cable transporting equipment
CN106869826A (en) A kind of new petroleum drill machine dynamic catwalk and its drilling tool stowage
CN106253147A (en) Vehicle-mounted box type Mobile cable hank device
CN207792534U (en) Suspension transferring machine
CN109678012A (en) Temporary ground wire stores trolley
CN109986527A (en) A kind of self-travel type space pickup crawl robot
JP7166145B2 (en) grapple device
CN108811736A (en) A kind of fruit picking device support fixture
CN212413887U (en) Hillside orchard double-cantilever telescopic picking machine
CN207328517U (en) Motor luggage car
CN209129553U (en) A kind of vehicle of drill pipe with drilling rod automatic loading and unloading function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200924

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TR01 Transfer of patent right