CN206737448U - Prefabricated post perpendicularity correction equipment - Google Patents

Prefabricated post perpendicularity correction equipment Download PDF

Info

Publication number
CN206737448U
CN206737448U CN201720577856.4U CN201720577856U CN206737448U CN 206737448 U CN206737448 U CN 206737448U CN 201720577856 U CN201720577856 U CN 201720577856U CN 206737448 U CN206737448 U CN 206737448U
Authority
CN
China
Prior art keywords
prefabricated post
cup
rim
pressing device
correction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720577856.4U
Other languages
Chinese (zh)
Inventor
田泽龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201720577856.4U priority Critical patent/CN206737448U/en
Application granted granted Critical
Publication of CN206737448U publication Critical patent/CN206737448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prefabricated post perpendicularity correction equipment of building engineering field, including the pressing device being arranged at prefabricated post installation rim of a cup, the pressing device includes multiple, and it is distributed in around rim of a cup, all pressing devices are in same level, for the press direction of the pressing device perpendicular to the center line of rim of a cup, the pressing device includes base and the press on base.The beneficial effects of the utility model are:By setting pressing device around the rim of a cup of prefabricated post, correction is finely adjusted to the prefabricated post for being put into rim of a cup using pressing device, chock is squeezed into after the completion of correction again to be consolidated, whole device is simple in construction, it can solve prefabricated post Correction Problemss, labor intensity is significantly reduced, improves correction efficiency and quality.

Description

Prefabricated post perpendicularity correction equipment
Technical field
It the utility model is related to building engineering field, more particularly to a kind of prefabricated post perpendicularity correction equipment.
Background technology
For some large-scale workshop buildings, prefabricated post bent structure is usually set up on the basis of elder generation, is then carried out again Roof and side plate are built.When carrying out the erection of prefabricated post bent structure, it is necessary first to excavate rim of a cup structure on the ground, then Precast concrete column is inserted in rim of a cup, finally consolidated., typically can not be disposable when prefabricated post is installed in rim of a cup , it is necessary to be corrected to perpendicularity, traditional prefabricated post correction is more to stir method using crowbar and beats chock method centring line, this Two methods labor intensity is big, error is big, and need to repeatedly correct, inefficient, wastes time and energy.Therefore, it is necessary to study one kind Prefabricated post perpendicularity correction equipment reduces labor intensity, and improves correction efficiency and quality.
Utility model content
To overcome the deficiencies such as existing prefabricated post perpendicularity correction correction method labor intensity is big, error is big, efficiency is low, this practicality is newly Type technical problem to be solved is:There is provided it is a kind of can reduce labor intensity, improve correction efficiency and quality prefabricated post it is vertical Spend means for correcting.
Technical scheme is used by the utility model solves its technical problem:Prefabricated post perpendicularity correction equipment, including The pressing device being arranged at prefabricated post installation rim of a cup, the pressing device are distributed in around rim of a cup including multiple, owned Pressing device is in same level, the center line of the press direction of the pressing device perpendicular to rim of a cup.
It is further that the pressing device includes five, and rim of a cup long side direction both sides are respectively provided with two, short side direction one Centrally disposed one of side.
It is further that the pressing device includes base and the press on base.
It is further that the front end of the base is provided with buckle structure, is stuck in by buckle structure on the inwall of rim of a cup real Now position.
It is further that the press is fly press, hydraulic press or jack.
It is further, in addition to chock, the chock are located at rim of a cup long side direction both sides, and two chocks are squeezed into per side, Chock is squeezed into after prefabricated post completes correction.
The beneficial effects of the utility model are:By setting pressing device around the rim of a cup of prefabricated post, filled using pushing Put and correction is finely adjusted to the prefabricated post for being put into rim of a cup, squeeze into chock after the completion of correction again and consolidated, the letter of whole device structure It is single, prefabricated post Correction Problemss are can solve, significantly reduce labor intensity, improve correction efficiency and quality.
Brief description of the drawings
Fig. 1 is the utility model structure top view.
Fig. 2 is the utility model structural front view.
It is 1- prefabricated posts to be marked in figure, 2- rims of a cup, 3- pressing devices, 4- chocks, 31- bases, 32- press, 33- buckles Structure.
Embodiment
The utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the utility model includes being arranged on the pressing device 3 at the installation rim of a cup 2 of prefabricated post 1, described Pressing device 3 is distributed in around rim of a cup 2 including multiple, and all pressing devices 3 are in same level, described to push away Center line of the press direction of pressure device 3 perpendicular to rim of a cup 2.It is of the present utility model to be using process:First with boom hoisting Prefabricated post 1 is fallen into rim of a cup 2, and by crowbar switch, its center line is tried one's best and is aligned with the center line of rim of a cup 2, if Pillar is too near from rim of a cup side, and crane can be allowed to hook up or pivoted arm, move pillar, and pressing device is then set up around rim of a cup 2 3, and perpendicularity inspection is carried out to prefabricated post 2, finally according to inspection result, start each pressing device 3, prefabricated post 1 is carried out micro- Adjust, until pillar is in plumbness.
According to actual use situation, the pressing device 3 sets five, and the wherein long side direction both sides of rim of a cup 2 are respectively set There are two, centrally disposed one of short side direction side.
Pressing device 3 can use the hydraulic means that digitlization accurately controls, but practicality is not high, can use simple bottom Seat 31 and the press 32 on base 31 can be achieved.The front end of the base 31 is provided with buckle structure 33, is being pushed away It can be stuck in during the erection of pressure device 3 by buckle structure 33 on the inwall of rim of a cup 2 and realize positioning, it is convenient and swift.The press 32 Fly press, hydraulic press or jack can be used, manual jack flexible adjustment, is optimal selection.
, it is necessary to which prefabricated post 1 is fixed after the completion of the correction work of prefabricated post 1, the utility model using Two chocks 4 are squeezed into the both sides of the long side direction of rim of a cup 2 respectively, prefabricated post 1 are clamped in rim of a cup 2 using chock 4, band, which unloads, to be pushed away After pressure device 3, then concreting is carried out, complete the erection of prefabricated post.
The utility model is simple in construction, can solve prefabricated post Correction Problemss, significantly reduces labor intensity, improves Correction efficiency and quality, have good practicality and an application prospect.

Claims (6)

1. prefabricated post perpendicularity correction equipment, it is characterized in that:Including the pushing at rim of a cup (2) place for being arranged on installation prefabricated post (1) Device (3), the pressing device (3) are distributed in around rim of a cup (2) including multiple, and all pressing devices (3) are in together On one horizontal plane, the center line of the press direction of the pressing device (3) perpendicular to rim of a cup (2).
2. prefabricated post perpendicularity correction equipment as claimed in claim 1, it is characterized in that:The pressing device (3) includes five, Rim of a cup (2) long side direction both sides are respectively provided with two, centrally disposed one of short side direction side.
3. prefabricated post perpendicularity correction equipment as claimed in claim 2, it is characterized in that:The pressing device (3) includes base (31) press (32) and on base (31).
4. prefabricated post perpendicularity correction equipment as claimed in claim 3, it is characterized in that:The front end of the base (31) is provided with card Buckle structure (33), it is stuck in by buckle structure (33) on the inwall of rim of a cup (2) and realizes positioning.
5. the prefabricated post perpendicularity correction equipment as described in claim 1,2,3 or 4, it is characterized in that:The press (32) is spiral shell Spinning machine, hydraulic press or jack.
6. prefabricated post perpendicularity correction equipment as claimed in claim 5, it is characterized in that:Also include chock (4), the chock (4) it is located at rim of a cup (2) long side direction both sides, two chocks (4) is squeezed into per side, chock (4) is beaten after prefabricated post (1) completes correction Enter.
CN201720577856.4U 2017-05-22 2017-05-22 Prefabricated post perpendicularity correction equipment Active CN206737448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720577856.4U CN206737448U (en) 2017-05-22 2017-05-22 Prefabricated post perpendicularity correction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720577856.4U CN206737448U (en) 2017-05-22 2017-05-22 Prefabricated post perpendicularity correction equipment

Publications (1)

Publication Number Publication Date
CN206737448U true CN206737448U (en) 2017-12-12

Family

ID=60567700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720577856.4U Active CN206737448U (en) 2017-05-22 2017-05-22 Prefabricated post perpendicularity correction equipment

Country Status (1)

Country Link
CN (1) CN206737448U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984590A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Prefabricated column positioning device and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984590A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Prefabricated column positioning device and installation method
CN110984590B (en) * 2019-11-29 2024-04-26 中国二十二冶集团有限公司 Prefabricated column installation method

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN205231660U (en) Fixing device of pre -buried electric terminal box of wall body
CN206737448U (en) Prefabricated post perpendicularity correction equipment
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN104762967A (en) Improved anchor rod static pressure pile sealing device and construction method
CN207567784U (en) Deep basal pit combined type supporting
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN211597710U (en) A adjustable shore structure of complete set for post-cast strip construction
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN211691524U (en) Prefabricated post positioner
CN209816838U (en) A construction platform for pouring bored concrete pile concrete
CN206769413U (en) A kind of new fixing device that can integrally lift assembling reinforcement
CN201546371U (en) Bundled non-bonded prestressed rib anchorage system for large-diameter silo
CN105421861A (en) Electricity grid telegraph pole erecting device and construction method
CN207727446U (en) A kind of Hanging Basket inner membrance slide device
CN207464037U (en) Stent producing device placed in the middle
CN214657193U (en) Splicing device of precast concrete foundation for tower crane
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN216586547U (en) Pile driving auxiliary device in building construction process
CN212052839U (en) Building pile
CN211007945U (en) Building engineering protection network is with consolidating stable structure
CN216360902U (en) Reinforcing apparatus of unilateral formwork
CN211333761U (en) Mould knocking structure convenient for removing mould
CN116950116B (en) Communication tower pre-buried connecting piece and pipe bolt basis
CN220035491U (en) Cup rim foundation form steel column installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant