CN206727564U - Crane span structure attachment structure - Google Patents

Crane span structure attachment structure Download PDF

Info

Publication number
CN206727564U
CN206727564U CN201621160365.1U CN201621160365U CN206727564U CN 206727564 U CN206727564 U CN 206727564U CN 201621160365 U CN201621160365 U CN 201621160365U CN 206727564 U CN206727564 U CN 206727564U
Authority
CN
China
Prior art keywords
connecting plate
crane span
span structure
arc
arc hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621160365.1U
Other languages
Chinese (zh)
Inventor
尚新春
孙保建
王玉玲
郭梁才
李成行
王轲
周旭恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUCHANG MEETALL CABLE TRAY CO Ltd
Original Assignee
XUCHANG MEETALL CABLE TRAY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG MEETALL CABLE TRAY CO Ltd filed Critical XUCHANG MEETALL CABLE TRAY CO Ltd
Priority to CN201621160365.1U priority Critical patent/CN206727564U/en
Application granted granted Critical
Publication of CN206727564U publication Critical patent/CN206727564U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of crane span structure attachment structure, including the first connecting plate and the second connecting plate, the first described connecting plate is provided with two upper interface arrangments and two lower interface arrangments, the upper end for being placed in the first described connecting plate at described two upper interface arrangment intervals, described two lower interface arrangments are placed in the lower end both sides of the first described connecting plate;The upper end of the second described connecting plate is provided with the mounting hole being engaged with described two upper interface arrangments, and lower end is provided with the arc fold bending structure being engaged with described lower interface arrangment.The technical solution adopted in the utility model, realize that the non-bolt of crane span structure quickly clamps on the basis of crane span structure bearing capacity is met, improve installation effectiveness more than 5 times.

Description

Crane span structure attachment structure
Technical field
The invention belongs to field of machining, more particularly, to a kind of crane span structure attachment structure.
Background technology
Traditional cable crane span structure when mounted, is fixed between section and section by the connecting plate of termination both sides, and every connecting plate needs 6~8 sets of connecting bolts are wanted, then each connection end needs 12~16 sets of connecting bolts to fix.Installation effectiveness is low, causes engineering Installation progress seriously lags.
Connecting bolt shared quantity in whole engineering material doses is larger, and surface treatment general in industry at present is general For plating, the surface treatment with crane span structure body seriously mismatches.Surface treatment is generally plastic-spraying or heat in cable testing bridge peace engineering Zinc is soaked, service life is not less than 40 years.And vital part of the bolt as connection crane span structure, its service life of the anticorrosive coat of its plating No more than 15 years, especially the life-span can be lower in a humid environment.Traditional solution has two kinds, and one kind is periodic replacement spiral shell Bolt, another kind are to use special bolt, improve the service life of bolt.The first solve solution in service life extremely Needing to change 3 bolts less, maintenance cost is high, in-convenience in use;Second of solution needs to improve the material of bolt, initial stage Put into larger, construction cost height.
The content of the invention
It is an object of the present invention to provide a kind of crane span structure attachment structure, reduces maintenance cost.
To achieve the above object, the technical solution adopted by the present invention is:Crane span structure attachment structure, including crane span structure and connecting plate, Described crane span structure is at least 2, and the both ends of crane span structure are respectively equipped with fixing hole;Described connecting plate is connected by the first connecting plate and second Fishplate bar is formed, and the first described connecting plate is provided with two upper interface arrangments and two lower interface arrangments, described two upper cards Connect the upper end for being placed in the first connecting plate of spacing structure, described two lower interface arrangments are placed in the first described connecting plate Lower end both sides;The upper end of the second described connecting plate is provided with the mounting hole being engaged with described two upper interface arrangments, lower end Provided with the arc fold bending structure being engaged with described lower interface arrangment;The first described connecting plate is placed on the inside of crane span structure, described The second connecting plate be placed on the outside of described crane span structure;Described upper interface arrangment is worn through mounting hole buckles into described mounting hole It is interior;Described arc fold bending structure is placed in described lower interface arrangment.
The technical solution adopted by the present invention, on the basis of crane span structure bearing capacity is met, realize the non-bolt rapid card of crane span structure Dress, more than 5 times of installation effectiveness is improved, and maintenance cost is low, crane span structure engineering whole service life length.
Further, the first described connecting plate is provided with spill muscle face, and described two upper interface arrangments are placed in spill The upper end in muscle face, described two lower interface arrangments are placed in the lower end both sides in described spill muscle face.
Transition arc caused by upper and lower two pairs of interface arrangments shaping is located in the cavity of spill muscle, when being assembled with crane span structure It can ensure that the first connecting plate is bonded with perfect on the inside of crane span structure.
Further, described upper interface arrangment is the upper arc hook that Open Side Down, and described lower interface arrangment is opening Upward lower arc hook;Described upper arc hook and lower arc hook are made by mould punching stretching, the draw direction with it is described Spill muscle face it is in opposite direction.
The punching press spill muscle face on the first connecting plate, arc hook is made along the stretching of spill muscle face direction on spill muscle face, Improve the intensity of the first connecting plate, it is possible to reduce the thickness of connecting plate, reduce the deadweight of attachment means.
Further, described upper arc hook is provided with symmetrical neck, and described mounting hole is convex mouth, the convex mouth Upper end be engaged with described neck;The shape one of the fixing hole of upper end on described bridge ladder side and described convex mouth Cause.
Neck convex structure of mounting hole, crane span structure attachment means can be effectively improved in the convenience of construction and fixed firm Property.
Further, the both sides of the second described connecting plate are respectively equipped with perpendicular to the convex of the second connecting plate length direction Bag shape reinforcement, upper end are provided with arc fold bending, and the direction of described arc fold bending and the direction of described convex hull-shaped reinforcement are hung down Directly.
Convex hull-shaped reinforcement together constitutes the reinforcement structure of the second connecting plate with arc fold bending, improves the second connecting plate Intensity.
Further, the transition position of described upper arc hook is provided with circular adjustment hole.
Circular adjustment hole adjusts the interior, cooperation position of the second connecting plate, and the second connecting plate of auxiliary in construction and installation Installation.
Brief description of the drawings
Fig. 1, the first connecting board structure schematic diagram;
Fig. 2, the second connecting board structure schematic diagram;
Fig. 3, portal structure schematic diagram;
Fig. 4, crane span structure attachment structure schematic diagram.
Embodiment
As Figure 1-Figure 4, crane span structure attachment structure, including the first connecting plate 1, the second connecting plate 2 and crane span structure 10.Described It is convex hole 12 that, which there is upside crane span structure end, and downside is the connecting plate of slot 11, after crane span structure docks two-by-two, the He of convex hole 12 Slot 11 coordinates respectively at the arc hook 4 of the first connecting plate 1 and arc hook 5.
The first described connecting plate 1 is provided with two upper interface arrangments and two lower interface arrangments.In embodiment, in order to The intensity of attachment means is improved, spill muscle face can be suppressed with mould on the first connecting plate, at spill muscle face upper end interval Negative drawing goes out two arc hooks that Open Side Down 4, and upper arc hook is provided with circular adjustment hole;In the lower end both sides in spill muscle face The arc hook 5 of each stretched opening upwards.It is interval with the upper end of the second connecting plate 2 and arc hook on described two The mounting hole being engaged.In actual use in order to which clamping is firm, it is respectively equipped with two of the first connecting plate 1 on arc hook Neck, the upper end size in the installation convex hole 6 on the upside of crane span structure end on convex hole 12 and the second connecting plate 2 and described neck Size is consistent, and the arc fold bending structure being engaged with the arc hook 5 of described opening upwards is provided with the lower end of the second connecting plate 2 7。
In order to improve the intensity of the second connecting plate 2, arc fold bending 8 is provided with along its length in the upper end of the second connecting plate 2, The convex hull-shaped reinforcement 9 perpendicular to the length direction of the second connecting plate 2, the convex hull-shaped are provided with the both sides of the second connecting plate 2 Reinforcement 9 is vertical with the direction of described V-arrangement bending 8, arc fold bending 7, effectively raises the overall strong of the second connecting plate 2 Degree.
As shown in figure 4, the installation process of the present invention is to be alignd two-by-two in crane span structure 10, the first connecting plate 1 is tilted into insertion On the inside of crane span structure, arc hook passes through from crane span structure hole 11,12, and the neck of 1 arc hook of the first connecting plate 4 is placed in the convex hole 12 of crane span structure 10 Between both wings, the first connecting plate 1 is set to be adjacent to crane span structure medial surface;In the lateral surface of crane span structure 10, by the second connecting plate 2 tilt 15 °- 45 °, specified location is penetrated from the arc hook of the first connecting plate opening upwards, the projecting apertures position pair on convex hole site and crane span structure Qi Shi, rotate the second connecting plate 2, until the inner plane of the second connecting plate 2 and crane span structure outside be bonded, 4 convex holes of the second connecting plate Both wings are sticked into the neck of the upper arc hook of the first connecting plate 1, complete to clamp.
The operation principle of the present invention is as follows:
First, the height of the arc fold bending of the lower end of the second connecting plate 2 is more than the first connecting plate 1 and dehisced with crane span structure assembling rear side Chamber size in formula arc hook, then the lower end circular arc bending of the second connecting plate 2 can smoothly tilt what the first connecting plate 1 of insertion was dehisced upwards In arc hook, crane span structure can be progressively clamped in the rotary course of the second connecting plate 2, this process utilizes the rigidity of steel itself, opens upwards The steel construction of the arc hook of mouth has preferably elasticity and tensile strength.It is more convenient for firm grip crane span structure, because under the second connecting plate 2 The center of side circular arc bending is in outside, and the power for giving the second connecting plate 2 to provide a larger despining.
2nd, the ultimate range of the both wings of the upside projecting apertures of the second connecting plate 2 and downside arc hook is less than circle on the first connecting plate The upper plane of arc hook and the distance of downside open mouth type arc hook inner plane, so the second connecting plate 2, in rotation process, upside is convex The track rotation of upside arc hook outer surface of the both wings in hole along the first connecting plate 1, because the upper arc hook of the first connecting plate Rigidity be far longer than downside open mouth type circular arc hook structure elasticity, then pulled in rotation process whole second connecting plate 2 to Upper movement, the elastic deformation of the first connecting plate open mouth type arc hook increase to maximum.Projecting apertures both wings on the upside of the second connecting plate turn When moving to the upper arc hook neck of the first connecting plate 1, the rigidity disappearance of the upside arc hook of the first connecting plate, downside open mouth type circle Arc uncinate gyrus bullet pulls the second connecting plate integrally to move down, and enters the first connecting plate so as to the upside projecting apertures both wings of the second connecting plate Upside arc hook neck in, and the complete clamping of overall structure is made by despining power.
The scheme that the present invention uses, it is first, second connecting plate, by structure design, is meeting crane span structure bearing capacity basis On realize that the non-bolt of crane span structure quickly clamps, improve more than 5 times of installation effectiveness.Avoid the use of bolt, reduce project into This.
First connecting plate:Mould suppress matrix muscle, for increase connecting plate self-strength (matrix muscle also has an effect, Concave bar face and arc hook are reverse, so can effectively avoid the transition arc of arc hook and base surface, make the first connection Plate is preferably adjacent to bridge ladder side.), upper and lower each two arc hooks of concave bar face negative drawing arc hook.Arc hook is upper on wherein Plane sets two symmetrical necks, and arc hook transition position sets technique circular hole, and lower arc hook is open mouth type, and circular hole rises when mounted Booster action.
Second connecting plate:Upper end is adopted as arc fold bending, for increasing connecting plate longitudinal strength, naturally it is also possible to using it The muscle of his shape;Projecting apertures coordinates with upper arc hook to be clamped;Convex closure is used to increase connecting plate transverse strength, the circular arc bending of lower end with Lower arc hook coordinates, clamping crane span structure, and increases for increasing connecting plate longitudinal strength.
Scheme provided by the invention, the construction of each field crane span structure is widely suitable for, does not use connecting bolt.Have following Some advantage:1. directly saving bolt cost, 2. connecting plates are consistent with crane span structure body anti-corrosion, and increase crane span structure entirety uses the longevity Life, 3. installations are quick, save human cost.4. improve project installation progress.
Upper and lower arc hook stretches out face and is adjacent to crane span structure on the inside of crane span structure, so as to upper and lower arc hook being vertically connected with through crane span structure Hole, arc neck is placed on the upside of crane span structure between the both wings of convex hole on the first connecting plate, prevents the first connecting plate double swerve;Enter one It is adjacent on first connecting plate of step above arc hook above the convex type hole of crane span structure, circular arc lower plane is adjacent to crane span structure under the first connecting plate Lower slot is following, prevents the first connecting plate from teetertottering;Realize the spacing of crane span structure and crane span structure.
(3) second connecting plates tilt the downside arc hook that the first connecting plate of insertion stretches out crane span structure on the outside of crane span structure, and arrival refers to When positioning is put and (alignd with crane span structure convex in the second connecting plate convex hole), by the tight connecting plate of inner side first, the second connection is then rotated Plate, the second connecting plate convex hole both wings is entered on the upside of the first connecting plate in arc hook neck, complete installation.

Claims (6)

1. a kind of crane span structure attachment structure, including crane span structure and connecting plate, described crane span structure is at least 2, and the both ends of crane span structure are set respectively There is mounting hole;Described connecting plate is made up of the first connecting plate and the second connecting plate, and the first described connecting plate is provided with two Upper interface arrangment and two lower interface arrangments, the upper end for being placed in the first connecting plate at described two upper interface arrangment intervals, institute The two lower interface arrangments stated are placed in the lower end both sides of the first described connecting plate;The upper end of the second described connecting plate is provided with The fixing hole being engaged with described two upper interface arrangments, lower end are provided with the arc fold bending being engaged with described lower interface arrangment Structure;The first described connecting plate is placed on the inside of crane span structure, and the second described connecting plate is placed on the outside of described crane span structure;Described is upper Interface arrangment is worn through mounting hole to be buckled into described mounting hole;Described arc fold bending structure is placed in described lower interface arrangment In.
2. according to the crane span structure attachment structure described in claim 1, it is characterised in that the first described connecting plate is provided with spill muscle Face, described two upper interface arrangments are placed in the upper end in spill muscle face, and described two lower interface arrangments are placed in described recessed The lower end both sides in shape muscle face.
3. according to the crane span structure attachment structure described in claim 2, it is characterised in that described upper interface arrangment is what Open Side Down Upper arc hook, described lower interface arrangment are the lower arc hook of opening upwards;Described upper arc hook is with lower arc hook by mould Tool punching stretch is made, and the draw direction is in opposite direction with described spill muscle face.
4. according to the crane span structure attachment structure described in claim 3, it is characterised in that described upper arc hook is provided with symmetrical card Groove, described mounting hole are convex mouth, and the upper end of the convex mouth is engaged with described neck.
5. according to the crane span structure attachment structure described in claim 4, it is characterised in that the both sides of the second described connecting plate are set respectively There is the convex hull-shaped reinforcement perpendicular to the second connecting plate length direction, top and bottom are provided with arc fold bending, described arc The direction of bending is vertical with the direction of described convex hull-shaped reinforcement.
6. according to the crane span structure attachment structure any one of claim 1-5, it is characterised in that the mistake of described upper arc hook The place of crossing is provided with circular adjustment hole.
CN201621160365.1U 2016-11-01 2016-11-01 Crane span structure attachment structure Expired - Fee Related CN206727564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621160365.1U CN206727564U (en) 2016-11-01 2016-11-01 Crane span structure attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621160365.1U CN206727564U (en) 2016-11-01 2016-11-01 Crane span structure attachment structure

Publications (1)

Publication Number Publication Date
CN206727564U true CN206727564U (en) 2017-12-08

Family

ID=60499612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621160365.1U Expired - Fee Related CN206727564U (en) 2016-11-01 2016-11-01 Crane span structure attachment structure

Country Status (1)

Country Link
CN (1) CN206727564U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107181215A (en) * 2016-11-01 2017-09-19 许昌美特桥架股份有限公司 Crane span structure attachment structure and the installation method using the structure
CN110061464A (en) * 2019-05-30 2019-07-26 海南金博桥架母线设备有限公司 A kind of cable testing bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107181215A (en) * 2016-11-01 2017-09-19 许昌美特桥架股份有限公司 Crane span structure attachment structure and the installation method using the structure
CN107181215B (en) * 2016-11-01 2019-07-30 许昌美特桥架股份有限公司 Gantry connection structure and the installation method for using the structure
CN110061464A (en) * 2019-05-30 2019-07-26 海南金博桥架母线设备有限公司 A kind of cable testing bridge

Similar Documents

Publication Publication Date Title
CN206727564U (en) Crane span structure attachment structure
CN107181215A (en) Crane span structure attachment structure and the installation method using the structure
CN207308643U (en) A kind of cold-formed mould of hyperboloid
CN206727563U (en) Crane span structure attachment means
CN206225126U (en) A kind of device for strengthening transformer stability
CN206783062U (en) A kind of light elevator solid guide rail
CN207511227U (en) Multi-functional conveyer belt
CN207266999U (en) A kind of sheet metal component, tube body one Bending Mould
CN208844365U (en) A kind of track type intelligent inspection robot track turn structure
CN207416984U (en) A kind of heavy truck kuppe mounting bracket
CN205918094U (en) Lock joint formula template
CN207941845U (en) The square washer progressive die
CN204018549U (en) A kind of for the stretching module in the progressive die
CN203514596U (en) Arched support for supporting factory roof
CN206229908U (en) A kind of aluminium alloy bone row and the bending machine die of edge sealing
CN202356464U (en) Arc-shaped steel pipe correcting device
CN202328551U (en) Installing structure for middle separation plate
CN207290419U (en) A kind of mould right-angle connector
CN209369340U (en) A kind of crossbeam mental section
CN205807323U (en) A kind of aluminium alloy punching press base
CN208734720U (en) One kind being fastenedly connected support assembling stand
CN209943753U (en) Conversion flange
CN219786115U (en) Bending machine for door plate bending processing
CN207043760U (en) A kind of grip device of lathe process groove profile wedged bottom thin-walled mechanical part
CN211124210U (en) Bracelet positioning jig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20211101