CN206722211U - A kind of construction steel structure assembled wallboard - Google Patents

A kind of construction steel structure assembled wallboard Download PDF

Info

Publication number
CN206722211U
CN206722211U CN201720506773.6U CN201720506773U CN206722211U CN 206722211 U CN206722211 U CN 206722211U CN 201720506773 U CN201720506773 U CN 201720506773U CN 206722211 U CN206722211 U CN 206722211U
Authority
CN
China
Prior art keywords
main body
reinforcing bar
wallboard main
steel plate
fixing connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720506773.6U
Other languages
Chinese (zh)
Inventor
华飞燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720506773.6U priority Critical patent/CN206722211U/en
Application granted granted Critical
Publication of CN206722211U publication Critical patent/CN206722211U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of construction steel structure assembled wallboard; including fixing connection steel plate; the fixing connection steel plate is connected by welding with reinforcing bar wallboard main body; and bolt connecting hole is machined with by drill bit on fixing connection steel plate; the inside of the reinforcing bar wallboard main body is connected by welding with reinforced steel; the inside of the reinforcing bar wallboard main body is filled with fill concrete; the front and rear sides of the reinforcing bar wallboard main body are connected by fastening bolt with protection rubber blanket, and the both ends of the protection clamp are equipped with buckle fixed strip.The construction steel structure assembled wallboard, which is provided with reinforced steel, to be played reinforcing bar wallboard main body is reinforced; prevent reinforcing bar wallboard main body because environmental factors deform; fill concrete is set to further increase the intensity of reinforcing bar wallboard main body; set protection rubber blanket to mitigate human body to building the shock degree of metope, and protect rubber blanket that also there is certain protective effect to reinforcing bar wallboard main body.

Description

A kind of construction steel structure assembled wallboard
Technical field
Technical field of buildings is the utility model is related to, specially a kind of construction steel structure assembled wallboard.
Background technology
With the increasingly raising of living standard, people for house and do utilities building demand it is increasing, at present, steel Structure building body turns into the main flow of modern architecture industry, and for steel construction building body in building, Side fascia installation typically uses assembled, Assemble in Side fascia installation process, general external wall of high-rise building plate nailing installation, when nailing is installed, it is necessary to install hanging basket or take If scaffold, substantial amounts of human and material resources and financial resources are consumed, nailing bonding strength is poor, Side fascia easily occurs and the feelings such as comes off The generation of condition, casualties is in turn resulted in, while high-altitude installation has certain danger to workmen.
Utility model content
The purpose of this utility model is to provide a kind of construction steel structure assembled wallboard, to solve in above-mentioned background technology For the existing steel-structure external wallboard proposed using nailing installation, nailing bonding strength is poor, Side fascia easily occurs and the feelings such as comes off The generation of condition, casualties is in turn resulted in, while high-altitude installation has the problem of certain danger to workmen.
To achieve the above object, the utility model provides following technical scheme:A kind of construction steel structure assembled wallboard, bag Fixing connection steel plate is included, the fixing connection steel plate is connected by welding with reinforcing bar wallboard main body, and on fixing connection steel plate Bolt connecting hole is machined with by drill bit, the inside of the reinforcing bar wallboard main body is connected by welding with reinforced steel, described The inside of reinforcing bar wallboard main body is filled with fill concrete, and the upper right of reinforcing bar wallboard main body is connected with concreting mouth Connect, the front and rear sides of the reinforcing bar wallboard main body are connected by fastening bolt with protection rubber blanket, and reinforcing bar wallboard main body Junction be provided with protection clamp, the both ends of the protection clamp are equipped with buckle fixed strip.
Preferably, the fixing connection steel plate is provided with four, and the rectangular distributed architecture of fixing connection steel plate altogether.
Preferably, the reinforcing bar wallboard main body is using reinforced steel as zhou duicheng tuxing, and reinforcing bar wallboard body shape is four Side shape structure.
Preferably, the reinforced steel is network structure, and reinforced steel forms groined type structure.
Preferably, the protection rubber blanket is solid construction, and the thickness of protection rubber blanket is 10-20mm.
Compared with prior art, the beneficial effects of the utility model are:The construction steel structure assembled wallboard is provided with solid Determine junction steel plate, reinforcing bar wallboard main body can be fixedly connected by fixing connection steel plate, reinforcing bar wallboard main body is formed entirety Metope, set bolt connecting hole that fastening bolt can be made to be fixedly connected two fixing connection steel plates, reinforcing bar wallboard master is set Body plays a part of forming building wall, sets reinforced steel to play and reinforcing bar wallboard main body is reinforced, prevent reinforcing bar wallboard Main body is because environmental factors deform, and then the personal safety to surrounding population impacts, and sets fill concrete further The intensity of reinforcing bar wallboard main body is improved, makes the metope of construction safer, sets concreting mouth can be easily to reinforcing bar Wallboard body interior carries out pouring for concrete, sets protection rubber blanket to mitigate shock degree of the human body to construction metope, and And protection rubber blanket also has certain protective effect to reinforcing bar wallboard main body, protection clamp is set to play to reinforcing bar wallboard main body Junction carries out protection covering, also functions to certain beauty function, sets buckle fixed strip to play a part of fixed protection clamp.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model side structure schematic diagram;
Fig. 3 is the utility model overlooking the structure diagram;
Fig. 4 is the utility model front partial structural diagram;
Fig. 5 is the utility model protection card plate structure schematic diagram.
In figure:1st, fixing connection steel plate, 2, bolt connecting hole, 3, reinforcing bar wallboard main body, 4, reinforced steel, 5, filling coagulation Soil, 6, fastening bolt, 7, concreting mouth, 8, protection rubber blanket, 9, protection clamp, 10, buckle fixed strip.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:A kind of construction steel structure assembled wallboard, including Fixing connection steel plate 1, fixing connection steel plate 1 are connected by welding with reinforcing bar wallboard main body 3, and are led on fixing connection steel plate 1 Cross drill bit and be machined with bolt connecting hole 2, fixing connection steel plate 1 is provided with four, and 1 rectangular distribution of fixing connection steel plate altogether Structure, set fixing connection steel plate 1 to be fixedly connected reinforcing bar wallboard main body 3, form reinforcing bar wallboard main body 3 overall Metope, reinforcing bar wallboard main body 3 is zhou duicheng tuxing with reinforced steel 4, and reinforcing bar wallboard main body 3 is shaped as quadrilateral structure, if Put reinforcing bar wallboard main body 3 to play a part of forming building wall, the inside of reinforcing bar wallboard main body 3 passes through welding and reinforced steel 4 It is connected, reinforced steel 4 is network structure, and reinforced steel 4 forms groined type structure, sets reinforced steel 4 to play to reinforcing bar Wallboard main body 3 is reinforced, and prevents reinforcing bar wallboard main body 3 because environmental factors deform, and then the person of surrounding population is pacified The effect impacted entirely, the inside of reinforcing bar wallboard main body 3 is filled with fill concrete 5, and the top of reinforcing bar wallboard main body 3 is right Side is connected with concreting mouth 7, and the front and rear sides of reinforcing bar wallboard main body 3 are by fastening bolt 6 with protecting the phase of rubber blanket 8 Connection, protection rubber blanket 8 is solid construction, and the thickness of protection rubber blanket 8 is 10-20mm, sets protection rubber blanket 8 to play and subtracts Light human body protects rubber blanket 8 also to there is certain protection to make reinforcing bar wallboard main body 3 to building the shock degree of metope With, and the junction of reinforcing bar wallboard main body 3 is provided with protection clamp 9, the both ends of protection clamp 9 are equipped with buckle fixed strip 10.
Operation principle:When using the construction steel structure assembled wallboard, fixing connection steel plate 1 can by fastening bolt 6 Reinforcing bar wallboard main body 3 is connected into a complete metope, being bolted hole 2 makes the location and installation of fastening bolt 6, passes through steel Muscle wallboard main body 3 forms the agent structure of building wall, and the intensity of reinforcing bar wallboard main body 3 is strengthened by reinforced steel 4, Prevent reinforcing bar wallboard main body 3 from deforming upon, and then the personal safety to surrounding population damages, fill concrete 5 can enter one Walk and the intensity of reinforcing bar wallboard main body 3 is reinforced, make the metope more secure being built into, pass through concreting mouth 7 It can be the inside addition concrete of reinforcing bar wallboard main body 3, by protecting rubber blanket 8 to protect reinforcing bar wallboard main body 3, and protect Protect rubber blanket 8 and hit metope prevented also from surrounding population, so as to mitigate the extent of injury caused by pedestrian impact metope, protection card Plate 9 can be protected to the junction for building up metope, and protect clamp 9 to play certain beauty function, and buckle fixed strip 10 can Protection clamp 9 is fixed, the above is the use process of this construction steel structure assembled wallboard.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent substitution, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., all should Within the scope of protection of the utility model.

Claims (5)

1. a kind of construction steel structure assembled wallboard, including fixing connection steel plate (1), it is characterised in that:It is described to be fixedly connected with steel Plate (1) is connected by welding with reinforcing bar wallboard main body (3), and is machined with bolt by drill bit on fixing connection steel plate (1) and is connected Hole (2) is connect, the inside of the reinforcing bar wallboard main body (3) is connected by welding with reinforced steel (4), the reinforcing bar wallboard main body (3) inside is filled with fill concrete (5), and the upper right of reinforcing bar wallboard main body (3) is connected with concreting mouth (7) Connect, the front and rear sides of the reinforcing bar wallboard main body (3) are connected by fastening bolt (6) with protection rubber blanket (8), and reinforcing bar The junction of wallboard main body (3) is provided with protection clamp (9), and the both ends of the protection clamp (9) are equipped with buckle fixed strip (10)。
A kind of 2. construction steel structure assembled wallboard according to claim 1, it is characterised in that:The fixing connection steel plate (1) four, and fixing connection steel plate (1) rectangular distributed architecture are provided with altogether.
A kind of 3. construction steel structure assembled wallboard according to claim 1, it is characterised in that:The reinforcing bar wallboard main body (3) with reinforced steel (4) for zhou duicheng tuxing, and reinforcing bar wallboard main body (3) is shaped as quadrilateral structure.
A kind of 4. construction steel structure assembled wallboard according to claim 1, it is characterised in that:The reinforced steel (4) For network structure, and reinforced steel (4) forms groined type structure.
A kind of 5. construction steel structure assembled wallboard according to claim 1, it is characterised in that:The protection rubber blanket (8) it is solid construction, and the thickness of protection rubber blanket (8) is 10-20mm.
CN201720506773.6U 2017-05-09 2017-05-09 A kind of construction steel structure assembled wallboard Expired - Fee Related CN206722211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720506773.6U CN206722211U (en) 2017-05-09 2017-05-09 A kind of construction steel structure assembled wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720506773.6U CN206722211U (en) 2017-05-09 2017-05-09 A kind of construction steel structure assembled wallboard

Publications (1)

Publication Number Publication Date
CN206722211U true CN206722211U (en) 2017-12-08

Family

ID=60509031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720506773.6U Expired - Fee Related CN206722211U (en) 2017-05-09 2017-05-09 A kind of construction steel structure assembled wallboard

Country Status (1)

Country Link
CN (1) CN206722211U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098316A (en) * 2018-09-05 2018-12-28 布雷尼建筑科技(苏州)有限公司 High-strength nano inorganic gel fire-retardant heat insulation assembled inner partition plate
CN109610688A (en) * 2018-12-24 2019-04-12 天津广坤腾阳建筑安装有限公司 A kind of the installation fixed structure and its installation method of building wall board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098316A (en) * 2018-09-05 2018-12-28 布雷尼建筑科技(苏州)有限公司 High-strength nano inorganic gel fire-retardant heat insulation assembled inner partition plate
CN109610688A (en) * 2018-12-24 2019-04-12 天津广坤腾阳建筑安装有限公司 A kind of the installation fixed structure and its installation method of building wall board

Similar Documents

Publication Publication Date Title
CN206571130U (en) A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony
CN206722211U (en) A kind of construction steel structure assembled wallboard
CN207700729U (en) The integral totally enclosed special upper people's escape way of tower crane
CN206495142U (en) A kind of overhead pier column operation platform of assembled
CN206174437U (en) Be applied to gallows of super high overlength cantilevered member construction
CN108396686A (en) A kind of highway barrier of enhancing safety
CN203160726U (en) Tool type edge protection structure
CN201190423Y (en) Horizontal protection shed for tall building
CN201801820U (en) Safety-protecting externally-hung device of falling object-resistant hanging basket
CN201236489Y (en) Roof edge protection railing for preventing high altitude falling
CN207295477U (en) A kind of bridge lower part construction safety protection column
CN204126290U (en) Elevator shaft horizontal protective device
CN203097310U (en) Horizontal opening protective covering plate device of high-rise building face
CN206220649U (en) Construction guard fender
CN207420069U (en) A kind of guard rail being used in turn
CN204691212U (en) A kind of nylon pin handsheet pedal of scaffold
CN207749848U (en) A kind of fall arrest construction holder
CN210262793U (en) Safety device for municipal building construction
CN204326488U (en) The building operations overhanging unloading platform that a kind of safety is high
CN209585605U (en) Climbing formwork lower hanging protection system
CN207863498U (en) A kind of box house pin-connected panel with outside corridor case is anti-to pound canopy
CN207863444U (en) Independent attached wall mounting column
CN207004083U (en) A kind of building protective screening
CN107476590A (en) A kind of guard rail being used in turn
CN201381653Y (en) Assembled type overhang safety protection shelter structure for high-rise building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20190509

CF01 Termination of patent right due to non-payment of annual fee