CN206721871U - Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body - Google Patents

Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body Download PDF

Info

Publication number
CN206721871U
CN206721871U CN201720584283.8U CN201720584283U CN206721871U CN 206721871 U CN206721871 U CN 206721871U CN 201720584283 U CN201720584283 U CN 201720584283U CN 206721871 U CN206721871 U CN 206721871U
Authority
CN
China
Prior art keywords
reinforcing bar
glass fiber
reinforced polymer
cage body
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720584283.8U
Other languages
Chinese (zh)
Inventor
唐伟轩
狄明世
张亚龙
岳国伟
牛朋朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
Shanghai Rail Transit Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group filed Critical Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
Priority to CN201720584283.8U priority Critical patent/CN206721871U/en
Application granted granted Critical
Publication of CN206721871U publication Critical patent/CN206721871U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is specially a kind of rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, solve the problems, such as to exist when existing glass fiber-reinforced polymer bored concrete pile cage body rigidity is strengthened operation limitation, utilization can not be had enough to meet the need, cutting is wasted time and energy and easy damaged glass fiber-reinforced polymer.Including glass fiber-reinforced polymer cage body and reinforcing bar cage body, two channel steel shape shaped steel are provided between the upper and lower external side of two steel reinforcement cages, reinforcing bar cage body includes reinforcing bar cage bar, ring-type stiffener is provided with the inside of reinforcing bar cage bar, spiral reinforcement stirrup is provided with the outside of reinforcing bar cage bar, the both sides up and down of channel steel shape shaped steel are provided with the U-shaped steel muscle that both ends are threaded and are enclosed in reinforcing bar cage bar, and the both ends of U-shaped steel muscle are screwed with the locking nut for being close to channel steel shape shaped steel inner face.The utility model meets the rigidity requirement of glass fiber-reinforced polymer, while reduces construction cost, is easily installed dismounting, realizes the requirement that turnover utilizes.

Description

Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body
Technical field
Underground engineering construction bored concrete pile cage body is the utility model is related to, specially a kind of rigidity heavier-duty glass fiber-reinforced polymer Bored concrete pile cage body.
Background technology
Glass fiber-reinforced polymer gradually starts to apply in shield launching arrival, is substituted using the glass fiber-reinforced polymer for being easy to cutting Reinforcing bar at building enclosure hole and realize that shield is directly cut, this is a kind of current trend for carrying out shield launching and receiving, The security risk due to cutting armored concrete and bringing can be exempted.
Because the modulus of elasticity of glass fiber-reinforced polymer is only 21% or so of reinforcing bar modulus of elasticity, glass fiber-reinforced polymer cage is fabricated to Rigidity has larger difference compared with regular reinforcement cage after type, and the self stability of skeleton is poor when fiber bar cage lifts by crane, and stress-should Varied curve shows obvious linear relationship before fracturing, and strong influence glass fiber-reinforced polymer cage is steady in lifting, transport Qualitative and bending resistance, shear resistant capacity, it is therefore desirable to which rigidity reinforcement is carried out to glass fiber-reinforced polymer cage.
It is mainly that steel bar girder is set inside muscle cage that existing bored concrete pile glass fiber-reinforced polymer cage rigidity, which strengthens technology, at present Strengthen, glass fiber-reinforced polymer is connected with steel bar girder colligation, both ends steel reinforcement cage cage bar and steel bar truss welding.Above-mentioned existing bored concrete pile Glass fiber-reinforced polymer cage rigidity strengthens technology, mainly there is following several respects deficiency:
1st, steel bar girder and both ends steel reinforcement cage cage bar are welded, and muscle cage, which enters, cuts steel bar girder, Jun Xuyou in the decentralization process of hole Special operation workers are taken appointment with certificate to operate and completed;
2nd, steel bar girder is cut in muscle cage decentralization process and is taken out, it is easy to glass fiber-reinforced polymer is damaged, to glass fibre Muscle stress performance adversely affects;
3rd, steel bar girder needs to cut into segment in order to be taken out from muscle cage cage bar hole, therefore steel bar girder can not week Turn to utilize, every width muscle cage needs, from new processing installation, it is more to produce waste material;
4th, every width muscle cage steel bar girder cutting quantities is larger, work efficiency is low, and time-consuming, and it is steady to be unfavorable for cast-in-situ bored pile hole wall Fixed and cost control.
The content of the invention
The utility model operates limitation, nothing to solve to exist when existing glass fiber-reinforced polymer bored concrete pile cage body rigidity is strengthened Method turnover is utilized, cutting is wasted time and energy and the problem of easy damaged glass fiber-reinforced polymer, there is provided a kind of rigidity heavier-duty glass fibre Muscle bored concrete pile cage body.
The utility model adopts the following technical scheme that realization:Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, bag Glass fiber-reinforced polymer cage body and the reinforcing bar cage body of lower both sides disposed thereon are included, two footpaths are provided between the upper and lower external side of two steel reinforcement cages Include some vertically arranged and annular spread reinforcing bar master in 90 ° of distributions and the channel steel shape shaped steel of notch outwardly, reinforcing bar cage body Muscle, reinforcing bar cage bar inner side are provided with the ring-type stiffeners of some distributions up and down, spiral reinforcement hoop are provided with the outside of reinforcing bar cage bar Muscle, the both sides up and down of channel steel shape shaped steel are provided with the U-shaped steel muscle that both ends are threaded and are enclosed in reinforcing bar cage bar, U-shaped steel muscle Both ends be screwed with the locking nut for being close to channel steel shape shaped steel inner face.
The structure design makes up the bullet of glass fiber-reinforced polymer and regular reinforcement by the bending strength of two shaped steel of incorgruous setting Property modulus difference, realize the integral rigidity of whole muscle cage, meet lifting force request;And the demountable structure of U-shaped steel muscle is real The requirement that turnover utilizes is showed, while common laborer is i.e. operable by simple training of telling somebody what one's real intentions are, and overcomes existing glass fiber-reinforced polymer Exist when bored concrete pile cage body rigidity is strengthened operation limitation, utilization can not be had enough to meet the need, cutting is wasted time and energy and easy damaged glass fibre The problem of muscle.
The utility model is reasonable in design reliable, meets the rigidity requirement of glass fiber-reinforced polymer, solves reinforcing bar and glass The problem that the overlap joint cage fabrication and installation of glass fiber bar are yielding, docking is difficult, and the whole cage lifting of unit is realized, save merogenesis and hang Fill the time of aperture docking, muscle cage hangs the shortening of load hole time, reduce poor strata because steel reinforcement cage enters that the hole time is long and hole The quality risk of mouth collapse hole shrinkage cavity, while construction cost is reduced, dismounting is easily installed, realizes the requirement that turnover utilizes.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation at channel steel shape shaped steel in Fig. 1;
Fig. 3 is the structural representation at U-shaped steel muscle in Fig. 2.
In figure:1- channel steel shape shaped steel, 2- reinforcing bar cage bars, 3- ring-type stiffeners, 4- spiral reinforcement stirrups, 5-U steel bars, 6- locking nuts.
Embodiment
Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, including the steel of glass fiber-reinforced polymer cage body and lower both sides disposed thereon Muscle cage body, two radial directions are provided between the upper and lower external side of two steel reinforcement cages in 90 ° of distributions and the channel steel shape shaped steel 1 of notch outwardly, Reinforcing bar cage body includes some vertically arranged and annular spread reinforcing bar cage bar 2, and the inner side of reinforcing bar cage bar 2 is provided with some distributions up and down Ring-type stiffener 3, the outside of reinforcing bar cage bar 2 is provided with spiral reinforcement stirrup 4, and the both sides up and down of channel steel shape shaped steel 1 are respectively provided with The U-shaped steel muscle 5 for having both ends threaded and being enclosed in reinforcing bar cage bar 2, the both ends of U-shaped steel muscle 5, which are screwed with, is close to channel steel shape shaped steel 1 The locking nut 6 of inner face.
In specific implementation process, exemplified by the station of ether original Line 2 Metro Hua Zhang streets, one shares 28 this type fender posts, this Engineering method is compared with traditional merogenesis lifts, and muscle cage hangs the load hole time and saves 65%, and fullness coefficient averagely reduces 4%, saves concrete About 0.9 ten thousand, save later stage bulge processing cost about 0.6 ten thousand;Reduce workmen's wage 0.6 ten thousand;Truck crane and other machineries are set Standby lease time shortens 2 days, saves expense 10,000;Items save about 3.1 ten thousand yuan of construction cost.

Claims (1)

  1. A kind of 1. rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, it is characterised in that:Including glass fiber-reinforced polymer cage body and it is located at The reinforcing bar cage body of its upper and lower both sides, two radial directions are provided between the upper and lower external side of two steel reinforcement cages in 90 ° of distributions and notch outwardly Channel steel shape shaped steel(1), reinforcing bar cage body includes some vertically arranged and annular spread reinforcing bar cage bar(2), reinforcing bar cage bar(2)It is interior Side is provided with the ring-type stiffener of some distributions up and down(3), reinforcing bar cage bar(2)Outside is provided with spiral reinforcement stirrup(4), groove Steel shape shaped steel(1)To be provided with both ends threaded and be enclosed on reinforcing bar cage bar for both sides up and down(2)On U-shaped steel muscle(5), it is U-shaped Reinforcing bar(5)Both ends be screwed with and be close to channel steel shape shaped steel(1)The locking nut of inner face(6).
CN201720584283.8U 2017-05-24 2017-05-24 Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body Expired - Fee Related CN206721871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720584283.8U CN206721871U (en) 2017-05-24 2017-05-24 Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720584283.8U CN206721871U (en) 2017-05-24 2017-05-24 Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body

Publications (1)

Publication Number Publication Date
CN206721871U true CN206721871U (en) 2017-12-08

Family

ID=60510859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720584283.8U Expired - Fee Related CN206721871U (en) 2017-05-24 2017-05-24 Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body

Country Status (1)

Country Link
CN (1) CN206721871U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374088A (en) * 2019-07-19 2019-10-25 海南大学 A kind of reinforcement structure and bridging method of large pile foundation
CN110835912A (en) * 2019-11-28 2020-02-25 孙凤芹 Rigidity-enhanced glass fiber reinforcement cast-in-place pile cage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374088A (en) * 2019-07-19 2019-10-25 海南大学 A kind of reinforcement structure and bridging method of large pile foundation
CN110374088B (en) * 2019-07-19 2023-12-22 海南大学 Reinforcing structure and lap joint method of large pile foundation
CN110835912A (en) * 2019-11-28 2020-02-25 孙凤芹 Rigidity-enhanced glass fiber reinforcement cast-in-place pile cage

Similar Documents

Publication Publication Date Title
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN102852244A (en) Detachable self-resetting type energy-dissipation coupling beam and construction process thereof
CN211114425U (en) Prefabricated steel pipe concrete column
CN206721871U (en) Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body
CN106088334B (en) A kind of huge steel pipe column abnormal shape combined joint of assembled and installation method
CN105696546A (en) Low-consumption underground diaphragm wall and construction method thereof
CN104863271A (en) Concrete-filled steel tube column-reinforced concrete beam joint connection method
CN207268073U (en) Novel flexible formwork bearing frame
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN110029813A (en) A kind of deformation joint wall formwork construction method
CN201309797Y (en) Reinforced structure of steel crane girder
CN203905298U (en) Superimposed component of reinforced concrete filled FRP pipe and concrete filled steel pipe
CN102691267A (en) High pier construction method for external whole operation platform
CN203160540U (en) Novel precast column
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN203947381U (en) A kind of steel concrete chain type plate
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN206599881U (en) Integral prefabricated individual layer steel plate concrete combined shear wall
CN101824918B (en) Construction method for dividing unit to prefabricate bearing bent frame
CN102433961A (en) Prefabricated beam structure construction member
CN206219089U (en) A kind of derrick crane attached wall inner support structure
CN202954577U (en) Reinforced structure for bearing beam of wall-attached embedded part of large-tonnage self-climbing tower crane
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN202324658U (en) Device for installing large-span roof truss
CN206903060U (en) The concrete composite beam of strap end portion shaped steel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20190524

CF01 Termination of patent right due to non-payment of annual fee