CN206721871U - Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body - Google Patents
Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body Download PDFInfo
- Publication number
- CN206721871U CN206721871U CN201720584283.8U CN201720584283U CN206721871U CN 206721871 U CN206721871 U CN 206721871U CN 201720584283 U CN201720584283 U CN 201720584283U CN 206721871 U CN206721871 U CN 206721871U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- glass fiber
- reinforced polymer
- cage body
- cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model is specially a kind of rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, solve the problems, such as to exist when existing glass fiber-reinforced polymer bored concrete pile cage body rigidity is strengthened operation limitation, utilization can not be had enough to meet the need, cutting is wasted time and energy and easy damaged glass fiber-reinforced polymer.Including glass fiber-reinforced polymer cage body and reinforcing bar cage body, two channel steel shape shaped steel are provided between the upper and lower external side of two steel reinforcement cages, reinforcing bar cage body includes reinforcing bar cage bar, ring-type stiffener is provided with the inside of reinforcing bar cage bar, spiral reinforcement stirrup is provided with the outside of reinforcing bar cage bar, the both sides up and down of channel steel shape shaped steel are provided with the U-shaped steel muscle that both ends are threaded and are enclosed in reinforcing bar cage bar, and the both ends of U-shaped steel muscle are screwed with the locking nut for being close to channel steel shape shaped steel inner face.The utility model meets the rigidity requirement of glass fiber-reinforced polymer, while reduces construction cost, is easily installed dismounting, realizes the requirement that turnover utilizes.
Description
Technical field
Underground engineering construction bored concrete pile cage body is the utility model is related to, specially a kind of rigidity heavier-duty glass fiber-reinforced polymer
Bored concrete pile cage body.
Background technology
Glass fiber-reinforced polymer gradually starts to apply in shield launching arrival, is substituted using the glass fiber-reinforced polymer for being easy to cutting
Reinforcing bar at building enclosure hole and realize that shield is directly cut, this is a kind of current trend for carrying out shield launching and receiving,
The security risk due to cutting armored concrete and bringing can be exempted.
Because the modulus of elasticity of glass fiber-reinforced polymer is only 21% or so of reinforcing bar modulus of elasticity, glass fiber-reinforced polymer cage is fabricated to
Rigidity has larger difference compared with regular reinforcement cage after type, and the self stability of skeleton is poor when fiber bar cage lifts by crane, and stress-should
Varied curve shows obvious linear relationship before fracturing, and strong influence glass fiber-reinforced polymer cage is steady in lifting, transport
Qualitative and bending resistance, shear resistant capacity, it is therefore desirable to which rigidity reinforcement is carried out to glass fiber-reinforced polymer cage.
It is mainly that steel bar girder is set inside muscle cage that existing bored concrete pile glass fiber-reinforced polymer cage rigidity, which strengthens technology, at present
Strengthen, glass fiber-reinforced polymer is connected with steel bar girder colligation, both ends steel reinforcement cage cage bar and steel bar truss welding.Above-mentioned existing bored concrete pile
Glass fiber-reinforced polymer cage rigidity strengthens technology, mainly there is following several respects deficiency:
1st, steel bar girder and both ends steel reinforcement cage cage bar are welded, and muscle cage, which enters, cuts steel bar girder, Jun Xuyou in the decentralization process of hole
Special operation workers are taken appointment with certificate to operate and completed;
2nd, steel bar girder is cut in muscle cage decentralization process and is taken out, it is easy to glass fiber-reinforced polymer is damaged, to glass fibre
Muscle stress performance adversely affects;
3rd, steel bar girder needs to cut into segment in order to be taken out from muscle cage cage bar hole, therefore steel bar girder can not week
Turn to utilize, every width muscle cage needs, from new processing installation, it is more to produce waste material;
4th, every width muscle cage steel bar girder cutting quantities is larger, work efficiency is low, and time-consuming, and it is steady to be unfavorable for cast-in-situ bored pile hole wall
Fixed and cost control.
The content of the invention
The utility model operates limitation, nothing to solve to exist when existing glass fiber-reinforced polymer bored concrete pile cage body rigidity is strengthened
Method turnover is utilized, cutting is wasted time and energy and the problem of easy damaged glass fiber-reinforced polymer, there is provided a kind of rigidity heavier-duty glass fibre
Muscle bored concrete pile cage body.
The utility model adopts the following technical scheme that realization:Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, bag
Glass fiber-reinforced polymer cage body and the reinforcing bar cage body of lower both sides disposed thereon are included, two footpaths are provided between the upper and lower external side of two steel reinforcement cages
Include some vertically arranged and annular spread reinforcing bar master in 90 ° of distributions and the channel steel shape shaped steel of notch outwardly, reinforcing bar cage body
Muscle, reinforcing bar cage bar inner side are provided with the ring-type stiffeners of some distributions up and down, spiral reinforcement hoop are provided with the outside of reinforcing bar cage bar
Muscle, the both sides up and down of channel steel shape shaped steel are provided with the U-shaped steel muscle that both ends are threaded and are enclosed in reinforcing bar cage bar, U-shaped steel muscle
Both ends be screwed with the locking nut for being close to channel steel shape shaped steel inner face.
The structure design makes up the bullet of glass fiber-reinforced polymer and regular reinforcement by the bending strength of two shaped steel of incorgruous setting
Property modulus difference, realize the integral rigidity of whole muscle cage, meet lifting force request;And the demountable structure of U-shaped steel muscle is real
The requirement that turnover utilizes is showed, while common laborer is i.e. operable by simple training of telling somebody what one's real intentions are, and overcomes existing glass fiber-reinforced polymer
Exist when bored concrete pile cage body rigidity is strengthened operation limitation, utilization can not be had enough to meet the need, cutting is wasted time and energy and easy damaged glass fibre
The problem of muscle.
The utility model is reasonable in design reliable, meets the rigidity requirement of glass fiber-reinforced polymer, solves reinforcing bar and glass
The problem that the overlap joint cage fabrication and installation of glass fiber bar are yielding, docking is difficult, and the whole cage lifting of unit is realized, save merogenesis and hang
Fill the time of aperture docking, muscle cage hangs the shortening of load hole time, reduce poor strata because steel reinforcement cage enters that the hole time is long and hole
The quality risk of mouth collapse hole shrinkage cavity, while construction cost is reduced, dismounting is easily installed, realizes the requirement that turnover utilizes.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation at channel steel shape shaped steel in Fig. 1;
Fig. 3 is the structural representation at U-shaped steel muscle in Fig. 2.
In figure:1- channel steel shape shaped steel, 2- reinforcing bar cage bars, 3- ring-type stiffeners, 4- spiral reinforcement stirrups, 5-U steel bars,
6- locking nuts.
Embodiment
Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, including the steel of glass fiber-reinforced polymer cage body and lower both sides disposed thereon
Muscle cage body, two radial directions are provided between the upper and lower external side of two steel reinforcement cages in 90 ° of distributions and the channel steel shape shaped steel 1 of notch outwardly,
Reinforcing bar cage body includes some vertically arranged and annular spread reinforcing bar cage bar 2, and the inner side of reinforcing bar cage bar 2 is provided with some distributions up and down
Ring-type stiffener 3, the outside of reinforcing bar cage bar 2 is provided with spiral reinforcement stirrup 4, and the both sides up and down of channel steel shape shaped steel 1 are respectively provided with
The U-shaped steel muscle 5 for having both ends threaded and being enclosed in reinforcing bar cage bar 2, the both ends of U-shaped steel muscle 5, which are screwed with, is close to channel steel shape shaped steel 1
The locking nut 6 of inner face.
In specific implementation process, exemplified by the station of ether original Line 2 Metro Hua Zhang streets, one shares 28 this type fender posts, this
Engineering method is compared with traditional merogenesis lifts, and muscle cage hangs the load hole time and saves 65%, and fullness coefficient averagely reduces 4%, saves concrete
About 0.9 ten thousand, save later stage bulge processing cost about 0.6 ten thousand;Reduce workmen's wage 0.6 ten thousand;Truck crane and other machineries are set
Standby lease time shortens 2 days, saves expense 10,000;Items save about 3.1 ten thousand yuan of construction cost.
Claims (1)
- A kind of 1. rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body, it is characterised in that:Including glass fiber-reinforced polymer cage body and it is located at The reinforcing bar cage body of its upper and lower both sides, two radial directions are provided between the upper and lower external side of two steel reinforcement cages in 90 ° of distributions and notch outwardly Channel steel shape shaped steel(1), reinforcing bar cage body includes some vertically arranged and annular spread reinforcing bar cage bar(2), reinforcing bar cage bar(2)It is interior Side is provided with the ring-type stiffener of some distributions up and down(3), reinforcing bar cage bar(2)Outside is provided with spiral reinforcement stirrup(4), groove Steel shape shaped steel(1)To be provided with both ends threaded and be enclosed on reinforcing bar cage bar for both sides up and down(2)On U-shaped steel muscle(5), it is U-shaped Reinforcing bar(5)Both ends be screwed with and be close to channel steel shape shaped steel(1)The locking nut of inner face(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720584283.8U CN206721871U (en) | 2017-05-24 | 2017-05-24 | Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720584283.8U CN206721871U (en) | 2017-05-24 | 2017-05-24 | Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206721871U true CN206721871U (en) | 2017-12-08 |
Family
ID=60510859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720584283.8U Expired - Fee Related CN206721871U (en) | 2017-05-24 | 2017-05-24 | Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206721871U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374088A (en) * | 2019-07-19 | 2019-10-25 | 海南大学 | A kind of reinforcement structure and bridging method of large pile foundation |
CN110835912A (en) * | 2019-11-28 | 2020-02-25 | 孙凤芹 | Rigidity-enhanced glass fiber reinforcement cast-in-place pile cage |
-
2017
- 2017-05-24 CN CN201720584283.8U patent/CN206721871U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374088A (en) * | 2019-07-19 | 2019-10-25 | 海南大学 | A kind of reinforcement structure and bridging method of large pile foundation |
CN110374088B (en) * | 2019-07-19 | 2023-12-22 | 海南大学 | Reinforcing structure and lap joint method of large pile foundation |
CN110835912A (en) * | 2019-11-28 | 2020-02-25 | 孙凤芹 | Rigidity-enhanced glass fiber reinforcement cast-in-place pile cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088397B (en) | A kind of prefabricated post and precast construction method thereof | |
CN102852244A (en) | Detachable self-resetting type energy-dissipation coupling beam and construction process thereof | |
CN211114425U (en) | Prefabricated steel pipe concrete column | |
CN206721871U (en) | Rigidity heavier-duty glass fiber-reinforced polymer bored concrete pile cage body | |
CN106088334B (en) | A kind of huge steel pipe column abnormal shape combined joint of assembled and installation method | |
CN105696546A (en) | Low-consumption underground diaphragm wall and construction method thereof | |
CN104863271A (en) | Concrete-filled steel tube column-reinforced concrete beam joint connection method | |
CN207268073U (en) | Novel flexible formwork bearing frame | |
CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
CN110029813A (en) | A kind of deformation joint wall formwork construction method | |
CN201309797Y (en) | Reinforced structure of steel crane girder | |
CN203905298U (en) | Superimposed component of reinforced concrete filled FRP pipe and concrete filled steel pipe | |
CN102691267A (en) | High pier construction method for external whole operation platform | |
CN203160540U (en) | Novel precast column | |
CN102777050A (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN203947381U (en) | A kind of steel concrete chain type plate | |
CN103046743A (en) | High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method | |
CN206599881U (en) | Integral prefabricated individual layer steel plate concrete combined shear wall | |
CN101824918B (en) | Construction method for dividing unit to prefabricate bearing bent frame | |
CN102433961A (en) | Prefabricated beam structure construction member | |
CN206219089U (en) | A kind of derrick crane attached wall inner support structure | |
CN202954577U (en) | Reinforced structure for bearing beam of wall-attached embedded part of large-tonnage self-climbing tower crane | |
CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
CN202324658U (en) | Device for installing large-span roof truss | |
CN206903060U (en) | The concrete composite beam of strap end portion shaped steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 Termination date: 20190524 |
|
CF01 | Termination of patent right due to non-payment of annual fee |