CN206721866U - A kind of drain bar construction shoe - Google Patents

A kind of drain bar construction shoe Download PDF

Info

Publication number
CN206721866U
CN206721866U CN201720232966.7U CN201720232966U CN206721866U CN 206721866 U CN206721866 U CN 206721866U CN 201720232966 U CN201720232966 U CN 201720232966U CN 206721866 U CN206721866 U CN 206721866U
Authority
CN
China
Prior art keywords
pile body
return piece
spacing hole
drain bar
bar construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720232966.7U
Other languages
Chinese (zh)
Inventor
宫宝军
陈锦标
常啸
司双洁
詹杨杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Original Assignee
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd filed Critical Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority to CN201720232966.7U priority Critical patent/CN206721866U/en
Application granted granted Critical
Publication of CN206721866U publication Critical patent/CN206721866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)

Abstract

It the utility model is related to water conservancy construction technical field, and in particular to a kind of drain bar construction shoe.Including annular for the pile body that is combined with construction casing, section on pile body at annular is circle, the bottom of pile body is provided with boots cap, boots cap is the frame structure of circular conical surface or taper, at least provided with a non-return piece on pile body, non-return piece bottom is provided with non-return hole, pile body is provided with the horizontally disposed spacing hole for being connected with the bottom of non-return piece, spacing hole is the horizontal through hole for penetrating pile body, and the both-side opening of spacing hole is respectively positioned on the outside of pile body, the access aperture for being communicated with spacing hole is further opened with pile body, the opening direction of access aperture is to be pointed to by spacing hole on the inside of pile body.Convenient material drawing, make simply, be hardly damaged, can effectively prevent from rewinding problem, improve drain bar construction qualification rate.

Description

A kind of drain bar construction shoe
Technical field
It the utility model is related to water conservancy construction technical field, and in particular to a kind of drain bar construction shoe.
Background technology
Plastic draining board is widely used to treatment of soft foundation now, highway both domestic and external, railway, airport, power plant, heap Field, harbour, enclose and cultivate, sewage treatment plant, refuse landfill, reclaiming land around sea, water conservancy and hydropower, the soft Ji Chu in the engineering such as wharf structure Reason project.It has(1)Drainability is good, and draining is unimpeded, and drainage effect is guaranteed;(2)Material has good intensity and ductility, Ground deformability can be adapted to without influenceing drainage performance;(3)Drain bar cross dimensions is small, to ground during injection drain bar Disturb small;(4)Plate construction can be carried out on super soft foundation;(5)The advantages that construction is fast, short time limit.
Enclosed and cultivated in water conservancy in drain bar construction, because soil property is mainly the water content such as mud, silt clay, silty clay Higher soil, so caused main problem is to rewind.The reason for causing to rewind has two, first, being sleeve pipe under Because the sealing between shoe and sleeve pipe is bad during inserting, cause soil sleeve pipe, soil and the contact of sleeve pipe internal drainage plate, Add the downward frictional resistance of drain bar when being pulled out on sleeve pipe and cause to rewind;Second, it is during being pulled out on sleeve pipe, shoe is not Come off or come off evening time and cause to rewind.Effect of the shoe in drain bar work progress as can be seen here.Shoe is in construction Effect have two:First, being to play casting when drain bar is squeezed into soil, plate is set smoothly to squeeze into, and soil will not squeeze into plate Core;Second, being when stake reaches and pulls out protecting pipe on regulation absolute altitude, shoe utilizes the resistance of soil, plastic draining board is stayed in way In be not pulled out.
The content of the invention
The purpose of this utility model is described above in order to solve the problems, such as presently, there are, there is provided a kind of drain bar construction Use shoe.
In order to reach above-mentioned purpose of utility model, the utility model uses following technical scheme:
A kind of drain bar construction shoe, including annular are used for the pile body that is combined with construction casing, on pile body annular The section at place is circle, and the bottom of pile body is provided with boots cap, and boots cap is the frame structure of circular conical surface or taper, on pile body at least Provided with a non-return piece, non-return piece bottom is provided with non-return hole, and pile body is provided with horizontally disposed be used for and the bottom of non-return piece company The spacing hole connect, spacing hole is the horizontal through hole for penetrating pile body, and the both-side opening of spacing hole is respectively positioned on the outside of pile body, pile body On be further opened with access aperture for being communicated with spacing hole, the opening direction of access aperture is to be pointed to by spacing hole on the inside of pile body.
Construction casing bottom connects with pile body, and pile body is protected to construction casing, prevents in soil sleeve pipe, boots cap For taper, consequently facilitating the insertion of shoe, the bottom of non-return piece is embedded in non-return hole, so as to which non-return piece can be on certain angle Rotated with pile body, when construction casing, which heads on pile body, to be declined, received in non-return piece, when construction casing is extracted upwards Wait, because the top of non-return piece connects with ambient earth so that non-return piece outwards deploys in the presence of upward power, so as to increase The combination dynamics of shoe and soil, forces shoe to be separated with construction casing.While construction casing exits from, shoe is stayed In hole.
Preferably, the non-return piece is symmetrical arranged.
Preferably, the non-return piece is two.
Preferably, it is provided with the pile body at non-return piece and is used to carry out non-return piece spacing limited block, Limited block is located on pile body with respect to the outside of non-return piece.Limited block can prevent non-return when shoe is larger by upward dynamics Piece rotates down, and loses non-return effect.
Preferably, the frame structure of the boots cap is drawn and in pile body lower endless for several by pile body bottom Center be connected boot of elevator composition.
Preferably, pile body bottom is provided with the pile cover for being used for covering its bottom.
Compared with prior art, beneficial effect is the utility model:Convenient material drawing, make simply, be hardly damaged, can be effective Prevent from rewinding problem, improve drain bar construction qualification rate.
Brief description of the drawings
Fig. 1 is structural representation of the shoe of the present utility model in downward construction;
Fig. 2 is structural representation of the shoe of the present utility model when construction casing exits from;
Fig. 3 is the structural representation of pile body of the present utility model;
Fig. 4 is the structural representation of non-return piece of the present utility model.
In figure:1 pile body, 2 construction casings, 3 boots caps, 4 non-return pieces, 5 non-return holes, 6 spacing holes, 7 limited blocks, 8 boot of elevators, 9 Cap, 10 access aperture.
Embodiment
Explanation is further described to the technical solution of the utility model below by specific embodiment.
Embodiment:
A kind of drain bar construction shoe, as Figure 1-4, including annular for the stake that is combined with construction casing 2 Body 1,1 loop configuration of pile body, the circular periphery of pile body 1 are used to contact with construction casing 2, and the section on pile body 1 at annular is Circle, the bottom of pile body 1 are provided with boots cap 3, and boots cap 3 is the frame structure of circular conical surface or taper, at least provided with one on pile body 1 Individual non-return piece 4, the bottom of non-return piece 4 are provided with non-return hole 5, and pile body 1 is provided with horizontally disposed for being connected with the bottom of non-return piece 4 Spacing hole 6, spacing hole 6 is the through hole of horizontal insertion pile body 1, and the both-side opening of spacing hole 6 is respectively positioned on the outside of pile body 1, The access aperture for being communicated with spacing hole 6 is further opened with pile body 1, the opening direction of access aperture is to point to pile body 1 by spacing hole 6 Inner side.Non-return piece 4 is two and is symmetrical arranged.
In order to prevent that it is larger that non-return piece 4 from rotating down angle, it is provided with and is used for non-return at non-return piece 4 on pile body 1 Piece 4 carries out spacing limited block 7, and limited block 7 is located on pile body 1 with respect to the outside of non-return piece 4.
Boots cap 3 for frame structure when, the bottom of pile body 1, which is provided with, to be used to cover the pile cover 9 of its bottom, and the frame structure is 2-3 are drawn by the bottom of pile body 1 and are formed in the boot of elevator 8 that the center of the lower endless of pile body 1 is connected.The structure of taper is easy to stake The test of boots.

Claims (6)

  1. A kind of 1. drain bar construction shoe, it is characterised in that including annular be used for and construction casing(2)The pile body being combined (1), pile body(1)Section at upper annular is circular, pile body(1)Bottom be provided with boots cap(3), boots cap(3)For circular conical surface or cone The frame structure of shape, positioned at pile body(1)On at least provided with a non-return piece(4), non-return piece(4)Bottom is provided with non-return hole(5), stake Body(1)It is provided with horizontally disposed be used for and non-return piece(4)Bottom connection spacing hole(6), spacing hole(6)Penetrated for level Pile body(1)Through hole, and spacing hole(6)Both-side opening be respectively positioned on pile body(1)Outside, pile body(1)On be further opened with being used for With spacing hole(6)The access aperture communicated(10), access aperture(10)Opening direction be by spacing hole(6)Point to pile body(1)Inner side.
  2. A kind of 2. drain bar construction shoe according to claim 1, it is characterised in that the non-return piece(4)Symmetrically set Put.
  3. A kind of 3. drain bar construction shoe according to claim 1, it is characterised in that the non-return piece(4)For two.
  4. A kind of 4. drain bar construction shoe according to claim 1, it is characterised in that the pile body(1)It is upper to be located at only Return piece(4)Place, which is provided with, to be used for non-return piece(4)Carry out spacing limited block(7), limited block(7)Positioned at pile body(1)It is upper to stop relatively Return piece(4)Outside.
  5. A kind of 5. drain bar construction shoe according to claim 1, it is characterised in that the boots cap(3)Framework knot Structure is several by pile body(1)Draw and in pile body in bottom(1)The boot of elevator that the center of lower endless is connected(8)Composition.
  6. A kind of 6. drain bar construction shoe according to claim 1, it is characterised in that pile body(1)Bottom, which is provided with, to be used for Cover the pile cover of its bottom(9).
CN201720232966.7U 2017-03-10 2017-03-10 A kind of drain bar construction shoe Active CN206721866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720232966.7U CN206721866U (en) 2017-03-10 2017-03-10 A kind of drain bar construction shoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720232966.7U CN206721866U (en) 2017-03-10 2017-03-10 A kind of drain bar construction shoe

Publications (1)

Publication Number Publication Date
CN206721866U true CN206721866U (en) 2017-12-08

Family

ID=60500962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720232966.7U Active CN206721866U (en) 2017-03-10 2017-03-10 A kind of drain bar construction shoe

Country Status (1)

Country Link
CN (1) CN206721866U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824417A (en) * 2018-07-27 2018-11-16 中交天航港湾建设工程有限公司 Plastic draining board based on treatment of soft foundation is anti-to rewind device and construction method
CN110044732A (en) * 2019-04-30 2019-07-23 中国地质大学(武汉) A kind of automatic cross plate boxshear apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824417A (en) * 2018-07-27 2018-11-16 中交天航港湾建设工程有限公司 Plastic draining board based on treatment of soft foundation is anti-to rewind device and construction method
CN110044732A (en) * 2019-04-30 2019-07-23 中国地质大学(武汉) A kind of automatic cross plate boxshear apparatus

Similar Documents

Publication Publication Date Title
CN103132521B (en) Undersea suction anchor
CN206721866U (en) A kind of drain bar construction shoe
CN205152951U (en) Novel skirt -type suction anchor
CN110847123A (en) Sleeve cage type anti-scouring structure and construction method
CN106703069A (en) Cylindrical foundation sinking device for ground breaking drag resistance and pressure maintenance and sinking method thereof
CN104652358B (en) Ecological slope protection system
CN108277811A (en) A kind of slope reinforcement structure and reinforcement means
CN206971174U (en) A kind of river course dykes and dams ecological slope protection structure
CN208121687U (en) Ecological riverway shore protection
CN1823575B (en) Afforestation method of water level up and down region shore slope
CN205875187U (en) Drainage device falls in basement construction
CN203200080U (en) Controlled planting and breeding facility of aquatic plant of compound ecological cleaning system
CN205530293U (en) Novel slope surface structure
CN206227227U (en) A kind of subirrigation system
CN211773369U (en) Sleeve cage type anti-scouring structure
CN108750014A (en) The support anchor structure and construction method of a kind of floating on water photovoltaic plant suitable for high water-level amplitude
CN110468837B (en) Underwater hollowing defect repairing method and device for ship lock navigation wall pile foundation on gravel layer basis
CN107165135A (en) A kind of water conservancy safety devices
CN209339085U (en) A kind of ecological bank protection structure of high stability
CN207144015U (en) A kind of anti-leakage structure of Novel underground diaphragm wall
CN205727371U (en) Trees fender pile and tree stabilizing system
CN201326164Y (en) Piping diversion early-warning device
CN205917649U (en) River bank slope protection structure
CN107285471B (en) Ecological chinampa fixed system of mountain source type river
CN211547598U (en) Take pile bolck to plant revetment structure in living groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant