CN206707270U - Early dismantling head and early-dismantling formwork system - Google Patents

Early dismantling head and early-dismantling formwork system Download PDF

Info

Publication number
CN206707270U
CN206707270U CN201720303464.9U CN201720303464U CN206707270U CN 206707270 U CN206707270 U CN 206707270U CN 201720303464 U CN201720303464 U CN 201720303464U CN 206707270 U CN206707270 U CN 206707270U
Authority
CN
China
Prior art keywords
early
lifting
support cylinder
supporting plate
shears
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720303464.9U
Other languages
Chinese (zh)
Inventor
唐黎
周小军
沃佳龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yichang cattle model King Technology Co., Ltd.
Original Assignee
GUANGZHOU ECHOM FORMWORK Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ECHOM FORMWORK Co Ltd filed Critical GUANGZHOU ECHOM FORMWORK Co Ltd
Priority to CN201720303464.9U priority Critical patent/CN206707270U/en
Application granted granted Critical
Publication of CN206707270U publication Critical patent/CN206707270U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of early dismantling head and early-dismantling formwork system, the early dismantling head includes support cylinder, shears and the elevating mechanism for lifting the shears, the elevating mechanism is on the support cylinder, one end of the support cylinder is provided with roof supporting, the shears includes supporting plate and is respectively arranged on the connecting lateral plate of the supporting plate both sides, the supporting plate is provided with mounting hole, the supporting plate is set at the mounting hole on the support cylinder, and the connecting lateral plate is provided with template connecting hole.The early dismantling head and early-dismantling formwork system, by setting connecting lateral plate in the both sides of supporting plate, and template connecting hole is set on connecting lateral plate, after early dismantling head installation, shears can connect as one with slab form, early stripping formwork system, can effective support shuttering, support it is solid and reliable.

Description

Early dismantling head and early-dismantling formwork system
Technical field
It the utility model is related to construction early-dismantling formwork system field, more particularly to a kind of early dismantling head and early stripping formwork system body System.
Background technology
Early-dismantling formwork system be in order to realize early stage remove slab form a kind of formwork system, its have save template, Advantage, the applications in construction such as saving is artificial, reduces investment outlay, speeds up the work are more and more extensive.In early stripping formwork system In system, independent support bar and early dismantling head are typically provided, independent support bar primarily serves the effect of vertical power transmission, and early dismantling head is used for Slab form is supported on independent support bar.Traditional early dismantling head is arranged on independent support bar, to building slab The support of plate and built on the sand, stability of strutting system needs further to be improved.
Utility model content
Based on this, it is necessary to provide a kind of early dismantling head and early-dismantling formwork system, the early dismantling head being capable of support shuttering and support It is solid and reliable;The supporting construction of the early-dismantling formwork system is solid and reliable.
Its technical scheme is as follows:
A kind of early dismantling head, including support cylinder, shears and the elevating mechanism for lifting the shears, it is described Elevating mechanism is on the support cylinder, and one end of the support cylinder is provided with roof supporting, and the shears includes support Plate and the connecting lateral plate for being respectively arranged on the supporting plate both sides, the supporting plate are provided with mounting hole, and the supporting plate is in the installation The outside of the support cylinder is set at hole, the connecting lateral plate is provided with template connecting hole.
In one of the embodiments, the elevating mechanism includes lifting earrings and guide shaft fixing unit, and described be oriented to is fixed Part is arranged on the support cylinder, and the lifting earrings is set in the outside of the support cylinder, and the lifting earrings is located at Side of the shears away from the roof supporting, the lifting earrings be provided with lifting chute along the longitudinal direction and Fixed chute in transverse direction, the fixed chute connects with the lower end of the lifting chute, it is described lift earrings can be Moved at fixed chute or lifting chute along the guide shaft fixing unit.
In one of the embodiments, the lifting earrings includes jacking sleeve and taps auricle, the jacking sleeve The outside of the support cylinder is set in, the jacking sleeve is provided with the lifting chute and fixed chute, the percussion ear Piece is on the outer wall of the jacking sleeve.
In one of the embodiments, the lifting chute is two, and two chutes that lift are along the jacking sleeve Be provided at circumferentially spaced, the fixed chute corresponds to two, between circumference of two fixed chutes along the jacking sleeve Every setting, the guide shaft fixing unit crosses the support cylinder, described to lead when the lifting earrings rises the shears To the both ends of fixture respectively positioned at the one end of the fixed chute away from corresponding lifting chute.
In one of the embodiments, the guide shaft fixing unit is fixing pin, and one end of the guide shaft fixing unit is provided with External screw thread, the support cylinder are provided with the threaded securing bores matched with the guide shaft fixing unit.
In one of the embodiments, the early dismantling head also includes adjusting nut, and the support cylinder is away from the support One end of top plate is thread segment, and the adjusting nut is set on the outside of the thread segment of the support cylinder.
In one of the embodiments, the shears also includes supporting plate sleeve, and the supporting plate sleeve is located at the support Side of the plate away from the roof supporting, the supporting plate sleeve dock with the mounting hole, and the supporting plate sleeve is set in described The outside of support cylinder, reinforcement position is provided between the supporting plate sleeve and the supporting plate.
In one of the embodiments, the reinforcement position is at least two, and at least two reinforcement positions are along described The circumferential direction arranged for interval of supporting plate sleeve.
In one of the embodiments, the template connecting hole is the lockpin hole that lock pin matching is connected with template.
A kind of early-dismantling formwork system, independent support bar, slab form, polylith early stripping formwork system, multiple template connector and Described early dismantling head, the one end of the support cylinder away from the roof supporting are arranged on the independent support bar, the branch Support plate is used for the top surface for supporting the slab form, and the shears is used to hold the slab form, morning described in polylith Form removal is connected by the template connecting piece, the early stripping formwork system adjacent with the slab form, connecting lateral plate and the building Template die plate is connected by the template connecting piece together.
The beneficial effects of the utility model are:
The early dismantling head is in use, support cylinder is arranged on independent support bar, the roof supporting of support cylinder one end The top surface of slab form is withstood for supporting, controls shears to rise by elevating mechanism, supporting plate can hold slab form, The installation form connector in template connecting hole can be passed through so that slab form, connecting lateral plate and and building slab on supporting plate The adjacent early stripping formwork system of plate is connected by template connecting piece together, slab form is supported solid and reliable;Need to remove mould During plate, template connecting piece of dismantling, shears is controlled to decline by elevating mechanism, you can to implement form removable and retain branch support Plate continues to support.The early dismantling head, by setting connecting lateral plate in the both sides of supporting plate, and template is set to connect on connecting lateral plate Hole, after early dismantling head installation, roof supporting can withstand and support the top surface of slab form, and shears can also be with floor Template, early stripping formwork system connect as one, can effective support shuttering, support it is solid and reliable.
The early-dismantling formwork system, including above-mentioned early dismantling head, possess the technique effect of above-mentioned early dismantling head, early dismantling head installation After can be connected as one with slab form and early stripping formwork system, supporting construction is solid and reliable.
Brief description of the drawings
Fig. 1 is the structural representation of the early dismantling head described in the utility model embodiment;
Fig. 2 is the structural representation of the lifting earrings described in the utility model embodiment;
Fig. 3 is the structural representation of the guide shaft fixing unit described in the utility model embodiment;
Fig. 4 is the structural representation of the shears described in the utility model embodiment;
Fig. 5 is the structural representation of the early-dismantling formwork system described in the utility model embodiment.
Description of reference numerals:
100th, support cylinder, 110, thread segment, 200, shears, 210, supporting plate, 220, connecting lateral plate, 222, template connects Connect hole, 230, supporting plate sleeve, 240, reinforcement position, 300, elevating mechanism, 310, lifting earrings, 312, lifting chute, 314, solid Determine chute, 316, jacking sleeve, 318, tap auricle, 320, guide shaft fixing unit, 400, roof supporting, 500, adjusting nut, 10, Independent support bar, 20, early stripping formwork system, 30, template connecting piece, 40, slab form.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings State.Better embodiment of the present utility model is given in accompanying drawing.But the utility model can come in many different forms Realize, however it is not limited to embodiments described herein.On the contrary, the purpose for providing these embodiments is to make to this practicality newly The more thorough and comprehensive that the disclosure of type understands.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.On the contrary, when element be referred to as " directly existing " another element " on " when, In the absence of intermediary element.Term as used herein " vertically ", " horizontal ", "left", "right" and similar statement are For illustrative purposes, it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model The implication that the technical staff in domain is generally understood that is identical.It is simply in term used in the description of the present utility model herein The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " bag Include the arbitrary and all combination of the Listed Items of one or more correlations.
As shown in figure 1, a kind of early dismantling head, including support cylinder 100, shears 200 and for lifting the lifting support The elevating mechanism 300 of frame 200.The elevating mechanism 300 is on the support cylinder 100.One end of the support cylinder 100 Provided with roof supporting 400.The shears 200 includes supporting plate 210 and is respectively arranged on the connecting side of the both sides of supporting plate 210 Plate 220.The supporting plate 210 is provided with mounting hole, and the supporting plate 210 is set in the support cylinder 100 at the mounting hole Outside.The connecting lateral plate 220 is provided with template connecting hole 222.
As shown in Figure 1, shown in Figure 5, the early dismantling head is in use, support cylinder 100 is arranged on independent support bar 10, support The roof supporting 400 of the one end of cylinder 100 is used to support the top surface for withstanding slab form 40, is controlled and lifted by elevating mechanism 300 Bracket 200 rises, and supporting plate 210 can hold slab form 40, can pass through the installation form connector in template connecting hole 222 30 so that together with the slab form 40, connecting lateral plate 220 and the early stripping formwork system 20 adjacent with slab form 40 on supporting plate 210 Connected, slab form 40 is supported solid and reliable by template connecting piece 30;When needing form removal, template of dismantling connection Part 30, shears 200 is controlled to decline by elevating mechanism 300, you can to implement form removable and retain roof supporting 400 and continue Support.The early dismantling head, by setting connecting lateral plate 220 in the both sides of supporting plate 210, and template is set on connecting lateral plate 220 Connecting hole 222, after early dismantling head installation, roof supporting 400 can withstand and support the top surface of slab form 40, and shears 200 can also connect as one with slab form 40, early stripping formwork system 20, can effective support shuttering, support it is solid and reliable.
In the present embodiment, the template connecting hole 222 is the lockpin hole that lock pin matching is connected with template.Usually, template The template connecting piece 30 being connected between template is that template connects lock pin.By the way that template connecting hole 222 is arranged into lockpin hole, even Conventional template connection lock pin can be used by connecing when side plate 220 is connected with slab form 40, early stripping formwork system 20, easy to operate.
Specifically, elevating mechanism 300 can be multiple structural forms, can such as include sleeve, be set on the inwall of sleeve Screw thread is put, the screw thread to match with sleeve is set on the outer wall of support cylinder 100, sleeve is set on support cylinder 100, By changing position of the sleeve on support cylinder 100 so that shears 200 rises or fallen along support cylinder 100, also may be used Think other forms, not limited to this.
In the present embodiment, as shown in figure 1, the elevating mechanism 300 includes lifting earrings 310 and guide shaft fixing unit 320.Institute Guide shaft fixing unit 320 is stated to be arranged on the support cylinder 100.The lifting earrings 310 is set in the support cylinder 100 Outside, the lifting earrings 310 are located at side of the shears 200 away from the roof supporting 400.The lifting earrings 310 are provided with lifting chute 312 along the longitudinal direction and fixed chute 314 in transverse direction.The fixed chute 314 with The lower end connection of the lifting chute 312.The lifting earrings 310 can be at fixed chute 314 or lifting chute 312 along institute Guide shaft fixing unit 320 is stated to move.Specifically, when lifting earrings 310 and rising shears 200, on support cylinder 100 with fixation One end corresponding section of the chute 314 away from lifting chute 312 is fixed bit, and the guide shaft fixing unit 320 is located at the fixed bit. The fixed chute 314 is " L " type with the lifting chute 312, simple in construction, easily manufactured.
Using said structure, lifting earrings 310 can move up and down at lifting chute 312 along guide shaft fixing unit 320, It can be rotated at fixed chute 314 along guide shaft fixing unit 320, when needing to rise shears 200, can will lift earrings 310 move along guide shaft fixing unit 320 so that and guide shaft fixing unit 320 is located at side of the fixed chute 314 away from lifting chute 312, Lifting earrings 310 can be fixed under the supporting role of guide shaft fixing unit 320;, can when needing form removal to fall shears 200 Lifting earrings 310 is set to be moved along guide shaft fixing unit 320 so that guide shaft fixing unit 320 is positioned at the upper end of lifting chute 312, lifting Earrings 310 highly declines and fixed under the supporting role of guide shaft fixing unit 320, and shears 200 can be fallen.By using Said structure, it is simple in construction, it can reliably rise or fall shears 200, it is simple to operate, reliable.
As shown in Figure 1 and Figure 2, the lifting earrings 310 includes jacking sleeve 316 and taps auricle 318.The lifting Sleeve 316 is set in the outside of the support cylinder 100.The jacking sleeve 316 is provided with the lifting chute 312 with fixing Chute 314.The auricle 318 that taps is on the outer wall of the jacking sleeve 316.Auricle 318, operator are tapped by setting Member can tap auricle 318 by specific purpose tool so that lifting earrings 310 is at fixed chute 214 or lifting chute 312 Moved along guide shaft fixing unit 320, operation is more convenient.In the present embodiment, the percussion auricle 318 is at least two panels, at least two Piece taps circumferential uniform intervals arrangement of the auricle 318 along jacking sleeve 316, and operating personnel can be tapped in different azimuth, be grasped It is more convenient to make.
In the present embodiment, the lifting chute 312 is two, and two chutes 312 that lift are along the jacking sleeve 316 Be provided at circumferentially spaced.The fixed chute 314 corresponds to two, and two fixed chutes 314 are along the jacking sleeve 316 Be provided at circumferentially spaced.The guide shaft fixing unit 320 crosses the support cylinder 100.Stretch respectively at the both ends of guide shaft fixing unit 320 Go out the support cylinder 100.When the lifting earrings 310 rises the shears 200, the guide shaft fixing unit 320 Both ends are respectively positioned at the one end of the fixed chute 314 away from corresponding lifting chute 312.Using said structure, when needing to rise When rising or falling shears 200, the both ends of guide shaft fixing unit 320 can play guiding and fixation to lifting earrings 310, Structure is more firm, reliable.
As shown in Figure 1, Figure 3, the guide shaft fixing unit 320 is fixing pin.One end of the guide shaft fixing unit 320 is provided with External screw thread.The support cylinder 100 is provided with the threaded securing bores matched with the guide shaft fixing unit 320.It is solid by being directed to Determine part 320 and be arranged to fixing pin structure, it is relatively low using general part, cost;Also, guide shaft fixing unit 320 is arranged on support column Fixation is connected through a screw thread when on body 100, it is easy for installation.
As shown in Figure 1, shown in Figure 5, the early dismantling head also includes adjusting nut 500.The support cylinder 100 is away from the support One end of top plate 400 is thread segment 110.The adjusting nut 500 is set in the outside of thread segment 110 of the support cylinder 100. Using said structure, the early dismantling head actual installation of the present embodiment is when on independent support bar 10, the thread segment of support cylinder 100 110 stretch into independent support bar 10, and play a part of spacing fixation by adjusting nut 500, by adjusting adjusting nut 500 Position on the thread segment 110 of support cylinder 100, you can the position that control support cylinder 100 is stretched into independent support bar 10, And then the whole height of the early dismantling head of adjustable the present embodiment, use are more flexible.
As Figure 1 and Figure 4, the shears 200 also includes supporting plate sleeve 230.The supporting plate sleeve 230 is located at institute Side of the supporting plate 210 away from the roof supporting 400 is stated, the supporting plate sleeve 230 docks with the mounting hole.The supporting plate set Cylinder 230 is set in the outside of the support cylinder 100, and reinforcement position is provided between the supporting plate sleeve 230 and the supporting plate 210 240.Shears 200 is set on support cylinder 100 by mounting hole and supporting plate sleeve 230, can be 100 liters along support cylinder Drop motion, and realized in the presence of earrings 310 is lifted and rise or fall;By setting reinforcement position 240, shears 200 Structural strength is good, and support effect is good, can further improve the solid and reliable property of support.
Further, the reinforcement position 240 is at least two.At least two reinforcement positions 240 are along the supporting plate The circumferential direction arranged for interval of sleeve 230, the structural strength of shears 200 is good, and support effect is good.In the present embodiment, reinforcement Position 240 is four, circumferential direction uniform intervals arrangement of four reinforcement positions 240 along the supporting plate sleeve 230, is being strengthened On the basis of muscle position 240 is less, the structural strength of shears 200 is preferable.
As shown in Figure 1, shown in Figure 5, a kind of early-dismantling formwork system, including independent support bar 10, slab form 40, polylith morning form removal Plate 20, multiple template connector 30 and described early dismantling head.The support cylinder 100 away from the roof supporting 400 one End is on the top of the independent support bar 10.The roof supporting 400 is used for the top surface for supporting the slab form 40. The shears 200 is used to hold the slab form 40.Early stripping formwork system 20 described in polylith passes through the template connecting piece 30 Connection.Pass through institute together with the early stripping formwork system 20 adjacent with the slab form 40, connecting lateral plate 220 and the slab form 40 Template connecting piece 30 is stated to connect.
The system of early stripping formwork system 20, including above-mentioned early dismantling head, possess the technique effect of above-mentioned early dismantling head, supporting construction It is solid and reliable.Early dismantling head is arranged on independent support bar 10, and roof supporting 400 can support the top surface for withstanding slab form 40, The supporting plate 210 of shears 200 can hold slab form 40, can pass through the installation form connector in template connecting hole 222 30 so that the connecting lateral plate 220 of supporting plate 210 connects as one with slab form 40 and early stripping formwork system 20, and then early dismantling head and building Template die plate 40, early stripping formwork system 20 connect as one, and compared to the structure that traditional early dismantling head only withstands slab form 40, support is more It is firm;When needing form removal, template connecting piece 30 of dismantling, shears 200 is fallen, you can implement form removable and retain branch Support plate 400 continues to support early dismantling head, easy to operate.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of early dismantling head, it is characterised in that including support cylinder, shears and lifting for lifting the shears Mechanism, for the elevating mechanism on the support cylinder, one end of the support cylinder is provided with roof supporting, the lifting support Frame includes supporting plate and is respectively arranged on the connecting lateral plate of the supporting plate both sides, and the supporting plate is provided with mounting hole, and the supporting plate exists The outside of the support cylinder is set at the mounting hole, the connecting lateral plate is provided with template connecting hole.
2. early dismantling head according to claim 1, it is characterised in that the elevating mechanism includes lifting earrings and be oriented to fix Part, the guide shaft fixing unit are arranged on the support cylinder, and the lifting earrings is set in the outside of the support cylinder, institute State lifting earrings and be located at side of the shears away from the roof supporting, the lifting earrings is provided with along the longitudinal direction Lifting chute and fixed chute in transverse direction, the fixed chute connects with the lower end for lifting chute, described Lifting earrings can move at fixed chute or lifting chute along the guide shaft fixing unit.
3. early dismantling head according to claim 2, it is characterised in that the lifting earrings includes jacking sleeve and taps ear Piece, the jacking sleeve are set in the outside of the support cylinder, and the jacking sleeve is provided with the lifting chute and fixation Chute, the auricle that taps is on the outer wall of the jacking sleeve.
4. early dismantling head according to claim 3, it is characterised in that the lifting chute is two, and two liftings are slided Groove is provided at circumferentially spaced along the jacking sleeve, and the fixed chute corresponds to two, and two fixed chutes are described in Jacking sleeve is provided at circumferentially spaced, and the guide shaft fixing unit crosses the support cylinder, when described in the lifting earrings rise During shears, the both ends of the guide shaft fixing unit are respectively positioned at the one end of the fixed chute away from corresponding lifting chute.
5. early dismantling head according to claim 4, it is characterised in that the guide shaft fixing unit is fixing pin, the guiding One end of fixture is provided with external screw thread, and the support cylinder is provided with the threaded securing bores matched with the guide shaft fixing unit.
6. according to the early dismantling head described in claim any one of 1-5, it is characterised in that also including adjusting nut, the support column The one end of body away from the roof supporting is thread segment, and the adjusting nut is set on the outside of the thread segment of the support cylinder.
7. early dismantling head according to claim 6, it is characterised in that the shears also includes supporting plate sleeve, the support Sleeve-board cylinder is located at side of the supporting plate away from the roof supporting, and the supporting plate sleeve docks with the mounting hole, the support Sleeve-board jacket casing is located at the outside of the support cylinder, and reinforcement position is provided between the supporting plate sleeve and the supporting plate.
8. early dismantling head according to claim 7, it is characterised in that the reinforcement position is at least two, at least two institutes State circumferential direction arranged for interval of the reinforcement position along the supporting plate sleeve.
9. according to the early dismantling head described in claim any one of 1-5, it is characterised in that the template connecting hole is to be connected with template The lockpin hole of lock pin matching.
10. a kind of early-dismantling formwork system, it is characterised in that including independent support bar, slab form, polylith early stripping formwork system, multiple Early dismantling head described in template connecting piece and claim any one of 1-9, the support cylinder away from the roof supporting one End is arranged on the independent support bar, and the roof supporting is used for the top surface for supporting the slab form, the shears For holding the slab form, early stripping formwork system is connected by the template connecting piece described in polylith, with the slab form phase Adjacent early stripping formwork system, connecting lateral plate and the slab form is connected by the template connecting piece together.
CN201720303464.9U 2017-03-24 2017-03-24 Early dismantling head and early-dismantling formwork system Active CN206707270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720303464.9U CN206707270U (en) 2017-03-24 2017-03-24 Early dismantling head and early-dismantling formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720303464.9U CN206707270U (en) 2017-03-24 2017-03-24 Early dismantling head and early-dismantling formwork system

Publications (1)

Publication Number Publication Date
CN206707270U true CN206707270U (en) 2017-12-05

Family

ID=60467402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720303464.9U Active CN206707270U (en) 2017-03-24 2017-03-24 Early dismantling head and early-dismantling formwork system

Country Status (1)

Country Link
CN (1) CN206707270U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661311A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of flooring early tears system and its application method open
CN108868195A (en) * 2018-07-03 2018-11-23 广东奇正科技有限公司 A kind of support component for tearing U support open with morning of support building template
CN109457953A (en) * 2018-12-20 2019-03-12 筑梦高科建筑有限公司 A kind of two-way positioning supporting frame of semi-solid-state shaping
CN109518946A (en) * 2018-12-20 2019-03-26 筑梦高科建筑有限公司 A kind of multidirectional positioning supporting frame of semi-solid-state shaping
CN113389371A (en) * 2021-08-17 2021-09-14 烟建集团有限公司 Early-dismantling formwork system and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868195A (en) * 2018-07-03 2018-11-23 广东奇正科技有限公司 A kind of support component for tearing U support open with morning of support building template
CN108661311A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of flooring early tears system and its application method open
CN108661311B (en) * 2018-07-23 2023-11-24 广东传世建设工程有限公司 Early floor dismantling system and application method thereof
CN109457953A (en) * 2018-12-20 2019-03-12 筑梦高科建筑有限公司 A kind of two-way positioning supporting frame of semi-solid-state shaping
CN109518946A (en) * 2018-12-20 2019-03-26 筑梦高科建筑有限公司 A kind of multidirectional positioning supporting frame of semi-solid-state shaping
CN109518946B (en) * 2018-12-20 2021-05-07 广东博智林机器人有限公司 Multidirectional positioning support frame for semi-solid forming
CN113389371A (en) * 2021-08-17 2021-09-14 烟建集团有限公司 Early-dismantling formwork system and construction method thereof

Similar Documents

Publication Publication Date Title
CN206707270U (en) Early dismantling head and early-dismantling formwork system
CN106801510A (en) Plastic formwork early removing system
CN206707269U (en) Early dismantling head and early-dismantling formwork system
CN100429375C (en) Formworkfor elevator well of high rising building and construction method thereof
CN107989364A (en) A kind of strip Quick Release support system for beam
CN108643456B (en) Mounting fixture of main rib of flanging die
CN206937564U (en) A kind of embedded parts positioning device
CN202627493U (en) Combined template for constructing elevator shaft
CN214044597U (en) Adjustable power distribution cabinet mounting bracket
CN206707266U (en) Plastic formwork early removing system
CN203755676U (en) Perpendicularity control tool for wall column
CN213498694U (en) Computer and office equipment maintenance are with raising positioning fixture
CN206530077U (en) A kind of support frame
CN205279745U (en) Vault with adjustable
CN210559672U (en) Lifting aeration device for sewage treatment
CN210763925U (en) Tire mold side plate hoisting and overturning support
CN208168384U (en) A kind of adjustable steel structure assembling fixture
CN201065645Y (en) High rising building elevator shaft formwork device
CN207672995U (en) A kind of In Great Basement late poured band support template
CN207511772U (en) One kind is used to build fixed fixed panel lifting transfer device
CN207658955U (en) A kind of adjustable steel wire rope of windlass conversion support
CN218931485U (en) Lifting appliance for frame beam reinforcement cage
CN207228602U (en) A kind of speed-regulating type scaffold
CN105041098A (en) Adjusting and fixing device for transmission gear rack of sliding door
CN206373585U (en) Fastener blade provision for disengagement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510000 29 Luogang District Science City, Guangzhou, Guangdong

Patentee after: Guangzhou Yichang cattle model King Technology Co., Ltd.

Address before: 510663 29 Luogang District Science City, Guangzhou, Guangdong

Patentee before: GUANGZHOU ECHOM FORMWORK CO., LTD.

CP03 Change of name, title or address