CN206373585U - Fastener blade provision for disengagement - Google Patents
Fastener blade provision for disengagement Download PDFInfo
- Publication number
- CN206373585U CN206373585U CN201720047014.8U CN201720047014U CN206373585U CN 206373585 U CN206373585 U CN 206373585U CN 201720047014 U CN201720047014 U CN 201720047014U CN 206373585 U CN206373585 U CN 206373585U
- Authority
- CN
- China
- Prior art keywords
- impact drill
- fastener
- stop sleeve
- cantilever beams
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model belongs to technical field of building construction, more particularly to a kind of fastener blade provision for disengagement, including workbench, fastener support base and impact drill and impact drill support, and wherein fastener support base and impact drill support is fixed on workbench;The fastener support base includes the stop sleeve being adapted with fastener body, the left and right sides is fixed with the sleeve pipe supported for rivet position at the top of along stop sleeve, along ring at the top of stop sleeve be provided with 3 points outside fastener body limited posts be adapted to, wherein limited post and sleeve pipe are setting of staggering;The impact drill support includes column and cantilever beams, and the impact drill is provided with impact drill elevating mechanism and impact drill laterial translation mechanism directly over stop sleeve between impact drill and cantilever beams.The utility model compact conformation, it is easy to implement, labor strength is low, and remediation efficiency is high, and operating cost is low.
Description
Technical field
The utility model belongs to technical field of building construction, more particularly to a kind of fastener blade provision for disengagement.
Background technology
With flourishing for construction market, fastener type steel pipe scaffold and shuttering supporting have obtained extensive utilization, and
Substantial amounts of fastener is applied in fastener type steel pipe scaffold and form bracing system.Conventional fastener structures generally comprise fastener
Main body 1, blade 2, and the rivet 3 for connection fastener main body and blade, coordinating to be provided between fastener body and blade is used for
The arc-shaped cavity 4 for connecing steel pipe is worn, Fig. 1 show right-angle type fastener.But in building construction process, there is difference in the blade of fastener
The slight crack of degree and fracture, and cause fastener to be scrapped, or because the anchoring of fastener rivet loosely causes fastener to be scrapped, so as to cause
Very big waste, and also there is larger safe construction hidden danger in fastener damage.But manually repair damage fastener completely and deposit
It is big in technical difficulty, waste time and energy, many defects such as operating cost height.Therefore, research and design is a kind of repaired in damage fastener
Cheng Zhong, the servicing unit for dismantling blade to reduce labor strength, improves remediation efficiency, reduces operating cost, is this
Art personnel technical problem urgently to be resolved hurrily.
The content of the invention
The technical problems to be solved in the utility model is exactly to overcome above-mentioned the deficiencies in the prior art, and it is tight to provide a kind of structure
Gather, it is easy to implement, labor strength is low, remediation efficiency is high, and the low fastener blade provision for disengagement of operating cost.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of fastener blade provision for disengagement, including workbench, fastener support base and impact drill and impact drill support are designed,
Wherein fastener support base and impact drill support is fixed on workbench;
The fastener support base includes the stop sleeve being adapted with fastener body, consolidates along the stop sleeve top left and right sides
Fixed be provided with is used for the sleeve pipe that rivet position is supported, along stop sleeve at the top of ring be provided with and fastener body outside 3 points of limits for being adapted to
Position post, wherein limited post are setting of staggering with sleeve pipe;
The impact drill support includes column and cantilever beams, and the impact drill is directly over stop sleeve, impact drill
Impact drill elevating mechanism and impact drill laterial translation mechanism are provided between cantilever beams.
Preferably, in above-mentioned fastener blade provision for disengagement, the impact drill elevating mechanism is lift cylinder or hydraulic pressure
Cylinder, lift cylinder or hydraulic cylinder body are arranged in cantilever beams, and the piston rod of lift cylinder or hydraulic cylinder is passed downwards
Cantilever beams, its end is installed by the impact drill.
Preferably, in above-mentioned fastener blade provision for disengagement, the impact drill laterial translation mechanism is passed including screw leading screw
Motivation structure and power unit, wherein screw lead-screw drive mechanism include leading screw and screw plate, and wherein leading screw end passes through connecting plate
It is connected with lift cylinder or hydraulic cylinder body side surface, screw plate is in cantilever beams.
Preferably, in above-mentioned fastener blade provision for disengagement, relative to lift cylinder or the piston rod of hydraulic cylinder, outstanding
Arm crossbeam is provided with the avoidance elongated slot through cantilever beam top and bottom.
Preferably, in above-mentioned fastener blade provision for disengagement, the power unit is stepper motor, stepper motor and leading screw
It is direct-connected by shaft coupling.
Preferably, in above-mentioned fastener blade provision for disengagement, described sleeve pipe and limited post are set along stop sleeve inwall ring
Put.
The beneficial effect of technical solutions of the utility model is:
The utility model fastener blade provision for disengagement is distinguished contacting piece by extension supporting sleeve, sleeve pipe and limited post and carried out
Support and positioned in the horizontal direction, support is firm, accurate positioning.Moreover, only need to be by controlling lift cylinder or hydraulic pressure
Cylinder piston rod stretches, you can completes rivet dismounting and resets.In addition, adjusting machine by stepper motor and screw-nut transverse translation
Structure, can freely adjust position of the impact drill in the vertical direction relative to rivet position.Thus, it is easy for operation, it is time saving
Laborsaving, labor strength is low, and remediation efficiency is high;And compact conformation, operating cost are low, suitable for promotion and implementation.
Brief description of the drawings
Embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the structural representation of existing cross fastener;
Fig. 2 is the structural representation of the utility model fastener blade provision for disengagement;
Fig. 3 is the overlooking the structure diagram shown in Fig. 2;
Fig. 4 is A shown in Fig. 2 to structural representation;
Sequence number in figure:1st, fastener body, 2, blade, 3, rivet, 4, arc-shaped cavity,
11st, workbench, 12, impact drill, 13, column, 14, cantilever beams, 15, stop sleeve, 16, sleeve pipe, 17, spacing
Post, 18, lift cylinder or hydraulic cylinder, 19, leading screw, 20, screw plate, 21, shaft coupling, 22, stepper motor, 23, avoid elongated slot.
Embodiment
Illustrate embodiment of the present utility model with reference to the accompanying drawings and examples, but following examples are to use
To describe the utility model in detail, scope of the present utility model is not limited in any way, it is involved in the examples below
Instrument element unless otherwise instructed, be conventional instrument element.
Embodiment one:
Referring to Fig. 2-4, in figure, the utility model fastener blade provision for disengagement, including workbench 11, fastener support base and
Impact drill 12 and impact drill support, wherein impact drill support include column 13 and cantilever beams 14, and fastener support base and column are solid
Due on workbench.
Fastener support base includes the stop sleeve 15 being adapted with fastener body, is fixed along the stop sleeve top left and right sides
Provided with the sleeve pipe 16 supported for rivet position, along stop sleeve at the top of ring be provided with and fastener body outside 3 points of limits for being adapted to
Position post 17, wherein limited post are setting of staggering with sleeve pipe, and sleeve pipe and limited post are arranged circumferentially along stop sleeve inwall.
Impact drill is provided with impact drill lift cylinder or liquid directly over stop sleeve between impact drill and cantilever beams
The piston rod of cylinder pressure 18, lift cylinder or hydraulic cylinder passes downwards cantilever beams, and impact drill is installed in its end.Lift cylinder or
Person's hydraulic cylinder body side surface is provided with leading screw 19 by connecting plate, and leading screw matches company with the set screw thread of screw plate 20 in cantilever beams
Connect, relative to lift cylinder or hydraulic cylinder connection end, stepper motor 22 is provided with by shaft coupling 21 in the leading screw other end, use
Adjusted with impact drill transverse translation.Relative to lift cylinder or the piston rod of hydraulic cylinder, it is provided with cantilever beams through outstanding
The avoidance elongated slot 23 of arm beam top and bottom.
When specifically used, fastener is placed on stop sleeve between three limited posts first, while ensureing rivet position
Above the sleeve pipe, then by stepper motor and screw lead-screw drive mechanism, regulation impact drill in the vertical direction relative to
The position at rivet position, after being adjusted in place, starts lift cylinder or hydraulic cylinder, control impact drill is moved down, and is directed at rivet,
Rivet is disassembled, so that the fastener blade damaged is disassembled, changed.After rivet is disassembled, lifting air
Cylinder or hydraulic cylinder piston rod are retracted, and drive impact drill to go up to reset.It is right respectively by extension supporting sleeve, sleeve pipe and limited post
Fastener is supported and positioned in the horizontal direction, and support is firm, accurate positioning;And only need to by control lift cylinder or
Person's hydraulic cylinder piston rod stretches, you can completes rivet dismounting and resets;Adjusted by stepper motor and screw-nut transverse translation
Mechanism, can freely adjust position of the impact drill in the vertical direction relative to rivet position.It is thus easy for operation, it is time saving
Laborsaving, labor strength is low, and remediation efficiency is high, and operating cost is low.
The utility model is described in detail above in conjunction with drawings and examples, still, the skill of art
Art personnel, can also be specific to each in above-described embodiment it is understood that on the premise of the utility model objective is not departed from
Parameter is changed, and is formed multiple specific embodiments, is common excursion of the present utility model, no longer detailed one by one herein
State.
Claims (6)
1. a kind of fastener blade provision for disengagement, it is characterized in that:Including workbench, fastener support base, impact drill and impact drill branch
Frame, wherein fastener support base and impact drill support are fixedly installed on workbench;
The fastener support base includes the stop sleeve being adapted with fastener body, fixes and sets along the stop sleeve top left and right sides
There is the sleeve pipe supported for rivet position, it is spacing provided with what is be adapted to 3 points outside fastener body along stop sleeve top ring
Post, wherein limited post are setting of staggering with sleeve pipe;
The impact drill support includes column and cantilever beams, and the impact drill is directly over stop sleeve, and impact drill is with hanging
Impact drill elevating mechanism and impact drill laterial translation mechanism are provided between arm crossbeam.
2. fastener blade provision for disengagement according to claim 1, it is characterized in that:The impact drill elevating mechanism is lifting air
Cylinder or hydraulic cylinder, lift cylinder or hydraulic cylinder body are arranged in cantilever beams, the piston of lift cylinder or hydraulic cylinder
Bar passes downwards cantilever beams, and the impact drill is installed in its end.
3. fastener blade provision for disengagement according to claim 2, it is characterized in that:The impact drill laterial translation mechanism includes
Screw lead-screw drive mechanism and power unit, wherein screw lead-screw drive mechanism include leading screw and screw plate, wherein leading screw end
It is connected by connecting plate with lift cylinder or hydraulic cylinder body side surface, screw plate is in cantilever beams.
4. fastener blade provision for disengagement according to claim 3, it is characterized in that:Relative to lift cylinder or hydraulic cylinder
Piston rod, is provided with the avoidance elongated slot through cantilever beam top and bottom in cantilever beams.
5. fastener blade provision for disengagement according to claim 3, it is characterized in that:The power unit is stepper motor, step
Stepper motor is direct-connected by shaft coupling with leading screw.
6. the fastener blade provision for disengagement according to any one of claim 1 to 5, it is characterized in that:Described sleeve pipe and limited post
It is arranged circumferentially along stop sleeve inwall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720047014.8U CN206373585U (en) | 2017-01-16 | 2017-01-16 | Fastener blade provision for disengagement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720047014.8U CN206373585U (en) | 2017-01-16 | 2017-01-16 | Fastener blade provision for disengagement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206373585U true CN206373585U (en) | 2017-08-04 |
Family
ID=59404961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720047014.8U Expired - Fee Related CN206373585U (en) | 2017-01-16 | 2017-01-16 | Fastener blade provision for disengagement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206373585U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109290771A (en) * | 2018-09-28 | 2019-02-01 | 青岛铭晨信息技术有限公司 | A kind of pressing machine for the installation of industrial coupler |
-
2017
- 2017-01-16 CN CN201720047014.8U patent/CN206373585U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109290771A (en) * | 2018-09-28 | 2019-02-01 | 青岛铭晨信息技术有限公司 | A kind of pressing machine for the installation of industrial coupler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111764686A (en) | Floor support plate supporting device | |
CN106801510A (en) | Plastic formwork early removing system | |
CN101597958A (en) | Can be whole upright, the template system of form removal | |
CN202627493U (en) | Combined template for constructing elevator shaft | |
CN206373585U (en) | Fastener blade provision for disengagement | |
CN106499173B (en) | The aluminum alloy mould plate mechanism of building floor construction is used for based on BIM technology | |
CN206513015U (en) | The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN201367729Y (en) | Multi-functional early-dismantled top support for slab formworks | |
CN209413294U (en) | A kind of beam form board mount for saving construction space | |
CN204310511U (en) | A kind of C-type steel upset props up device | |
CN203684664U (en) | Cast-in-place beam die for doors and windows | |
CN201367730Y (en) | A die plate supporting device convenient for dismounting die plates | |
CN205894292U (en) | Prefabricated assembly structure tip beam column node fixed knot constructs | |
CN206707266U (en) | Plastic formwork early removing system | |
CN202544399U (en) | Supporting frame for overhang floor slab with steel structure | |
CN201539097U (en) | Full hydraulic climbing template | |
CN204603635U (en) | For the moulding bed of Node In Large-span Pipe Truss modularization making | |
CN204711557U (en) | The servicing unit of large-scale vertical mill spiral system assembling | |
CN204299173U (en) | A kind of elevator integral mold plate | |
CN212802707U (en) | Floor support plate supporting device | |
CN209976067U (en) | Lifting guide rail type steel bracket structure for jacking and storey-adding | |
CN212385661U (en) | Prefabricated plate napping device | |
CN220469813U (en) | Derrick foot positioning device for derrick | |
CN204418681U (en) | The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170804 Termination date: 20180116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |