CN206707234U - A kind of scaffold for building - Google Patents

A kind of scaffold for building Download PDF

Info

Publication number
CN206707234U
CN206707234U CN201720493546.4U CN201720493546U CN206707234U CN 206707234 U CN206707234 U CN 206707234U CN 201720493546 U CN201720493546 U CN 201720493546U CN 206707234 U CN206707234 U CN 206707234U
Authority
CN
China
Prior art keywords
scaffold
pneumatic jack
jack bar
operation plate
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720493546.4U
Other languages
Chinese (zh)
Inventor
马从贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Horsepower Building Decoration Group Co Ltd
Original Assignee
Anhui Horsepower Building Decoration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Horsepower Building Decoration Group Co Ltd filed Critical Anhui Horsepower Building Decoration Group Co Ltd
Priority to CN201720493546.4U priority Critical patent/CN206707234U/en
Application granted granted Critical
Publication of CN206707234U publication Critical patent/CN206707234U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of scaffold for building, including scaffold, folding rod is provided with left and right sides of the scaffold, both sides below the scaffold are movably hinged with the first pneumatic jack bar and the second pneumatic jack bar respectively, the first chute is provided with the inside of the scaffold, the upper end of the first pneumatic jack bar and the second pneumatic jack bar, which is slided, to be connected in the first chute, the second chute is provided with the outside of the scaffold, clamping screw is provided with second chute, the top of the first pneumatic jack bar and the second pneumatic jack bar is provided with screwed hole, and it is adapted to clamping screw, the top of the first pneumatic jack bar and the second pneumatic jack bar is mounted on support block, the first operation plate and the second operation plate are movably hinged with above the support block.The scaffold is not required to install when in use, more time saving, the height of adjustable operating plate during use, and to reduce, take up an area can also be by its folding shrinking after the completion of use.

Description

A kind of scaffold for building
Technical field
Technical field of buildings is the utility model is related to, specially a kind of scaffold for building.
Background technology
Engineering structure generally there are certain height, can not be fulfiled assignment using the normal height of people, then need pin hand Auxiliary equipment as frame, but in general scaffold some needs to install, when mounted it needs to be determined that the position of each rod member And installation method, it is also necessary to the instrument of some auxiliary, such as screw wrench, be not only inconvenient to also relatively time-consuming, some is not required to pacify Dress, but height and size are relatively more fixed, it is impossible to allow operating personnel also to take many vacant lots with a kind of comfortable posture operation.
Utility model content
The purpose of this utility model is to provide a kind of scaffold for building, asked with solve to propose in above-mentioned background technology Topic.
To achieve the above object, the utility model provides following technical scheme:A kind of scaffold for building, including pin hand Frame, is provided with folding rod at left and right sides of the scaffold, and the both sides below the scaffold are movably hinged with first respectively Pneumatic jack bar and the second pneumatic jack bar, the first chute, the first pneumatic jack bar and the second pneumatic jack are provided with the inside of the scaffold The upper end of bar, which is slided, to be connected in the first chute, and the second chute, second chute are provided with the outside of the scaffold Interior to be provided with clamping screw, the top of the first pneumatic jack bar and the second pneumatic jack bar is provided with screwed hole, and is adapted to clamping screw, The top of the first pneumatic jack bar and the second pneumatic jack bar is mounted on support block, and first is movably hinged with above the support block Operation plate and the second operation plate, first operation plate are rotatablely connected by screw rod and the second operation plate, first operation plate Anti-skidding ripple is provided with the second operation plate upper surface.
Preferably, the first pneumatic jack bar and the second pneumatic jack bar are provided with two groups, and the first pneumatic jack bar and the second pneumatic jack Bar is arranged in a crossed manner.
Preferably, first operation plate and the second operation plate seam crossing are arranged to curved surface.
Preferably, the scaffold includes four montants and two cross bars.
Preferably, the folding rod includes two rod members, and two rod members are rotatablely connected.
Compared with prior art, the beneficial effects of the utility model are:The scaffold is made up of rod member and sheet material, structure letter Single, it is mainly supported by vertical steel pipe, and there is rod member support in each direction, ensure that the stability of structure, when in use not Need to install, it is more time saving, the height of adjustable operating plate during use, receipts can be also folded to reduce to take up an area after the completion of use Contracting, the first operation plate and the second operation plate are surface blending during contraction, and compared to the corner angle of right-angle surface, curved surface can preferably agree with And it is not easy friction damage.
Brief description of the drawings
Fig. 1 is the utility model agent structure schematic diagram;
Fig. 2 is the first operation plate of the present utility model, the second operation plate and the first pneumatic jack bar assembling side elevation;
Fig. 3 is the partial top view of the utility model scaffold.
In figure:1 scaffold, 2 first pneumatic jack bars, 3 second pneumatic jack bars, 4 folding rods, 5 first chutes, 6 second chutes, 7 locks Tight bolt, 8 screw rods, 9 anti-skidding ripples, 10 first operation plates, 11 second operation plates, 12 support blocks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of scaffold for building, including scaffold 1, The scaffold 1 is made up of four montants and two cross bars, and two cross bars be arranged in parallel, and the left and right sides of the scaffold 1 is equal Folding rod 4 is provided with, the folding rod 4 includes two rod members, and two rod members are rotatablely connected, the both sides of the lower section of scaffold 1 The first pneumatic jack bar 2 and the second pneumatic jack bar 3 are movably hinged with respectively, and the first pneumatic jack bar 2 and the second pneumatic jack bar 3 are provided with four Group, and the first pneumatic jack bar 2 and the second pneumatic jack bar 3 are arranged in a crossed manner, the inner side of the scaffold 1 is provided with the first chute 5, described The upper end of first pneumatic jack bar 2 and the second pneumatic jack bar 3, which is slided, to be connected in the first chute 5, and the outside of the scaffold 1 is respectively provided with There is the second chute 6, be provided with clamping screw 7 in second chute 6, the top of the first pneumatic jack bar 2 and the second pneumatic jack bar 3 is equal Screwed hole is provided with, and is adapted to clamping screw 7, the top of the first pneumatic jack bar 2 and the second pneumatic jack bar 3 is mounted on support block 12, the top of the support block 12 is movably hinged with the first operation plate 10 and the second operation plate 11, and first operation plate 10 is logical Cross screw rod 8 to be rotatablely connected with the second operation plate 11, the upper surface of 10 and second operation plate of the first operation plate 11 is provided with anti- Sliding ripple 9, the seam crossing of 10 and second operation plate of the first operation plate 11 are arranged to curved surface.
Operation principle:The scaffold 1 is made up of rod member and sheet material, and scaffold 1 is made up of four montants and two cross bars, knot Structure is simple, is not required to install when in use, need to only open scaffold 1, the first pneumatic jack bar 2 and the second pneumatic jack bar 3 upwards or to Lower folding and unfolding, clamping screw 7, the first operation plate 10 and the second operation plate 11 also and then move, the He of the first operation plate 10 to be regulated The height of second operation plate 11, it can be used with the locking of clamping screw 7, it is more time saving, by the pine of clamping screw 7 after the completion of use Open, scaffold 1 shrinks inwards, and the first operation plate 10 and the second operation plate 11 shrink upwards, and folding rod 4 also shrinks upwards, you can Reduce to take up an area and folded.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of scaffold for building, including scaffold (1), it is characterised in that:It is respectively provided with left and right sides of the scaffold (1) There is a folding rod (4), the both sides below the scaffold (1) are movably hinged with the first pneumatic jack bar (2) and the second pneumatic jack bar respectively (3), it is provided with the first chute (5) on the inside of the scaffold (1), the first pneumatic jack bar (2) and the second pneumatic jack bar (3) Upper end, which is slided, to be connected in the first chute (5), is provided with the second chute (6) on the outside of the scaffold (1), and described second It is provided with clamping screw (7) in chute (6), the top of the first pneumatic jack bar (2) and the second pneumatic jack bar (3) is provided with screwed hole, And be adapted to clamping screw (7), the top of the first pneumatic jack bar (2) and the second pneumatic jack bar (3) is mounted on support block (12), The first operation plate (10) and the second operation plate (11), first operation plate are movably hinged with above the support block (12) (10) it is rotatablely connected by screw rod (8) and the second operation plate (11), on first operation plate (10) and the second operation plate (11) Surface is provided with anti-skidding ripple (9).
A kind of 2. scaffold for building according to claim 1, it is characterised in that:The first pneumatic jack bar (2) and second Pneumatic jack bar (3) is disposed as two groups, and the first pneumatic jack bar (2) and the second pneumatic jack bar (3) are arranged in a crossed manner.
A kind of 3. scaffold for building according to claim 1, it is characterised in that:First operation plate (10) and second Operation plate (11) seam crossing is arranged to curved surface.
A kind of 4. scaffold for building according to claim 1, it is characterised in that:The scaffold (1) includes four and erected Bar and two cross bars.
A kind of 5. scaffold for building according to claim 1, it is characterised in that:The folding rod (4) includes two bars Part, and two rod members are rotatablely connected.
CN201720493546.4U 2017-05-05 2017-05-05 A kind of scaffold for building Expired - Fee Related CN206707234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720493546.4U CN206707234U (en) 2017-05-05 2017-05-05 A kind of scaffold for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720493546.4U CN206707234U (en) 2017-05-05 2017-05-05 A kind of scaffold for building

Publications (1)

Publication Number Publication Date
CN206707234U true CN206707234U (en) 2017-12-05

Family

ID=60466371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720493546.4U Expired - Fee Related CN206707234U (en) 2017-05-05 2017-05-05 A kind of scaffold for building

Country Status (1)

Country Link
CN (1) CN206707234U (en)

Similar Documents

Publication Publication Date Title
CN102720356B (en) Steel beam grid floor formwork system
CN204126230U (en) Assembly scaffold unit
CN203403674U (en) Instrumental adjustable stair steel formwork
CN204081538U (en) A kind of assembling turnover processing protection canopy
CN205804939U (en) template assembly for subway station side wall
CN206707234U (en) A kind of scaffold for building
CN206205442U (en) Aluminum alloy mould plate supports slab adjusting device
CN206309019U (en) One kind is used for heavy in section frame column gang form bracing means
CN204715746U (en) One side spin axis collapsible triangle independent support bar
CN208072912U (en) A kind of Easy opened scaffold that construction site auxiliary is built
CN110653323A (en) Compound concatenation riveting frock of electrical cabinet
CN203640266U (en) Building template system
CN212743445U (en) Movable telescopic folding shed frame
CN206477573U (en) A kind of concrete blinding is adjustable to be shored
CN205935924U (en) Rail stand connecting piece
CN208280657U (en) support frame for building
CN206495483U (en) A kind of workbench of elevator
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN208950301U (en) A kind of combined type bearing constructed for skyscraper or bridge tower
CN202787960U (en) Steel girder grid floor formwork system
CN206581576U (en) A kind of easy-to-mount scaffold
CN208039879U (en) A kind of stair step finished product protection folded sheet
CN205617763U (en) Omnipotent support combined bay support element and omnipotent support combined bay
CN211949494U (en) Foldable scaffold for building construction
CN206784879U (en) The portable folding cat ladder of construction operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205