CN206707114U - 一种运用bim建模的带rfid芯片的预制墙板 - Google Patents
一种运用bim建模的带rfid芯片的预制墙板 Download PDFInfo
- Publication number
- CN206707114U CN206707114U CN201720520614.1U CN201720520614U CN206707114U CN 206707114 U CN206707114 U CN 206707114U CN 201720520614 U CN201720520614 U CN 201720520614U CN 206707114 U CN206707114 U CN 206707114U
- Authority
- CN
- China
- Prior art keywords
- lobe wallboard
- rfid chip
- wallboard
- internal lobe
- fixed card
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
一种运用BIM建模的带RFID芯片的预制墙板,包括外叶墙板、内叶墙板、RFID芯片、固定卡扣、竖向连接钢筋和边缘构件骨架,内叶墙板外侧有外叶墙板,外叶墙板和内叶墙板中部有槽,外叶墙板和内叶墙板中部的槽互相对应,内叶墙板上方伸出有一排竖向连接钢筋,内叶墙板两侧各有一排边缘构件骨架,内叶墙板另一侧有RFID芯片和固定卡扣,固定卡扣成对设置,RFID芯片通过贴片或者紧固件固定在内叶墙板侧面上方的一个角。本申请采用模块化设计,配套RFID芯片,可用于装配式建筑的建造,优化整合预制构件生产流程、加快装配式建筑模型试制过程、改善预制构件库存和现场管理、提高施工现场管理效率。
Description
技术领域
本实用新型涉及建筑用配套设备领域,特别是涉及一种运用BIM建模的带RFID芯片的预制墙板。
背景技术
当前,伴随我国经济发展而来的环境问题日益突出。传统建筑业因其资源浪费率高、污染重而饱受诟病,与此同时,装配式建筑由于其施工污染少、施工速度快、资源利用率高等优点越来越受到全社会的关注。装配式建筑具有设计系统化、构件生产工厂化、安装专业化等特点,这些特点使装配式建筑与传统现浇式建筑在设计、预制构件生产以及施工过程中都有显著的差别。近年来,我国建筑行业正在逐步推广BIM相关技术和方法,对于装配式建筑而言,BIM相关的技术平台和工具可以有效地提高装配式建筑设计、生产及施工的效率,促进装配式建筑这一新型建筑形式更好更快地推广。装配式建筑的预制构件生产阶段是装配式建筑生产周期中的重要环节,也是连接装配式建筑设计与施工的关键环节。预制墙板在预制厂(场)或建筑工地加工制成供建筑装配用的加筋混凝土板型构件,简称墙板或壁板。采用预制混凝土墙板建造装配式大板建筑,可以提高工厂化、机械化施工程度,减少现场湿作业,节约现场用工,克服季节影响,缩短建筑施工周期,因此其中预制墙板是装配式建筑的一个主要部分,为了配合BIM相关的技术,需要设计一种运用BIM建模的带RFID芯片的预制墙板,来配合装配式建筑建造。
实用新型内容
为了解决上述存在的问题,本实用新型提供一种运用BIM建模的带RFID芯片的预制墙板,采用模块化设计,配套RFID芯片,可以用于装配式建筑的建造,优化整合预制构件生产流程、加快装配式建筑模型试制过程、改善预制构件库存和现场管理、提高施工现场管理效率、5D施工模拟优化施工和成本计划,为达此目的,本实用新型提供一种运用BIM建模的带RFID芯片的预制墙板,包括外叶墙板、内叶墙板、RFID芯片、固定卡扣、竖向连接钢筋和边缘构件骨架,所述内叶墙板外侧有外叶墙板,所述外叶墙板和内叶墙板中部有槽,所述外叶墙板和内叶墙板中部的槽互相对应,所述内叶墙板上方伸出有一排竖向连接钢筋,所述内叶墙板两侧各有一排边缘构件骨架,所述内叶墙板另一侧有RFID芯片和固定卡扣,所述固定卡扣成对设置,所述RFID芯片通过贴片或者紧固件固定在内叶墙板侧面上方的一个角。
本实用新型的进一步改进,所述预制墙板插放在插放架的插槽内,所述插放架有一对,所述插放架两侧为一对对称的三角结构,为了便于放置本实用新型实用插放架来放置预制墙板,插放架采用预制结构这样可以提供支持架强度。
本实用新型的进一步改进,所述固定卡扣有两对,所述固定卡扣安装在内叶墙板的四个角,为了便于移动配套相应的固定卡扣。
本实用新型一种运用BIM建模的带RFID芯片的预制墙板,利用BIM技术结合RFID技术,通过在预制构件生产的过程中嵌入含有安装部位及用途信息等构件信息的RFID芯片,存储验收人员及物流配送人员可以直接读取预制构件的相关信息,实现电子信息的自动对照,减少在传统的人工验收和物流模式下出现的验收数量偏差、构件堆放位置偏差、出库记录不准确等问题的发生,可以明显地节约时间和成本。装配式建筑吊装工艺复杂、施工机械化程度高、施工安全保证措施要求高。
附图说明
图1为本实用新型立体图;
图2为本实用新型主视图;
图3为本实用新型侧视图;
标号说明:1—外叶墙板;2—内叶墙板;3—RFID芯片 ;4—固定卡扣;5—竖向连接钢筋;6—插放架;7—边缘构件骨架。
具体实施方式
下面结合附图与具体实施方式对本实用新型作进一步详细描述:
本实用新型提供一种运用BIM建模的带RFID芯片的预制墙板,采用模块化设计,配套RFID芯片,可以用于装配式建筑的建造,优化整合预制构件生产流程、加快装配式建筑模型试制过程、改善预制构件库存和现场管理、提高施工现场管理效率、5D施工模拟优化施工和成本计划。
作为本实用新型一种实施例,本实用新型提供一种运用BIM建模的带RFID芯片的预制墙板,包括外叶墙板1、内叶墙板2、RFID芯片3、固定卡扣4、竖向连接钢筋5和边缘构件骨架7,所述内叶墙板2外侧有外叶墙板1,所述外叶墙板1和内叶墙板2中部有槽,所述外叶墙板1和内叶墙板2中部的槽互相对应,所述内叶墙板2上方伸出有一排竖向连接钢筋5,所述内叶墙板2两侧各有一排边缘构件骨架7,所述内叶墙板2另一侧有RFID芯片3和固定卡扣4,所述固定卡扣4成对设置,所述RFID芯片3通过贴片或者紧固件固定在内叶墙板2侧面上方的一个角。
作为本实用新型一种具体实施例,本实用新型提供如图1-3所示的一种运用BIM建模的带RFID芯片的预制墙板,包括外叶墙板1、内叶墙板2、RFID芯片3、固定卡扣4、竖向连接钢筋5和边缘构件骨架7,所述内叶墙板2外侧有外叶墙板1,所述外叶墙板1和内叶墙板2中部有槽,所述外叶墙板1和内叶墙板2中部的槽互相对应,所述内叶墙板2上方伸出有一排竖向连接钢筋5,所述内叶墙板2两侧各有一排边缘构件骨架7,所述内叶墙板2另一侧有RFID芯片3和固定卡扣4,所述固定卡扣4成对设置,所述固定卡扣有两对,所述固定卡扣4安装在内叶墙板5的四个角,为了便于移动配套相应的固定卡扣,所述RFID芯片3通过贴片或者紧固件固定在内叶墙板2侧面上方的一个角,所述预制墙板插放在插放架6的插槽内,所述插放架6有一对,所述插放架6两侧为一对对称的三角结构,为了便于放置本实用新型实用插放架来放置预制墙板,插放架采用预制结构这样可以提供支持架强度。
以上所述,仅是本实用新型的较佳实施例而已,并非是对本实用新型作任何其他形式的限制,而依据本实用新型的技术实质所作的任何修改或等同变化,仍属于本实用新型所要求保护的范围。
Claims (4)
1.一种运用BIM建模的带RFID芯片的预制墙板,包括外叶墙板(1)、内叶墙板(2)、RFID芯片(3)、固定卡扣(4)、竖向连接钢筋(5)和边缘构件骨架(7),其特征在于:所述内叶墙板(2)外侧有外叶墙板(1),所述外叶墙板(1)和内叶墙板(2)中部有槽,所述外叶墙板(1)和内叶墙板(2)中部的槽互相对应,所述内叶墙板(2)上方伸出有一排竖向连接钢筋(5),所述内叶墙板(2)两侧各有一排边缘构件骨架(7),所述内叶墙板(2)另一侧有RFID芯片(3)和固定卡扣(4),所述固定卡扣(4)成对设置,所述RFID芯片(3)通过贴片或者紧固件固定在内叶墙板(2)侧面上方的一个角。
2.根据权利要求1所述的一种运用BIM建模的带RFID芯片的预制墙板,其特征在于:所述预制墙板插放在插放架(6)的插槽内,所述插放架(6)有一对。
3.根据权利要求2所述的一种运用BIM建模的带RFID芯片的预制墙板,其特征在于:所述插放架(6)两侧为一对对称的三角结构。
4.根据权利要求1所述的一种运用BIM建模的带RFID芯片的预制墙板,其特征在于:所述固定卡扣(4)有两对,所述固定卡扣(4)安装在内叶墙板(2)的四个角。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720520614.1U CN206707114U (zh) | 2017-05-11 | 2017-05-11 | 一种运用bim建模的带rfid芯片的预制墙板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720520614.1U CN206707114U (zh) | 2017-05-11 | 2017-05-11 | 一种运用bim建模的带rfid芯片的预制墙板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707114U true CN206707114U (zh) | 2017-12-05 |
Family
ID=60466979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720520614.1U Active CN206707114U (zh) | 2017-05-11 | 2017-05-11 | 一种运用bim建模的带rfid芯片的预制墙板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206707114U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110092086A (zh) * | 2019-05-23 | 2019-08-06 | 安徽富煌百城建筑科技有限公司 | 一种组装装配式建筑用混凝土预制构件码放装置 |
CN110670880A (zh) * | 2019-10-15 | 2020-01-10 | 广东建星建造集团有限公司 | 一种房屋一体化建造系统 |
-
2017
- 2017-05-11 CN CN201720520614.1U patent/CN206707114U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110092086A (zh) * | 2019-05-23 | 2019-08-06 | 安徽富煌百城建筑科技有限公司 | 一种组装装配式建筑用混凝土预制构件码放装置 |
CN110670880A (zh) * | 2019-10-15 | 2020-01-10 | 广东建星建造集团有限公司 | 一种房屋一体化建造系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | BIM-enabled modular and industrialized construction in China | |
CN109811931A (zh) | 一种基于bim的装配式剪力墙建筑结构及其施工方法 | |
WO2017219921A1 (zh) | 一种基于构件分类和组合的建筑协同构建系统和方法 | |
Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
CN206707114U (zh) | 一种运用bim建模的带rfid芯片的预制墙板 | |
Abdul Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
Fleischmann et al. | Icd/itke research pavilion: A case study of multi-disciplinary collaborative computational design | |
Auti et al. | Prefabrication technology-A promising alternative in construction industry | |
CN103437546B (zh) | 一种组合结构铝合金模板 | |
CN101752017B (zh) | 用于核电站核岛的模块化建造方法 | |
Li | The Application of Computer BIM Technology in Prefabricated Construction Project Management | |
CN101736925B (zh) | 用于核电站核岛的模块化建造方法 | |
Chao et al. | Research on construction quality control of prefabricated concrete bridge based on BIM technology | |
Azman et al. | A study on the trend of the use of IBS components and the setting UP of IBS manufacturing factories in the malaysian construction industry | |
Wang | Automatic System Design of Assembly Building Components for Sustainable Building Projects Based on BIM Technology | |
CN113818712A (zh) | 构件堆放区其对应区域地下空间的加固方法 | |
Ishirugi | Analysis of modular construction techniques advantages and disadvantages | |
Yue et al. | Research on the development trend of China’s construction industry modernization: The case of Jiangsu, China | |
Gunawardena et al. | A holistic model for designing and optimising sustainable prefabricated modular buildings | |
Ning et al. | Analysis on key factors to affect construction industrialization development in China | |
Liu | Research on Construction of Bill of Quantities of Prefabricated Buildings Based on BIM | |
Tamang | A Complete Modelling Guide for Precast Element Wall Using Tekla Structures | |
CN205530326U (zh) | 一种塔吊支腿锚固装置 | |
Zhao et al. | Application Strategy of BIM Technology in Virtual Construction of Prefabricated Buildings | |
Zhang et al. | Study on the impact of prefabricated building cost system based on Vensim PLE |