CN206707070U - A kind of sheet material Combined hanger installation system - Google Patents
A kind of sheet material Combined hanger installation system Download PDFInfo
- Publication number
- CN206707070U CN206707070U CN201720172378.9U CN201720172378U CN206707070U CN 206707070 U CN206707070 U CN 206707070U CN 201720172378 U CN201720172378 U CN 201720172378U CN 206707070 U CN206707070 U CN 206707070U
- Authority
- CN
- China
- Prior art keywords
- bolt
- corner brace
- annex
- antidetonation
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of sheet material Combined hanger installation system, it the utility model is related to building stone curtain wall technology field;The double back of the body bolt suspension members of L-shaped are bolted to the back side of No.1 stone material by back of the body bolt, the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation separation pad and regulation corner brace, and corner brace annex, antidetonation separation pad and regulation corner brace are connected by connecting bolt and the double back of the body bolt suspension members of L-shaped;The vertical plane of described corner brace annex is located in the slotting annex tension hole on antidetonation separation pad;The alignment pin of described antidetonation separation pad is plugged in the vertical faces of stone materials groove of No.1 stone material upper end, and expansion clinch bolt is connected with the vertical plane of described regulation corner brace;Described expansion clinch bolt is located in wall.Its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process back of the body bolt, back of the body hook, improves its mechanical strength, practicality is stronger.
Description
Technical field
The present invention relates to building stone curtain wall technology field, and in particular to a kind of sheet material Combined hanger installation system.
Background technology
Traditional back of the body bolt and back of the body hook, it is subitem processing, partial installation, independently undertakes suspension member and carry power, engineering often has hidden danger to deposit
.The T-shaped suspension member vertical faces of stone materials groove of tradition, back of the body hook and slot(45 ° are chosen part)Cutting machine fluting is operated by manual site, is positioned during fluting
It is inaccurate, damaged at stone material fluting seriously, opening is larger, hidden danger is easily left to stone material engineering, and stone material carries out live facade and opened
During groove processing, noise is big, and dust pollution is big, and labor intensity is big, and imbedibility pulmonary heart disease is easily caused to field worker.
Traditional architecture stone curtain wall is fixedly mounted using chemical rivet bolt, and perforating complete inflator uses chemical drugs again after drilling cuttings is blown off
Pipe is smashed in embedment hole, and bolt could be embedded to by waiting during initial set, is reloaded into steel plate tightening nuts after waiting solidification, is thus needed multiple tracks
Process, time-consuming, takes a lot of work more;Traditional architecture stone curtain wall needs fabrication and installation steelframe, and rolled steel dosage is big, cycle duration length, makes
Valency is high;Traditional architecture stone curtain wall, stone material need the artificial fluting in scene, and noise is big, and dust pollution is big, and artificial duration progress is slow.
The heat insulation decoration integrated plate risen in recent years, has been generally used, but we have found that installation is used with viscous, extension
What method was installed, based on viscous, supplemented by metalwork.Metal component structure principle is Tuo He Hook relation, and it can not reach
The function being intimately engaged with sheet material, it is impossible to safe effect after the installation of independent bearing sheet material.As wall basic unit releasing agent is un-cleared,
Wall foundation base intension not enough causes sheet material to be come off with wall adhesive linkage, often has what different regions, disparity items sheet material fell down to show
As, it would be highly desirable to improve.
The content of the invention
It is reasonable in design, make in view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of simple in construction
With convenient sheet material Combined hanger installation system, its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and not
Need individually to process back of the body bolt, back of the body hook, improve its mechanical strength, practicality is stronger.
To achieve the above object, the technical solution adopted by the present invention is:It includes building concrete wall combination installation system
System and building frame filling wall combination installation system are formed;
Wherein, described building concrete wall combination installation system include expansion clinch bolt, regulation corner brace, connecting bolt,
The double back of the body bolt suspension members of corner brace annex, antidetonation separation pad, L-shaped, back of the body bolt bolt;The double back of the body bolt suspension members of described L-shaped are consolidated by back of the body bolt bolt
The back side of No.1 stone material is scheduled on, the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation separation pad and regulation corner brace, and angle
Code annex, antidetonation separation pad and regulation corner brace are connected by connecting bolt and the double back of the body bolt suspension members of L-shaped;Described corner brace annex
Vertical plane be located in the slotting annex tension hole on antidetonation separation pad;The alignment pin of described antidetonation separation pad is plugged in No.1
In the vertical faces of stone materials groove of stone material upper end, expansion clinch bolt is connected with the vertical plane of described regulation corner brace;Described expansion clinch bolt
It is located in wall;
Wherein described building frame filling wall combination installation system includes aluminium alloy back of the body bolt hooking part, cup square neck bolt, the back of the body
Bolt, T-shaped annex, L-shaped iron main part, band iron safety belt, through-wall bolt;Described aluminium alloy back of the body bolt hooking part passes through back of the body bolt and No. two
Back face of stone is connected, and the top of aluminium alloy back of the body bolt hooking part is connected with L-shaped iron main part and T-shaped annex by cup square neck bolt,
And the vertical plane of T-shaped annex is plugged in the fluting of No. two stone material upper ends;Pass through on the outside of the vertical plane of described L-shaped iron main part
Cup square neck bolt is connected with band iron safety belt, and the upper and lower ends of band iron safety belt are fixed with upper beam body and lower beam body respectively;It is described
One end of through-wall bolt wear and be fixed in the vertical plane of band iron safety belt and L-shaped iron main part, its other end and filled wall
It is connected.
Further, described No. two are provided with heat-insulation layer between back face of stone and filled wall.
The operating procedure of the present invention is as follows:
Building concrete wall combines installation system:It is the stone material preparatory stage first, according to design requirement, stone material is being processed
After workshop is processed as the No.1 stone material of dimension board, it is sent to production line and is standardized processing using special equipment fluting perforate, and
Once complete the processing in groove and hole;Expansion clinch bolt is installed in live wall perforating, and is fastened, and expansion clinch bolt one has swollen riveting at three
Point, its stability and pull strength comply fully with design requirement;The double back of the body bolt suspension members of L-shaped are passed through into back of the body bolt bolt and No.1 stone material
Connection;Installation and adjustment corner brace, it is connected with expansion clinch bolt;Will regulation corner brace and corner brace annex, the double back of the body bolt suspension members of L-shaped and antidetonation
Separation pad is connected, while the vertical plane of antidetonation separation pad and corner brace annex is set with, and the alignment pin of antidetonation separation pad is inserted
Enter in vertical faces of stone materials groove and install.
Building frame filling wall combination installation system:It is the stone material preparatory stage first, according to design requirement, stone material is being processed
After workshop is processed as specification plate No.2 stone material, it is sent to production line and is standardized processing, and one using special equipment fluting perforate
The secondary processing for completing groove and hole;Next to that mounting suspension member, after clearing up drilling cuttings dust, is embedded to suspension member and back of the body bolt, by aluminium alloy back of the body bolt
The groove hook of hooking part lower end and the slotted eye held successfully on No. two stone materials are corresponding in place, mounting suspension member, pass through aluminium alloy back of the body bolt hooking part
On back of the body bolt hole, with electronic sleeve pipe fastening suspension member installation connection back of the body bolt nut;Again, check that aluminium alloy is carried on the back using pressure spanner
Whether the bonding strength of hitch suspension member and No. two stone materials is qualified;Recycle cup square neck bolt connection L-shaped band iron main part and T-shaped annex;
Aluminium alloy back of the body bolt hooking part is connected with through-wall bolt again, while L-shaped band iron main part is connected with band iron safety belt by cup square neck bolt
Connect.
After said structure, the present invention has the beneficial effect that:A kind of sheet material Combined hanger installation system of the present invention,
Its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process back of the body bolt, back of the body hook, improves it
Mechanical strength, practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, the advantages that low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation of building concrete wall combination installation system in the present invention.
Fig. 2 is the structural representation of building frame filling wall combination installation system in the present invention.
Description of reference numerals:
Building concrete wall combination installation system 1, expansion clinch bolt 1-1, regulation corner brace 1-2, connecting bolt 1-3, corner brace
Annex 1-4, antidetonation separation pad 1-5, insert the double back of the body bolt suspension member 1-6 of annex tension hole 1-5-1, alignment pin 1-5-2, L-shaped, back of the body bolt bolt
2, No. two 1-7, wall 1-8, No.1 stone material 1-9, vertical faces of stone materials groove 1-10, building frame filling wall combination installation system stone material 2-
1st, slot 2-2, aluminium alloy back of the body bolt hooking part 2-3, cup square neck bolt 2-4, back of the body bolt 2-5, T-shaped annex 2-6, L-shaped iron main part 2-7, flat
Iron safety belt 2-8, through-wall bolt 2-9, filled wall 2-10, upper beam body 2-11, lower beam body 2-12, heat-insulation layer 2-13.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to as depicted in figs. 1 and 2, the technical scheme that present embodiment uses is:It includes building concrete wall
Body combines installation system 1 and building frame filling wall combination installation system 2 is formed;
Wherein, described building concrete wall combination installation system includes expansion clinch bolt 1-1, regulation corner brace 1-2, connection
The double back of the body bolt suspension member 1-6 of bolt 1-3, corner brace annex 1-4, antidetonation separation pad 1-5, L-shaped, back of the body bolt bolt 1-7;The double back ofs the body of described L-shaped
Bolt suspension member 1-6 is fixed on the No.1 stone material 1-9 back side by back of the body bolt bolt 1-7, and the double back of the body bolt suspension member 1-6 of L-shaped top is provided with angle
Code annex 1-4, antidetonation separation pad 1-5 and regulation corner brace 1-2, and corner brace annex 1-4, antidetonation separation pad 1-5 and regulation corner brace 1-2
It is connected by connecting bolt 1-3 and the double back of the body bolt suspension member 1-6 of L-shaped;Described corner brace annex 1-4 vertical plane is located in antidetonation
In slotting annex tension hole 1-5-1 on separation pad 1-5;Described antidetonation separation pad 1-5 alignment pin 1-5-2 is plugged in No.1 stone
In the vertical faces of stone materials groove 1-10 of material 1-9 upper ends, expansion clinch bolt 1-1 is connected with described regulation corner brace 1-2 vertical plane;It is described
Expansion clinch bolt 1-1 be located in wall 1-8;
Wherein described building frame filling wall combination installation system includes aluminium alloy back of the body bolt hooking part 2-3, cup square neck bolt
2-4, back of the body bolt 2-5, T-shaped annex 2-6, L-shaped iron main part 2-7, band iron safety belt 2-8, through-wall bolt 2-9;The described aluminium alloy back of the body
Hitch suspension member 2-3 is connected by back of the body bolt 2-5 and No. two stone material 2-1 back sides, and aluminium alloy back of the body bolt hooking part 2-3 top passes through
Cup square neck bolt 2-4 is connected with L-shaped iron main part 2-7 and T-shaped annex 2-6, and T-shaped annex 2-6 vertical plane is plugged in No. two stone materials
In the fluting 2-2 of 2-1 upper ends;The outside of described L-shaped iron main part 2-7 vertical plane is connected with band iron by cup square neck bolt 2-4
Safety belt 2-8, and band iron safety belt 2-8 upper and lower ends are fixed with upper beam body 2-11 and lower beam body 2-12 respectively;Described wears
Wall screw 2-9 one end, which is worn, to be fixed in band iron safety belt 2-8 and L-shaped iron main part 2-7 vertical plane, its other end and filling
Wall 2-10 is connected.
Further, No. two described stone material 2-1 back sides are provided with heat-insulation layer 2-13 with filled wall 2-10.
The operating procedure of present embodiment is as follows:
Building concrete wall combines installation system 1:It is the stone material preparatory stage first, according to design requirement, stone material is adding
After work workshop is processed as the No.1 stone material 1-10 of dimension board, be sent to production line using special equipment fluting perforate be standardized plus
Work, and once complete the processing in groove and hole;Expansion clinch bolt 1-1 is installed in live wall perforating, and is fastened, and expansion clinch bolt one has three
Locate swollen riveting point, its stability and pull strength greatly increases by force relative to current expansion bolt, and complies fully with design and want
Ask;The double back of the body bolt suspension member 1-6 of L-shaped are connected by back of the body bolt bolt 1-7 with No.1 stone material 1-10;Installation and adjustment corner brace 1-2, by its with
Expansion clinch bolt 1-1 connections;Regulation corner brace 1-2 and corner brace annex 1-4, the double back of the body bolt suspension member 1-6 and antidetonation separation pad 1-5 of L-shaped are connected
Connect, while antidetonation separation pad 1-5 and corner brace annex 1-4 vertical plane are set with, and by antidetonation separation pad 1-5 alignment pin 1-
Installed in 5-2 insertion vertical faces of stone materials grooves 1-10.
Building frame filling wall combination installation system 2:It is the stone material preparatory stage first, according to design requirement, stone material is adding
After work workshop is processed as specification plate No.2 stone material 2-1, it is sent to production line and is standardized processing using special equipment fluting perforate,
And once complete the processing in groove and hole;Next to that mounting suspension member, after clearing up drilling cuttings dust, embedment suspension member and back of the body bolt 2-5, aluminium is closed
The groove hook of golden back of the body bolt hooking part 2-3 lower ends and the slotted eye held successfully on No. two stone material 2-1 are corresponding in place, mounting suspension member, are closed by aluminium
Back of the body bolt hole on golden back of the body bolt hooking part 2-3, with electronic sleeve pipe fastening suspension member installation connection back of the body bolt 2-5 nut;Again, using pressure
Torque wrench checks whether aluminium alloy back of the body bolt hooking part 2-3 and No. two stone material 2-1 bonding strength are qualified;Recycle cup square neck bolt 2-
4 connection L-shaped band iron main part 2-7 and T-shaped annex 2-6;Aluminium alloy back of the body bolt hooking part 2-3 is connected with through-wall bolt 2-9 again, simultaneously
L-shaped band iron main part 2-7 is connected with band iron safety belt 2-8 by cup square neck bolt 2-4, heat-insulation layer 2-13 back of the body bolt hook and No. two stone materials
2-1 installations pass through perforating, fluting, after aluminium alloy back of the body bolt hooking part 2-3 is by bolt, nut, connection fastening, aluminium alloy back of the body bolt hook
Suspension member 2-3 and No. two stone material 2-1 play intimate interlocking, are integrally formed.
After said structure, present embodiment has the beneficial effect that:A kind of sheet material described in present embodiment
Combined hanger installation system, its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process
Back of the body bolt, back of the body hook, improve its mechanical strength, and practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, and cost of manufacture is low etc.
Advantage.
It is described above, it is merely illustrative of the technical solution of the present invention and unrestricted, those of ordinary skill in the art are to this hair
The other modifications or equivalent substitution that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention,
It all should cover among scope of the presently claimed invention.
Claims (1)
- A kind of 1. sheet material Combined hanger installation system, it is characterised in that:It includes expansion bolt, regulation corner brace, connecting bolt, angle The double back of the body bolt suspension members of code annex, antidetonation separation pad, L-shaped, back of the body bolt bolt;The double back of the body bolt suspension members of described L-shaped are fixed by back of the body bolt bolt At the back side of No.1 stone material, the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation separation pad and regulation corner brace, and corner brace Annex, antidetonation separation pad and regulation corner brace are connected by connecting bolt and the double back of the body bolt suspension members of L-shaped;Described corner brace annex Vertical plane is located in the slotting annex tension hole on antidetonation separation pad;The alignment pin of described antidetonation separation pad is plugged in No.1 stone In the vertical faces of stone materials groove of material upper end, expansion bolt is connected with the vertical plane of described regulation corner brace;Described expansion bolt is worn It is located in wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720172378.9U CN206707070U (en) | 2017-02-24 | 2017-02-24 | A kind of sheet material Combined hanger installation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720172378.9U CN206707070U (en) | 2017-02-24 | 2017-02-24 | A kind of sheet material Combined hanger installation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707070U true CN206707070U (en) | 2017-12-05 |
Family
ID=60469372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720172378.9U Active CN206707070U (en) | 2017-02-24 | 2017-02-24 | A kind of sheet material Combined hanger installation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206707070U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107795089A (en) * | 2017-12-07 | 2018-03-13 | 宁夏长力节能建材有限公司 | A kind of insulating decoration integral board for building exterior wall corner brace Combined hanger |
CN109235725A (en) * | 2018-11-08 | 2019-01-18 | 宁夏长力节能建材有限公司 | A kind of porous glue riveting hook porcelain plate pendant assembly of aluminium alloy |
-
2017
- 2017-02-24 CN CN201720172378.9U patent/CN206707070U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107795089A (en) * | 2017-12-07 | 2018-03-13 | 宁夏长力节能建材有限公司 | A kind of insulating decoration integral board for building exterior wall corner brace Combined hanger |
CN109235725A (en) * | 2018-11-08 | 2019-01-18 | 宁夏长力节能建材有限公司 | A kind of porous glue riveting hook porcelain plate pendant assembly of aluminium alloy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507539B (en) | A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method | |
CN204059678U (en) | A kind of anti-skidding, locus regulate freely with the curtain wall system of easy construction | |
CN108360683A (en) | Section construction unit and construction and the method for transporting section construction unit | |
CN204876268U (en) | Light steel suspended ceiling keel that excels in | |
CN205822665U (en) | Welding steel structure system exempted from by a kind of indoor wall stone material | |
CN206707070U (en) | A kind of sheet material Combined hanger installation system | |
CN106836574A (en) | A kind of sheet material Combined hanger installation system | |
CN205955173U (en) | Modular link wall spare subassembly | |
CN206800622U (en) | A kind of assembled integral concrete shear force wall balcony attachment structure | |
CN202209046U (en) | Wall connecting rod for external scaffold | |
CN208293854U (en) | A kind of open dry-hang aluminum plate system | |
CN206591839U (en) | A kind of reinforcing bar posting having enough to meet the need | |
CN216713553U (en) | Fireproof environment-friendly curtain box | |
CN108797857B (en) | Back bolt dry-hanging assembly and back bolt dry-hanging system | |
CN205296501U (en) | Stone material installation device | |
CN205046830U (en) | Formula steel pipe scaffold is detained to bowl | |
CN105113684B (en) | A kind of unit assembled building external protecting system and its construction method equipped with window | |
CN107675853A (en) | A kind of installation system of groove formula porcelain plate | |
CN202899532U (en) | Connecting component for low carbon plate adhesive clamping combination | |
CN209538584U (en) | A kind of self-heat conserving external wall plate dry type mounting structure | |
CN208122125U (en) | A kind of portable new-type fixture | |
CN207110500U (en) | The discharging of modularization ready-package and outer protection integrated system for assembled architecture | |
CN107201816B (en) | Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate | |
CN207032758U (en) | A kind of installation system of groove formula porcelain plate | |
CN207419934U (en) | A kind of installation node of hanging plate, pendant and cladding panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |