CN106836574A - A kind of sheet material Combined hanger installation system - Google Patents

A kind of sheet material Combined hanger installation system Download PDF

Info

Publication number
CN106836574A
CN106836574A CN201710104623.7A CN201710104623A CN106836574A CN 106836574 A CN106836574 A CN 106836574A CN 201710104623 A CN201710104623 A CN 201710104623A CN 106836574 A CN106836574 A CN 106836574A
Authority
CN
China
Prior art keywords
bolt
shaped
corner brace
annex
body bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710104623.7A
Other languages
Chinese (zh)
Inventor
母养清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Changli energy-saving building materials Co. Ltd.
Original Assignee
母养清
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 母养清 filed Critical 母养清
Priority to CN201710104623.7A priority Critical patent/CN106836574A/en
Publication of CN106836574A publication Critical patent/CN106836574A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements

Abstract

A kind of sheet material Combined hanger installation system, the present invention relates to building stone curtain wall technology field;The double back of the body bolt suspension members of L-shaped are bolted to a back side for stone material by back of the body bolt, the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation separation pad and regulation corner brace, and corner brace annex, antidetonation separation pad and regulation corner brace are connected by connecting bolt and the double back of the body bolt suspension members of L-shaped;The vertical plane of described corner brace annex is located in the slotting annex tension hole on antidetonation separation pad;The alignment pin of described antidetonation separation pad is plugged in a vertical faces of stone materials groove for stone material upper end, and expansion clinch bolt is connected with the vertical plane of described regulation corner brace;Described expansion clinch bolt is located in wall.Its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process back of the body bolt, back of the body hook, improves its mechanical strength, and practicality is stronger.

Description

A kind of sheet material Combined hanger installation system
Technical field
The present invention relates to building stone curtain wall technology field, and in particular to a kind of sheet material Combined hanger installation system.
Background technology
Traditional back of the body bolt and back of the body hook, are subitem processing, and partial installation independently undertakes suspension member and carries power, and engineering often has hidden danger to deposit .The T-shaped suspension member vertical faces of stone materials groove of tradition, back of the body hook and slot(45 ° are chosen part)Slotted by manual site's operation cutting machine, positioned during fluting It is inaccurate, damage serious at stone material fluting, it is open larger, hidden danger is easily left to stone material engineering, and stone material carries out live facade and opens During groove processing, noise is big, and dust pollution is big, and labour intensity is big, and imbedibility pulmonary heart disease is easily caused to field worker.
Traditional architecture stone curtain wall uses chemical drugs again using chemical rivet bolt fixed installation, perforating complete inflator after drilling cuttings is blown off Pipe is smashed in embedment hole, and bolt could be imbedded when waiting initial set, and steel plate tightening nuts are reinstalled after waiting solidification, is so accomplished by multiple tracks Operation, time-consuming, takes a lot of work many;Traditional architecture stone curtain wall needs fabrication and installation steelframe, and rolled steel dosage is big, and cycle duration is long, makes Valency is high;Traditional architecture stone curtain wall, stone material needs the artificial fluting in scene, and noise is big, and dust pollution is big, and artificial duration progress is slow.
The heat insulation decoration integrated plate for rising in recent years, has been generally used, but uses to glue, hang we have found that installing What method was installed, based on viscous, supplemented by metalwork.Metal component structure principle is the relation of Tuo He Hook, and it can not reach The function being intimately engaged with sheet material, it is impossible to independent bearing sheet material effect safe after installing.As wall basic unit releasing agent is un-cleared, Wall foundation base intension not enough causes sheet material to be come off with wall adhesive linkage, often has what different regions, disparity items sheet material fell down to show As, it would be highly desirable to improve.
The content of the invention
Defect and deficiency it is an object of the invention to be directed to prior art, there is provided a kind of simple structure, it is reasonable in design, make With convenient sheet material Combined hanger installation system, its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and not Individually processing back of the body bolt, back of the body hook are needed, its mechanical strength is improved, practicality is stronger.
To achieve the above object, the technical solution adopted by the present invention is:It installs system comprising the combination of building concrete wall System and building frame filling wall combination installation system are constituted;
Wherein, described building concrete wall combination installation system includes expansion clinch bolt, regulation corner brace, connecting bolt, corner brace The double back of the body bolt suspension members of annex, antidetonation separation pad, L-shaped, back of the body bolt bolt;The double back of the body bolt suspension members of described L-shaped are bolted to by back of the body bolt A number back side for stone material, the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation separation pad and regulation corner brace, and corner brace is attached Part, antidetonation separation pad and regulation corner brace are connected by connecting bolt and the double back of the body bolt suspension members of L-shaped;Described corner brace annex hang down Face directly in the slotting annex tension hole being located on antidetonation separation pad;The alignment pin of described antidetonation separation pad is plugged in a stone material In the vertical faces of stone materials groove of upper end, expansion clinch bolt is connected with the vertical plane of described regulation corner brace;Described expansion clinch bolt wears In wall;
Wherein described building frame filling wall combination installation system includes aluminium alloy back of the body bolt hooking part, cup square neck bolt, back of the body bolt, T Shape annex, L-shaped iron main part, band iron safety belt, through-wall bolt;Described aluminium alloy back of the body bolt hooking part is by back of the body bolt and No. two stone materials The back side is connected, and the top of aluminium alloy back of the body bolt hooking part is connected with L-shaped iron main part and T-shaped annex, and T-shaped by cup square neck bolt The vertical plane of annex is plugged in No. two flutings of stone material upper end;The outside of the vertical plane of described L-shaped iron main part passes through carriage Bolt connection has band iron safety belt, and the upper and lower ends of band iron safety belt are fixed with upper beam body and lower beam body respectively;Described wears One end of wall screw wears and is fixed in the vertical plane of band iron safety belt and L-shaped iron main part, and its other end is connected with filled wall It is fixed.
Further, described No. two are provided with heat-insulation layer between back face of stone and filled wall.
After said structure, the present invention has the beneficial effect that:A kind of sheet material Combined hanger installation system of the present invention, Its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process back of the body bolt, back of the body hook, improves it Mechanical strength, practicality is stronger, and the present invention has simple structure, and it is reasonable to set, the advantages of low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also Other accompanying drawings are obtained with according to these accompanying drawings.
Fig. 1 is the structural representation of building concrete wall combination installation system in the present invention.
Fig. 2 is the structural representation of building frame filling wall combination installation system in the present invention.
Description of reference numerals:
Building concrete wall combination installation system 1, expansion clinch bolt 1-1, regulation corner brace 1-2, connecting bolt 1-3, corner brace annex 1-4, antidetonation separation pad 1-5, insert the double back of the body bolt suspension member 1-6 of annex tension hole 1-5-1, alignment pin 1-5-2, L-shaped, back of the body bolt bolt 1-7, Wall 1-8, stone material 1-9, vertical faces of stone materials groove 1-10, a building frame filling wall combine 2, No. two stone material 2-1 of installation system, open Groove 2-2, aluminium alloy back of the body bolt hooking part 2-3, cup square neck bolt 2-4, back of the body bolt 2-5, T-shaped annex 2-6, L-shaped iron main part 2-7, band iron are protected Danger is with 2-8, through-wall bolt 2-9, filled wall 2-10, upper beam body 2-11, lower beam body 2-12, heat-insulation layer 2-13.
Specific embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to as depicted in figs. 1 and 2, the technical scheme that this specific embodiment is used is:It includes building concrete wall Body combines installation system 1 and building frame filling wall combination installation system 2 is constituted;
Wherein, described building concrete wall combination installation system includes expansion clinch bolt 1-1, regulation corner brace 1-2, connecting bolt The double back of the body bolt suspension member 1-6 of 1-3, corner brace annex 1-4, antidetonation separation pad 1-5, L-shaped, back of the body bolt bolt 1-7;The double back of the body bolt of described L-shaped are hung Part 1-6 is fixed on a back side of stone material 1-9 by back of the body bolt bolt 1-7, and it is attached that the top of the double back of the body bolt suspension member 1-6 of L-shaped is provided with corner brace Part 1-4, antidetonation separation pad 1-5 and regulation corner brace 1-2, and corner brace annex 1-4, antidetonation separation pad 1-5 and regulation corner brace 1-2 pass through Connecting bolt 1-3 back of the body bolt suspension member 1-6s double with L-shaped are connected;The vertical plane of described corner brace annex 1-4 is located in antidetonation interval In slotting annex tension hole 1-5-1 on pad 1-5;The alignment pin 1-5-2 of described antidetonation separation pad 1-5 is plugged in a stone material 1- In the vertical faces of stone materials groove 1-10 of 9 upper ends, expansion clinch bolt 1-1 is connected with the vertical plane of described regulation corner brace 1-2;Described is swollen Swollen rivet bolt 1-1 is located in wall 1-8;
Wherein described building frame filling wall combination installation system comprising aluminium alloy back of the body bolt hooking part 2-3, cup square neck bolt 2-4, Back of the body bolt 2-5, T-shaped annex 2-6, L-shaped iron main part 2-7, band iron safety belt 2-8, through-wall bolt 2-9;Described aluminium alloy back of the body bolt hook Suspension member 2-3 is connected by back of the body bolt 2-5 with No. two stone material 2-1 back sides, and the top of aluminium alloy back of the body bolt hooking part 2-3 passes through carriage Bolt 2-4 is connected with L-shaped iron main part 2-7 and T-shaped annex 2-6, and the vertical plane of T-shaped annex 2-6 is plugged on No. two stone material 2-1 In the fluting 2-2 at end;The outside of the vertical plane of described L-shaped iron main part 2-7 is connected with band iron safety belt by cup square neck bolt 2-4 2-8, and the upper and lower ends of band iron safety belt 2-8 fix with upper beam body 2-11 and lower beam body 2-12 respectively;Described through-wall bolt One end of 2-9 wears and is fixed in the vertical plane of band iron safety belt 2-8 and L-shaped iron main part 2-7, its other end and filled wall 2- 10 are connected.
Further, No. two described stone material 2-1 back sides are provided with heat-insulation layer 2-13 with filled wall 2-10.
The operating procedure of this specific embodiment is as follows:
Building concrete wall combines installation system 1:It first it is the stone material preparatory stage, according to design requirement, stone material is in processing cart Between be processed as a stone material 1-10 of dimension board after, be sent to production line using special equipment slot perforate be standardized processing, And once complete the processing in groove and hole;Expansion clinch bolt 1-1 is installed in live wall perforating, and is fastened, and expansion clinch bolt one has at three Swollen riveting point, its stability and pull strength is greatly increased by force relative to current expansion bolt, and complies fully with design requirement; The double back of the body bolt suspension member 1-6 of L-shaped are connected by back of the body bolt bolt 1-7 with a stone material 1-10;Install regulation corner brace 1-2, by its with it is swollen Swollen rivet bolt 1-1 connections;Regulation corner brace 1-2 is connected with corner brace annex 1-4, the double back of the body bolt suspension member 1-6 and antidetonation separation pad 1-5 of L-shaped, The vertical plane of antidetonation separation pad 1-5 and corner brace annex 1-4 is set with simultaneously, and by the alignment pin 1-5-2 of antidetonation separation pad 1-5 Installed in insertion vertical faces of stone materials groove 1-10.
Building frame filling wall combination installation system 2:It first it is the stone material preparatory stage, according to design requirement, stone material is adding After work workshop is processed as specification plate No.2 stone material 2-1, it is sent to production line and is standardized processing using special equipment fluting perforate, And once complete the processing in groove and hole;Next to that mounting suspension member, after cleaning drilling cuttings dust, imbeds suspension member and back of the body bolt 2-5, aluminium is closed The groove hook of golden back of the body bolt hooking part 2-3 lower ends is corresponding in place with the slotted eye held successfully on No. two stone material 2-1, mounting suspension member, is closed by aluminium Back of the body bolt hole on golden back of the body bolt hooking part 2-3, the nut that suspension member installs connection back of the body bolt 2-5 is fastened with electronic sleeve pipe;Again, pressure is used Torque wrench checks whether aluminium alloy back of the body bolt hooking part 2-3 and No. two bonding strengths of stone material 2-1 are qualified;Recycle cup square neck bolt 2- 4 connection L-shaped band iron main part 2-7 and T-shaped annex 2-6;Aluminium alloy back of the body bolt hooking part 2-3 is connected with through-wall bolt 2-9 again, while L-shaped band iron main part 2-7 is connected with band iron safety belt 2-8 by cup square neck bolt 2-4, the back of the body bolt hook of heat-insulation layer 2-13 and No. two stone materials 2-1 install by perforating, fluting, aluminium alloy back of the body bolt hooking part 2-3 by bolt, nut, connection fasten after, aluminium alloy back of the body bolt hook Suspension member 2-3 and No. two stone material 2-1 play intimate interlocking, are integrally formed.
After said structure, this specific embodiment has the beneficial effect that:A kind of sheet material described in this specific embodiment Combined hanger installation system, its is durable, and firmly independence is good, and shock resistance is strong, and installation operation is convenient, and need not individually process Back of the body bolt, back of the body hook, improve its mechanical strength, and practicality is stronger, and the present invention has simple structure, set reasonable, and cost of manufacture is low Advantage.
The above, is merely illustrative of the technical solution of the present invention and unrestricted, and those of ordinary skill in the art are to this hair Other modifications or equivalent that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, All should cover in the middle of scope of the presently claimed invention.

Claims (4)

1. a kind of sheet material Combined hanger installation system, it is characterised in that:It comprising building concrete wall combination installation system and Building frame filling wall combination installation system is constituted;Wherein, described building concrete wall combination installation system includes expansion Rivet bolt, regulation corner brace, connecting bolt, corner brace annex, antidetonation separation pad, the double back of the body bolt suspension members of L-shaped, back of the body bolt bolt;Described L-shaped is double Back of the body bolt suspension member is bolted to a back side for stone material by back of the body bolt, and the top of the double back of the body bolt suspension members of L-shaped is provided with corner brace annex, antidetonation Separation pad and regulation corner brace, and corner brace annex, antidetonation separation pad and regulation corner brace pass through connecting bolt and the double back of the body bolt suspension members of L-shaped connect Connect fixation;The vertical plane of described corner brace annex is located in the slotting annex tension hole on antidetonation separation pad;Between described antidetonation The alignment pin of dottle pin is plugged in a vertical faces of stone materials groove for stone material upper end, is connected with the vertical plane of described regulation corner brace swollen Swollen rivet bolt;Described expansion clinch bolt is located in wall;Wherein described building frame filling wall combination installation system includes aluminium Alloy back of the body bolt hooking part, cup square neck bolt, back of the body bolt, T-shaped annex, L-shaped iron main part, band iron safety belt, through-wall bolt;Described aluminium is closed Golden back of the body bolt hooking part is connected by back of the body bolt with No. two back face of stone, and the top of aluminium alloy back of the body bolt hooking part passes through cup square neck bolt L-shaped iron main part and T-shaped annex are connected with, and the vertical plane of T-shaped annex is plugged in No. two flutings of stone material upper end;Described L The outside of the vertical plane of shape iron main part is connected with band iron safety belt by cup square neck bolt, and the upper and lower ends of band iron safety belt are distinguished Fixed with upper beam body and lower beam body;One end of described through-wall bolt wears and is fixed on hanging down for band iron safety belt and L-shaped iron main part In facing directly, its other end is connected with filled wall.
2. a kind of sheet material Combined hanger installation system according to claim 1, it is characterised in that:The described No. two stone materials back of the body Heat-insulation layer is provided between face and filled wall.
3. a kind of sheet material Combined hanger installation system according to claim 1, it is characterised in that:Operating procedure of the invention It is as follows:
Building concrete wall combines installation system:It first it is the stone material preparatory stage, according to design requirement, stone material is in job shop After being processed as a stone material of dimension board, it is sent to production line and is standardized processing using special equipment fluting perforate, and once Complete the processing in groove and hole;Expansion clinch bolt is installed in live wall perforating, and is fastened, and expansion clinch bolt one has swollen riveting point at three, it Stability and pull strength comply fully with design requirement;The double back of the body bolt suspension members of L-shaped are connected by back of the body bolt bolt with a stone material; Regulation corner brace is installed, it is connected with expansion clinch bolt;Will regulation corner brace and corner brace annex, the double back of the body bolt suspension members of L-shaped and antidetonation interval Pad connection, while the vertical plane of antidetonation separation pad and corner brace annex is set with, and inserts stone by the alignment pin of antidetonation separation pad Installed in material facade groove.
4. building frame filling wall combines installation system:It first it is the stone material preparatory stage, according to design requirement, stone material is in processing cart Between be processed as specification plate No.2 stone material after, be sent to production line and be standardized processing using special equipment perforate of slotting, and once Complete the processing in groove and hole;Next to that mounting suspension member, after cleaning drilling cuttings dust, imbeds suspension member and back of the body bolt, by aluminium alloy back of the body bolt hook The groove hook of suspension member lower end is corresponding in place with the slotted eye held successfully on No. two stone materials, mounting suspension member, by aluminium alloy back of the body bolt hooking part Back of the body bolt hole, with electronic sleeve pipe fasten suspension member install connection back of the body bolt nut;Again, aluminium alloy back of the body bolt is checked using pressure spanner Whether hooking part and No. two bonding strengths of stone material are qualified;Recycle cup square neck bolt connection L-shaped band iron main part and T-shaped annex;Again Aluminium alloy back of the body bolt hooking part is connected with through-wall bolt, while L-shaped band iron main part is connected with band iron safety belt by cup square neck bolt.
CN201710104623.7A 2017-02-24 2017-02-24 A kind of sheet material Combined hanger installation system Pending CN106836574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710104623.7A CN106836574A (en) 2017-02-24 2017-02-24 A kind of sheet material Combined hanger installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710104623.7A CN106836574A (en) 2017-02-24 2017-02-24 A kind of sheet material Combined hanger installation system

Publications (1)

Publication Number Publication Date
CN106836574A true CN106836574A (en) 2017-06-13

Family

ID=59133829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710104623.7A Pending CN106836574A (en) 2017-02-24 2017-02-24 A kind of sheet material Combined hanger installation system

Country Status (1)

Country Link
CN (1) CN106836574A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338934A (en) * 2017-08-10 2017-11-10 深圳市建艺装饰集团股份有限公司 A kind of metope vitrified tile pastes the construction method of skeleton
CN111305502A (en) * 2020-03-04 2020-06-19 中国十七冶集团有限公司 Fixing technology for installing stone dry hanging keel on porous brick filling wall
CN112900884A (en) * 2021-01-21 2021-06-04 宁夏长力节能建材有限公司 Construction method of steel belt hanging plate of filler wall

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046785A (en) * 1996-07-30 1998-02-17 Comany Kk Mounting structure for decorative wall panel
CN2806600Y (en) * 2005-06-30 2006-08-16 淄博德惠来装饰瓷板有限公司 Dry-hanging type wall surface decorative structure containing electromagnetic screen fiber reinforced cement board and back lining slab
CN201546405U (en) * 2009-11-06 2010-08-11 佛山市利铭蜂窝复合材料有限公司 Wallboard mounting and fixing device
CN103291037A (en) * 2013-06-05 2013-09-11 郑念标 Heat-preserving wall space finish material
CN203947642U (en) * 2014-06-26 2014-11-19 深圳市嘉信装饰设计工程有限公司 A kind of can six the orientation hanger structure and the device thereof that regulate
CN204898966U (en) * 2015-08-12 2015-12-23 深圳海龙建筑制品有限公司 Compound prefabricated component's curtain unit
CN105386551A (en) * 2015-12-15 2016-03-09 母养清 Stone installation device
KR101631689B1 (en) * 2015-12-18 2016-06-17 김세열 Complex anchor system
CN205558146U (en) * 2016-02-15 2016-09-07 上海江蓝实业有限公司 Mounting structure of slim decorative board coincide heat preservation and wall body

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046785A (en) * 1996-07-30 1998-02-17 Comany Kk Mounting structure for decorative wall panel
CN2806600Y (en) * 2005-06-30 2006-08-16 淄博德惠来装饰瓷板有限公司 Dry-hanging type wall surface decorative structure containing electromagnetic screen fiber reinforced cement board and back lining slab
CN201546405U (en) * 2009-11-06 2010-08-11 佛山市利铭蜂窝复合材料有限公司 Wallboard mounting and fixing device
CN103291037A (en) * 2013-06-05 2013-09-11 郑念标 Heat-preserving wall space finish material
CN203947642U (en) * 2014-06-26 2014-11-19 深圳市嘉信装饰设计工程有限公司 A kind of can six the orientation hanger structure and the device thereof that regulate
CN204898966U (en) * 2015-08-12 2015-12-23 深圳海龙建筑制品有限公司 Compound prefabricated component's curtain unit
CN105386551A (en) * 2015-12-15 2016-03-09 母养清 Stone installation device
KR101631689B1 (en) * 2015-12-18 2016-06-17 김세열 Complex anchor system
CN205558146U (en) * 2016-02-15 2016-09-07 上海江蓝实业有限公司 Mounting structure of slim decorative board coincide heat preservation and wall body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338934A (en) * 2017-08-10 2017-11-10 深圳市建艺装饰集团股份有限公司 A kind of metope vitrified tile pastes the construction method of skeleton
CN111305502A (en) * 2020-03-04 2020-06-19 中国十七冶集团有限公司 Fixing technology for installing stone dry hanging keel on porous brick filling wall
CN112900884A (en) * 2021-01-21 2021-06-04 宁夏长力节能建材有限公司 Construction method of steel belt hanging plate of filler wall

Similar Documents

Publication Publication Date Title
CN105507539B (en) A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method
CN106836574A (en) A kind of sheet material Combined hanger installation system
CN208072858U (en) A kind of stone panel hanger structure
CN205822665U (en) Welding steel structure system exempted from by a kind of indoor wall stone material
CN206707070U (en) A kind of sheet material Combined hanger installation system
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN216713553U (en) Fireproof environment-friendly curtain box
CN205296501U (en) Stone material installation device
CN202706308U (en) Clamping slot type light steel keel suspension structure
CN206581451U (en) A kind of prefabricated partition board based on light steel skeleton and lightweight concrete
CN212358610U (en) Mounting structure of top surface spherical net rack
CN105113684B (en) A kind of unit assembled building external protecting system and its construction method equipped with window
CN107476532A (en) A kind of outdoor wall surface stone installation structure and its installation method
CN207032758U (en) A kind of installation system of groove formula porcelain plate
CN205687383U (en) The mounting hanger of engine starter
CN107700778A (en) A kind of dry-hanging component of groove formula porcelain plate
CN202899532U (en) Connecting component for low carbon plate adhesive clamping combination
CN108797857B (en) Back bolt dry-hanging assembly and back bolt dry-hanging system
CN106906978A (en) A kind of combined wall board bracket and the wall body structure using the bracket
CN208122125U (en) A kind of portable new-type fixture
CN205224352U (en) Combination is involved to point -type
CN206769289U (en) Wall surface dry-hang stone fixture and fixed structure
CN107201816B (en) Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate
CN212957480U (en) Outdoor connection structure who hangs stone material and shutter futilely
CN111197368A (en) Outer slabstone material positioner of building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Mu Yangqing

Inventor after: Chen Xiufeng

Inventor before: Mu Yangqing

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170725

Address after: 750200 the Ningxia Hui Autonomous Region Yinchuan city Helan County Desheng Industrial Park (Halal Food Park) on the east side of Aolailu

Applicant after: Ningxia Changli energy-saving building materials Co. Ltd.

Address before: Room 402, tower C, Central Plaza, Zhangye Road, Chengguan District, Gansu, Lanzhou

Applicant before: Mu Yangqing

TA01 Transfer of patent application right