CN206703280U - Reinforcing bar positioning fixture for precast member for reinforcing bar concrete - Google Patents

Reinforcing bar positioning fixture for precast member for reinforcing bar concrete Download PDF

Info

Publication number
CN206703280U
CN206703280U CN201720441291.7U CN201720441291U CN206703280U CN 206703280 U CN206703280 U CN 206703280U CN 201720441291 U CN201720441291 U CN 201720441291U CN 206703280 U CN206703280 U CN 206703280U
Authority
CN
China
Prior art keywords
plate
reinforcing bar
template
location
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720441291.7U
Other languages
Chinese (zh)
Inventor
章彰
赵瑞华
陈杰
徐东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongjianhang Building Industry Development Co Ltd
Original Assignee
Shanghai Zhongjianhang Building Industry Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongjianhang Building Industry Development Co Ltd filed Critical Shanghai Zhongjianhang Building Industry Development Co Ltd
Priority to CN201720441291.7U priority Critical patent/CN206703280U/en
Application granted granted Critical
Publication of CN206703280U publication Critical patent/CN206703280U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of reinforcing bar positioning fixture for precast member for reinforcing bar concrete, including:For the template of pouring reinforcement concrete prefabricated components, formed with the first jack in the template;First fixture, including be mounted at first connecting plate in the outside of the template and be connected to the first location-plate of first connecting plate, first location-plate is placed in first jack;And second fixture, the second connecting plate including the outside that is mounted at the template and it is connected to the second location-plate of second connecting plate, second location-plate is placed in first jack, the grasping part formed with the protruding bar for positioning the precast member for reinforcing bar concrete between second location-plate and first location-plate.The protruding bar of prefabricated components is stuck in template when the utility model solves the production of existing precast member for reinforcing bar concrete, the problem of form removal difficulty.

Description

Reinforcing bar positioning fixture for precast member for reinforcing bar concrete
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of steel for precast member for reinforcing bar concrete Muscle positioning fixture.
Background technology
Precast member for reinforcing bar concrete has obtained extensively by the advantage that speed of application is fast, structural behaviour is good in building field General application.Precast member for reinforcing bar concrete in high volume makes in factory, and production efficiency is high, quality is good, saves resource and energy Source.
During existing precast member for reinforcing bar concrete manufacture craft, typically poured using template.After the completion of pouring, Concrete prefabricated element is spontaneously dried, hardened in a mold, after waiting the intensity for reaching certain, could carry out form removal.But in form removal When, template separate depositing protruding bar and being stuck in template to cause to be stripped with the protruding bar of precast member for reinforcing bar concrete and is stranded Difficulty, on the other hand, if after the jack that protruding bar plugs being supplied to expand in template, easy form removal, but bring another to ask again The problem of off normal occurs in casting and compacting of concrete for topic protruding bar, and then the prefabricated components for causing to produce can not install application.
Utility model content
The defects of to overcome present in prior art, a kind of reinforcing bar for precast member for reinforcing bar concrete is now provided and positioned Fixture, the protruding bar of prefabricated components is stuck in template during solving the production of existing precast member for reinforcing bar concrete, and form removal is stranded The problem of difficult.
To achieve the above object, there is provided a kind of reinforcing bar positioning fixture for precast member for reinforcing bar concrete, including:
For the template of pouring reinforcement concrete prefabricated components, formed with the first jack in the template;
First fixture, including be mounted at first connecting plate in the outside of the template and be connected to described first First location-plate of connecting plate, first location-plate are placed in first jack;And
Second fixture, including be mounted at second connecting plate in the outside of the template and be connected to described second Second location-plate of connecting plate, second location-plate are placed in first jack, second location-plate and described Grasping part formed with the protruding bar for positioning the precast member for reinforcing bar concrete between one location-plate.
Further, first location-plate and second location-plate are arc.
Further, the first side of first connecting plate fits in the outside of the template, first connecting plate Second side is provided with lift-pull handle.
Further, the lift-pull handle is draw ring, and the draw ring is foldable to be connected to first connecting plate.
Further, first connecting plate is connected to the template by screw rod, is offered on first connecting plate First screwed hole, offers the second screwed hole in the template, and the screw flight is connected to first screwed hole and described Between second screwed hole.
Further, first connecting plate is connected to the template by bearing pin, is offered on first connecting plate First locks hole, and second is offered in the template and locks hole, the bearing pin is inserted in described first and locks hole and described second Lock in hole.
The beneficial effects of the utility model are that the utility model is used for the reinforcing bar locating clip of precast member for reinforcing bar concrete Tool, by setting the first location-plate and the between the jack and protruding bar that are plugged for protruding bar that are opened up in original template Two location-plates, on the one hand protruding bar can accurately be positioned in original template in jack, on the other hand, the first positioning Plate and the second location-plate are mounted in template by the first connecting plate and the second connecting plate respectively, and then are caused rear During phase form removal, first the first location-plate being contained in jack and the second location-plate can be removed in advance, then form removal, So that protruding bar will not be stuck in template, the protruding bar compared with easy mold release, and then prefabricated components can be easy to stretch into upper strata component In the grout sleeve of bottom, engineering construction quality is improved.
Brief description of the drawings
Fig. 1 is the signal of the first embodiment for the reinforcing bar positioning fixture that the utility model is used for precast member for reinforcing bar concrete Figure.
Fig. 2 is the profile at A-A in Fig. 1.
Fig. 3 is the first of the first embodiment for the reinforcing bar positioning fixture that the utility model is used for precast member for reinforcing bar concrete The bonding state schematic diagram of fixture and the second fixture.
Fig. 4 is the profile at B-B in Fig. 3.
Fig. 5 is the first of the second embodiment for the reinforcing bar positioning fixture that the utility model is used for precast member for reinforcing bar concrete The bonding state schematic diagram of fixture and the second fixture.
Fig. 6 is the profile at C-C in Fig. 5.
Embodiment
Illustrate embodiment of the present utility model below by way of specific instantiation, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages and effect of the present utility model easily.The utility model can also be by addition Different embodiments are embodied or practiced, and the various details in this specification can also be based on different viewpoints with answering With, without departing from it is of the present utility model spirit under carry out various modifications or alterations.
First embodiment
Fig. 1 is the signal of the first embodiment for the reinforcing bar positioning fixture that the utility model is used for precast member for reinforcing bar concrete Figure, Fig. 2 are that profile, Fig. 3 in Fig. 1 at A-A are the reinforcing bar locating clip that the utility model is used for precast member for reinforcing bar concrete First fixture of the first embodiment of tool and the bonding state schematic diagram of the second fixture, Fig. 4 are the profile in Fig. 3 at B-B.
Referring to figs. 1 to shown in Fig. 4, the utility model provides a kind of reinforcing bar for precast member for reinforcing bar concrete and positioned Fixture, including:Template 1, the first fixture and the second fixture.
Template 1 is used for pouring reinforcement concrete prefabricated components 5.Formed with the first jack in template 1.
First fixture includes the first location-plate 21 and the first connecting plate 22.
First connecting plate 22 is mounted at the outside of template 1.First location-plate 21 be placed in template 1 first insert Kong Zhong, and the first location-plate 21 is connected to the side of the close template 1 of the first connecting plate 22.
Second fixture includes the second location-plate 31 and the second connecting plate 32.
Second connecting plate 32 is mounted at the outside of template 1.Second location-plate 31 be placed in template 1 first insert Kong Zhong, and the second location-plate 31 is connected to the second connecting plate 32.Enclose to be formed between second location-plate 31 and the first location-plate 21 There is the grasping part D of the protruding bar 4 for spacer bar concrete prefabricated element 5.
Specifically, the first location-plate 21 and the second location-plate 31 are arc.In the present embodiment, the first location-plate 21st, the first connecting plate 22, the second location-plate 31 and the second connecting plate 32 are that steel plate is made.
As a kind of preferable embodiment, in order to can easily be by the in form removal after concreting, maintenance One fixture and the second fixture are extracted from the first jack of template 1, installation and lift-pull handle on the first connecting plate 22.First connection First side of plate 22 fits in the outside of template 1, and the second side of the first connecting plate 22 is provided with lift-pull handle.
Further, lift-pull handle is draw ring, and draw ring is foldable to be connected to the first connecting plate 22.Draw ring passes through connecting pole Foldable the second side for being connected to the first connecting plate 22.Connecting pole is made up of round steel.The first end of connecting pole be welded to connect in Second side of the first connecting plate 22, the second end of connecting pole offer perforation, and draw ring is arranged in the perforation of connecting pole.Perforation Aperture is more than the diameter of draw ring so that draw ring is mobilizable to be arranged in perforation.
Accordingly, extracting the second fixture from the first jack of template 1 for convenience, also pacifies on the second connecting plate 32 Equipped with draw ring, the structure of draw ring, the structure of mounting means and the draw ring on the first connecting plate 22 and mounting means are all identical.
As a kind of preferable embodiment, the first connecting plate 22 is connected to template 1 by screw rod.On first connecting plate 22 Offer the first screwed hole 221.Second screwed hole corresponding with the position of the first screwed hole 221 is offered in template 1.Screw rod It is threadedly connected between the first screwed hole 221 and the second screwed hole of template 1.
In form removal after concreting, maintenance, can by screw rod from the first screwed hole 221 and template 1 second Disassemble, and then the first fixture can easily be disassembled from the first jack of template 1 in screwed hole.
Accordingly, the second connecting plate 32 can also take same mode to be mounted in template 1.
In certain embodiments, the first location-plate 21 and the first connecting plate 22 are formed in one, the He of the second location-plate 31 What the second connecting plate 32 was formed in one.
The utility model is used for the reinforcing bar positioning fixture of precast member for reinforcing bar concrete, passes through what is opened up in original template First location-plate and the second location-plate are set between the jack and protruding bar that are plugged for protruding bar, on the one hand cause overhanging steel Muscle can accurately be positioned in original template in jack, and on the other hand, the first location-plate and the second location-plate are respectively by the One connecting plate and the second connecting plate are mounted in template, and then are caused in later stage form removal, will first can be held Put the first location-plate in jack and the second location-plate is removed in advance, then form removal so that protruding bar will not be stuck in mould On plate, the protruding bar compared with easy mold release, and then prefabricated components can be easy to stretch into the grout sleeve of upper strata member bottom section, improve work Journey construction quality.
Second embodiment
Fig. 5 is the first of the second embodiment for the reinforcing bar positioning fixture that the utility model is used for precast member for reinforcing bar concrete The bonding state schematic diagram of fixture and the second fixture, Fig. 6 are the profile in Fig. 5 at C-C.
To shown in Fig. 6, the utility model provides a kind of reinforcing bar for precast member for reinforcing bar concrete and positioned reference picture 5 Fixture, including:Template, the first fixture and the second fixture.
Template is used for pouring reinforcement concrete prefabricated components.Formed with the first jack in template.
First fixture includes the first location-plate 21 ' and the first connecting plate 22 '.
First connecting plate 22 ' is mounted at the outside of template.First location-plate 21 ' be placed in template first insert Kong Zhong, and the first location-plate 21 ' is connected to the first connecting plate 22 '.
Second fixture includes the second location-plate 31 ' and the second connecting plate 32 '.
Second connecting plate 32 ' is mounted at the outside of template.Second location-plate 31 ' be placed in template first insert Kong Zhong, and the second location-plate 31 ' is connected to the second connecting plate 32 '.Enclosed between second location-plate 31 ' and the first location-plate 21 ' Grasping part D ' formed with the protruding bar for spacer bar concrete prefabricated element.
Specifically, the first location-plate 21 ' and the second location-plate 31 ' are arc.In the present embodiment, the first location-plate 21 ', first connecting plate 22 ', the second location-plate 31 ' and the second connecting plate 32 ' are that steel plate is made.
As a kind of preferable embodiment, in order to can easily be by the in form removal after concreting, maintenance One fixture and the second fixture are extracted from the first jack of template, installation and lift-pull handle on the first connecting plate 22 '.First connection First side of plate 22 ' fits in the outside of template, and the second side of the first connecting plate 22 ' is provided with lift-pull handle.
Further, lift-pull handle is draw ring, and draw ring is foldable to be connected to the first connecting plate 22 '.Draw ring passes through connection Foldable the second side for being connected to the first connecting plate 22 ' of post.Connecting pole is made up of round steel.The first end of connecting pole is welded to connect In the second side of the first connecting plate 22 ', the second end of connecting pole offers perforation, and draw ring is arranged in the perforation of connecting pole.Pass through The aperture in hole is more than the diameter of draw ring so that draw ring is mobilizable to be arranged in perforation.
As a kind of preferable embodiment, the first connecting plate 22 ' is connected to template, the first connecting plate 22 ' by bearing pin On offer first and lock hole 221 ', second corresponding with the position that first locks hole 221 ' is offered in template and locks hole, Bearing pin, which is removably inserted in first and locks hole 221 ' and second, to be locked in hole.
In form removal after concreting, maintenance, bearing pin can be locked to the second of hole 221 ' and template from first Lock in hole and disassemble, and then the first fixture can easily be disassembled from the first jack of template.
Accordingly, the second connecting plate 32 ' can also take same mode to be mounted in template.
The utility model is used for the reinforcing bar positioning fixture of precast member for reinforcing bar concrete, passes through what is opened up in original template First location-plate and the second location-plate are set between the jack and protruding bar that are plugged for protruding bar, on the one hand cause overhanging steel Muscle can accurately be positioned in original template in jack, and on the other hand, the first location-plate and the second location-plate are respectively by the One connecting plate and the second connecting plate are mounted in template, and then are caused in later stage form removal, will first can be held Put the first location-plate in jack and the second location-plate is removed in advance, then form removal so that protruding bar will not be stuck in mould On plate, the protruding bar compared with easy mold release, and then prefabricated components can be easy to stretch into the grout sleeve of upper strata member bottom section, improve work Journey construction quality.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to the utility model can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influenceing the effect of the utility model can be generated and the purpose that can reach, all should still fall disclosed in the utility model Technology contents obtain and can cover in the range of.Meanwhile in this specification it is cited as " on ", " under ", "left", "right", " in Between " and " one " etc. term, be merely convenient to understanding for narration, and be not used to limit the enforceable scope of the utility model, its Relativeness is altered or modified, in the case where changing technology contents without essence, when being also considered as the enforceable category of the utility model.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality New restriction, the utility model will be used as protection domain using the scope that appended claims define.

Claims (6)

  1. A kind of 1. reinforcing bar positioning fixture for precast member for reinforcing bar concrete, it is characterised in that including:
    For the template of pouring reinforcement concrete prefabricated components, formed with the first jack in the template;
    First fixture, including be mounted at first connecting plate in the outside of the template and be connected to first connection First location-plate of plate, first location-plate are placed in first jack;And
    Second fixture, including be mounted at second connecting plate in the outside of the template and be connected to second connection Second location-plate of plate, second location-plate are placed in first jack, and second location-plate and described first is determined Grasping part formed with the protruding bar for positioning the precast member for reinforcing bar concrete between the plate of position.
  2. 2. the reinforcing bar positioning fixture according to claim 1 for precast member for reinforcing bar concrete, it is characterised in that described First location-plate and second location-plate are arc.
  3. 3. the reinforcing bar positioning fixture according to claim 1 for precast member for reinforcing bar concrete, it is characterised in that described First side of the first connecting plate fits in the outside of the template, and the second side of first connecting plate is provided with lift-pull handle.
  4. 4. the reinforcing bar positioning fixture according to claim 3 for precast member for reinforcing bar concrete, it is characterised in that described Lift-pull handle is draw ring, and the draw ring is foldable to be connected to first connecting plate.
  5. 5. the reinforcing bar positioning fixture according to claim 1 for precast member for reinforcing bar concrete, it is characterised in that described First connecting plate is connected to the template by screw rod, offers the first screwed hole on first connecting plate, in the template The second screwed hole is offered, the screw flight is connected between first screwed hole and second screwed hole.
  6. 6. the reinforcing bar positioning fixture according to claim 1 for precast member for reinforcing bar concrete, it is characterised in that described First connecting plate is connected to the template by bearing pin, and first is offered on first connecting plate and locks hole, in the template Offer second and lock hole, the bearing pin, which is inserted in described first and locks hole and described second, to be locked in hole.
CN201720441291.7U 2017-04-25 2017-04-25 Reinforcing bar positioning fixture for precast member for reinforcing bar concrete Expired - Fee Related CN206703280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720441291.7U CN206703280U (en) 2017-04-25 2017-04-25 Reinforcing bar positioning fixture for precast member for reinforcing bar concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720441291.7U CN206703280U (en) 2017-04-25 2017-04-25 Reinforcing bar positioning fixture for precast member for reinforcing bar concrete

Publications (1)

Publication Number Publication Date
CN206703280U true CN206703280U (en) 2017-12-05

Family

ID=60457331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720441291.7U Expired - Fee Related CN206703280U (en) 2017-04-25 2017-04-25 Reinforcing bar positioning fixture for precast member for reinforcing bar concrete

Country Status (1)

Country Link
CN (1) CN206703280U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609962A (en) * 2020-12-21 2021-04-06 中冶东北建设(沈阳)工程技术有限公司 Embedded steel bar nesting template free of post-processing and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609962A (en) * 2020-12-21 2021-04-06 中冶东北建设(沈阳)工程技术有限公司 Embedded steel bar nesting template free of post-processing and construction method thereof

Similar Documents

Publication Publication Date Title
CN206753064U (en) A kind of aluminum alloy mould plate pull-tab system
CN105926935A (en) Integral column formwork based on 3d printing and used for concrete pouring and column pouring method
CN206614632U (en) A kind of cylindrical reinforced concrete test specimen pours mould
CN104947798A (en) Assembly type housing embedded hoisting components and anchoring method
CN104278840A (en) Decorating bare concrete construction method and split bolt hole die for same
CN207739628U (en) A kind of constructional column horn mouth formwork for placing of regularization
CN206703280U (en) Reinforcing bar positioning fixture for precast member for reinforcing bar concrete
CN209854874U (en) Inspection shaft well body pouring template
CN201362959Y (en) Floor slab preformed hole device
CN204001745U (en) The assembly structure of a kind of construction formwork and pulling-on piece assembly
CN204590571U (en) A kind of concrete construction mould
CN101349102A (en) Inner clip type formwork and matching apparatus thereof
CN108943343A (en) A kind of sleeve shear wall particular manufacturing craft and its application method
CN217782045U (en) Quick detachable deep-buried latticed column positioning and guiding device
CN207526118U (en) For pre-buried and closure unwrapping wire hole unwrapping wire punch die
CN211250563U (en) Pouring die for bearing wall board
CN212072343U (en) Precast concrete member template
CN205908019U (en) Prefabricated staircase mould of removable template
CN209723594U (en) A kind of positioning of assembled architecture reinforcing bar and check device
CN204531420U (en) Concreting plate device
CN209718152U (en) A kind of molding machine of concrete component hole for hoist
CN103240797B (en) Speed tears multipurpose die open
CN206287304U (en) A kind of fluid pressure type box culvert mould
CN207077584U (en) Cross celluar concrete stake template
CN206308625U (en) A kind of highway bridge is poured uses mixed mud steel form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20210425