CN206693593U - Aluminium alloy movement connects crane span structure soon - Google Patents
Aluminium alloy movement connects crane span structure soon Download PDFInfo
- Publication number
- CN206693593U CN206693593U CN201720314686.0U CN201720314686U CN206693593U CN 206693593 U CN206693593 U CN 206693593U CN 201720314686 U CN201720314686 U CN 201720314686U CN 206693593 U CN206693593 U CN 206693593U
- Authority
- CN
- China
- Prior art keywords
- pole
- workbench
- crane span
- span structure
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses aluminium alloy movement to connect crane span structure soon, including cast aluminium joint, pole, inclined support bar and workbench, the cast aluminium joint is connected by screw thread with pole, and it is welded with cross bar between cast aluminium joint, it is provided between the pole on the inside of fix bar and fix bar and is provided with cat ladder, the pole bottom is provided with adjustable legs, and the adjustable legs other end is fixed with roller, the workbench both ends are provided with rhinoceros nose fastening hook, and rhinoceros nose fastening hook is connected with cross bar, the worktable upper surface offers scaffold fixing groove, the inclined support bar is slidably connected by slide rail and pole.Pole is set and is integrated by the utility model with fix bar, cast aluminium joint sets with cross bar and is integrated, connected between pole by cast aluminium joint, overall structure is easy to connect, and workbench and cat ladder are connected by nose of an ox fastening hook with cross bar, connection fastening, the scaffold fixing groove that table surface is set can be such that crane span structure is used in combination with scaffold.
Description
Technical field
Building crane span structure equipment technical field is the utility model is related to, specially aluminium alloy movement connects crane span structure soon.
Background technology
At present, job site for operation and solves vertically and horizontally to transport the various crane span structures set up.Architecture field
Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height are used on construction site, mainly for applying
Worker person works up and down or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., and scaffold making material generally has:Bamboo and wood, steel
Pipe or synthetic material etc., some engineerings are also with scaffold when template use, in addition in advertising, municipal administration, traffic road and bridge, mine etc.
Department is also used extensively, and in the market crane span structure weight is big, complex installation process, and certain inconvenient, stability is poor.
The content of the invention
The purpose of this utility model is that provide aluminium alloy movement connects crane span structure soon, to solve what is proposed in above-mentioned background technology
Problem, possessed beneficial effect are:Pole is set with fix bar and is integrated, cast aluminium joint sets with cross bar and is integrated, and props up
Connected between bar by cast aluminium joint, overall structure is easy to connect, and workbench and cat ladder are connected by nose of an ox fastening hook and cross bar
Connect, connection fastening, the scaffold fixing groove that table surface is set can be such that crane span structure is used in combination with scaffold.
To achieve the above object, the utility model provides following technical scheme:Aluminium alloy movement connects crane span structure, including cast aluminium soon
Joint, pole, inclined support bar and workbench, the cast aluminium joint is connected by screw thread with pole, and is welded between cast aluminium joint
There is cross bar, fix bar is provided between the pole, and cat ladder is provided with the inside of fix bar, the pole bottom is provided with adjustable
Leg is saved, and the adjustable legs other end is fixed with roller, the workbench both ends are provided with rhinoceros nose fastening hook, and rhinoceros nose fastens
Hook is connected with cross bar, and the worktable upper surface offers scaffold fixing groove, and workbench both sides are provided with guardrail, described oblique
Support bar is slidably connected by slide rail and pole, and inclined support bar bottom is provided with non-slipping block.
Preferably, minimum one meter of the guardrail height.
Preferably, the table surface is provided with anti-slip veins, and workbench bottom is provided with support frame.
Preferably, the cat ladder is fixed by rhinoceros nose fastening hook with cross bar.
Preferably, locking device is installed inside the roller.
Compared with prior art, the beneficial effects of the utility model are:The equipment pole is welded with fix bar by TIG techniques
Fixation is connect, is cold-pressed admittedly by Rib-Grip cold expandings between cast aluminium joint and cross bar, passes through connection, easy to connect, work between pole
Make platform and cat ladder to be connected with cross bar by nose of an ox fastening hook, connection fastening, the scaffold fixing groove that table surface is set can make
Crane span structure is used in combination with scaffold, the stability of crane span structure when inclined support bar can protect work, prevents that ground is uneven by adjustable legs
When be difficult to ensure that stability, roller makes crane span structure conveniently moving, and need not move and make to be locked by locking device, anti-sliding stop, leads to
Cross aluminum alloy junction to be configured to, lightweight construction is easy to use.
Brief description of the drawings
Fig. 1 is overall structure front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is workbench schematic diagram of the present utility model.
In figure:1- guardrails;2- cast aluminium joints;3- poles;4- fix bars;5- inclined support bars;6- adjustable legs;7- works
Platform;8- cat ladders;9- slide rails;10- non-slipping blocks;11- rollers;12- screw threads;13- cross bars;14- rhinoceros nose fastening hooks;15- scaffolds
Fixing groove.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of embodiment provided by the utility model:Aluminium alloy movement connects crane span structure soon, including cast aluminium connects
First 2, pole 3, inclined support bar 5 and workbench 7, cast aluminium joint 2 is connected by screw thread 12 with pole 3, and is welded between cast aluminium joint 2
Cross bar 13 is connected to, fix bar 4 is provided between pole 3, and the inner side of fix bar 4 is provided with cat ladder 8, the bottom of pole 3 is provided with can
Leg 6 is adjusted, and the other end of adjustable legs 6 is fixed with roller 11, the both ends of workbench 7 are provided with rhinoceros nose fastening hook 14, and rhinoceros
Nose fastening hook 14 is connected with cross bar 13, and the upper surface of workbench 7 offers scaffold fixing groove 15, and the both sides of workbench 7 are provided with
Guardrail 1, inclined support bar 5 are slidably connected by slide rail 9 and pole 3, and the bottom of inclined support bar 5 is provided with non-slipping block 10, and guardrail 1 is high
Minimum one meter is spent, the surface of workbench 7 is provided with anti-slip veins, and the bottom of workbench 7 is provided with support frame, states cat ladder 8 and passes through rhinoceros
Nose of an ox fastening hook 14 is fixed with cross bar 13, and locking device is provided with inside roller 11.
Operation principle:In use, pole 3 is welded and fixed with fix bar 4 by TIG techniques, cast aluminium joint 2 and cross bar 13 it
Between be cold-pressed by Rib-Grip cold expandings solid, by 2 connections between pole 3, easy to connect, workbench 7 and cat ladder 8 are tight by nose of an ox
Gu hook 14 is connected with cross bar 13, connection fastening, the scaffold fixing groove 15 that the surface of workbench 7 is set can make crane span structure and scaffold knot
Close and use, inclined support bar 5 can ensure the stability of crane span structure during work, prevent ground not to be difficult to ensure that usually by adjustable legs 6
Stability, roller 11 make crane span structure conveniently moving, and need not move and make to be locked by locking device, anti-sliding stop.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (5)
1. aluminium alloy movement connects crane span structure, including cast aluminium joint soon(2), pole(3), inclined support bar(5)And workbench(7), it is special
Sign is:The cast aluminium joint(2)Pass through screw thread(12)With pole(3)Connection, and cast aluminium joint(2)Between be welded with cross bar
(13), the pole(3)Between be provided with fix bar(4), and fix bar(4)Inner side is provided with cat ladder(8), the pole(3)
Bottom is provided with adjustable legs(6), and adjustable legs(6)The other end is fixed with roller(11), the workbench(7)Install at both ends
There is rhinoceros nose fastening hook(14), and rhinoceros nose fastening hook(14)With cross bar(13)Connection, the workbench(7)Upper surface offers
Scaffold fixing groove(15), and workbench(7)Both sides are provided with guardrail(1), the inclined support bar(5)Pass through slide rail(9)With branch
Bar(3)It is slidably connected, and inclined support bar(5)Bottom is provided with non-slipping block(10).
2. aluminium alloy movement according to claim 1 connects crane span structure soon, it is characterised in that:The guardrail(1)It is highly minimum
One meter.
3. aluminium alloy movement according to claim 1 connects crane span structure soon, it is characterised in that:The workbench(7)Surface is set
There are anti-slip veins, and workbench(7)Bottom is provided with support frame.
4. aluminium alloy movement according to claim 1 connects crane span structure soon, it is characterised in that:The cat ladder(8)Pass through rhinoceros nose
Fastening hook(14)With cross bar(13)It is fixed.
5. aluminium alloy movement according to claim 1 connects crane span structure soon, it is characterised in that:The roller(11)Inside is provided with
Locking device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720314686.0U CN206693593U (en) | 2017-03-29 | 2017-03-29 | Aluminium alloy movement connects crane span structure soon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720314686.0U CN206693593U (en) | 2017-03-29 | 2017-03-29 | Aluminium alloy movement connects crane span structure soon |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206693593U true CN206693593U (en) | 2017-12-01 |
Family
ID=60440413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720314686.0U Active CN206693593U (en) | 2017-03-29 | 2017-03-29 | Aluminium alloy movement connects crane span structure soon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206693593U (en) |
-
2017
- 2017-03-29 CN CN201720314686.0U patent/CN206693593U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100025151A1 (en) | Integral safety system which can be used for construction | |
CN207110413U (en) | A kind of portable scaffold for building | |
CN103422663A (en) | Adhesive lifting scaffold | |
CN206693593U (en) | Aluminium alloy movement connects crane span structure soon | |
CN205369866U (en) | Assembled steel ladder | |
CN206530033U (en) | A kind of overhanging type movable Scaffold | |
CN203034370U (en) | Walking car used for maintaining suspended rails | |
CN206693590U (en) | A kind of Quick-mounting aluminium alloy scaffold | |
CN206693594U (en) | Aluminium alloy scaffold mobile tower body panel | |
CN210369827U (en) | Scaffold for building external wall construction | |
CN204775838U (en) | A device of passing a bridge for it is current between container ship ladder | |
CN207017620U (en) | A kind of constructing tunnel scaffold | |
RU150737U1 (en) | CONSTRUCTION HAND AND FLOORING WITH HATCH | |
CN204174915U (en) | Scaffold | |
CN203488077U (en) | Ladder for building workers | |
CN203961323U (en) | Quick lap joint formula guard system | |
CN207110439U (en) | A kind of connection ladder on scaffold | |
CN111075175A (en) | Scaffold for architectural decoration | |
CN208023939U (en) | A kind of building scaffold falling-proof safety device | |
CN208152532U (en) | A kind of construction scaffold | |
CN205777426U (en) | One hangs overhanging scaffold | |
CN104372935A (en) | Scaffold | |
CN210973515U (en) | Maintenance guardrail of escalator | |
CN213837685U (en) | Detachable upper and lower slope heavy carriageway | |
CN206016232U (en) | A kind of construction coherent-wall scaffolding cantilever arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181121 Address after: 510000 Lianhu Plaza, Lianhu Village, Shatou Street, Panyu District, Guangzhou, Guangdong Patentee after: Guangzhou Yingsteng Industrial Equipment Co., Ltd. Address before: 510000 No. 625, Mengyong Shinan Road, Dashi Street, Panyu District, Guangzhou City, Guangdong Province Patentee before: Guangzhou Yi Sheng Electrical and mechanical equipment Co., Ltd. |
|
TR01 | Transfer of patent right |