CN206681758U - Railway modular Varied section chassis - Google Patents
Railway modular Varied section chassis Download PDFInfo
- Publication number
- CN206681758U CN206681758U CN201720376808.9U CN201720376808U CN206681758U CN 206681758 U CN206681758 U CN 206681758U CN 201720376808 U CN201720376808 U CN 201720376808U CN 206681758 U CN206681758 U CN 206681758U
- Authority
- CN
- China
- Prior art keywords
- chassis
- right sides
- template
- needle beam
- railway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model belongs to constructing tunnel equipment technical field, specifically a kind of railway modular Varied section chassis.Solves railway list two-wire Varied section lining construction, including setting chassis in orbit, it is connected respectively by changing long filament rod sleeve with side template at left and right sides of chassis, side template bottom is hinged with the small arc mould in bottom, two pieces of adjustable curvature templates are connected between the side template of the left and right sides, it is connected between two pieces of adjustable curvature templates by connecting plate, horizontally arranged scalable needle beam is provided with the downside of adjustable curvature template, scalable needle beam is arranged on the upper longeron of the left and right sides, the upper longeron of the left and right sides is symmetricly set on chassis, the one end of the upper side rail inner of the left and right sides respectively with horizontal thrust oil cylinder is connected, the other end of horizontal thrust oil cylinder is connected with chassis.The utility model need not change installing/dismounting template, shorten construction period, and practical performance is preferable, simple in construction, and stress is clear and definite, and use is also easy.
Description
Technical field
The utility model belongs to constructing tunnel equipment technical field, specifically a kind of railway modular Varied section chassis.
Background technology
In railway list two-wire Varied section lining construction, in the past using it is artificial set up hung outside platform supporting steel arch-shelf it is small
Template is disconnected in template or original chassis and is added and widens block or steel arch-shelf and small template is hung on original chassis to realize, is irrigated
After need repeated disassembled and assembled and to have bad luck, work efficiency is not high.For this reason, it may be necessary to a kind of can meet to work continuously, avoid having bad luck installing/dismounting repeatedly
Modular Varied section trolley formwork improve efficiency of construction and quality.
The content of the invention
The utility model meets the general anchor section of railway, section of casting anchor, complete to solve railway list two-wire Varied section lining construction
Section is widened, the construction of local widening, horn mouth section, there is provided a kind of modular trolley formwork, avoids dismantling template repeatedly, operates
Safety, a kind of railway modular Varied section chassis of folding with convenience.
The utility model takes following technical scheme:A kind of railway modular Varied section chassis, including set in orbit
Chassis, be connected respectively by changing long filament rod sleeve with side template at left and right sides of chassis, side template bottom is hinged with the small arc in bottom
Mould, two pieces of adjustable curvature templates are connected between the side template of the left and right sides, pass through connecting plate between two pieces of adjustable curvature templates
It is connected, horizontally arranged scalable needle beam is provided with the downside of adjustable curvature template, scalable needle beam is arranged on a left side
On the upper longeron of right both sides, the upper longeron of the left and right sides is symmetricly set on chassis, the upper side rail inner of the left and right sides respectively with
One end connection of horizontal thrust oil cylinder, the other end of horizontal thrust oil cylinder are connected with chassis.
Described scalable needle beam is set to two sections, has been bolted between two sections and has removably widened needle beam,
The outer end of scalable needle beam is connected by hinging pin shaft with adjustable curvature template.
Described chassis lower end, which is provided with, increases seat.
The modular template of adjustable curvature is used at the top of chassis, meet railway list two-wire radius change scope 500mm~
The Varied section construction of 1500mm curature variation, passes through changing for the flexible action chord length for realizing section arc of scalable needle beam
Become, side template rotates the fitting for realizing section variation, and bottom increases seat and adapted to the height adjustment that section variation is brought, bottom
Small arc mould meets the adjustment that the change of section arc length brings arc length, and more traditional template of untiing widens block and multiple positions
Widen the construction method of block, there is larger facility, simultaneously for trumpet-like tunnel front and rear cross section regulation also have be easy to
The characteristics of realizing, big side can be adjusted with side and adjusts small or does not adjust, is had just for the lining construction for changing section repeatedly
The characteristics of profit is safe and reliable.
Traditional one circulation of Varied section chassis installing/dismounting needs the people of model sheetinstallat work 5, and a cycle installation dismounting is pacified again
Filling locating template needs 18 working days.The utility model needs model sheetinstallat using one circulation of modular chassis installing/dismounting
The people of work 2, locating template is installed in a cycle installation dismounting again needs 2 working days.The modular trolley formwork, it is not necessary to change
Installing/dismounting template, construction period is shortened, practical performance is preferable, simple in construction, and stress is clear and definite, and use is also easy.
Brief description of the drawings
Fig. 1 is the utility model structure diagram I;
Fig. 2 is the utility model structure diagram II;
1- adjustable curvatures template in figure, 2- connecting plates, the scalable needle beams of 3-, 4- hinging pin shafts, the upper longerons of 5-, 6- are horizontal
Push action cylinder, 7- widen needle beam, 8- side templates, and 9- increases seat, the small arc mould in 10- bottoms, and 11- changes long filament rod sleeve, 12- platforms
Car.
Embodiment
To make the technical problems to be solved in the utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing
And specific embodiment is described in detail.
As shown in figure 1, a kind of railway modular Varied section chassis, including chassis 12 in orbit is set, chassis 12 is left
Right both sides are connected by changing long filament rod sleeve 11 with side template 8 respectively, and the bottom of side template 8 is hinged with the small arc mould 10 in bottom, left and right
Two pieces of adjustable curvature templates 1 are connected between the side template 8 of both sides, are connected between two pieces of adjustable curvature templates 1 by connecting plate 2
Fixed, the downside of adjustable curvature template 1 is provided with horizontally arranged scalable needle beam 3, and scalable needle beam 3 is arranged on left and right
On the upper longeron 5 of both sides, the upper longeron 5 of the left and right sides is symmetricly set on chassis 12, and the inner side of upper longeron 5 of the left and right sides is respectively
It is connected with one end of horizontal thrust oil cylinder 6, the other end of horizontal thrust oil cylinder 6 is connected with chassis 12.
Described scalable needle beam 3 is set to two sections, has been bolted between two sections and has removably widened needle beam
7, the outer end of scalable needle beam 3 is connected by hinging pin shaft 4 with adjustable curvature template 1.
The described lower end of chassis 12, which is provided with, increases seat 9.
The generally 10mm plates of adjustable curvature template 1 are externally reinforced, and [ 20a channel-section steel frames, connecting plate use 12mm plates, adjustable song
The top plate face of rate template 1 is that entirety connecting plate is connected, it is necessary to when changing curvature, unclamps connecting plate, and adjustable curvature template 1
The scalable needle beam 13 of lower section(It is general to use [ 20a channel-section steels or [ 25a channel-section steels), it is hinged between template using hinge pin
(Typically it is considered as Φ 60mm diameter pintles), the upper longeron of needle beam bottom consolidation, promote template to change by horizontal thrust oil cylinder 6
Variable curvature, increase or reduction chord length, horizontal thrust oil cylinder 6, which promotes scalable needle beam 13 to reach template chord length, needs chord length
When, inserted among scalable needle beam 13 and widen needle beam 7, lock the connecting plate of die head.Then side template is strutted to connect
The nearly theoretical profile for expanding section, error are in the range of 0mm~+20mm, and seat 9 is increased in lifting integral trolley installation, then installs bottom
The small arc mould in portion bottom, finally installation change long filament rod sleeve 11, template are fixed on stand.Chassis detection positioning after stretching over the ground
Screw mandrel, locking screw and anti-sidesway screw mandrel, concrete perfusion, after the completion of, about 24 hours, support screw is unclamped, shrinks side template,
Side template inwardly rotates disengagement concrete, falls chassis, running truck to next station, form coating, positioning, starts next ring
Section construction.After the completion of section construction is expanded, the small arc mould in bottom is first removed, seat 9 is increased in dismounting, and contraction rotates back to side template
Contracting, chassis is fallen, release the fixation post between adjustable curvature template 1 and scalable needle beam 13, unclamp scalable small horizontal stroke
Beam 13 and the connecting bolt for widening needle beam 7, the connecting plate 2 at the top of adjustable curvature template 1 is unclamped, promotes horizontal thrust oil cylinder 6
Stretch out, needle beam 7 is widened in taking-up, withdraws horizontal thrust oil cylinder 6, and scalable needle beam 13 returns to standard section position, checks
Top template section, locking connecting plate, consolidation post and needle beam, carries out the construction of standard section.
Described above is preferred embodiment of the present utility model, it is noted that for the ordinary skill of the art
For personnel, on the premise of principle described in the utility model is not departed from, some improvements and modifications can also be made, these improvement
The scope of protection of the utility model is also should be regarded as with retouching.
Claims (3)
- A kind of 1. railway modular Varied section chassis, it is characterised in that:Including setting chassis in orbit(12), chassis(12) The left and right sides is respectively by changing long filament rod sleeve(11)With side template(8)Connection, side template(8)Bottom is hinged with the small arc mould in bottom (10), the side template of the left and right sides(8)Between be connected with two pieces of adjustable curvature templates(1), two pieces of adjustable curvature templates(1)Between Pass through connecting plate(2)It is connected, adjustable curvature template(1)Downside is provided with horizontally arranged scalable needle beam(3), can Flexible needle beam(3)Upper longeron installed in the left and right sides(5)On, the upper longeron of the left and right sides(5)It is symmetricly set on chassis (12)On, the upper longeron of the left and right sides(5)Inner side respectively with horizontal thrust oil cylinder(6)One end connection, horizontal thrust oil cylinder(6) The other end and chassis(12)Connection.
- 2. railway modular Varied section chassis according to claim 1, it is characterised in that:Described scalable needle beam (3)Two sections are set to, has been bolted between two sections and has removably widened needle beam(7), scalable needle beam(3)Outer end Pass through hinging pin shaft(4)With adjustable curvature template(1)Connection.
- 3. railway modular Varied section chassis according to claim 2, it is characterised in that:Described chassis(12)Lower end is set Have and increase seat(9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720376808.9U CN206681758U (en) | 2017-04-12 | 2017-04-12 | Railway modular Varied section chassis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720376808.9U CN206681758U (en) | 2017-04-12 | 2017-04-12 | Railway modular Varied section chassis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206681758U true CN206681758U (en) | 2017-11-28 |
Family
ID=60399242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720376808.9U Expired - Fee Related CN206681758U (en) | 2017-04-12 | 2017-04-12 | Railway modular Varied section chassis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206681758U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111520145A (en) * | 2020-04-29 | 2020-08-11 | 中铁七局集团有限公司 | Underground excavation tunnel primary support slope adjusting and arch changing construction method |
-
2017
- 2017-04-12 CN CN201720376808.9U patent/CN206681758U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111520145A (en) * | 2020-04-29 | 2020-08-11 | 中铁七局集团有限公司 | Underground excavation tunnel primary support slope adjusting and arch changing construction method |
CN111520145B (en) * | 2020-04-29 | 2021-10-01 | 中铁七局集团有限公司 | Underground excavation tunnel primary support slope adjusting and arch changing construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207109856U (en) | Piping lane, culvert construction hydraulic steel formwork jumbo | |
CN103352710B (en) | The convertible tunnel overhead arch mould plate trolley of a kind of suspension and construction method thereof | |
CN105442838A (en) | Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof | |
CN107387122A (en) | A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring | |
CN207315404U (en) | Municipal tunnel big cross section culvert and piping lane trolley | |
CN107152158B (en) | A kind of fixed scaffold | |
CN209799969U (en) | A integrally lift up cantilever formwork device for quick construction shaft lining cutting | |
CN206681758U (en) | Railway modular Varied section chassis | |
CN209686443U (en) | One kind can formwork composed bogie in early demoulding gallery | |
CN109869153B (en) | Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method | |
CN205704617U (en) | Precast beam hydraulic pressure opening template | |
CN205400756U (en) | Variable section platform truck | |
CN206128814U (en) | Iron tower is salvageed chevron shape and is embraced pole | |
CN105332718A (en) | Trolley for construction of large-span multi-section tunnel | |
CN207620814U (en) | A kind of adjustable folding formula support component | |
CN111140254A (en) | Full-circle double-lining inverted arch construction template system for long-distance tunnel and template transferring method | |
CN211230492U (en) | Hydraulic self-propelled movable formwork support for tunnel center ditch | |
CN216809520U (en) | Gray sheet supporting frame with stepless adjustment function | |
CN206329347U (en) | A kind of lining trolley for metro station construction | |
CN211030511U (en) | Flexible extension formula segment case roof beam centre form | |
CN206128815U (en) | Single armful of pole is salvageed to iron tower | |
CN218264750U (en) | But reuse's people's air defense door steel door frame quick fixation device | |
CN216276883U (en) | Combined structure of construction elevator and creeping formwork support body | |
CN215803086U (en) | Cantilever template | |
CN219411822U (en) | Stable large-span ultrahigh formwork system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 |