CN206128815U - Single armful of pole is salvageed to iron tower - Google Patents
Single armful of pole is salvageed to iron tower Download PDFInfo
- Publication number
- CN206128815U CN206128815U CN201621077598.5U CN201621077598U CN206128815U CN 206128815 U CN206128815 U CN 206128815U CN 201621077598 U CN201621077598 U CN 201621077598U CN 206128815 U CN206128815 U CN 206128815U
- Authority
- CN
- China
- Prior art keywords
- base
- support
- steel tower
- lower plate
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title abstract description 20
- 229910052742 iron Inorganic materials 0.000 title abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 43
- 239000010959 steel Substances 0.000 claims abstract description 43
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 4
- 208000005168 Intussusception Diseases 0.000 claims abstract description 4
- 230000000875 corresponding Effects 0.000 claims description 6
- 241000731961 Juncaceae Species 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 238000004891 communication Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 12
- 238000010276 construction Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 230000001771 impaired Effects 0.000 description 2
- 239000002965 rope Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
Abstract
The utility model discloses a single armful of pole is salvageed to iron tower comprises bracing piece, jacking lead screw, " V " font angle steel anchor clamps and base, the bracing piece is the high strength aluminum alloy pipe, and including upper strut pipe and lower part stay tube, the upper strut pipe is a lesson at least, and the lower part stay tube is two segment structures, is equipped with the internal thread that matches with the jacking lead screw in two sections lower part stay tubes, and the jacking lead screw is installed between two sections lower part stay tubes, " V " font angle steel anchor clamps include the punch holder and the lower plate of intussusception and connect the fastening bolt of two splint that the bottom of lower plate articulates through the round pin axle the top of bracing piece, the base is universal base, and its center hinges in the bottom of bracing piece, is equipped with ground anchor eye and pull ring on the base. The utility model has the advantages of simple structure, installation labour saving and time saving, operation safe and reliable are particularly suitable for various electric power or communication tower and salvage and maintain.
Description
Technical field
This utility model belongs to power maintenance tool, and in particular to a kind of steel tower repairing list pole.
Background technology
The main material of electric power or communication steel tower is often subject to natural agent or artificial destruction, when serious steel tower can occur it is crooked,
Now need immediately to keep in repair it, during maintenance, righting steel tower is obtained first, part is then changed again.Existing dimension
The means for repairing steel tower are typically, the setting support first on tower side, then by the top bracing mechanism on support by steel tower righting, so
After change part.Prior art exist defect be:1st, field is with a varied topography, and the strong point that support needs is more, and overall huge,
It is difficult to build;2nd, support is not enough to the support degree of top bracing mechanism, built on the sand, not safe enough;3rd, support adopts steel pipe to build
Material, transport difficulty is big;4th, top bracing mechanism is to recover the original height of steel tower later putting up support using jack, its construction
Difficulty is big, righting effect is poor.Single Maintenance is carried out to steel tower with existing means generally needs the staff of more than 20, uses 7-
8 hours could put up on support.It follows that the means of existing maintenance steel tower were both laborious and time-consuming, not meeting repairing will
Ask.
Utility model content
In view of this, this utility model provides a kind of repairing of steel tower single pole, with simple structure, operate it is time saving and energy saving,
Safe and reliable the characteristics of.
The technical solution of the utility model is that a kind of steel tower rushes to repair single pole, it is characterised in that:It is by support bar, jacking
Leading screw, " V " font angle steel fixture and base composition;The support bar be High-strength aluminum alloy round pipe, including upper support pipe and
Lower support pipe, the upper support pipe is at least a section, and the lower support pipe is two-stage structure, in two pars infrasegmentalis support tubes
The female thread matched with the jacking leading screw is provided with, the jacking leading screw is arranged between the two pars infrasegmentalises support tube;It is described
" V " font angle steel fixture includes the fastening bolt of two clamping plates of the train wheel bridge and lower plate of intussusception and connection, the bottom of lower plate
By hinge on the top of the support bar;The base is gimballed base, and its center is hinged on the bottom of support bar, bottom
Seat is provided with anchor hole and draw ring.
Further, the upper support pipe has more than two sections, with flange arrangement connection between Guan Yuguan.
Further, upper and lower corresponding bar hole is respectively equipped with two inclined-planes of the train wheel bridge and lower plate, it is described tight
Fixing bolt is plugged in bar hole.
Further, the corresponding surface of the train wheel bridge and lower plate is provided with anti-skid rubber cushion.
Further, the main body of the base is rectangular flat, and an anchor hole, four sides are respectively provided with four angles of flat board
On be respectively provided with a draw ring.
The utility model has the advantages that:1st, the pole main body as righting steel tower is a support bar, and support bar
It is that more piece is knockdown, therefore, substantially reduce the number equipment and its cost of transportation used by repairing steel tower and artificial;2nd, on support bar
" V " font angle steel fixture that end is arranged is adapted to the tower material of Multiple Type, and can conveniently, steadily hold tower material;3rd, bottom
Seat can be positioned on the ground of any complexity with guiding principle pricker and rope are firm;4th, " V " font angle steel fixture and base with
Strut is hinged, therefore the support angle of support bar can be adjusted arbitrarily.In practice, do a steel tower repairing with this utility model or tie up
Repair, it is only necessary to three workmans, used time 1-2 hour can be completed, and safe and reliable.From the foregoing, knot of the present utility model
Structure is simple, install time saving and energy saving, safe operation reliability, is particularly suitable for various electric power or the repairing of communication steel tower and safeguards.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of " V " font angle steel fixture in this utility model.
Fig. 3 is the structural representation of base in this utility model.
In figure:1. " V " font angle steel fixture, 1-1. train wheel bridges, 1-2. lower plates, 1-3. fastening bolts, 1-4. bar holes,
2. support bar, 2-1. flanges, 2-2. jacking leading screws, 3. base, 3-1. anchor holes, 3-2. draw rings, 4. bearing pin.
Specific embodiment
In order that those skilled in the art more fully understands the technical solution of the utility model, below in conjunction with the accompanying drawings and tool
The utility model is described in further detail for body embodiment.
As shown in figure 1, a kind of steel tower repairing list pole, is by support bar 2, jacking leading screw 2-2, " V " font angle steel fixture 1
Constitute with base 3.In order that the intensity increase of support bar 2, weight saving and convenient transport, so support bar 2 is using high-strength
Degree tube and pipe of aluminium alloy.Support bar 2 includes upper support pipe and lower support pipe, and upper support pipe is at least a section.If top
Stay tube is more than two sections, with the connection of flange 2-1 structures between Guan Yuguan.So the length of support bar 2 can arbitrarily extend, to adapt to
The iron tower main material replacing of differing heights.And lower support pipe is two-stage structure, it is provided with two pars infrasegmentalis support tubes and jacking leading screw
The female thread of 2-2 matchings, between the two pars infrasegmentalis support tubes that jacking leading screw 2-2 is arranged on.When rotating forward jacking leading screw 2-2,
Extend can support bar 2, until by steel tower righting, and jacking leading screw 2-2 has the effect of accurate construction.The top of support bar 2
End is hinged with the bottom of " V " font angle steel fixture 1 by bearing pin 4.The bottom of support bar 2 is then hinged with the center of base 3, base
3 is gimballed base.Because the upper and lower ends of support bar 2 are using the attachment structure that is hinged, thus support bar 2 with iron tower main material
During connection, its angle of inclination arbitrarily can be adjusted as needed.
As shown in Fig. 2 " V " font angle steel fixture 1 includes that the train wheel bridge 1-1 and lower plate 1-2 of intussusception and connection two are pressed from both sides
Fastening bolt 1-3 of plate.The bottom of lower plate 1-2 is hinged on the top of support bar 2 by bearing pin 4.Iron tower main material is clamped in
Between train wheel bridge 1-1 and lower plate 1-2.In order that iron tower main material will not skid in clamped maintenance process, therefore in train wheel bridge
The corresponding surface of 1-1 and lower plate 1-2 is provided with anti-skid rubber cushion.It should be noted that due to the size and specification of iron tower main material
Difference, in order that " V " font angle steel fixture 1 can do adapt, therefore two in train wheel bridge 1-1 and lower plate 1-2 oblique
Upper and lower corresponding bar hole 1-4 is respectively equipped with face, fastening bolt 1-3 is plugged in bar hole 1-4.It is provided with bar hole 1-4's
It is ∠ 80- ∠ 240 that " V " font angle steel fixture 1 adapts to iron tower main material specification.
As shown in figure 3, base 3 is provided with anchor hole 3-1 and draw ring 3-2.Specifically the main body of base 3 is set to into rectangle to put down
Plate, is respectively provided with an anchor hole 3-1 on four angles of flat board, a draw ring 3-2 is respectively provided with four sides.If ground even, can
By squeezing into drill rod in anchor hole 3-1, base 3 is fixed on into ground, when ground environment complexity, it is impossible to only with drill rod or completely
When cannot make earth anchor, then draw ring 3-2 can be connected come firm banking 3 with peripheric fixture body by rope.
During construction, by this utility model location and installation in Iron tower incline or impaired side, jacking leading screw is rotated forward, you can
By steel tower righting, then impaired tower material is changed or steel tower is keeped in repair.This utility model simple structure, operation saves time
It is laborsaving, it is only necessary to which that 3 one hour staff's used times can complete the connection of this utility model and iron tower main material and can help on steel tower
Just, efficiency of construction is effectively improved, and it is safe and reliable, it is widely used in the repairing and maintenance of various electric power or communication steel tower class.
Claims (5)
1. a kind of steel tower rushes to repair single pole, it is characterised in that:It is by support bar, jacking leading screw, " V " font angle steel fixture and base
Composition;The support bar is High-strength aluminum alloy round pipe, including upper support pipe and lower support pipe, and the upper support pipe is extremely
It is less a section, the lower support pipe is two-stage structure, being provided with two pars infrasegmentalis support tubes in match with the jacking leading screw
Screw thread, the jacking leading screw is arranged between the two pars infrasegmentalises support tube;" V " the font angle steel fixture includes the upper of intussusception
The fastening bolt of two clamping plates of clamping plate and lower plate and connection, the bottom of lower plate passes through hinge on the top of the support bar
End;The base is gimballed base, and its center is hinged on the bottom of support bar, and base is provided with anchor hole and draw ring.
2. according to the single pole of steel tower repairing described in claim 1, it is characterised in that:The upper support pipe has more than two sections,
With flange arrangement connection between Guan Yuguan.
3. according to the single pole of steel tower repairing described in claim 1, it is characterised in that:Two of the train wheel bridge and lower plate are tiltedly
Upper and lower corresponding bar hole is respectively equipped with face, the fastening bolt is plugged in bar hole.
4. according to the single pole of steel tower repairing described in claim 1, it is characterised in that:The corresponding surface of the train wheel bridge and lower plate
It is provided with anti-skid rubber cushion.
5. according to the single pole of steel tower repairing described in claim 1, it is characterised in that:The main body of the base is rectangular flat,
An anchor hole is respectively provided with four angles of flat board, a draw ring is respectively provided with four sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621077598.5U CN206128815U (en) | 2016-09-18 | 2016-09-18 | Single armful of pole is salvageed to iron tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621077598.5U CN206128815U (en) | 2016-09-18 | 2016-09-18 | Single armful of pole is salvageed to iron tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206128815U true CN206128815U (en) | 2017-04-26 |
Family
ID=58569771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621077598.5U Active CN206128815U (en) | 2016-09-18 | 2016-09-18 | Single armful of pole is salvageed to iron tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206128815U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165901A (en) * | 2017-06-28 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of antidetonation connector |
-
2016
- 2016-09-18 CN CN201621077598.5U patent/CN206128815U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165901A (en) * | 2017-06-28 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of antidetonation connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110984674B (en) | Electric power engineering construction power consumption pole correcting device | |
CN105442934B (en) | Bi-directional torque cement pole pole centralizing device | |
CN206128814U (en) | Iron tower is salvageed chevron shape and is embraced pole | |
CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
CN206128815U (en) | Single armful of pole is salvageed to iron tower | |
CN205445099U (en) | Pole orthotic devices | |
CN202433253U (en) | Auxiliary device for pull-out test of hooked anchors | |
CN204609435U (en) | The auxiliary tower that hoists of emergent repairing tower | |
CN203806966U (en) | Wind driven generator foundation anchor plate transportation and storage device | |
CN206607594U (en) | The structure with oblique member of construction | |
CN202202344U (en) | Construction device of threaded connection sound detection pipe | |
CN204199667U (en) | Detachable builder's jack corner tripod | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN209413439U (en) | A kind of undercrossing tunnel frame bridge large-tonnage long range incremental launching construction protective device | |
CN204570396U (en) | D type is the traversing door frame of beam just | |
CN204277366U (en) | For the hydraulic lifting apparatus of vertical type tubular equipment upside-down mounting | |
CN208226447U (en) | A kind of portable temporary guy of distribution line | |
CN208685449U (en) | The dismounting device of bent cap bed die | |
CN206724095U (en) | The draw bail of street lamp post and pedestal | |
CN205089034U (en) | Constant diameter pole pole setting ware | |
CN206090614U (en) | Formwork support spare in underground pipe gallery construction | |
CN205778937U (en) | A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate | |
CN206681758U (en) | Railway modular Varied section chassis | |
CN214570413U (en) | Special device for underground rapid lifting pipeline of mine | |
CN205479959U (en) | Emergent extrusion cut -off equipment of heavy -calibre steel pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |