CN206681328U - A kind of civil engineering safe construction frame - Google Patents
A kind of civil engineering safe construction frame Download PDFInfo
- Publication number
- CN206681328U CN206681328U CN201720248548.7U CN201720248548U CN206681328U CN 206681328 U CN206681328 U CN 206681328U CN 201720248548 U CN201720248548 U CN 201720248548U CN 206681328 U CN206681328 U CN 206681328U
- Authority
- CN
- China
- Prior art keywords
- hole
- bolt
- connection valve
- steel pipe
- king
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mechanically-Actuated Valves (AREA)
Abstract
The utility model discloses a kind of civil engineering safe construction frame, including steel pipe, the inner chamber of the steel pipe is provided with multiple king-bolt through holes, and the upper and lower ends of the steel pipe are mounted on connecting valve union, and the outer wall of the steel pipe is socketed with multiaspect connection valve.The civil engineering safe construction frame, when needing installation frame, steel pipe through hole is run through by steel pipe, multiaspect connection valve is set to be enclosed on outer wall of steel pipe, multiaspect connection valve is fixed through fixing bolt large through-hole and king-bolt through hole by king-bolt, by connecting valve union penetrator through hole, multiaspect connection valve is set to be enclosed on the outer wall of connection valve union, multiaspect connection valve is fixed through fixing bolt small through hole and stove bolt through hole by stove bolt, when dismantling scaffold, by pulling out stove bolt and king-bolt, can be to unload multiaspect connection valve respectively, can be realized from this does not have excessive cumbersome binding equipment easily to install during installation, and support body consolidates, there is no excessive binding equipment operation simple during dismounting.
Description
Technical field
Construction frame technical field is the utility model is related to, specially a kind of civil engineering safe construction frame.
Background technology
In building construction process, it is required for using scaffold, with the construction that is convenient for people to ascend a height, current scaffold, one
As include the montants of four rectanglar arrangements, be respectively connected with sheer pole, such as the patent No. between the bottom of two montants of arbitrary neighborhood
201520014435.1 patents, include the montant of four rectanglar arrangements, be respectively connected between the bottom of two montants of arbitrary neighborhood
Sheer pole, a rectangular flat and four montants mutually fixed and positioned at montant top, wherein the one of a sheer pole and rectangular flat
Cat ladder is provided between side, is respectively connected with cross tube between the top of two montants of arbitrary neighborhood, cross tube is respectively positioned on rectangle
The top of flat board, every montant are respectively connected with a rope, and the free end of every rope is respectively connected with a grounding rod in construction operation
In, although placing firm and workmen can be avoided to fall, the scaffold assembly and disassembly on existing market are very
Trouble, wastes time and energy.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering safe construction frame, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering safe construction frame, including
Steel pipe, the inner chamber of the steel pipe are provided with multiple king-bolt through holes, and the upper and lower ends of the steel pipe are mounted on connecting valve union, institute
The inner chamber for stating connection valve union is provided with stove bolt through hole, and the outer wall of the steel pipe is socketed with multiaspect connection valve, and the multiaspect connects
Connecing valve includes connection valve, and the front center of the connection valve is provided with steel pipe through hole, and the steel pipe runs through steel pipe through hole, the connection
Fixing bolt large through-hole is provided with the right side of the top of valve, the front and rear sides of the fixing bolt large through-hole are equipped with gag lever post slideway,
The inner chamber of the fixing bolt large through-hole is provided with king-bolt, and the king-bolt leads to through fixing bolt large through-hole and king-bolt
Hole, the top of the king-bolt are provided with stretch ring, gag lever post, the gag lever post are mounted at left and right sides of the king-bolt
Coordinate with gag lever post slideway and be connected, the bottom of the gag lever post slideway is provided with gag lever post neck, the gag lever post and gag lever post
Neck, which coordinates, to be connected, and the outside four sides of the connection valve is equipped with tab through-hole, the connection valve union penetrator through hole, institute
The positive corner for stating connection valve is equipped with fixing bolt small through hole, and the inner chamber of the fixing bolt small through hole is provided with stove bolt,
The stove bolt run through bolt small through hole and stove bolt through hole.
Preferably, the top installation guard rail rod of the multiaspect connection valve, the guard rail rod include railing, and the railing is just
Face is provided with roller groove, is mounted on roller at left and right sides of the inner chamber of the roller groove, the inner chamber of the roller is provided with wheel shaft
Bull stick, the wheel shaft bull stick coordinate with roller groove through roller and are connected, and the roller groove front is provided with handle, the handle
Top is provided with card ball, and the inner chamber of the card ball is provided with bull stick, and the bull stick coordinates with roller groove through card ball and is connected.
Preferably, the positive top of the roller groove is provided with a hand-rails, described being provided with column on the left of hand-rails
Bar drags, described to drag cooperation to be connected with railing hand-rails.
Preferably, the top of the stove bolt is provided with connection ring.
Preferably, the connection ring inner chamber is provided with small draw ring.
Compared with prior art, the beneficial effects of the utility model are:The civil engineering safe construction frame, when needing to install
During scaffold, steel pipe through hole is run through by steel pipe, multiaspect connection valve is enclosed on outer wall of steel pipe, fixing bolt is run through by king-bolt
Large through-hole and king-bolt through hole fix multiaspect connection valve, by connecting valve union penetrator through hole, multiaspect is connected valve pocket
In the outer wall of connection valve union, multiaspect connection valve is fixed through fixing bolt small through hole and stove bolt through hole by stove bolt,
When dismantling scaffold, by pulling out stove bolt and king-bolt, peace can be realized from this to unload multiaspect connection valve respectively
There is no excessive cumbersome binding equipment easily to install during dress, and support body consolidates, there is no excessive binding equipment operation during dismounting
Simply, it is time saving and energy saving.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structural representation of the utility model multiaspect connection valve;
Fig. 3 is the structural representation of the utility model king-bolt;
Fig. 4 is the structural representation of the utility model guard rail rod;
Fig. 5 is the structural representation of the utility model stove bolt.
In figure:1st, steel pipe, 2, multiaspect connection valve, 201, king-bolt, 202, steel pipe through hole, 203, tab through-hole, 204, solid
Determine bolt small through hole, 205, stove bolt, 206, fixing bolt large through-hole, 207, stretch ring, 208, small draw ring, 209, gag lever post,
210th, gag lever post slideway, 211, gag lever post neck, 212, connection ring, 213, connection valve, 3, king-bolt through hole, 4, connection valve connects
Head, 5, stove bolt through hole, 6, guard rail rod, 601, roller, 602, wheel shaft bull stick, 603, bull stick, 604, handle, 605, card ball,
606th, hand-rails, 607, railing drag, 608, railing, 609, roller groove.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of civil engineering safe construction frame technical scheme:A kind of civil engineering
Safe construction frame, including steel pipe 1, the inner chamber of steel pipe 1 be provided with multiple king-bolt through holes 3, and which king-bolt selected as needed
Through hole 3 determines the position of multiaspect connection valve 2, and the upper and lower ends of steel pipe 1 are mounted on connecting valve union 4, connection valve union 4 can
To insert in tab through-hole 203, the inner chamber of connection valve union 4 is provided with stove bolt through hole 5, and the outer wall of steel pipe 1 is socketed with multiaspect
Connection valve 2, the top installation guard rail rod 6 of multiaspect connection valve 2, guard rail rod 6 include railing 608, and the front of railing 608 is provided with rolling
Race 609, the inner chamber left and right sides of roller groove 609 are mounted on roller 601, and roller 601 rolls on steel pipe 1 to be used to adjust
Person is provided with wheel shaft bull stick 602 to the requirement for height of guard rail rod, the inner chamber of roller 601, and roller 601 surrounds 602 turns of wheel shaft bull stick
Dynamic, wheel shaft bull stick 602 coordinates with roller groove 609 through roller 601 and is connected, and bull stick 602 is fixed on roller groove 609, roller groove
609 fronts are provided with handle 604, and the top of handle 604 is provided with card ball 605, promotes handle 604 to drive card ball 605 to make card ball
605 extruding steel pipes 1, fix it, the inner chamber of card ball 605 is provided with bull stick 603, and bull stick 603 runs through card ball 605 and roller groove
609 cooperations are connected, and card ball 605 can rotate around bull stick 603, and the positive top of roller groove 609 is provided with a hand-rails 606,
Handle 604 can be blocked during swing handle railing 606 to open naturally, the left side of hand-rails 606, which is provided with railing, drags 607,
Hand-rails 606 drags 607 cooperations to be connected with railing, and railing drags 607 hand-rails 606 will be blocked and prevents from continuing lower turn, multiaspect connection
Valve 2 includes connection valve 213, and the front center of connection valve 213 is provided with steel pipe through hole 202, and steel pipe 1 runs through steel pipe through hole 202, made more
Face connection valve 2 is socketed on the outer wall of steel pipe 1, and fixing bolt large through-hole 206, fixing bolt are provided with the right side of the top of connection valve 213
The front and rear sides of large through-hole 206 are equipped with gag lever post slideway 210, and gag lever post 209 can slide in gag lever post slideway 210, Gu
The inner chamber for determining bolt large through-hole 206 is provided with king-bolt 201, and king-bolt 201 leads to through fixing bolt large through-hole 206 and king-bolt
Hole 3, the top of king-bolt 201 are provided with stretch ring 207, pull stretch ring 207 to drive king-bolt 201, king-bolt 201
The left and right sides is mounted on gag lever post 209, and gag lever post 209 coordinates with gag lever post slideway 210 and is connected, the bottom of gag lever post slideway 210
End is provided with gag lever post neck 211, and gag lever post 209 coordinates with gag lever post neck 211 and is connected, gag lever post slideway 210 and gag lever post
Neck 211 is UNICOM, and in fixed multiaspect connection valve 2, gag lever post 209 enters gag lever post neck 211 from gag lever post slideway 210,
Then rotate stretch ring 207 and drive king-bolt 201, gag lever post 209 is departed from gag lever post slideway 210 and enter gag lever post neck 211
Interior, the outside four sides of connection valve 213 is equipped with tab through-hole 203, connects the penetrator through hole 203 of valve union 4, connection valve 213
Positive corner be equipped with fixing bolt small through hole 204, the inner chamber of fixing bolt small through hole 204 is provided with stove bolt 205, small spiral shell
The run through bolt small through hole 204 of bolt 205 and stove bolt through hole 5, stove bolt 205 secure connection valve union 4 and multiaspect connection valve 2
Position relationship, the top of stove bolt 205 are provided with connection ring 212, and the inner chamber of connection ring 212 is provided with small draw ring 208, are not needing
Small draw ring 208 can be fallen during mobile stove bolt 205.
When needing installation frame, steel pipe 1 runs through steel pipe through hole 201, multiaspect connection valve 2 is enclosed on the outer wall of steel pipe 1, greatly
Bolt 201 fixes multiaspect connection valve 2 through fixing bolt large through-hole 206 and king-bolt through hole 3, and connection valve union 4, which runs through, to be connect
Head through hole 203, makes multiaspect connection valve 2 be enclosed on the outer wall of connection valve union 4, and stove bolt 205 runs through the He of fixing bolt small through hole 204
Stove bolt through hole 5 fixes multiaspect connection valve 2, when dismantling scaffold, pulls out stove bolt 205 and king-bolt 201, can with point
Multiaspect connection valve 2 is not unloaded, and can be realized from this does not have excessive cumbersome binding equipment easily to install during installation, and support body is steady
Gu there is no excessive binding equipment operation simple during dismounting.
In description of the present utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
Portion ", " other end ", " on ", " side ", " top ", " interior ", " front portion ", " center ", the orientation of the instruction such as " both ends " or position close
It is to be described based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplifying, rather than
Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore can not
It is interpreted as to limitation of the present utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for describing purpose, and it is not intended that instruction or
Relative importance or the implicit quantity for indicating indicated technical characteristic are implied, thus, defines " first ", " second ", " the
Three ", at least one this feature can be expressed or be implicitly included to the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu
Calmly ", the term such as " spinning " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;
Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be with
It is connection or the interaction relationship of two elements of two element internals, is limited unless otherwise clear and definite, for this area
For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of civil engineering safe construction frame, including steel pipe (1), it is characterised in that:The inner chamber of the steel pipe (1) is provided with multiple
King-bolt through hole (3), the upper and lower ends of the steel pipe (1) are mounted on connecting valve union (4), the connection valve union (4)
Inner chamber is provided with stove bolt through hole (5), and the outer wall of the steel pipe (1) is socketed with multiaspect connection valve (2), the multiaspect connection valve
(2) connection valve (213) is included, the front center of the connection valve (213) is provided with steel pipe through hole (202), and the steel pipe (1) is run through
Steel pipe through hole (202), the top right side of the connection valve (213) are provided with fixing bolt large through-hole (206), and the fixing bolt is big
The front and rear sides of through hole (206) are equipped with gag lever post slideway (210), and the inner chamber of the fixing bolt large through-hole (206) is provided with
King-bolt (201), the king-bolt (201) run through fixing bolt large through-hole (206) and king-bolt through hole (3), the king-bolt
(201) top is provided with stretch ring (207), and gag lever post (209), institute are mounted at left and right sides of the king-bolt (201)
State gag lever post (209) with gag lever post slideway (210) cooperation to be connected, the bottom of the gag lever post slideway (210) is provided with gag lever post
Neck (211), the gag lever post (209) and gag lever post neck (211) coordinate and are connected, the outside four sides of the connection valve (213)
It is equipped with tab through-hole (203), described connection valve union (4) penetrator through hole (203), the front of the connection valve (213)
Corner is equipped with fixing bolt small through hole (204), and the inner chamber of the fixing bolt small through hole (204) is provided with stove bolt (205),
Stove bolt (205) the run through bolt small through hole (204) and stove bolt through hole (5).
A kind of 2. civil engineering safe construction frame according to claim 1, it is characterised in that:The multiaspect connection valve (2)
Top installation guard rail rod (6), the guard rail rod (6) includes railing (608), and the front of the railing (608) is provided with roller
Groove (609), the inner chamber left and right sides of the roller groove (609) are mounted on roller (601), the inner chamber peace of the roller (601)
Equipped with wheel shaft bull stick (602), the wheel shaft bull stick (602) coordinates with roller groove (609) through roller (601) and is connected, the rolling
Race (609) front is provided with handle (604), and the top of the handle (604) is provided with card ball (605), the card ball (605)
Inner chamber bull stick (603) is installed, the bull stick (603) is connected through card ball (605) with roller groove (609) cooperation.
A kind of 3. civil engineering safe construction frame according to claim 2, it is characterised in that:The roller groove (609)
Positive top is provided with a hand-rails (606), described to be dragged (607) railing is provided with the left of hand-rails (606), the handle
Railing (606) drags (607) cooperation to be connected with railing.
A kind of 4. civil engineering safe construction frame according to claim 1, it is characterised in that:The stove bolt (205)
Top is provided with connection ring (212).
A kind of 5. civil engineering safe construction frame according to claim 1, it is characterised in that:In the connection ring (212)
Chamber is provided with small draw ring (208).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720248548.7U CN206681328U (en) | 2017-03-15 | 2017-03-15 | A kind of civil engineering safe construction frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720248548.7U CN206681328U (en) | 2017-03-15 | 2017-03-15 | A kind of civil engineering safe construction frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206681328U true CN206681328U (en) | 2017-11-28 |
Family
ID=60392571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720248548.7U Expired - Fee Related CN206681328U (en) | 2017-03-15 | 2017-03-15 | A kind of civil engineering safe construction frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206681328U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989202A (en) * | 2017-12-20 | 2018-05-04 | 潮峰钢构集团有限公司 | A kind of elastic plastic experiment and its operating method using steel construction |
-
2017
- 2017-03-15 CN CN201720248548.7U patent/CN206681328U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989202A (en) * | 2017-12-20 | 2018-05-04 | 潮峰钢构集团有限公司 | A kind of elastic plastic experiment and its operating method using steel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208202530U (en) | A kind of new type scaffold wall-connecting piece | |
CN206681328U (en) | A kind of civil engineering safe construction frame | |
CN203769305U (en) | Formwork overturning passage plate of steel platform | |
CN205778937U (en) | A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate | |
CN209585646U (en) | A kind of rack promotion temporary weld ball node | |
CN206636169U (en) | Disk button beam side Overhanging Outside Scaffold | |
CN102642784A (en) | Support structure of internal-climbing tower crane | |
CN207194436U (en) | A kind of disk button steel pipe support cross bar connection deadhead of optimization | |
CN112211384B (en) | Scaffold for building site | |
CN206448505U (en) | Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly | |
CN212078870U (en) | Novel monitoring rod | |
CN202672687U (en) | Three-point lifting scaffolding | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN202542746U (en) | Supporting structure for interior climbing tower crane | |
CN204980945U (en) | Supplementary tower crane dismounting device | |
CN204645588U (en) | A kind of plug-in type builder's jack for building | |
CN208933832U (en) | Shear connector | |
CN210217137U (en) | Adjustable template support with notch lintel | |
CN204022864U (en) | The hanging ladder of welding converter flue | |
CN209145257U (en) | Hang lift-type pit shaft platform | |
CN208686105U (en) | A kind of device controlling framework lower end filling concrete height | |
CN207142690U (en) | A kind of tower crane climbing stock directive wheel | |
CN203568661U (en) | Built-in tail-sliding lifting lug | |
CN205225068U (en) | Device is scrambleed fast to boat car pillar | |
CN206016286U (en) | A kind of ceiling board mounting platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 Termination date: 20180315 |