CN206670117U - Skyscraper is cold and hot double for journey piping installation, building air-conditioner device - Google Patents
Skyscraper is cold and hot double for journey piping installation, building air-conditioner device Download PDFInfo
- Publication number
- CN206670117U CN206670117U CN201621482882.0U CN201621482882U CN206670117U CN 206670117 U CN206670117 U CN 206670117U CN 201621482882 U CN201621482882 U CN 201621482882U CN 206670117 U CN206670117 U CN 206670117U
- Authority
- CN
- China
- Prior art keywords
- delivery pipe
- stop valve
- pipe
- power plant
- thermal power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 35
- 238000005057 refrigeration Methods 0.000 claims abstract description 73
- 239000011229 interlayer Substances 0.000 claims abstract description 44
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 230000004087 circulation Effects 0.000 claims description 13
- 238000005496 tempering Methods 0.000 claims description 7
- 238000010438 heat treatment Methods 0.000 abstract description 28
- 238000001816 cooling Methods 0.000 abstract description 15
- 238000004378 air conditioning Methods 0.000 abstract description 8
- 239000003795 chemical substances by application Substances 0.000 description 7
- 239000003507 refrigerant Substances 0.000 description 7
- 239000002699 waste material Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000013475 authorization Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 239000008400 supply water Substances 0.000 description 1
Landscapes
- Other Air-Conditioning Systems (AREA)
Abstract
It the utility model is related to air-conditioning device technical field, it is that a kind of skyscraper is cold and hot double for journey piping installation, building air-conditioner device, it includes thermal power plant unit, refrigeration unit, the first delivery pipe, the second delivery pipe, the 3rd delivery pipe, interlayer feed pipe, interlayer return pipe, thermal power plant unit is fixedly mounted on top, and refrigeration unit is fixedly mounted on bottom.The utility model reasonable and compact in structure, it is easy to use, it adds a refrigeration unit on the basis of heating installation, refrigeration unit shares a set of delivery pipe with thermal power plant unit, pass through the control of stop valve, when heating in the winter time, start thermal power plant unit and simultaneously open corresponding stop valve, you can by delivery pipe be user's heat supply;When refrigeration is needed in summer, start refrigeration unit and simultaneously open corresponding stop valve, you can by delivery pipe be user's cooling, with the same Cheng Pingheng of cold and hot waterpower, it is safe, laborsaving, easy, efficient the characteristics of.
Description
Technical field
Air-conditioning device technical field is the utility model is related to, is that a kind of skyscraper is cold and hot double for journey piping installation, building
Space air-conditioning device.
Background technology
Authorization Notice No. is that CN204128033U patent document discloses a kind of segmentation water circulation heating device and building
Heating plant, heat-source Cycles, the defeated circulation of pipe and user's circulation are divided into three independent closed circulations, while ring ring phase again by it
Button, the pressure difference very little of each point in defeated circulation is managed, only needs the pump of a power very little to drive, it is not necessary to be divided again by skyscraper
Come for high segment, middle section and lower curtate to high rise building heating, substantially reduce the transmission & distribution water that subregion is installed in piping shaft
Guard system quantity and section cyclic supply-water pump quantity, electric energy is saved, reduced pipe-line equipment cost.But this heating installation is only
Use in the winter time, most long usage time is low all in idle state, utilization rate in spring, summer, Qiu Sanji at five months or so;
And the equipment such as air-conditioning, fan are also purchased in addition and are freezed in the period of summer sweltering heat, user so that existing in user family
Heating installation, there is refrigeration plant again, heating installation spring and autumn three quarters are all in idle state, and refrigeration plant is in the winter time in idle
State so that the utilization rate of heating installation and refrigeration plant is not high, huge waste be present.A kind of therefore it provides air-conditioning dress
Put, the function of heating and refrigeration can be had concurrently, be those skilled in the art's technical problem urgently to be resolved hurrily.
The content of the invention
It is cold and hot double for journey piping installation, building air-conditioner device, overcoming that the utility model provides a kind of skyscraper
The deficiency of above-mentioned prior art, it can be effectively solved existing for existing heating installation and refrigeration plant, high rise building heating or drop
Temperature is by high segment, middle section and lower curtate division, and the heat supply brought and cooling pipeline system partitioning subsystem are set, existing pipe
Road system utilization rate is not high, the problem of huge waste be present.
The first technical scheme of the present utility model is realized by following measures:A kind of cold and hot double confessions of skyscraper
Supplied water with journey piping installation, including thermal power plant unit, refrigeration unit, the first delivery pipe, the second delivery pipe, the 3rd delivery pipe, interlayer
Pipe, interlayer return pipe, thermal power plant unit are fixedly mounted on top, and refrigeration unit is fixedly mounted on bottom;The high temperature of thermal power plant unit goes out
The mouth of a river connects with the upper end of the first delivery pipe, and the top of the first delivery pipe is serially connected with the first stop valve;The low temperature of thermal power plant unit returns
The mouth of a river connects with the upper end of the second delivery pipe, and the top of the second delivery pipe is serially connected with the second stop valve;The upper end of 3rd delivery pipe
Connected with the second delivery pipe below the second stop valve, the top of the 3rd delivery pipe is serially connected with the 3rd stop valve;Refrigeration unit
Low temperature delivery port connects with the lower end of the first delivery pipe, and the bottom of the first delivery pipe is serially connected with the 4th stop valve;Refrigeration unit
High-temperature tempering mouth connects with the lower end of the second delivery pipe, and the bottom of the second delivery pipe is serially connected with the 5th stop valve;3rd delivery pipe
Lower end connected with the second delivery pipe above the 5th stop valve, the bottom of the 3rd delivery pipe is serially connected with the 6th stop valve;First
At least two interlayer feed pipes are parallel with the first delivery pipe between stop valve and the 4th stop valve;3rd stop valve and the 6th
At least two interlayer return pipes are accordingly parallel with the 3rd delivery pipe between stop valve;Each interlayer feed pipe with it is corresponding
At least two recuperated cycle sections are parallel between interlayer return pipe.
Here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
Above-mentioned skyscraper is cold and hot double for also being followed with journey piping installation including the user corresponding with each recuperated cycle section
Ring segment.
Second of technical scheme of the present utility model is realized by following measures:A kind of cold and hot double confessions of skyscraper
Supplied water with journey piping installation, including thermal power plant unit, refrigeration unit, the first delivery pipe, the second delivery pipe, the 3rd delivery pipe, interlayer
Pipe, interlayer return pipe, refrigeration unit are fixedly mounted on top, and thermal power plant unit is fixedly mounted on bottom;The high temperature of refrigeration unit goes out
The mouth of a river connects with the upper end of the first delivery pipe, and the top of the first delivery pipe is serially connected with the first stop valve;The low temperature of refrigeration unit returns
The mouth of a river connects with the upper end of the second delivery pipe, and the top of the second delivery pipe is serially connected with the second stop valve;The upper end of 3rd delivery pipe
Connected with the second delivery pipe below the second stop valve, the top of the 3rd delivery pipe is serially connected with the 3rd stop valve;Thermal power plant unit
Low temperature delivery port connects with the lower end of the first delivery pipe, and the bottom of the first delivery pipe is serially connected with the 4th stop valve;Thermal power plant unit
High-temperature tempering mouth connects with the lower end of the second delivery pipe, and the bottom of the second delivery pipe is serially connected with the 5th stop valve;3rd delivery pipe
Lower end connected with the second delivery pipe above the 5th stop valve, the bottom of the 3rd delivery pipe is serially connected with the 6th stop valve;First
At least two interlayer feed pipes are parallel with the first delivery pipe between stop valve and the 4th stop valve;Second stop valve and the 5th
At least two interlayer return pipes are accordingly parallel with the second delivery pipe between stop valve;Each interlayer feed pipe with it is corresponding
At least two recuperated cycle sections are parallel between interlayer return pipe.
Here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
Above-mentioned skyscraper is cold and hot double for also being followed with journey piping installation including the user corresponding with each recuperated cycle section
Ring segment.
The third technical scheme of the present utility model is realized by following measures:One kind uses above-mentioned skyscraper
Cold and hot double building air-conditioner devices for journey piping installation, including building body and piping shaft, building body are internally provided with through type
The piping shaft in lower direction, thermal power plant unit are fixedly mounted on the top of building body, and refrigeration unit is fixedly mounted on the bottom of building body, and first
Delivery pipe, the second delivery pipe, the 3rd delivery pipe are respectively and fixedly installed to the inside of piping shaft.
4th kind of technical scheme of the present utility model is realized by following measures:One kind uses above-mentioned skyscraper
Cold and hot double building air-conditioner devices for journey piping installation, including building body and piping shaft, building body are internally provided with through type
The piping shaft in lower direction, refrigeration unit are fixedly mounted on the top of building body, and thermal power plant unit is fixedly mounted on the bottom of building body, and first
Delivery pipe, the second delivery pipe, the 3rd delivery pipe are respectively and fixedly installed to the inside of piping shaft.
The utility model reasonable and compact in structure, easy to use, it adds a refrigeration on the basis of heating installation
Unit, refrigeration unit share a set of pipeline system with thermal power plant unit, by the control of stop valve, when heating in the winter time, opened
Dynamic thermal power plant unit simultaneously opens corresponding stop valve, you can is supplied by the first delivery pipe, the second delivery pipe, the 3rd delivery pipe for user
Heat;When refrigeration is needed in summer, start refrigeration unit and simultaneously open corresponding stop valve, you can by the first delivery pipe, second defeated
It is user's cooling to send pipe, the 3rd delivery pipe;The utility model has just been provided simultaneously with the function of heat supply and cooling, improves heat supply dress
The utilization rate of pipeline is put, meanwhile, user need not purchase the refrigeration plants such as air-conditioning, fan in summer, it is possible to enjoy and be similar to
The cooling service of central heating, reduce the spending of buying refrigeration plant, it is not necessary to refrigeration plant, section are installed and placed in house
The about interior space, it is identical with traditional central heating pattern using this refrigeration modes, there are quiet, cleaning, energy-conserving and environment-protective
Advantage;The utility model is set by rational pipeline, stop valve, can make each recuperated cycle section to thermal power plant unit/system
The stroke of cold group is identical, so that pressure loss of the heating agent/refrigerant when reaching each recuperated cycle section is identical, and then
It ensure that temperature when heating agent/refrigerant reaches each recuperated cycle section, flow are identical, avoid the occurrence of situation uneven in temperature,
Avoid to increase the temperature of some recuperated cycle section, flow increases the power of whole thermal power plant unit/refrigeration unit, save energy
Source, energy waste is reduced, there is the characteristics of same Cheng Pingheng of cold and hot waterpower, safe, laborsaving, easy, efficient.
Brief description of the drawings
Accompanying drawing 1 is the main structure diagram of the utility model embodiment one.
Accompanying drawing 2 is the main structure diagram of the utility model embodiment two.
Accompanying drawing 3 is the main view broken section structural representation of the utility model embodiment three.
Accompanying drawing 4 is the main view broken section structural representation of the utility model embodiment four.
Coding in accompanying drawing is respectively:1 is thermal power plant unit, and 2 be refrigeration unit, and 3 be the first delivery pipe, and 4 be the second conveying
Pipe, 5 be the 3rd delivery pipe, and 6 be interlayer feed pipe, and 7 be interlayer return pipe, and 8 be the first stop valve, and 9 be the second stop valve, and 10 are
3rd stop valve, 11 be the 4th stop valve, and 12 be the 5th stop valve, and 13 be the 6th stop valve, and 14 be recuperated cycle section, and 15 be use
Family circulation section, 16 be building body, and 17 be piping shaft.
Embodiment
The utility model is not limited by following embodiments, can according to the technical solution of the utility model and actual conditions come
Determine specific embodiment.
In the utility model, for the ease of description, the description of the relative position relation of each part is according to specification
The Butut mode of accompanying drawing 1 is described, such as:The position relationship of forward and backward, upper and lower, left and right etc. is according to Figure of description
Butut direction determine.
The utility model is further described with reference to embodiment and accompanying drawing:
Embodiment one:As shown in Figure 1, the skyscraper is cold and hot double for including thermal power plant unit 1, refrigeration with journey piping installation
Unit 2, the first delivery pipe 3, the second delivery pipe 4, the 3rd delivery pipe 5, interlayer feed pipe 6, interlayer return pipe 7, thermal power plant unit 1 are solid
Dingan County is mounted in top, and refrigeration unit 2 is fixedly mounted on bottom;The high-temperature water outlet mouth of thermal power plant unit 1 and the upper end of the first delivery pipe
Connection, the top of the first delivery pipe is serially connected with the first stop valve 8;The low-temperature return water mouth of thermal power plant unit 1 is upper with the second delivery pipe
End connection, the top of the second delivery pipe is serially connected with the second stop valve 9;The upper end of 3rd delivery pipe 5 and the lower section of the second stop valve 9
Second delivery pipe connects, and the top of the 3rd delivery pipe is serially connected with the 3rd stop valve 10;The low temperature delivery port of refrigeration unit 2 and first
The lower end connection of delivery pipe, the bottom of the first delivery pipe is serially connected with the 4th stop valve 11;The high-temperature tempering mouth of refrigeration unit 2 and
The lower end connection of two delivery pipes, the bottom of the second delivery pipe is serially connected with the 5th stop valve 12;The lower end and the 5th of 3rd delivery pipe 5
The second delivery pipe connection of the top of stop valve 12, the bottom of the 3rd delivery pipe is serially connected with the 6th stop valve 13;First stop valve 8 with
At least two interlayer feed pipes 6 are parallel with the first delivery pipe between 4th stop valve 11;3rd stop valve 10 and the 6th section
Only at least two interlayer return pipes 7 are accordingly parallel with the 3rd delivery pipe 5 between valve 13;Each interlayer feed pipe 6 with it is right
At least two recuperated cycle sections 14 are parallel between the interlayer return pipe 7 answered.The utility model is on the basis of related heating installation
On add a refrigeration unit 2, refrigeration unit 2 shares a set of delivery pipe with thermal power plant unit 1, by the control of stop valve,
During heat supply in winter, start thermal power plant unit 1 and simultaneously open corresponding stop valve, you can pass through the first delivery pipe 3, the second delivery pipe 4, the
Three delivery pipes 5 are user's heat supply;When refrigeration is needed in summer, start refrigeration unit 2 and open corresponding stop valve, you can pass through
First delivery pipe 3, the second delivery pipe 4, the 3rd delivery pipe 5 are user's cooling.So, the utility model has just been provided simultaneously with heat supply
With the function of cooling, the utilization rate of heating plant pipeline is improved, meanwhile, user need not purchase the system such as air-conditioning, fan in summer
Cool equipment, it is possible to enjoy the cooling service similar to central heating, reduce the spending of buying refrigeration plant, it is not necessary in room
Refrigeration plant is installed and placed within doors, saves the interior space, it is identical with traditional central heating pattern using this refrigeration modes,
The advantages of with quiet, cleaning, energy-conserving and environment-protective.During heat supply in winter, the first stop valve 8, the second stop valve 9, the 6th stop valve 13
Open, the 3rd stop valve 10, the 4th stop valve 11, the 5th stop valve 12 are closed, and start thermal power plant unit 1, by supplying
High-temperature water after heat engine group 1 heats passes through the first delivery pipe 3, interlayer feed pipe 6, recuperated cycle section 14, interlayer return pipe successively
7th, the 3rd delivery pipe 5 returns to the second delivery pipe 4, and low-temperature return water is transported in thermal power plant unit 1 by the second delivery pipe 4, so as to complete
Heating cycle;During summer cooling, the 3rd stop valve 10, the 4th stop valve 11, the 5th stop valve 12 are opened, the first stop valve 8,
Second stop valve 9, the 6th stop valve 13 are closed, and start refrigeration unit 2, the low temperature after the refrigeration of refrigeration unit 2
Water returns to the by the first delivery pipe 3, interlayer feed pipe 6, recuperated cycle section 14, interlayer return pipe 7, the 3rd delivery pipe 5 successively
High-temperature tempering is transported in refrigeration unit 2 by two delivery pipes 4, the second delivery pipe 4, so as to complete cooling circulation, refrigeration unit 2
For public technology, such as air-conditioning, fan." same to journey " described in the utility model refers to that heating agent is delivered to from thermal power plant unit
Each recuperated cycle section, and it is identical from the recuperated cycle section to return to the stroke that thermal power plant unit passed by;Or refer to refrigerant from system
Cold group is delivered to each recuperated cycle section, and it is identical from the recuperated cycle section to return to the stroke that refrigeration unit passed by.By
Identical in stroke of the heating agent between thermal power plant unit and each recuperated cycle section, refrigerant follows in refrigeration unit and each heat exchange
Stroke between ring segment is identical, so pressure loss is identical, temperature, flow phase when heating agent reaches each recuperated cycle section
Together, the temperature, flow when refrigerant reaches each recuperated cycle section are identical, occur so as to avoid between each recuperated cycle section
Phenomenon uneven in temperature, the cold and hot same Cheng Pingheng of waterpower, the energy is greatlyd save, reduce energy waste, more energy-conserving and environment-protective.
Can be according to being actually needed, cold and hot to above-mentioned skyscraper pair for further optimizing or/and changing with journey piping installation
Enter:
As shown in Figure 1, above-mentioned skyscraper is cold and hot double for also including and each recuperated cycle section 14 with journey piping installation
Corresponding user's circulation section 15.User's circulation section 15 can carry out heat exchange with recuperated cycle section 14, so as to be obtained in summer
Cooling service is obtained, obtains heat supply service in the winter time.
Embodiment two:As shown in Figure 2, the skyscraper is cold and hot double for including thermal power plant unit 1, refrigeration with journey piping installation
Unit 2, the first delivery pipe 3, the second delivery pipe 4, the 3rd delivery pipe 5, interlayer feed pipe 6, interlayer return pipe 7, refrigeration unit 2 are solid
Dingan County is mounted in top, and thermal power plant unit 1 is fixedly mounted on bottom;The high-temperature water outlet mouth of refrigeration unit 2 and the upper end of the first delivery pipe
Connection, the top of the first delivery pipe is serially connected with the first stop valve 8;The low-temperature return water mouth of refrigeration unit 2 is upper with the second delivery pipe
End connection, the top of the second delivery pipe is serially connected with the second stop valve 9;The upper end of 3rd delivery pipe 5 and the lower section of the second stop valve 9
Second delivery pipe connects, and the top of the 3rd delivery pipe is serially connected with the 3rd stop valve 10;The low temperature delivery port of thermal power plant unit 1 and first
The lower end connection of delivery pipe, the bottom of the first delivery pipe is serially connected with the 4th stop valve 11;The high-temperature tempering mouth of thermal power plant unit 1 and
The lower end connection of two delivery pipes, the bottom of the second delivery pipe is serially connected with the 5th stop valve 12;The lower end and the 5th of 3rd delivery pipe 5
The second delivery pipe connection of the top of stop valve 12, the bottom of the 3rd delivery pipe is serially connected with the 6th stop valve 13;First stop valve 8 with
At least two interlayer feed pipes 6 are parallel with the first delivery pipe between 4th stop valve 11;Second stop valve 9 and the 5th cut-off
At least two interlayer return pipes 7 are accordingly parallel with the second delivery pipe between valve 12;Each interlayer feed pipe 6 with it is corresponding
At least two recuperated cycle sections 14 are parallel between interlayer return pipe 7.The present embodiment and embodiment one are essentially identical, its difference
Be in:Refrigeration unit 2 is fixedly mounted on top, and thermal power plant unit 1 is fixedly mounted on bottom.
Can be according to being actually needed, cold and hot to above-mentioned skyscraper pair for further optimizing or/and changing with journey piping installation
Enter:
As shown in Figure 2, above-mentioned skyscraper is cold and hot double for also including and each recuperated cycle section 14 with journey piping installation
Corresponding user's circulation section 15.User's circulation section 15 can carry out heat exchange with recuperated cycle section 14, so as to be obtained in summer
Cooling service is obtained, obtains heat supply service in the winter time.
Embodiment three:As shown in Figure 3, this is cold and hot double for journey piping installation using the skyscraper described in embodiment one
Building air-conditioner device, including building body 16 and piping shaft 17, the piping shaft for being internally provided with through type above-below direction of building body 16
17, thermal power plant unit 1 is fixedly mounted on the top of building body 16, and refrigeration unit 2 is fixedly mounted on the bottom of building body 16, the first conveying
Pipe, the second delivery pipe, the 3rd delivery pipe are respectively and fixedly installed to the inside of piping shaft 17.So, the utility model supplies in correlation
A refrigeration unit 2 is added on the basis of thermal, coordinates the use of stop valve, while realizes heat supply and cooling function,
Heat supply and refrigeration share a set of delivery pipe, it is not necessary to set up delivery pipe in addition, reduce construction cost, while save the sky of piping shaft 17
Between so that piping shaft 17 need not be made big, reduce space waste.
Example IV:As shown in Figure 4, this is cold and hot double for journey piping installation using the skyscraper described in embodiment two
Building air-conditioner device, including building body 16 and piping shaft 17, the piping shaft for being internally provided with through type above-below direction of building body 16
17, refrigeration unit 2 is fixedly mounted on the top of building body 16, and thermal power plant unit 1 is fixedly mounted on the bottom of building body 16, the first conveying
Pipe, the second delivery pipe, the 3rd delivery pipe are respectively and fixedly installed to the inside of piping shaft 17.The present embodiment and three basic phase of embodiment
Together, its difference is:Refrigeration unit 2 is fixedly mounted on the top of building body 16, and thermal power plant unit 1 is fixedly mounted on building body 16
Bottom.
Application method during three heat supply in winter of embodiment one and embodiment, is carried out in accordance with the following steps:
The first step, open the first stop valve 8, the second stop valve 9 and the 6th stop valve 13;
Second step, close the 3rd stop valve 10, the 4th stop valve 11 and the 5th stop valve 12;
3rd step, start thermal power plant unit 1.
Application method during three cooling in summer of embodiment one and embodiment, is carried out in accordance with the following steps:
The first step, open the 3rd stop valve 10, the 4th stop valve 11 and the 5th stop valve 12;
Second step, close the first stop valve 8, the second stop valve 9 and the 6th stop valve 13;
3rd step, start refrigeration unit 2.
Application method when embodiment two and example IV cooling in summer, is carried out in accordance with the following steps:
The first step, open the first stop valve 8, the second stop valve 9 and the 6th stop valve 13;
Second step, close the 3rd stop valve 10, the 4th stop valve 11 and the 5th stop valve 12;
3rd step, start refrigeration unit 2.
Application method when embodiment two and example IV heat supply in winter, is carried out in accordance with the following steps:
The first step, open the 3rd stop valve 10, the 4th stop valve 11 and the 5th stop valve 12;
Second step, close the first stop valve 8, the second stop valve 9 and the 6th stop valve 13;
3rd step, start thermal power plant unit 1.
The utility model by rational pipeline, stop valve set, can make each recuperated cycle section to thermal power plant unit/
The stroke of refrigeration unit is identical, so that pressure loss of the heating agent/refrigerant when reaching each recuperated cycle section is identical, enters
And ensure that temperature when heating agent/refrigerant reaches each recuperated cycle section, flow are identical, avoid the occurrence of feelings uneven in temperature
Condition, avoid to increase the temperature of some recuperated cycle section, flow increases the power of whole thermal power plant unit/refrigeration unit, section
The about energy, reduce energy waste.
Above technical characteristic constitutes embodiment of the present utility model, and it has stronger adaptability and implementation result, can
According to the non-essential technical characteristic of increase and decrease is actually needed, to meet the needs of different situations.
Claims (6)
1. a kind of skyscraper is cold and hot double for journey piping installation, it is characterised in that including thermal power plant unit, refrigeration unit, first defeated
Pipe, the second delivery pipe, the 3rd delivery pipe, interlayer feed pipe, interlayer return pipe are sent, thermal power plant unit is fixedly mounted on top, refrigeration
Unit is fixedly mounted on bottom;The high-temperature water outlet mouth of thermal power plant unit connects with the upper end of the first delivery pipe, the first delivery pipe it is upper
Portion is serially connected with the first stop valve;The low-temperature return water mouth of thermal power plant unit connects with the upper end of the second delivery pipe, the second delivery pipe it is upper
Portion is serially connected with the second stop valve;The upper end of 3rd delivery pipe connects with the second delivery pipe below the second stop valve, the 3rd conveying
The top of pipe is serially connected with the 3rd stop valve;The low temperature delivery port of refrigeration unit connects with the lower end of the first delivery pipe, the first conveying
The bottom of pipe is serially connected with the 4th stop valve;The high-temperature tempering mouth of refrigeration unit connects with the lower end of the second delivery pipe, the second conveying
The bottom of pipe is serially connected with the 5th stop valve;The lower end of 3rd delivery pipe connects with the second delivery pipe above the 5th stop valve, the
The bottom of three delivery pipes is serially connected with the 6th stop valve;It is parallel with the first delivery pipe between first stop valve and the 4th stop valve
At least two interlayer feed pipes;At least two are accordingly parallel with the 3rd delivery pipe between 3rd stop valve and the 6th stop valve
Individual interlayer return pipe;At least two recuperated cycle sections are each parallel between interlayer feed pipe and corresponding interlayer return pipe.
2. skyscraper according to claim 1 is cold and hot double for journey piping installation, it is characterised in that skyscraper is cold and hot
It is double to supply also to include the user circulation section corresponding with each recuperated cycle section with journey piping installation.
3. the cold and hot double building air-conditioner devices for journey piping installation of skyscraper described in a kind of usage right requirement 1 or 2, its
It is characterised by including building body and piping shaft, the piping shaft for being internally provided with through type above-below direction of building body, thermal power plant unit is fixed
Installed in the top of building body, refrigeration unit is fixedly mounted on the bottom of building body, the first delivery pipe, the second delivery pipe, the 3rd conveying
Pipe is respectively and fixedly installed to the inside of piping shaft.
4. a kind of skyscraper is cold and hot double for journey piping installation, it is characterised in that including thermal power plant unit, refrigeration unit, first defeated
Pipe, the second delivery pipe, the 3rd delivery pipe, interlayer feed pipe, interlayer return pipe are sent, refrigeration unit is fixedly mounted on top, heat supply
Unit is fixedly mounted on bottom;The high-temperature water outlet mouth of refrigeration unit connects with the upper end of the first delivery pipe, the first delivery pipe it is upper
Portion is serially connected with the first stop valve;The low-temperature return water mouth of refrigeration unit connects with the upper end of the second delivery pipe, the second delivery pipe it is upper
Portion is serially connected with the second stop valve;The upper end of 3rd delivery pipe connects with the second delivery pipe below the second stop valve, the 3rd conveying
The top of pipe is serially connected with the 3rd stop valve;The low temperature delivery port of thermal power plant unit connects with the lower end of the first delivery pipe, the first conveying
The bottom of pipe is serially connected with the 4th stop valve;The high-temperature tempering mouth of thermal power plant unit connects with the lower end of the second delivery pipe, the second conveying
The bottom of pipe is serially connected with the 5th stop valve;The lower end of 3rd delivery pipe connects with the second delivery pipe above the 5th stop valve, the
The bottom of three delivery pipes is serially connected with the 6th stop valve;It is parallel with the first delivery pipe between first stop valve and the 4th stop valve
At least two interlayer feed pipes;At least two are accordingly parallel with the second delivery pipe between second stop valve and the 5th stop valve
Individual interlayer return pipe;At least two recuperated cycle sections are each parallel between interlayer feed pipe and corresponding interlayer return pipe.
5. skyscraper according to claim 4 is cold and hot double for journey piping installation, it is characterised in that skyscraper is cold and hot
It is double to supply also to include the user circulation section corresponding with each recuperated cycle section with journey piping installation.
6. the cold and hot double building air-conditioner devices for journey piping installation of skyscraper described in a kind of usage right requirement 4 or 5, its
It is characterised by including building body and piping shaft, the piping shaft for being internally provided with through type above-below direction of building body, refrigeration unit is fixed
Installed in the top of building body, thermal power plant unit is fixedly mounted on the bottom of building body, the first delivery pipe, the second delivery pipe, the 3rd conveying
Pipe is respectively and fixedly installed to the inside of piping shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621482882.0U CN206670117U (en) | 2016-12-30 | 2016-12-30 | Skyscraper is cold and hot double for journey piping installation, building air-conditioner device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621482882.0U CN206670117U (en) | 2016-12-30 | 2016-12-30 | Skyscraper is cold and hot double for journey piping installation, building air-conditioner device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206670117U true CN206670117U (en) | 2017-11-24 |
Family
ID=60356936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621482882.0U Active CN206670117U (en) | 2016-12-30 | 2016-12-30 | Skyscraper is cold and hot double for journey piping installation, building air-conditioner device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206670117U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106595124A (en) * | 2016-12-30 | 2017-04-26 | 何宗衡 | Cooling and heating equal pipeline device for high-rise building, air conditioner for building and use method of air conditioner for building |
CN114261499A (en) * | 2021-12-20 | 2022-04-01 | 中船邮轮科技发展有限公司 | Hot drinking water distribution system for mail steamer |
-
2016
- 2016-12-30 CN CN201621482882.0U patent/CN206670117U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106595124A (en) * | 2016-12-30 | 2017-04-26 | 何宗衡 | Cooling and heating equal pipeline device for high-rise building, air conditioner for building and use method of air conditioner for building |
CN114261499A (en) * | 2021-12-20 | 2022-04-01 | 中船邮轮科技发展有限公司 | Hot drinking water distribution system for mail steamer |
CN114261499B (en) * | 2021-12-20 | 2024-05-14 | 中船邮轮科技发展有限公司 | Post wheel hot drink water distribution system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103542614B (en) | heating and refrigerating system | |
CN107763726B (en) | heat pump system | |
CN206670117U (en) | Skyscraper is cold and hot double for journey piping installation, building air-conditioner device | |
CN203949271U (en) | A kind of domestic heating and Living Water one water system | |
CN206651620U (en) | A kind of energy-saving variable-temperature mattress | |
CN202511359U (en) | Combined station sewage waste heat direct heating system | |
CN204678563U (en) | Large-scale water-loop heat pump system | |
CN105571151B (en) | A kind of solar magnetic suspension central air-conditioning heating system | |
CN204962942U (en) | Carbon dioxide heat pump heating device | |
CN204100645U (en) | A kind of geothermal heat pump air-conditioner and hot-water heating system | |
CN103758591A (en) | Heat supplying system for generating power by recycling steam as function force | |
CN204026891U (en) | Recuperation of heat ladder-elevating temperature and water inflow control system | |
CN207881280U (en) | Heat pump monoblock type Cooling and Heat Source computer room | |
CN103471192B (en) | Multiple Air Conditioning System with Heat and operation method thereof | |
CN202769858U (en) | Multi-user ground source heat pump air conditioning system | |
CN104676928A (en) | Coil pipe auxiliary heating double-container type water tank of solar and heat pump water heater | |
CN106595124A (en) | Cooling and heating equal pipeline device for high-rise building, air conditioner for building and use method of air conditioner for building | |
CN107387259A (en) | A kind of heating available for cold, heat and electricity triple supply, the refrigeration system available for cold, heat and electricity triple supply and cold, heat and power triple supply system | |
CN103174474A (en) | System used for improving combined cycle generator set vacuumizing efficiency and saving air conditioner power utilization | |
CN102914000A (en) | Fresh air humidification air-conditioning unit | |
CN204313478U (en) | A kind of once-through cycle formula air-source water heater | |
CN203893298U (en) | Novel domestic heater | |
CN209376399U (en) | The recycling of farm's thermal energy and heating system | |
CN203385201U (en) | Split heat pump water heater | |
CN203274352U (en) | Air conditioner heat pump hot water and solar energy heating integrated system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181220 Address after: 830000 Xinjiang Uygur Autonomous Region Urumqi High-tech Industrial Development Zone (New Urban District) North District 21 Patentee after: Xinjiang Constan energy Limited by Share Ltd Address before: 830000 Xinjiang Uygur Autonomous Region Urumqi High-tech Zone North District 21 Xinjiang Kangsjia Cold and Heating Equipment Company Patentee before: He Zongheng |
|
TR01 | Transfer of patent right |