CN206655460U - Occasional passage and groups of building between floor monomer - Google Patents
Occasional passage and groups of building between floor monomer Download PDFInfo
- Publication number
- CN206655460U CN206655460U CN201720321993.1U CN201720321993U CN206655460U CN 206655460 U CN206655460 U CN 206655460U CN 201720321993 U CN201720321993 U CN 201720321993U CN 206655460 U CN206655460 U CN 206655460U
- Authority
- CN
- China
- Prior art keywords
- floor
- liang
- occasional passage
- monomer
- floor monomer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Occasional passage and groups of building between the utility model floor monomer, occasional passage between a kind of floor monomer is disclosed, including:Two foundation beams, Ji Liang both ends ride upon on two floor monomers respectively;The bracing element being arranged on the downside of base beam, lower end is detachably connected with floor monomer, upper end and Ji Liang middle part are connected;The scaffold board being laid on Ji Liang, the both lateral sides of scaffold board are overlapped on the Ji Liang of both sides respectively.Between the floor monomer in occasional passage, by setting up Ji Liang and bracing element, the robustness of whole occasional passage ensure that.There is provided scaffold board, ensures cargo conveyance capacity after occasional passage foundation.Using occasional passage between the floor monomer, it can ensure that the goods between two floor monomers can be transported by occasional passage between the floor monomer, so the problem of groups of building small areas floor monomer elevator cost is bigger can be efficiently solved.The invention also discloses a kind of groups of building for including occasional passage between above-mentioned floor monomer.
Description
Technical field
Technical field of buildings is the utility model is related to, more specifically to occasional passage between a kind of floor monomer, is also related to
And include the groups of building of occasional passage between above-mentioned floor monomer.
Background technology
When carrying out floor group construction, for single floor monomer, common buildings area is little, so actually applying
In work, usually there are multiple floor monomers while go into operation, especially close floor monomer.Although single building area is little
(in 1000m2Below), but the duration is longer.And during being built, in order to be rapidly performed by vertical transport, all need
Elevator is used to carry out vertical transport.And what general each floor monomer was all mutually isolated, separate, so each building
Layer monomer is required to be independently arranged elevator, to meet needs.
Found at that time by inventor's long-term practice, in the long-term duration, when the area of single floor monomer is little,
The elevator standby time of transport is very long, and to be shelved on outside damage comparison for a long time serious for elevator, and for rental
For elevator, cost of idleness also can be bigger.
In summary, the problem of groups of building small areas floor monomer elevator cost is bigger how is efficiently solved, is
Those skilled in the art's urgent problem at present.
Utility model content
In view of this, first purpose of the present utility model is to provide occasional passage between a kind of floor monomer, the floor
Occasional passage can efficiently solve the problem of groups of building small areas floor monomer elevator cost is bigger, this practicality between monomer
Second new purpose is to provide a kind of groups of building for including occasional passage between above-mentioned floor monomer.
In order to reach above-mentioned first purpose, the utility model provides following technical scheme:
Occasional passage between a kind of floor monomer, including:Two arranged in parallel and spacing preset distance Ji Liang, it is described
Ji Liang both ends ride upon on two floor monomers respectively;The bracing element being arranged on the downside of the base beam, is formed with the Ji Liang
Certain angle is set, and lower end is detachably connected with the floor monomer, upper end is connected with the middle part of the Ji Liang;It is laid in
Scaffold board on the Ji Liang, the both lateral sides of the scaffold board are overlapped on the Ji Liang of both sides respectively.
Preferably, be additionally provided with the support column being vertically arranged, the lower end of the support column is used to offseting with ground, upper end with
It is relatively fixed in the middle part of the Ji Liang, the both sides of the support column are provided with the bracing element.
Preferably, the lower end of the bracing element is removably connected with the connection pedestal being embedded in the floor monomer, institute
State and be provided with rib on connection pedestal, the U-shaped and stress leg of opening laterally outwardly is provided with the rib.
Preferably, in addition to the crossbeam that is fixedly connected respectively with the Ji Liang positioned at both sides of both ends.
Preferably, guardrail is additionally provided with, the height of the guardrail is between 1.3 meters to 1.5 meters.
Preferably, the Ji Liang and the crossbeam are steel I-beam.
Preferably, the both ends of the Ji Liang are provided with locking member, and the locking member is in inverted U and is stuck in the Ji Liang
On, the lower end of the locking member is embedded in the floor of the floor monomer, is inserted between the locking member and the base beam
Wedge.
Preferably, the lower end of the locking member is provided with U-shaped and opening up rib.
Preferably, at each end of the Ji Liang at least provided with three locking members, in the end of the Ji Liang, far
From the direction in the base beam-ends face, adjacent locking member spacing increases successively.
Occasional passage between a kind of floor monomer provided by the utility model, between the floor monomer occasional passage include Ji Liang,
Bracing element and scaffold board.There are two mutually Ji Liang of setting and spacing preset distance, Ji Liang both ends ride upon floor list respectively
On body, to be used as spandrel girder.Wherein bracing element is arranged on the downside of base beam, and at a certain angle with base beam shape, i.e. bracing element
Extension line and Ji Liang extension line shape form an angle.And the lower end of the bracing element is connected with floor monomer, and upper end with
Ji Liang middle part connection.Wherein scaffold board is laid on Ji Liang, and the both lateral sides of scaffold board are overlapped on positioned at both sides respectively
On Ji Liang, so that Ji Liang is supported to scaffold board, and the upper face of scaffold board forms surface channel, for pedestrian or goods row
Walk.
According to above-mentioned technical scheme, it is recognised that in occasional passage between using the floor monomer, by Ji Liang both ends
Ride upon respectively on the floors of high-storey such as two floor monomers, then bracing element is set, with to being supported in the middle part of Ji Liang,
And scaffold board will be laid, so as to establish occasional passage between two floor monomers, two can be made by the foundation of occasional passage
Floor monomer shares an elevator.Between the floor monomer in occasional passage, by setting up Ji Liang and bracing element, it ensure that whole
The robustness of occasional passage, meanwhile, bracing element is detachably connected with floor monomer, to facilitate the later stage to dismantle.There is provided scaffold board,
Cargo conveyance capacity after guarantee occasional passage is established.Using occasional passage between the floor monomer between floor monomer, can ensure
Goods between two floor monomers can be transported by occasional passage between the floor monomer, so in summary, the building
Occasional passage can efficiently solve the problem of groups of building small areas floor monomer elevator cost is bigger between layer monomer.
In order to reach above-mentioned second purpose, the utility model additionally provides a kind of groups of building, and the groups of building include above-mentioned
Occasional passage between any floor monomer, the Ji Liang both ends of the occasional passage same height with two floor monomers respectively between floor monomer
Spend floor connection.Because occasional passage has above-mentioned technique effect between above-mentioned floor monomer, with interim between the floor monomer
The groups of building of passage should also have corresponding technique effect.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of occasional passage between the floor monomer that the utility model embodiment provides;
Fig. 2 is the attachment structure schematic diagram for the locking member that the utility model embodiment provides.
Marked in accompanying drawing as follows:
Base beam 1, floor monomer 2, bracing element 3, support column 4, connection pedestal 5, guardrail 6, locking member 7, wedge 8.
Embodiment
The utility model embodiment discloses occasional passage between a kind of floor monomer, to efficiently solve facet in groups of building
The problem of product floor monomer elevator cost is bigger.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-Fig. 2 is referred to, Fig. 1 is the structural representation of occasional passage between the floor monomer that the utility model embodiment provides
Figure;Fig. 2 is the attachment structure schematic diagram for the locking member that the utility model embodiment provides.
In a kind of specific embodiment, occasional passage between a kind of floor monomer is present embodiments provided, between the floor monomer
Occasional passage includes base beam 1, bracing element 3 and scaffold board.Between being overlapped on two floor monomers 2, so that two floor monomers 2
Connected on same height floor.
There are two mutually to set and the base beam 1 of spacing preset distance, the both ends of base beam 1 ride upon on floor monomer 2 respectively,
To be used as spandrel girder.Need what is illustrated, the distance between two base beams 1, i.e., preset distance should be according to the width required for passage
To be determined.Herein it should also be noted that, being described herein as two foundation beams 1, it is intended to describe, such two foundation at least be present
Beam 1, this two foundation beam 1, which is described above, to be configured, if in order to further reinforce, is being added among the two base beams 1
One foundation beam 1 is also possible.Wherein base beam 1 can be made of I-steel, i.e., using steel I-beam, for proof strength,
Typically use No. 18 I-steel (18# I-steel).
Wherein bracing element 3 is arranged on the downside of base beam 1, and at a certain angle with the shape of base beam 1, i.e. the extension line of bracing element 3
Formed an angle with the extension line shape of base beam 1.And the lower end of the bracing element 3 is connected with floor monomer 2, and upper end and Ji Liang
1 middle part connection, that is, the extension line for showing the bracing element 3 should not be arranged in parallel, can be carried in vertical direction to base beam 1
For certain support.It should also be noted that, the middle part of bracing element 3 is relative to the end of base beam 1, wherein being overlapped on floor monomer
Part on 2 can be considered as end, between two floor monomers 2, then be considered to be middle part.
Wherein scaffold board is laid on base beam 1, and the both lateral sides of scaffold board are overlapped on the base beam 1 positioned at both sides respectively
On, so that base beam 1 is supported to scaffold board, and the upper face of scaffold board forms surface channel, so that pedestrian or goods walk.Need
It is noted that wherein scaffold board refers to that one kind is laid on scaffold, crosshead, it is easy to staff to go above it
A kind of construction material being used in turn temporarily of material and construction operation is walked, transports, specific structure may be referred to prior art,
In this not go into detail.
In the present embodiment, in occasional passage between using the floor monomer, the both ends of base beam 1 are ridden upon two respectively
On the floor of the grade high-storey of floor monomer 2, then bracing element 3 is set, be supported with the middle part to base beam 1, and will lay
Scaffold board, so as to establish occasional passage between two floor monomers 2, two floor monomers 2 can be made by the foundation of occasional passage
Share an elevator.In 2 occasional passages of the floor monomer, by setting up base beam 1 and bracing element 3, it ensure that whole interim
The robustness of passage, meanwhile, bracing element 3 is detachably connected with floor monomer 2, to facilitate the later stage to dismantle.There is provided scaffold board, protects
Demonstrate,prove cargo conveyance capacity after occasional passage is established.Using occasional passage between the floor monomer between floor monomer 2, two can be ensured
Goods between individual floor monomer 2 can be transported by 2 occasional passages of the floor monomer, so in summary, the building
It is bigger can to efficiently solve groups of building small areas floor 2 elevator costs of monomer for occasional passage between layer monomer
The problem of.
Further, it is contemplated that the span between two floor monomers 2 may be bigger, in order to reduce the deflection of base beam 1,
Ensure the stability of whole base beam 1, and then ensure the stability of whole floor monomer 2, based on this, be preferably additionally provided with branch herein
Dagger 4, the support column 4 are vertically arranged, and the lower end of support column 4 is used to offset with ground, and upper end and the middle part of the base beam 1
It is relatively fixed, to be supported by ground in face of the middle part of base beam 1.Bracing element 3 is provided with the both sides of support column 4 simultaneously,
So that, also at least there are three strong points in the overlap joint strong point of the base beam 1 except both ends.In order to facilitate control, herein preferably, support
Post 4 makees three fourth class branches, and support column 4 is connected with the center of base beam 1, and the Along ent on both sides is propped up by bracing element 3 respectively
Support.
Further, the lower end of preferably bracing element 3 is removably connected with the connection pedestal 5 being embedded in floor monomer 2, even
Connect and rib is provided with pedestal 5, the U-shaped and stress leg of opening laterally outwardly is provided with rib.Pass through pre-buried linker
Seat 5, the stationarity between connection pedestal 5 and floor monomer 2 is ensure that, and rib is provided with connection pedestal 5, and make rib
Bar has U-shaped stress leg, greatly ensure that the stress intensity between connection pedestal 5 and floor monomer 2, then causes oblique
When support member 3 is to connection 5 applying power of pedestal, floor monomer 2 can be preferably transferred to.Make connection pedestal 5 can with bracing element 3 simultaneously
Dismantling connection, it can connect pedestal 5 when separating in the later stage and be retained in floor monomer 2, without separating.It should be noted that
Stress leg opening laterally outward, wherein the outer direction of the export-oriented wall for referring to floor monomer 2.
Further, it is contemplated that there may be trickle transverse shifting between two foundation beams 1, whole occasional passage can be caused
Exist unstable, in order to ensure integrally-built stability, it is solid with the base beam 1 positioned at both sides respectively to be preferably provided with both ends herein
Surely the crossbeam connected.For proof strength, wherein base beam 1 and crossbeam preferably uses I-steel herein.
Further, when the position that occasional passage is set up is higher, in order to ensure the security of each passage, herein preferably
Guardrail 6 is provided with, guardrail 6 should be provided with the both sides of occasional passage, sufficiently to protect staff and goods.Examine
Consider security, the height of preferred guardrail 6 is between 1.3 meters and 1.5 meters herein, and including 1.3 meters and 1.5 meters.
Further, only base beam 1 is ridden upon on floor monomer 2, base beam 1 may be caused to move left and right, can then made
Certain rock be present into whole occasional passage.Based on this, herein preferably, locking member 7 is provided with the both ends of base beam 1, should
Locking member 7 is in inverted U, and is stuck on base beam 1, to push base beam 1, and limits the transverse shifting of base beam 1.And by under locking member 7
End is embedded in the floor of floor monomer 2, ensures the connective stability between locking member 7 and floor monomer 2, and make between the two
With larger bonding strength.And wedge 8 is inserted between locking member 7 and base beam 1, so as to block between locking member 7 and base beam 1
Tightly, avoid both from relatively moving or rock, make locking member 7 keep being relatively fixed with base beam 1.Wherein for locking member 7 and floor
There is more preferable connectivity between monomer 2, be preferably provided with rib in the lower end of locking member 7 herein, and the rib is U-shaped and opens
Mouth is set upward.
Further, it is contemplated that the limited width of locking member 7, and in the end of base beam 1, the length overlapped with floor monomer 2
Degree has certain extension, based on this, herein preferably at each end of base beam 1 at least provided with three locking members 7.Further
, it is contemplated that closer to the place of the end face of base beam 1, the degree that base beam 1 upwarps is bigger, based on this, herein preferably, in base beam 1
End, the direction of the end face away from base beam 1, the adjacent spacing of locking member 7 increases successively, can such as be spaced successively 200 millimeters,
400 millimeters.
A kind of building is additionally provided based on occasional passage, the utility model between the floor monomer provided in above-described embodiment
Group, the groups of building include in above-described embodiment occasional passage between any one floor monomer, occasional passage between the floor monomer
Same height floor of the Ji Liang both ends respectively with two floor monomers be connected.Because the groups of building are employed in above-described embodiment
Occasional passage between floor monomer, so the beneficial effect of the groups of building refer to above-described embodiment.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality
Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein
The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The most wide scope consistent with features of novelty.
Claims (10)
- A kind of 1. occasional passage between floor monomer, it is characterised in that including:Two arranged in parallel and spacing preset distance Ji Liang, the both ends of the Ji Liang ride upon two floor monomers respectively On;The bracing element being arranged on the downside of the base beam, and the base beam shape setting at a certain angle, and lower end and the floor Monomer is detachably connected, upper end is connected with the middle part of the Ji Liang;The scaffold board being laid on the Ji Liang, the both lateral sides of the scaffold board are overlapped on the Ji Liang positioned at both sides respectively On.
- 2. occasional passage between floor monomer according to claim 1, it is characterised in that be additionally provided with the support being vertically arranged Post, the lower end of the support column is used to offseting with ground, upper end with being relatively fixed in the middle part of the Ji Liang, the two of the support column Side is provided with the bracing element.
- 3. occasional passage between floor monomer according to claim 2, it is characterised in that the lower end of the bracing element is detachable The connection pedestal being embedded in the floor monomer is connected with, rib is provided with the connection pedestal, is set on the rib There is the U-shaped and stress leg of opening laterally outwardly.
- 4. occasional passage between floor monomer according to claim 3, it is characterised in that also including both ends respectively with positioned at two The crossbeam that the Ji Liang of side is fixedly connected.
- 5. occasional passage between floor monomer according to claim 4, it is characterised in that be additionally provided with guardrail, the guardrail Height be between 1.3 meters to 1.5 meters.
- 6. occasional passage between floor monomer according to claim 5, it is characterised in that the Ji Liang and the crossbeam are Steel I-beam.
- 7. occasional passage between the floor monomer according to claim any one of 1-6, it is characterised in that the both ends of the Ji Liang Locking member is provided with, the locking member is in inverted U and is stuck on the Ji Liang, and the lower end of the locking member is embedded in the building In the floor of layer monomer, wedge is inserted between the locking member and the base beam.
- 8. occasional passage between floor monomer according to claim 7, it is characterised in that the lower end of the locking member is provided with U-shaped and opening up rib.
- 9. occasional passage between floor monomer according to claim 8, it is characterised in that at each end of the Ji Liang at least Three locking members are provided with, in the end of the Ji Liang, the direction away from the base beam-ends face, adjacent locking member spacing Increase successively.
- 10. a kind of groups of building, including at least two floor monomers, it is characterised in that also include such as any one of claim 1-9 institutes Occasional passage between the floor monomer stated, between the floor monomer Ji Liang both ends of occasional passage respectively with two floor monomers Same height floor connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720321993.1U CN206655460U (en) | 2017-03-29 | 2017-03-29 | Occasional passage and groups of building between floor monomer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720321993.1U CN206655460U (en) | 2017-03-29 | 2017-03-29 | Occasional passage and groups of building between floor monomer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206655460U true CN206655460U (en) | 2017-11-21 |
Family
ID=60315404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720321993.1U Expired - Fee Related CN206655460U (en) | 2017-03-29 | 2017-03-29 | Occasional passage and groups of building between floor monomer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206655460U (en) |
-
2017
- 2017-03-29 CN CN201720321993.1U patent/CN206655460U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603496B (en) | A kind of off normal integrally hoisting steel vestibule enters the method for position | |
CN107675630A (en) | A kind of overhead prefabricated box girder erection device of light rail and its construction method | |
CN108104460A (en) | A kind of overhanging type framed bent sets up structure and construction method | |
CN102400470B (en) | Construction method for multi-platform deep foundation of hillside high-rise building | |
CN202187539U (en) | Scaffold for slope and platform operation of high-rise building | |
KR100838409B1 (en) | Deck plate | |
KR101502484B1 (en) | Bridge improved supporting force and aesthetic design and method for constructing the same | |
CN206655460U (en) | Occasional passage and groups of building between floor monomer | |
CN208056613U (en) | A kind of overhanging type framed bent sets up structure | |
CN206986640U (en) | A kind of travelling bridge device for being used for track slab pavement and removing | |
CN103882808B (en) | Ramp bridge and main line bridge join the construction method across erecting beam support system | |
CN204325940U (en) | A kind of large span arch bridge non-support cable crane system construction pylon | |
CN111705682A (en) | Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN203684102U (en) | Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge | |
CN205330133U (en) | Overhanging scaffold | |
JP2002167969A (en) | Pipe-constructed frame with carriage | |
CN205976573U (en) | Large -span stand cable protection canopy | |
CN212296237U (en) | Side slope drilling trolley | |
CN210104532U (en) | Arch bridge structure | |
CN107217685A (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN208701901U (en) | One kind is across empty floor external elevator anchor | |
CN207193774U (en) | Knotted rope platform | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN206438383U (en) | Cambered surface double layer tunnel inverted arch trestle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |