- CN206655237U CN206655237U CN201720342143.XU CN201720342143U CN206655237U CN 206655237 U CN206655237 U CN 206655237U CN 201720342143 U CN201720342143 U CN 201720342143U CN 206655237 U CN206655237 U CN 206655237U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- precast beam
- pile cover
- prefabricated pile
- rubber blanket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of prefabricated PC node structure, and it is combined by prefabricated pile cover, precast beam, preserved pipeline, deformed bar, anchorage, grouting material and rubber blanket;Preserved pipeline is equipped with the prefabricated pile cover and the precast beam, cheated provided with anchor the port of the preserved pipeline, rubber blanket is set between the prefabricated pile cover and the precast beam, the rubber blanket is pasted onto on prefabricated pile cover, the deformed bar passes through the rubber blanket, the prefabricated pile cover and the precast beam, and locked with anchorage in the anchor hole of the precast beam, reaches the prestressing force of deformed bar design, anchor hole and preserved pipeline are blocked by grouting material again, form prestressed node.Advantage of the present utility model is that offshore construction does not need poured in place concrete, and node connection speed is fast.
Description
Technical field
It the utility model is related to port and pier engineering field, and in particular to a kind of prestressed node structure.
Background technology
Fabricated construction is that transportation industry develops irreversible trend, by sending out for many years in the construction of dock structure
Exhibition, pile foundation, Liang Heban in high-pile beam dock structure all produce in precast plant substantially to be completed, and field cast-in-place node enters luggage
Match somebody with somebody, assembly rate has reached 60%.But as assembling degree further improves, cast-in-place node has not adapted to high stake code
The construction speed of head.Off-lying sea operation is particularly gone, because the high and artificial safeguard procedures of local labour cost require high, and it is existing to constructing
The environmental requirement of field is relatively harsh, it is therefore desirable to the new node structure of utility model, solves the problems, such as cast-in-place node.With reference to the modern times
The development of grouting technique, solves node connectivity problem using high-strength grouting material and deformed bar, thus proposes that assembled is pre-
Stress node structure.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated PC node structure, its by prefabricated pile cover 1, precast beam 2,
Preserved pipeline 3, deformed bar 4, anchorage 5, grouting material 6 and rubber blanket 7 combine;
Preserved pipeline 3 is equipped with the prefabricated pile cover 1 and the precast beam 2, the port of the preserved pipeline 3 is provided with anchor
Hole, rubber blanket 7 is set, the rubber blanket 7 is pasted onto on prefabricated pile cover 1, institute between the prefabricated pile cover 1 and the precast beam 2
State deformed bar 4 and pass through the rubber blanket 7, the prefabricated pile cover 1 and the precast beam 2, and cheated in the anchor of the precast beam 2
It is interior locked with anchorage 5, reach the prestressing force of the design of deformed bar 4, grouting material 6 blocks anchor hole and preserved pipeline 3, is formed pre-
Stress node.
Preferably, the preserved pipeline 3 of the middle and upper part of precast beam 2 and deformed bar 4 set quantity to be more than bottom.Because
At bearing, top is big by pulling force, lower compression power, so top configuration is more, bottom is few.
Preferably, the anchor hole and the upper and lower ends space of the rubber blanket 7 are all blocked using grouting material 6.
Preferably, the prefabricated pile cover 1 is erected in pile foundation.
Preferably, the preserved pipeline 3 is staggeredly reserved.
Beneficial effect:Advantage of the present utility model is that offshore construction does not need poured in place concrete, node connection speed
Degree is fast, and assembling degree is high, reduces the measure cost of off-lying sea operating personnel's quantity and protection.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of prefabricated PC node structure of the utility model;
Fig. 2 is Fig. 1 A-A to sectional view;
Fig. 3 is the partial enlarged drawing at C in Fig. 1.
Embodiment
Embodiment 1
Referring to Fig. 1-3, a kind of prefabricated PC node structure, its by prefabricated pile cover 1, precast beam 2, preserved pipeline 3,
Deformed bar 4, anchorage 5, grouting material 6 and rubber blanket 7 combine;It is all provided with the prefabricated pile cover 1 and the precast beam 2
There is preserved pipeline 3, the port of the preserved pipeline 3 is cheated provided with anchor, and rubber blanket is set between the precast beam 2 and prefabricated pile cover 1
7, the rubber blanket 7 is pasted onto on prefabricated pile cover 1;The deformed bar 4 passes through the rubber blanket 7, the prefabricated and of pile cover 1
The precast beam 2, and it is locked with anchorage 5 in the anchor hole of the precast beam 2, reach the prestressing force of the design of deformed bar 4, then
Anchor hole and preserved pipeline 3 are blocked by grouting material 6, form prestressed node.
According to sequence of construction, prefabricated pile cover 1 and precast beam 2 first are produced in precast plant, on prefabricated pile cover 1 and precast beam 2
Good preserved pipeline 3 is reserved, rubber blanket 7 is pasted onto prefabricated pile cover 1, after prefabricated pile cover 1 is arranged in pile foundation, hung using crane ship
Dress precast beam 2 is placed on prefabricated pile cover 1, is finely tuned prefabricated pile cover 1 and precast beam 2 relative position by jack, is made provided pipe
Road 3 aligns, then wears deformed bar 4 and cross rubber blanket 7, prefabricated pile cover 1 and precast beam 2, and uses anchorage in the anchor hole of precast beam 2
5 locked deformed bars 4, and reach the prestressing force of the design of deformed bar 4, then grouting material 6 is poured into by grouting pump by envelope
In stifled anchor hole and preserved pipeline 3, prestressed node is formed.
Claims (5)
- A kind of 1. prefabricated PC node structure, it is characterised in that:It is by prefabricated pile cover, precast beam, preserved pipeline, prestressing force Reinforcing bar, anchorage, grouting material and rubber blanket combine;Preserved pipeline is equipped with the prefabricated pile cover and the precast beam, the port of the preserved pipeline is cheated provided with anchor, described Rubber blanket is set between prefabricated pile cover and the precast beam, and the rubber blanket is pasted onto on prefabricated pile cover, the deformed bar Through the rubber blanket, the prefabricated pile cover and the precast beam, and it is locked with anchorage in the anchor hole of the precast beam, reach The prestressing force of deformed bar design, grouting material closure anchor hole and preserved pipeline, form prestressed node.
- A kind of 2. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The precast beam middle and upper part Preserved pipeline and deformed bar set quantity to be more than bottom.
- A kind of 3. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The anchor hole and the rubber The upper and lower ends space of pad is all blocked using grouting material.
- A kind of 4. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The prefabricated pile hat stand is located at In pile foundation.
- A kind of 5. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The preserved pipeline is staggeredly pre- Stay.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720342143.XU CN206655237U (en) | 2017-04-01 | 2017-04-01 | Prefabricated PC node structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720342143.XU CN206655237U (en) | 2017-04-01 | 2017-04-01 | Prefabricated PC node structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206655237U true CN206655237U (en) | 2017-11-21 |
Family
ID=60318196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720342143.XU Expired - Fee Related CN206655237U (en) | 2017-04-01 | 2017-04-01 | Prefabricated PC node structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206655237U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894433A (en) * | 2017-04-01 | 2017-06-27 | 中交第三航务工程勘察设计院有限公司 | Prefabricated PC node structure and its construction method |
-
2017
- 2017-04-01 CN CN201720342143.XU patent/CN206655237U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894433A (en) * | 2017-04-01 | 2017-06-27 | 中交第三航务工程勘察设计院有限公司 | Prefabricated PC node structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107354862B (en) | Prefabricated interlayer steel tube concrete and hollow steel bar concrete assembly bridge pier | |
CN107268807A (en) | A kind of Prefabricated concrete-filled steel tube superposed column | |
CN203514303U (en) | Post-grouting bottom-expanding uplift miniature pile | |
CN103015414A (en) | Precast concrete post grouting pile and grouting process | |
CN107165177A (en) | A kind of side slope supporting construction method | |
CN203701125U (en) | Connection structure of preformed pile and pile cap and pile feeder of connection structure | |
CN206655237U (en) | Prefabricated PC node structure | |
CN201485863U (en) | Digging rock bolt compound environment-protection basis | |
CN205501843U (en) | Consolidate rigid framed arch bridge | |
JP6370645B2 (en) | Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements | |
CN109914434A (en) | Foundation pit supporting pile top crown beam construction structure | |
CN206418516U (en) | A kind of combined embedded footing on piles, low capped pile foundation plinth | |
CN203007977U (en) | Composite protective structure for reinforced net-plane stopping wall | |
CN203361182U (en) | Unequal-length bottom-expanded rock anchor pile of power transmission pole tower | |
CN208235562U (en) | A kind of static pressure pile structure for Collapsible Loess Stabilized | |
CN103061334B (en) | I-section prestressed reinforced concrete support pile by centrifugal pouring | |
CN217460548U (en) | Bag grouting squeezing and expanding combined anchor rod with built-in prestressed rod core | |
CN202989911U (en) | Post-grouting pile of precast concrete | |
CN106894433A (en) | Prefabricated PC node structure and its construction method | |
CN203129133U (en) | Centrifugal poured prestressed steel bar concrete H-shaped section support pile | |
CN208472751U (en) | Offshore wind turbine prestressing force gravity type foundation | |
CN209429165U (en) | A kind of civil construction retaining wall structure | |
CN208455613U (en) | A kind of sleeve connection assembled pile foundation | |
CN206986915U (en) | A kind of fan platform installation foundation | |
CN207919592U (en) | A kind of prefabricated assembled pile foundation of bearing platform plinth of transmission tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||