CN206655237U - Prefabricated PC node structure - Google Patents

Prefabricated PC node structure Download PDF

Info

Publication number
CN206655237U
CN206655237U CN201720342143.XU CN201720342143U CN206655237U CN 206655237 U CN206655237 U CN 206655237U CN 201720342143 U CN201720342143 U CN 201720342143U CN 206655237 U CN206655237 U CN 206655237U
Authority
CN
China
Prior art keywords
prefabricated
precast beam
pile cover
prefabricated pile
rubber blanket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720342143.XU
Other languages
Chinese (zh)
Inventor
李武
程泽坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201720342143.XU priority Critical patent/CN206655237U/en
Application granted granted Critical
Publication of CN206655237U publication Critical patent/CN206655237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of prefabricated PC node structure, and it is combined by prefabricated pile cover, precast beam, preserved pipeline, deformed bar, anchorage, grouting material and rubber blanket;Preserved pipeline is equipped with the prefabricated pile cover and the precast beam, cheated provided with anchor the port of the preserved pipeline, rubber blanket is set between the prefabricated pile cover and the precast beam, the rubber blanket is pasted onto on prefabricated pile cover, the deformed bar passes through the rubber blanket, the prefabricated pile cover and the precast beam, and locked with anchorage in the anchor hole of the precast beam, reaches the prestressing force of deformed bar design, anchor hole and preserved pipeline are blocked by grouting material again, form prestressed node.Advantage of the present utility model is that offshore construction does not need poured in place concrete, and node connection speed is fast.

Description

Prefabricated PC node structure
Technical field
It the utility model is related to port and pier engineering field, and in particular to a kind of prestressed node structure.
Background technology
Fabricated construction is that transportation industry develops irreversible trend, by sending out for many years in the construction of dock structure Exhibition, pile foundation, Liang Heban in high-pile beam dock structure all produce in precast plant substantially to be completed, and field cast-in-place node enters luggage Match somebody with somebody, assembly rate has reached 60%.But as assembling degree further improves, cast-in-place node has not adapted to high stake code The construction speed of head.Off-lying sea operation is particularly gone, because the high and artificial safeguard procedures of local labour cost require high, and it is existing to constructing The environmental requirement of field is relatively harsh, it is therefore desirable to the new node structure of utility model, solves the problems, such as cast-in-place node.With reference to the modern times The development of grouting technique, solves node connectivity problem using high-strength grouting material and deformed bar, thus proposes that assembled is pre- Stress node structure.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated PC node structure, its by prefabricated pile cover 1, precast beam 2, Preserved pipeline 3, deformed bar 4, anchorage 5, grouting material 6 and rubber blanket 7 combine;
Preserved pipeline 3 is equipped with the prefabricated pile cover 1 and the precast beam 2, the port of the preserved pipeline 3 is provided with anchor Hole, rubber blanket 7 is set, the rubber blanket 7 is pasted onto on prefabricated pile cover 1, institute between the prefabricated pile cover 1 and the precast beam 2 State deformed bar 4 and pass through the rubber blanket 7, the prefabricated pile cover 1 and the precast beam 2, and cheated in the anchor of the precast beam 2 It is interior locked with anchorage 5, reach the prestressing force of the design of deformed bar 4, grouting material 6 blocks anchor hole and preserved pipeline 3, is formed pre- Stress node.
Preferably, the preserved pipeline 3 of the middle and upper part of precast beam 2 and deformed bar 4 set quantity to be more than bottom.Because At bearing, top is big by pulling force, lower compression power, so top configuration is more, bottom is few.
Preferably, the anchor hole and the upper and lower ends space of the rubber blanket 7 are all blocked using grouting material 6.
Preferably, the prefabricated pile cover 1 is erected in pile foundation.
Preferably, the preserved pipeline 3 is staggeredly reserved.
Beneficial effect:Advantage of the present utility model is that offshore construction does not need poured in place concrete, node connection speed Degree is fast, and assembling degree is high, reduces the measure cost of off-lying sea operating personnel's quantity and protection.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of prefabricated PC node structure of the utility model;
Fig. 2 is Fig. 1 A-A to sectional view;
Fig. 3 is the partial enlarged drawing at C in Fig. 1.
Embodiment
Embodiment 1
Referring to Fig. 1-3, a kind of prefabricated PC node structure, its by prefabricated pile cover 1, precast beam 2, preserved pipeline 3, Deformed bar 4, anchorage 5, grouting material 6 and rubber blanket 7 combine;It is all provided with the prefabricated pile cover 1 and the precast beam 2 There is preserved pipeline 3, the port of the preserved pipeline 3 is cheated provided with anchor, and rubber blanket is set between the precast beam 2 and prefabricated pile cover 1 7, the rubber blanket 7 is pasted onto on prefabricated pile cover 1;The deformed bar 4 passes through the rubber blanket 7, the prefabricated and of pile cover 1 The precast beam 2, and it is locked with anchorage 5 in the anchor hole of the precast beam 2, reach the prestressing force of the design of deformed bar 4, then Anchor hole and preserved pipeline 3 are blocked by grouting material 6, form prestressed node.
According to sequence of construction, prefabricated pile cover 1 and precast beam 2 first are produced in precast plant, on prefabricated pile cover 1 and precast beam 2 Good preserved pipeline 3 is reserved, rubber blanket 7 is pasted onto prefabricated pile cover 1, after prefabricated pile cover 1 is arranged in pile foundation, hung using crane ship Dress precast beam 2 is placed on prefabricated pile cover 1, is finely tuned prefabricated pile cover 1 and precast beam 2 relative position by jack, is made provided pipe Road 3 aligns, then wears deformed bar 4 and cross rubber blanket 7, prefabricated pile cover 1 and precast beam 2, and uses anchorage in the anchor hole of precast beam 2 5 locked deformed bars 4, and reach the prestressing force of the design of deformed bar 4, then grouting material 6 is poured into by grouting pump by envelope In stifled anchor hole and preserved pipeline 3, prestressed node is formed.

Claims (5)

  1. A kind of 1. prefabricated PC node structure, it is characterised in that:It is by prefabricated pile cover, precast beam, preserved pipeline, prestressing force Reinforcing bar, anchorage, grouting material and rubber blanket combine;
    Preserved pipeline is equipped with the prefabricated pile cover and the precast beam, the port of the preserved pipeline is cheated provided with anchor, described Rubber blanket is set between prefabricated pile cover and the precast beam, and the rubber blanket is pasted onto on prefabricated pile cover, the deformed bar Through the rubber blanket, the prefabricated pile cover and the precast beam, and it is locked with anchorage in the anchor hole of the precast beam, reach The prestressing force of deformed bar design, grouting material closure anchor hole and preserved pipeline, form prestressed node.
  2. A kind of 2. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The precast beam middle and upper part Preserved pipeline and deformed bar set quantity to be more than bottom.
  3. A kind of 3. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The anchor hole and the rubber The upper and lower ends space of pad is all blocked using grouting material.
  4. A kind of 4. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The prefabricated pile hat stand is located at In pile foundation.
  5. A kind of 5. prefabricated PC node structure as claimed in claim 1, it is characterised in that:The preserved pipeline is staggeredly pre- Stay.
CN201720342143.XU 2017-04-01 2017-04-01 Prefabricated PC node structure Expired - Fee Related CN206655237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720342143.XU CN206655237U (en) 2017-04-01 2017-04-01 Prefabricated PC node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720342143.XU CN206655237U (en) 2017-04-01 2017-04-01 Prefabricated PC node structure

Publications (1)

Publication Number Publication Date
CN206655237U true CN206655237U (en) 2017-11-21

Family

ID=60318196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720342143.XU Expired - Fee Related CN206655237U (en) 2017-04-01 2017-04-01 Prefabricated PC node structure

Country Status (1)

Country Link
CN (1) CN206655237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894433A (en) * 2017-04-01 2017-06-27 中交第三航务工程勘察设计院有限公司 Prefabricated PC node structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894433A (en) * 2017-04-01 2017-06-27 中交第三航务工程勘察设计院有限公司 Prefabricated PC node structure and its construction method

Similar Documents

Publication Publication Date Title
CN107354862B (en) Prefabricated interlayer steel tube concrete and hollow steel bar concrete assembly bridge pier
CN107268807A (en) A kind of Prefabricated concrete-filled steel tube superposed column
CN203514303U (en) Post-grouting bottom-expanding uplift miniature pile
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN107165177A (en) A kind of side slope supporting construction method
CN203701125U (en) Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN206655237U (en) Prefabricated PC node structure
CN201485863U (en) Digging rock bolt compound environment-protection basis
CN205501843U (en) Consolidate rigid framed arch bridge
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN109914434A (en) Foundation pit supporting pile top crown beam construction structure
CN206418516U (en) A kind of combined embedded footing on piles, low capped pile foundation plinth
CN203007977U (en) Composite protective structure for reinforced net-plane stopping wall
CN203361182U (en) Unequal-length bottom-expanded rock anchor pile of power transmission pole tower
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN217460548U (en) Bag grouting squeezing and expanding combined anchor rod with built-in prestressed rod core
CN202989911U (en) Post-grouting pile of precast concrete
CN106894433A (en) Prefabricated PC node structure and its construction method
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile
CN208472751U (en) Offshore wind turbine prestressing force gravity type foundation
CN209429165U (en) A kind of civil construction retaining wall structure
CN208455613U (en) A kind of sleeve connection assembled pile foundation
CN206986915U (en) A kind of fan platform installation foundation
CN207919592U (en) A kind of prefabricated assembled pile foundation of bearing platform plinth of transmission tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121

Termination date: 20200401