CN206637120U - A kind of multiple tube cold-hot water integral pipe clamp - Google Patents

A kind of multiple tube cold-hot water integral pipe clamp Download PDF

Info

Publication number
CN206637120U
CN206637120U CN201720326505.6U CN201720326505U CN206637120U CN 206637120 U CN206637120 U CN 206637120U CN 201720326505 U CN201720326505 U CN 201720326505U CN 206637120 U CN206637120 U CN 206637120U
Authority
CN
China
Prior art keywords
pipe clamp
hot water
pipe
connector
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720326505.6U
Other languages
Chinese (zh)
Inventor
刘欣伟
余林杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Weixing New Building Materials Co Ltd
Original Assignee
Zhejiang Weixing New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Weixing New Building Materials Co Ltd filed Critical Zhejiang Weixing New Building Materials Co Ltd
Priority to CN201720326505.6U priority Critical patent/CN206637120U/en
Application granted granted Critical
Publication of CN206637120U publication Critical patent/CN206637120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of multiple tube cold-hot water integral pipe clamp, it includes integral pipe clamp component and pipe clamp fixes iron nail, integral pipe clamp component includes pipe clamp suspension rod and the pipe clamp connector of perpendicular connection, pipe clamp suspension rod termination is set to expansion-head, iron nail correspondence position is fixed with pipe clamp be provided with drift bolt hole on pipe clamp connector, pipe clamp fixes iron nail and is hammered into pipe clamp suspension rod in wall by drift bolt hole, pipe clamp connector both ends set pipe clamp respectively, pipe clamp is annular opening structure, opening is provided with pipe clamp fixation kit, after multiple tube hot water pipe loads pipe clamp, by the clamping of pipe clamp fixation kit and fixation.The utility model is by using above-mentioned technology, hot water pipe with heat-insulation layer is arranged on two pipe clamps, ensure on sustained height, pipe clamp is provided with bending trace, pipe clamp is facilitated to be adjusted, pipe clamp to insulating tube tighten up fixation using the combining structure of dentation, and horizontal power makes two parts combination stagger during dismounting, and its is easy for construction, installation is attractive in appearance.

Description

A kind of multiple tube cold-hot water integral pipe clamp
Technical field
The utility model belongs to pipe installation technology field, and in particular to a kind of multiple tube cold-hot water integral pipe clamp, its energy Facilitate the installation of ceiling of house ornamentation insulation cold hot water piping, its pipe clamp size designs according to insulating tube entire outer diameter, and pipe clamp passes through company Hot water pipe card is fixed together by junctor, and convenient construction, installation are attractive in appearance.
Background technology
With the continuous change of house ornamentation company and the market demand in recent years, PP-R plastic water supply pipes road carries heat-insulation layer Product enjoys favor.As new product development initial stage, corresponding supporting installation fitting is not also very perfect.Top, which is walked, in pipeline does furred ceiling In installation process, cold hot water piping is intended to fix using pipe clamp, and construction is troublesome and cold hot water piping occurs setting height(from bottom) not Unified phenomenon.
Utility model content
For problem above, the purpose of this utility model is to provide a kind of for the compound of PP-R insulating tube installation of ceiling Pipe cold-hot water integral pipe clamp, its material are PP-R materials, are process using integrated injection molding technique.
A kind of described multiple tube cold-hot water integral pipe clamp, including with the use of integral pipe clamp component and pipe clamp fix iron Nail, it is characterised in that integral pipe clamp component includes pipe clamp suspension rod and the pipe clamp connector of perpendicular connection, pipe clamp suspension rod termination Expansion-head is set to, fixing iron nail correspondence position with pipe clamp on pipe clamp connector is provided with drift bolt hole, and pipe clamp fixes iron nail and passes through drift bolt Hole hammers into pipe clamp suspension rod in wall, and pipe clamp connector both ends set pipe clamp respectively, and pipe clamp is annular opening structure, and opening is set After thering is pipe clamp fixation kit, multiple tube hot water pipe to load pipe clamp, by the clamping of pipe clamp fixation kit and fixation.
Described a kind of multiple tube cold-hot water integral pipe clamp, it is characterised in that pipe clamp fixation kit is by being arranged on pipe clamp both ends Connector and link slot form, connector connects with link slot Corresponding matching, pipe clamp opening locked.
Described a kind of multiple tube cold-hot water integral pipe clamp, it is characterised in that pipe clamp is provided with bending trace.
Described a kind of multiple tube cold-hot water integral pipe clamp, it is characterised in that pipe clamp suspension rod is provided with least two and marked Ring, for marking pipe clamp hanger erection depth.
A kind of above-mentioned multiple tube cold-hot water integral pipe clamp, including with the use of integral pipe clamp component and pipe clamp fix iron Nail, it is characterised in that integral pipe clamp component includes pipe clamp suspension rod and the pipe clamp connector of perpendicular connection, pipe clamp suspension rod termination Expansion-head is set to, fixing iron nail correspondence position with pipe clamp on pipe clamp connector is provided with drift bolt hole, and pipe clamp fixes iron nail and passes through drift bolt Hole hammers into pipe clamp suspension rod in wall, and pipe clamp connector both ends set pipe clamp respectively, and pipe clamp is annular opening structure, and opening is set After thering is pipe clamp fixation kit, multiple tube hot water pipe to load pipe clamp, by the clamping of pipe clamp fixation kit and fixation.The utility model leads to To cross using above-mentioned technology, hot water pipe is arranged on two pipe clamps, ensured on sustained height, pipe clamp is provided with bending trace, Pipe clamp is facilitated to be adjusted, pipe clamp to insulating tube tighten up fixation using the combining structure of dentation, horizontal power during dismounting Two parts combination is set to stagger, its is easy for construction, installation is attractive in appearance.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is pipe clamp fixation kit partial enlarged drawing.
In figure:1- pipe clamp suspension rods, 2- expansion-heads, 3- Marking rings, 4- bending traces, 5- pipe clamps, 6- pipe clamp fixation kits, 601- Connector, 602- link slots, 7- drift bolts hole, 8- pipe clamp connectors, 9- pipe clamps fix iron nail.
Embodiment
Below in conjunction with Figure of description, the utility model will be further described, but the scope of protection of the utility model is simultaneously It is not limited only to this:
As shown in Figure 1-2, a kind of multiple tube cold-hot water integral pipe clamp of the present utility model, including with the use of integral tube Card component and pipe clamp fix iron nail 9, and integral pipe clamp component integrated injection molding, it includes pipe clamp suspension rod 1 and perpendicular connection Pipe clamp connector 8, the termination of pipe clamp suspension rod 1 is set to expansion-head 2, and fixing the correspondence position of iron nail 9 with pipe clamp on pipe clamp connector 8 sets There is drift bolt hole 7, pipe clamp fixes iron nail 9 and hammers into pipe clamp suspension rod 1 in wall by drift bolt hole 7, and the both ends of pipe clamp connector 8 are set respectively Put the pipe clamp 5 for fixing hot water pipe, the spacing between two pipe clamps 5 is 100mm;Pipe clamp 5 is annular opening structure, opening Place is provided with pipe clamp fixation kit 6, and pipe clamp fixation kit 6 is made up of the connector 601 and link slot 602 for being arranged on the both ends of pipe clamp 5, The edge of connector 601 and link slot 602 is provided with the broached-tooth design of matching, connector 601 and corresponding of link slot 602 during use With connection, pipe clamp 5 is open locking, horizontal power makes two parts combination stagger during dismounting.
The utility model is provided with bending trace 4 on pipe clamp 5, facilitates when mounted and pipe clamp 5 is adjusted.
As illustrated, the utility model is provided with Marking ring 3 at least two on pipe clamp suspension rod 1, for marking pipe clamp suspension rod 1 Fitting depth, the pipe clamp suspension rod 1 of installation is set all to ensure sustained height.
As shown in Figure 1-2, Novel pipe clamp of the present utility model, PP-R insulating tubes are coordinated to be used together.Before use, needing true Determine material and instrument is complete, and select suitable installation site, carry out marking pipe clamp installation site, it is sharp after mark point Electricity consumption drilling row punching, needs to confirm the direction of pipe clamp 5 in a pre-installation, afterwards penetrates pipe clamp fixation iron nail 9 by drift bolt hole 7, The expansion-head 2 of the front end of pipe clamp suspension rod 1 is penetrated to the hole accomplished fluently in advance, pipe clamp fixation iron nail 9 is knocked in into hole using iron hammer, this When pipe clamp fix iron nail 9 and can compress the both sides of expansion-head 2,
It is tightly held in hole.When tapping, the whole fitting depth of pipe clamp is controlled using Marking ring 3, is protected The unification of setting height(from bottom) is demonstrate,proved, before hot water pipe is installed, pipe clamp fixation kit 6 is opened, connector 601 is separated with link slot 602, Bending trace 4 can facilitate the opening of pipe clamp 5, the insulating tube connected is caught in pipe clamp 5, cold hot water piping passes through pipe clamp connector 8 can ensure in same level height, are tightened up by pipe clamp fixation kit 6 and firmly fix tubing, can reach height Imitate attractive in appearance, the set-up time of conventional two pipe clamps is reduced to one, this is concrete operation step of the present utility model.

Claims (4)

1. a kind of multiple tube cold-hot water integral pipe clamp, including with the use of integral pipe clamp component and pipe clamp fix iron nail(9), its It is characterised by that integral pipe clamp component includes pipe clamp suspension rod(1)And the pipe clamp connector of perpendicular connection(8), pipe clamp suspension rod(1) Termination is set to expansion-head(2), pipe clamp connector(8)Upper and pipe clamp fixes iron nail(9)Correspondence position is provided with drift bolt hole(7), pipe clamp Fixed iron nail(9)Pass through drift bolt hole(7)By pipe clamp suspension rod(1)Hammer into wall, pipe clamp connector(8)Both ends set pipe clamp respectively (5), pipe clamp(5)For annular opening structure, opening is provided with pipe clamp fixation kit(6), multiple tube hot water pipe loading pipe clamp(5) Afterwards, by pipe clamp fixation kit(6)Clamping and fixation.
A kind of 2. multiple tube cold-hot water integral pipe clamp according to claim 1, it is characterised in that pipe clamp fixation kit(6)By It is arranged on pipe clamp(5)The connector at both ends(601)And link slot(602)Form, connector(601)And link slot(602)It is corresponding Matching connection, by pipe clamp(5)Opening locking.
A kind of 3. multiple tube cold-hot water integral pipe clamp according to claim 1, it is characterised in that pipe clamp(5)It is provided with bending Trace(4).
A kind of 4. multiple tube cold-hot water integral pipe clamp according to claim 1, it is characterised in that pipe clamp suspension rod(1)It is provided with Marking ring at least two(3), for marking pipe clamp suspension rod(1)Fitting depth.
CN201720326505.6U 2017-03-30 2017-03-30 A kind of multiple tube cold-hot water integral pipe clamp Active CN206637120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720326505.6U CN206637120U (en) 2017-03-30 2017-03-30 A kind of multiple tube cold-hot water integral pipe clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720326505.6U CN206637120U (en) 2017-03-30 2017-03-30 A kind of multiple tube cold-hot water integral pipe clamp

Publications (1)

Publication Number Publication Date
CN206637120U true CN206637120U (en) 2017-11-14

Family

ID=60262309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720326505.6U Active CN206637120U (en) 2017-03-30 2017-03-30 A kind of multiple tube cold-hot water integral pipe clamp

Country Status (1)

Country Link
CN (1) CN206637120U (en)

Similar Documents

Publication Publication Date Title
CN201090838Y (en) Piping clip
CN206637120U (en) A kind of multiple tube cold-hot water integral pipe clamp
CN204960953U (en) Vertical waterstop of formula of burying device of flare -outing in tunnel
CN201628420U (en) Extension-type underground heat exchanger for ground source heat pump
CN201407855Y (en) Bushing type underground heat exchanger for ground source heat pump
CN219607271U (en) Soil source heat pump system
CN201236365Y (en) Drainpipe built-in base
CN209929914U (en) Combined power line wall load
CN203782687U (en) Energy post for energy saving of ground source heat pump
CN204059967U (en) Fixed building template taper split bolt assembly
CN205591549U (en) Building structure floor plate preformed hole mould
CN203160236U (en) Anti-floating anchor rod capable of collecting ground source heat energy
CN202252348U (en) Single pipe buttress arranged on water supply and drainage pipeline
CN202972273U (en) Plug-in type plumbing pipe fitting connecting structure with outer sleeve chuck
CN207109747U (en) A kind of adjustable interim fixed supporting member
CN217030380U (en) Fastener for round pipe and round pipe
CN2929412Y (en) Special clip for pipeline
CN216312609U (en) Steel construction activity board house is with quick positioner of circuit bright tube
CN216196250U (en) Building steel structure convenient to dismantle heated board
CN216896089U (en) Positioning installation groove supplementing die
CN204590257U (en) A kind of embedded sleeve barrel assembly for secondary structure wall lacing wire
CN208039230U (en) A kind of steel-pipe pile of flapper-type connector and the built-in connector
CN216664108U (en) Tubular pile connecting device convenient to dismantle
CN210165010U (en) Wall bushing device for curtain wall
CN221300369U (en) Pre-buried adjustable water supply and drainage pipe hanging bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant