CN206635819U - A kind of flexible vertical barrier system - Google Patents

A kind of flexible vertical barrier system Download PDF

Info

Publication number
CN206635819U
CN206635819U CN201720169560.9U CN201720169560U CN206635819U CN 206635819 U CN206635819 U CN 206635819U CN 201720169560 U CN201720169560 U CN 201720169560U CN 206635819 U CN206635819 U CN 206635819U
Authority
CN
China
Prior art keywords
barrier system
vertical barrier
hdpe film
backfill
flexible vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720169560.9U
Other languages
Chinese (zh)
Inventor
周小娟
刘海燕
吴瑜红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201720169560.9U priority Critical patent/CN206635819U/en
Application granted granted Critical
Publication of CN206635819U publication Critical patent/CN206635819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

A kind of flexible vertical barrier system, including HDPE film and the mud off for being vertically set on groove both sides, multiple backfill bodies being sequentially overlapped from top to bottom, in triangular prism structure are provided between the both sides mud off, the HDPE film is continuously arranged along the mating surface between adjacent backfill body, the backfill body section is in isosceles triangle, apex angle α=40 °~50 ° of the isosceles triangle, the backfill body axial length is 1~1.5m, and the wedge shape backfills external wall and is surrounded by geotextiles.The utility model provides a kind of new flexible vertical barrier system, the protection more safe and feasible to HDPE film, it is ensured that the safe operation of vertical barrier system, while the setting of anchoring hook is eliminated, it can be widely applied to the repairing and treating field of soil.

Description

A kind of flexible vertical barrier system
Technical field
The repairing and treating technical field of soil is the utility model is related to, more particularly to a kind of flexible vertical barrier system.
Background technology
Barrier landfill is one of technology the most frequently used in repairing and treating technology.By contaminated soil or the soil after improvement It is placed in antiseepage barrier landfill yard, or stops the approach of pollutants in soil diffusion by laying barrier layer, makes Polluted Soil Earth is isolated with surrounding environment, is avoided pollutant with human contact and is migrated with the soil water and then human body and surrounding environment are caused to endanger Evil.Vertical barrier system is to obstruct the important component of Landfill.Vertical barrier system is the hydrology according to contaminated site Geology, engineering geological condition, utilize independent hydrogeologic condition, impermeable stratum existing for landfill yard or contaminated site ground beneath Deng in the vertical antiseepage barrier engineering of landfill yard or the setting of contaminated site periphery.The outside diffusion mobility of pollutant is prevented, while Underground water is prevented to flow into landfill yard or contaminated site.
The laying method of HDPE film is mainly gravity plastic film mulch method in currently used flexible vertical barrier system, and top needs Phenomena such as setting anchoring hook, fixed HDPE film is higher to construction requirement, and easily generation comes off, drawing crack destroys.The both sides of HDPE film Backfilling material is generally the good material or mud of grading, and HDPE film, mud can be pierced through when containing sharp stone in material Consolidation sedimentation can occur for the later stage, and downward pulling force can be also produced to film, be unfavorable for the safety of film.
Utility model content
The purpose of this utility model is to provide a kind of protection that can strengthen to HDPE film and ensures the vertical of safe operation Barrier system.
A kind of flexible vertical barrier system, including HDPE film and the mud off for being vertically set on groove both sides, described two It is provided with multiple backfill bodies being sequentially overlapped from top to bottom, in triangular prism structure between the mud off of side, the HDPE film is along phase Mating surface between adjacent backfill body is continuously arranged.
Preferably, the backfill body section is in isosceles triangle, apex angle α=40 °~50 ° of the isosceles triangle.
Preferably, the backfill body axial length is 1~1.5m.
Preferably, the external side of backfill is surrounded by geotextiles.
Compared with prior art, the utility model has the advantages that:
1., it is used backfill material be geotextiles parcel backfill body, HDPE film can be effectively protected and do not pierced by sharp debris Wear;
2., HDPE film using in a zigzag lay, can avoid because HDPE film caused by Action of Gravity Field and other external force takes off Fall and destroyed with drawing crack;
3., eliminate need in the prior art system head set anchoring hook the step of, reduce workload.
Brief description of the drawings
Fig. 1 is the structural representation of flexible vertical barrier system described in the utility model.
Fig. 2 is the structural representation that wedge shape described in the utility model backfills body.
Embodiment
As shown in figure 1, a kind of flexible vertical barrier system, including HDPE film 1 and the mud for being vertically set on groove both sides Retaining wall 2, multiple backfill bodies 3 being sequentially overlapped from top to bottom, in triangular prism structure are provided between the both sides mud off 2, The HDPE film 1 is continuously arranged along the mating surface between adjacent backfill body 3.
As shown in Fig. 2 backfill body 3 section is in isosceles triangle, apex angle α=40 ° of the isosceles triangle~ 50 °, the backfill axial length of body 3 is 1~1.5m, and the backfill outer wall of body 3 is surrounded by geotextiles 31.
Flexible vertical barrier system installation steps described in the utility model are as follows:
A, smooth location, excavate groove, the width of the groove be 0.8~1.0m, cutting depth regarding concrete condition and It is fixed, typically it is excavated to 0.5~1.0m under impermeable stratum.The groove of excavation carries out mud off in time, prevents landslip of the sides of the trench.Such as Underground water is met, answers timely pump drainage.
B, backfill body is made, backfilling material decimation stage matches somebody with somebody the good soil body, removes the sharp debris such as stone cleaning, branch, permeates Coefficient should be less than being equal to 1 × 10-9M/s, and there is certain compactness.The section of backfill body is in isosceles triangle, the isosceles The apex angle α of triangle takes 40 °~50 °, and backfill body axial length takes 1~1.5m, and backfill wraps up in geotextiles in vitro.
C, HDPE film is laid upwards since trench bottom, often lays one-level, is laid one piece of backfill body, is backfilled body and HDPE film Between should be in close contact.Upper and lower two-stage backfill body answers the fissure of displacement to lay.Use and be welded to connect between adjacent HDPE film.Due to HDPE film into Lay, and be compacted by backfill body in a zigzag, therefore the setting of top anchor hook can be saved.
Compared with prior art, the utility model has the advantages that:
1., it is used backfill material be geotextiles parcel backfill body, HDPE film can be effectively protected and do not pierced by sharp debris Wear;
2., HDPE film using in a zigzag lay, can avoid because HDPE film caused by Action of Gravity Field and other external force takes off Fall and destroyed with drawing crack;
3., eliminate need in the prior art system head set anchoring hook the step of, reduce workload.
Preferred embodiments of the present utility model are the foregoing is only, it is all new in this practicality not to limit the utility model Within the spirit and principle of type, any modification, equivalent substitution and improvements made etc., protection model of the present utility model is all contained in Within enclosing.

Claims (4)

1. a kind of flexible vertical barrier system, including HDPE film (1) and the mud off (2) for being vertically set on groove both sides, its It is characterised by:Multiple backfills being sequentially overlapped from top to bottom, in triangular prism structure are provided between the both sides mud off (2) Body (3), the HDPE film (1) are continuously arranged along the mating surface between adjacent backfill body (3).
2. flexible vertical barrier system according to claim 1, it is characterised in that:Described backfill body (3) section is in isosceles Triangle, apex angle α=40 °~50 ° of the isosceles triangle.
3. flexible vertical barrier system according to claim 2, it is characterised in that:Described backfill body (3) axial length is 1 ~1.5m.
4. flexible vertical barrier system according to claim 3, it is characterised in that:Described backfill body (3) outer wall is surrounded by soil Work cloth (31).
CN201720169560.9U 2017-02-24 2017-02-24 A kind of flexible vertical barrier system Active CN206635819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720169560.9U CN206635819U (en) 2017-02-24 2017-02-24 A kind of flexible vertical barrier system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720169560.9U CN206635819U (en) 2017-02-24 2017-02-24 A kind of flexible vertical barrier system

Publications (1)

Publication Number Publication Date
CN206635819U true CN206635819U (en) 2017-11-14

Family

ID=60251727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720169560.9U Active CN206635819U (en) 2017-02-24 2017-02-24 A kind of flexible vertical barrier system

Country Status (1)

Country Link
CN (1) CN206635819U (en)

Similar Documents

Publication Publication Date Title
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
Zhu et al. Vacuum preloading method for land reclamation using hydraulic filled slurry from the sea: a case study in coastal China
Zhang et al. Field tests of pumping-recharge technology for deep confined aquifers and its application to a deep excavation
CN104533467B (en) A kind of high artesian, the method for protecting support in fault disruption zone tunnel
Long et al. Performance of PVD improved soft ground using vacuum consolidation methods with and without airtight membrane
CN210104706U (en) Construction structure for treating deep and thick soft foundation by vacuum combined preloading
CN108951675A (en) HDPE geomembrane and bentonite-clay complex vertical cut-pff wall and its construction method of installation
CN104088637B (en) A kind of residual coal second mining of upper group shallow embedding method under coal seam group condition
JP2006336434A (en) Floatation-settlement preventing method for structure
CN110029632A (en) A kind of storage of general industrial solid waste, disposition field structure and its construction method
CN109469042A (en) A kind of antiseepage stockyard place karst cave treatment structure
CN103542174B (en) A kind of Subsidence Land in Coal Mining Area Pipe-lining methods
CN206635819U (en) A kind of flexible vertical barrier system
CN204919528U (en) A go out membrane structure for detecting vacuum pre -compaction in -process reinforcement effect
KR20160025670A (en) Repair-reinforcement method of the reservoir
CN206873466U (en) One kind is used for footrill flume section safeguard structure
CN213088018U (en) Shield constructs down and wears building to prevent supporting construction of settlement control
CN107724405A (en) A kind of underground pipe construction middle pipe dewatering of foundation construction method
Xu et al. Numerical study on karst treatment technology of Wuhan Metro Line 6
CN209482289U (en) A kind of antiseepage stockyard place karst cave treatment structure
Alexandris et al. Remediation of the Pissouri landslide in Cyprus
CN105544555B (en) A kind of foundation pit supporting method with gas sealing
KR100524136B1 (en) Basic bottom permanent drainage structure using trench and drainage member and it's construction method
CN203603156U (en) Combining structure of mortar flag stone retaining wall and flexible reinforcement supporting structure
KR20150021098A (en) Waterside structures reinforced method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant