CN206625216U - A kind of civil engineering built pile - Google Patents
A kind of civil engineering built pile Download PDFInfo
- Publication number
- CN206625216U CN206625216U CN201720349660.XU CN201720349660U CN206625216U CN 206625216 U CN206625216 U CN 206625216U CN 201720349660 U CN201720349660 U CN 201720349660U CN 206625216 U CN206625216 U CN 206625216U
- Authority
- CN
- China
- Prior art keywords
- groove
- vertical
- fixed mount
- sliding block
- transverse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of civil engineering built pile, including horizontal fixed mount, the top end surface of the horizontal fixed mount is provided with the 3rd groove, the first sliding block is installed on the inside of 3rd groove, first sliding block coordinates with the 3rd groove and is connected, vertical supports are installed, the inner side left and right ends of the horizontal fixed mount are mounted on the second groove, the first shank of bolt is mounted at left and right sides of the top of the horizontal fixed mount between first sliding block.The civil engineering built pile, when needing to use it, by promoting vertical fixed mount to drive fixture block to move, second groove is entered by fixture block, the first sliding block is entered the 3rd groove, will be fixed between two horizontal fixed mounts, second sliding block is driven by horizontal support, the second sliding block is entered the first groove, will be fixed between two vertical fixed mounts, be then injected into concrete, it is easy to loading and unloading, fastness is strong, saves the time, is effectively improved operating efficiency.
Description
Technical field
Technical field of civil engineering is the utility model is related to, specially a kind of civil engineering built pile.
Background technology
Civil engineering refers to plan, construction and the maintenance of the relevant infrastructure of all He Shui, soil, culture, current general
Building job have road, water conservancy, canal business, disaster resistant engineering and traffic etc., in the past by the people of all non-military uses
With engineering project, sort out into this class, but as engineering science is increasingly wide, much belonged to the content of civil engineering scope originally all
Independent Cheng Ke, with the development of progress and the engineering practice of science and technology, this subject of civil engineering also has evolved into
Intension is extensive, class is numerous, baroque combined system.Such as the patent of Patent No. 20162063376.0, including transverse direction
Fixed and vertical fixed plate, the horizontal fixed plate are provided with two pieces, and the vertical fixed plate is provided with two pieces, and vertical fixed
Plate is arranged between horizontal fixed plate, and horizontal fixed plate and the rectangle that is shaped as of vertical fixed plate composition, described laterally fixed
Fix bar is installed between plate and vertical fixed plate, although simple in construction, existing civil engineering built pile fastness is poor,
Dismounting is inconvenient when in use, loses time, and operating efficiency is low.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering built pile, to solve what is proposed in above-mentioned background technology
Problem.
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering built pile, including transverse direction
Fixed mount, the top end surface of the horizontal fixed mount are provided with the 3rd groove, the first cunning are provided with the inside of the 3rd groove
Block, first sliding block coordinate with the 3rd groove and are connected, and vertical supports are provided between first sliding block, described laterally fixed
The inner side left and right ends of frame are mounted on the second groove, and the first bolt is mounted at left and right sides of the top of the horizontal fixed mount
Bar, left and right ends are mounted on vertical fixed mount between the horizontal fixed mount, and the front and rear sides of the vertical fixed mount are pacified
Equipped with fixture block, the fixture block coordinates with the second groove and is connected, and first shank of bolt sequentially passes through horizontal fixed mount and fixture block, institute
The top end surface for stating vertical fixed mount is provided with the first groove, is provided with the second sliding block on the inside of first groove, and described
Two sliding blocks coordinate with the first groove and are connected, and horizontal support, the bottom of the horizontal fixed mount are provided between second sliding block
The left and right sides is mounted on vertical reinforcement, and the bottom front and rear sides of the vertical reinforcement are mounted on vertical pallet, described vertical
The bottom front and rear sides of fixed mount are mounted on transverse steel, and horizontal support is mounted at left and right sides of the bottom of the transverse steel
Disk, the transverse steel are provided with multiple vertical reinforcing bars with the surrounding of vertical reinforcement.
Preferably, the bottom end surface of the horizontal fixed mount is provided with transverse concave groove, is provided with the inside of the transverse concave groove
First card article, first card article coordinate with transverse concave groove and are connected, and the bottom of first card article is provided with transverse baffle, described
The 4th groove is installed at left and right sides of the inner side of transverse baffle, multiple second spiral shells are mounted at left and right sides of the transverse baffle
Tightening latch, the bottom end surface of the vertical fixed mount are provided with vertical groove, the second card article, institute are provided with the inside of the vertical groove
State the second card article with vertical groove cooperation to be connected, the bottom of second card article is provided with vertical baffle plate, the vertical baffle plate
Front and rear sides are mounted on the 3rd card article, and the 3rd card article of institute coordinates with the 4th groove and is connected, and second shank of bolt sequentially passes through
Transverse baffle and the 3rd card article.
Preferably, nuts is installed on the outside of second shank of bolt.
Preferably, multiple first pallets are installed on the inside of the transverse baffle.
Preferably, multiple second pallets are installed on the inside of the vertical baffle plate.
Compared with prior art, the beneficial effects of the utility model are:The civil engineering built pile, when needing to use it
When, by promoting vertical fixed mount to drive fixture block to move, the second groove is entered by fixture block, will by rotating the first shank of bolt
The position relationship of horizontal fixed mount and vertical fixed mount is fixed, by the way that transverse steel is put into horizontal pallet, by by vertically
Reinforcing bar is put into vertical pallet, is driven the first sliding block by vertical supports, the first sliding block is entered the 3rd groove, by two transverse directions
It is fixed between fixed mount, the second sliding block is driven by horizontal support, the second sliding block is entered the first groove, it is vertical by two
It is fixed between fixed mount, is then injected into concrete, easy to loading and unloading, fastness is strong, saves the time, is effectively improved work
Efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structural representation of the utility model transverse baffle;
Fig. 3 is the structural representation of the groove of the utility model second;
Fig. 4 is the structural representation of the utility model transverse concave groove;
Fig. 5 is the structural representation of the card article of the utility model first.
In figure:1st, horizontal fixed mount, 2, vertical fixed mount, 3, vertical baffle plate, 4, transverse baffle, the 5, first shank of bolt, 6,
Second shank of bolt, 7, vertical reinforcement, 8, vertical reinforcing bar, 9, transverse steel, 10, horizontal support, 11, vertical supports, 12, first slides
Block, 13, vertical pallet, 14, horizontal pallet, the 15, second sliding block, the 16, first groove, 17, fixture block, the 18, second groove, 19,
Three grooves, 20, transverse concave groove, 21, vertical groove, the 22, first card article, the 23, first pallet, the 24, the 4th groove, the 25, the 3rd card
Bar, the 26, second pallet, the 27, second card article, 28, nuts.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of native technical scheme:A kind of civil engineering built pile, including transverse direction
Fixed mount 1, horizontal fixed mount 1 play the effect at fixed Combination stake top end, the top table of horizontal fixed mount 1 with vertical fixed mount 2
Face is provided with the 3rd groove 19, and the 3rd groove 19 is used to fix the first sliding block 12, and the inner side of the 3rd groove 19 is provided with first
Sliding block 12, the first sliding block 12 coordinate with the 3rd groove 19 and are connected, and the first sliding block 12 can separate with the 3rd groove 19, the first sliding block
Vertical supports 11 are installed, vertical supports 11 are used to supporting and fixing two horizontal fixed mounts 1, horizontal fixed mount 1 between 12
Inner side left and right ends are mounted on the second groove 18, and the first shank of bolt 5 is mounted at left and right sides of the top of horizontal fixed mount 1,
Left and right ends are mounted on vertical fixed mount 2 between horizontal fixed mount 1, and the front and rear sides of vertical fixed mount 2 are mounted on fixture block
17, fixture block 17 coordinates with the second groove 18 and is connected, and fixture block 17 can slide into the second groove 18, makes horizontal fixed mount 1 and vertically consolidates
Determine frame 2 to fix at a right angle, the first shank of bolt 5 sequentially passes through horizontal fixed mount 1 and fixture block 17, and the first shank of bolt 5 consolidates fixture block 17
It is fixed, make its irremovable, the top end surface of fixed support 2 is provided with the first groove 16, and for fixing the second sliding block 15, first is recessed
The inner side of groove 16 is provided with the second sliding block 15, and the second sliding block 15 coordinates with the first groove 16 and is connected, and the second sliding block 15 can remove
First groove 16, horizontal support 10 is installed, horizontal support 10 is used to support and fix company vertically consolidates between second sliding block 15
Determine frame 2, vertical reinforcement 7 is mounted at left and right sides of the bottom of horizontal fixed mount 1, vertical reinforcement 7 is used to reinforce built pile, vertically
The bottom front and rear sides of reinforcing bar 7 are mounted on vertical pallet 13, and vertical pallet 13 is used to put vertical reinforcement 7, vertical fixed mount 2
Bottom front and rear sides be mounted on transverse steel 9, transverse steel 9 is used to reinforce built pile, the bottom of transverse steel 9 or so two
Side is mounted on horizontal pallet 14, and horizontal pallet is used to put transverse steel 9, and the surrounding of transverse steel 9 and vertical reinforcement 7 is installed
There are multiple vertical reinforcing bars 8, vertical reinforcing bar 8 makes built pile more firm, and the bottom end surface of horizontal fixed mount 1 is provided with transverse concave groove
20, the inner side of transverse concave groove 20 is provided with the first card article 22, and the first card article 22 coordinates with transverse concave groove 20 and is connected, the first card article 22
Transverse concave groove 20 can be put into, is fixed the position of transverse baffle 4, the bottom of the first card article 22 is provided with transverse baffle 4,
Transverse baffle 4 is used to block concrete, and the inner side of transverse baffle 4 is provided with multiple first pallets 23, and the first pallet 23 is used to put
Put reinforcing bar, the 4th groove 24 is installed at left and right sides of the inner side of transverse baffle 4, the left and right sides of transverse baffle 4 is mounted on more
Individual second shank of bolt 6, the second shank of bolt 6 fix the 3rd card article 25, make its immovable, the outside installation of the second shank of bolt 6
There is nuts 28, rotating bolt cap 28 drives the second shank of bolt 6, and the bottom end surface of vertical fixed mount 2 is provided with vertical groove 21, erects
Second card article 27 is installed to the inner side of groove 21, the second card article 27 coordinates with vertical groove 21 and is connected, and the second card article 27 can
Into groove 21, it is fixed the position of vertical baffle plate 3, the bottom of the second card article 27 is provided with vertical baffle plate 3, vertical baffle plate
3 inner side is provided with multiple second pallets 26, and the second pallet 26 is used to put reinforcing bar, and the front and rear sides of vertical baffle plate 3 are respectively mounted
There is the 3rd card article 25, the 3rd card article 25 of institute coordinates with the 4th groove 24 and is connected, and the 3rd card article 25 can be put into the 4th groove 24,
Second shank of bolt 6 sequentially passes through the card article 25 of transverse baffle 4 and the 3rd.
When needing to use it, vertical fixed mount 2 is promoted to drive fixture block 17 to move, fixture block 17 enters the second groove 18,
The first shank of bolt 5 is rotated, the position relationship of horizontal fixed mount 1 and vertical fixed mount 2 is fixed, transverse steel 9 is put into transverse direction
In pallet 14, vertical reinforcement 7 is put into vertical pallet 13, vertical supports 11 drive the first sliding block 12, enter the first sliding block 12
Enter the 3rd groove 19, will be fixed between two horizontal fixed mounts 1, horizontal support 10 drives the second sliding block 15, makes the second cunning
Block 15 enters the first groove 16, will be fixed between two vertical fixed mounts 2, is then injected into concrete, easy to loading and unloading, firmly
Property is strong, saves the time, is effectively improved operating efficiency.
In description of the present utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
Portion ", " other end ", " on ", " side ", " top ", " interior ", " front portion ", " center ", the orientation of the instruction such as " both ends " or position close
It is to be described based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplifying, rather than
Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore can not
It is interpreted as to limitation of the present utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for describing purpose, and it is not intended that instruction or
Relative importance or the implicit quantity for indicating indicated technical characteristic are implied, thus, defines " first ", " second ", " the
Three ", at least one this feature can be expressed or be implicitly included to the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu
Calmly ", the term such as " spinning " should be interpreted broadly, and also can be to be detachably connected for example, can be fixedly connected, or integrally;
Can mechanically connect, also can be electrical connection;Can be joined directly together, can be also indirectly connected by intermediary, can
It is connection or the interaction relationship of two elements of two element internals, is limited unless otherwise clear and definite, for this area
For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It will be appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of civil engineering built pile, including horizontal fixed mount(1), it is characterised in that:The horizontal fixed mount(1)Top
Surface is provided with the 3rd groove(19), the 3rd groove(19)Inner side the first sliding block is installed(12), first sliding block
(12)With the 3rd groove(19)Coordinate and be connected, first sliding block(12)Between vertical supports are installed(11), the transverse direction consolidates
Determine frame(1)Inner side left and right ends be mounted on the second groove(18), the horizontal fixed mount(1)Top at left and right sides of pacify
Equipped with the first shank of bolt(5), the horizontal fixed mount(1)Between left and right ends be mounted on vertical fixed mount(2), it is described vertical
Fixed mount(2)Front and rear sides be mounted on fixture block(17), the fixture block(17)With the second groove(18)Coordinate and be connected, described the
One shank of bolt(5)Sequentially pass through horizontal fixed mount(1)And fixture block(17), the vertical fixed mount(2)Top end surface be provided with
First groove(16), first groove(16)Inner side the second sliding block is installed(15), second sliding block(15)With first
Groove(16)Coordinate and be connected, second sliding block(15)Between horizontal support is installed(10), the horizontal fixed mount(1)Bottom
The end left and right sides is mounted on vertical reinforcement(7), the vertical reinforcement(7)Bottom front and rear sides be mounted on vertical pallet
(13), the vertical fixed mount(2)Bottom front and rear sides be mounted on transverse steel(9), the transverse steel(9)Bottom
The left and right sides is mounted on horizontal pallet(14), the transverse steel(9)With vertical reinforcement(7)Surrounding be provided with it is multiple vertical
Reinforcing bar(8).
A kind of 2. civil engineering built pile according to claim 1, it is characterised in that:The horizontal fixed mount(1)Bottom
End surfaces are provided with transverse concave groove(20), the transverse concave groove(20)Inner side the first card article is installed(22), first card article
(22)With transverse concave groove(20)Coordinate and be connected, first card article(22)Bottom transverse baffle is installed(4), the transverse gear
Plate(4)Inner side at left and right sides of the 4th groove is installed(24), the transverse baffle(4)The left and right sides be mounted on multiple
Two shanks of bolt(6), the vertical fixed mount(2)Bottom end surface be provided with vertical groove(21), the vertical groove(21)It is interior
Side is provided with the second card article(27), second card article(27)With vertical groove(21)Coordinate and be connected, second card article(27)
Bottom vertical baffle plate is installed(3), the vertical baffle plate(3)Front and rear sides be mounted on the 3rd card article(25), institute the 3rd
Card article(25)With the 4th groove(24)Coordinate and be connected, second shank of bolt(6)Sequentially pass through transverse baffle(4)With the 3rd card article
(25).
A kind of 3. civil engineering built pile according to claim 2, it is characterised in that:Second shank of bolt(6)It is outer
Side is provided with nuts(28).
A kind of 4. civil engineering built pile according to claim 2, it is characterised in that:The transverse baffle(4)Inner side
Multiple first pallets are installed(23).
A kind of 5. civil engineering built pile according to claim 2, it is characterised in that:The vertical baffle plate(3)Inner side
Multiple second pallets are installed(26).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720349660.XU CN206625216U (en) | 2017-04-05 | 2017-04-05 | A kind of civil engineering built pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720349660.XU CN206625216U (en) | 2017-04-05 | 2017-04-05 | A kind of civil engineering built pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206625216U true CN206625216U (en) | 2017-11-10 |
Family
ID=60207111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720349660.XU Expired - Fee Related CN206625216U (en) | 2017-04-05 | 2017-04-05 | A kind of civil engineering built pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206625216U (en) |
-
2017
- 2017-04-05 CN CN201720349660.XU patent/CN206625216U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201495027U (en) | Hoisting tool for mill housing | |
CN108005398A (en) | A kind of warning rail for building easy to recycling dismounting | |
CN208441235U (en) | A kind of easy-disassembling-assembling two layers of steel construction room | |
CN206625216U (en) | A kind of civil engineering built pile | |
CN204662458U (en) | Detachable pretightning force combined support frame system brace summer transition Connection Block | |
CN205688782U (en) | A kind of corner steel girder erection structure of boat scaffold | |
CN202899159U (en) | Outer hanging type construction elevator foundation | |
CN202338112U (en) | Two-way seat for connecting two horizontal connecting rods | |
CN209113353U (en) | A kind of novel compositions beam lifting lug device | |
CN205669326U (en) | A kind of architectural engineering modular guard canopy | |
CN206752669U (en) | A kind of building frame | |
CN202081633U (en) | Detachable scaffold locking plate | |
CN212897448U (en) | Plug-in card type multifunctional scaffold | |
CN209493209U (en) | A kind of prefabricated small box girder dismounting templated porous formula balance hanger | |
CN207790464U (en) | A kind of transport device of vehicle-mounted adjustable prefabricated panel | |
CN201588414U (en) | Supporting structure for framework scaffolds | |
CN205677224U (en) | A kind of scaffold being readily disassembled | |
CN205821976U (en) | A kind of easy-to-mount high intensity overlapping beam slab | |
CN206070389U (en) | A kind of bracing frame system for box beam | |
CN206581259U (en) | A kind of civil engineering built pile | |
CN208563348U (en) | Deep big foundation pit is two-way inverse to make structure | |
CN214006551U (en) | Environment-friendly wall body pours and uses securing device | |
CN207063568U (en) | A kind of extension type construction guardrail | |
CN219235625U (en) | T-beam prefabricated steel template | |
CN214459749U (en) | Road and bridge crack reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171110 Termination date: 20180405 |