CN206618755U - A kind of experimental rig for being used to examine apparent mass of clear concrete - Google Patents

A kind of experimental rig for being used to examine apparent mass of clear concrete Download PDF

Info

Publication number
CN206618755U
CN206618755U CN201720250637.5U CN201720250637U CN206618755U CN 206618755 U CN206618755 U CN 206618755U CN 201720250637 U CN201720250637 U CN 201720250637U CN 206618755 U CN206618755 U CN 206618755U
Authority
CN
China
Prior art keywords
clear
experimental rig
apparent mass
concrete
graduated scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720250637.5U
Other languages
Chinese (zh)
Inventor
王伟
徐仁崇
杨善顺
刘君秀
陈贤锡
陈裕佳
石莹
连亚明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Tian Run Jin Long Building Materials Co Ltd
Original Assignee
Xiamen Tian Run Jin Long Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Tian Run Jin Long Building Materials Co Ltd filed Critical Xiamen Tian Run Jin Long Building Materials Co Ltd
Priority to CN201720250637.5U priority Critical patent/CN206618755U/en
Application granted granted Critical
Publication of CN206618755U publication Critical patent/CN206618755U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides a kind of experimental rig for being used to examine apparent mass of clear concrete, including:The cuboid container for the both ends open being put together by four pieces of templates;One openend of cuboid container is placed in the level ground for the plastic sheeting that paves;At least one piece has the longitudinal graduated scale axially set in four pieces of templates, and the part that the template is located at another openend has the horizontal graduated scale vertical with longitudinal graduated scale;Cuboid container is built with clear-water concrete, and a vibrating head is inserted to vibrate in the cuboid container to clear-water concrete;The height of clear-water concrete is recorded by longitudinal graduated scale, the insertion position of vibrating head is recorded by horizontal graduated scale;And by a time set record vibrating head vibrate when insertion duration, vibrate duration and extract duration.The utility model provides a kind of experimental rig for being used to examine apparent mass of clear concrete, the apparent mass for clear-water concrete before science, economy, rationally detection construction.

Description

A kind of experimental rig for being used to examine apparent mass of clear concrete
Technical field
The utility model is related to a kind of experimental rig, is particularly used for examining the experiment dress of apparent mass of clear concrete Put.
Background technology
Clear-water concrete is one-shot forming, do not do the concrete of any external decoration, directly using the nature of cast-in-place concrete Color is used as facing, it is desirable to concrete surface flat smooth, uniform color, no clashing and breaking and pollution, and split bolt and construction joint are set Put and answer neat appearance, and do not allow common quality defect that normal concrete occur.Although the existing successful clear-water concrete work in the country Journey case, but not yet have available method for the evaluation of apparent mass of clear concrete before construction.Clear-water concrete engineering energy No success, depending on fully relying on the performance after construction, the form of construction work of this clear-water concrete more blindly and not science.Using This experimental rig and test method can simulate dry concrete construction, and the convenient apparent mass to clear-water concrete before construction enters Row is evaluated, and economical rationality, simple to operate.
Patent CN105891453A is disclosed " experimental rig and its test method of apparent mass of clear concrete ", experiment Device includes:Transparent vessel, for housing clear-water concrete;Support, branch is located at the top surface of transparent vessel, and the midpoint of support is located at The center of container;Vibrating head, is arranged in the center of support and then stretches into clear-water concrete;Scale measuring stick, from diverse location Sink in clear-water concrete, for record sink to vibrate after clear-water concrete depth.
Patent CN103848604A discloses " a kind of level is with cobblestone clear water self-compacting concrete and its shaped device ", clearly Water coagulation soil match ratio is calculated according to components by weight percent, includes 230 kilograms of cement, 172 kilograms of water, sand per cubic meter of concrete 780 kilograms of son, 1020 kilograms of cobblestone, 60 kilograms of flyash, 50 kilograms of high efficiency water reducing agent;Its device is:Using plastic formwork Combine and install with glued board, follow closely 10 × 15mm (wide × high) aluminium alloy in plastic formwork and glued board seam crossing and drip lines, glue Plywood glues foam adhesive tape with wall seam side, makes gang form one overall structure of formation.
It is related to the less of clear-water concrete experimental rig and test method in the technical data being disclosed at present, it is only above-mentioned Two patents.The problem of existing is as follows:" patent CN105891453A " can intuitively see number of bubbles using transparent vessel And distribution, but the situation of transparent template is not almost used in production, the device can not really react clear-water concrete Apparent mass after construction, because the influence of template material confrontation apparent mass of clear concrete is larger;" patent CN103848604A " is only A kind of clear-water concrete match ratio and a kind of simple assembled mould are only there is provided, specific test method is not provided with, Lack to apparent mass of clear concrete evaluation before construction, easily cause the waste of manpower and materials.
Utility model content
Main purpose of the present utility model is to overcome drawbacks described above of the prior art to be used to examine clear there is provided one kind The experimental rig of water coagulation soil apparent mass, the apparent mass for clear-water concrete before science, economy, rationally detection construction.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of experimental rig for being used to examine apparent mass of clear concrete, including:Two be put together by four pieces of templates The cuboid container of end opening;One openend of the cuboid container is placed in the level ground for the plastic sheeting that paves;It is described At least one piece has the longitudinal graduated scale axially set in four pieces of templates, and the template is located at the part of another openend With the horizontal graduated scale vertical with longitudinal graduated scale;
The cuboid container is built with clear-water concrete, and a vibrating head is inserted in the cuboid container to clear-water concrete Vibrated;The height of clear-water concrete is recorded by longitudinal graduated scale, by being shaken described in the horizontal graduated scale record The insertion position of dynamic rod;And by a time set record vibrating head vibrate when insertion duration, vibrate duration and extract duration.
In a preferred embodiment:Described template includes two blocks of A patterns plates and two pieces of Type B templates.
In a preferred embodiment:The A patterns plate has 4 split bolt eyelets, is the trisection line of longitudinal and transverse axis Intersection point;Type B template has 2 split bolt eyelets, is the top one in longitudinal axis quarterline and transverse axis center line intersection point and most Lower section one.
In a preferred embodiment:Also include the angle bar frame for being arranged at the cuboid container periphery;Described angle steel Support is made up of two angle steel and two split bolts, and the angle steel is equal leg angle;Respectively there is a split bolt at angle steel two ends Eyelet;The angle bar frame is individually fixed in the top, middle part and the position of bottom three of container side wall periphery, for fixing cuboid It is accommodating, mortar leakage prevention.
In a preferred embodiment:Described two blocks of A patterns plates and two pieces of Type B templates are consolidated by split bolt respectively Fixed, wherein two blocks of A patterns plates are fixed by 4 split bolts, two pieces of Type B templates are consolidated by two split bolts It is fixed.
In a preferred embodiment:Also include pvc pipe, described pvc pipe is sheathed on the split bolt positioned at cuboid Outside part in container.
In a preferred embodiment:The time set is stopwatch.
The utility model has the advantage of the evaluation of apparent mass of clear concrete before realizing to constructing, and determine difference Influence of the form of construction work to apparent mass of clear concrete, economical rationality is simple to operate.
It is mainly manifested in the following aspects:
1st, using the template with engineering construction phase same material, the processing assembling present apparatus reduces error;
2nd, there are longitudinally, laterally two scales in template, can intuitively embody the height of filling concrete and vibration every time Rod smashes slotting position;
3rd, device exterior bottom is filled with sand, can not only prevent bottom spillage, and simplifies device, is conveniently torn open Mould.
Brief description of the drawings
Fig. 1 is the structural perspective of the utility model preferred embodiment;
Fig. 2 is the link schematic diagram of Type B template and split bolt in the utility model preferred embodiment;
Fig. 3 is A patterns plate and the front view of Type B template in the utility model preferred embodiment;
Description of reference numerals:
1-A plastic boards;101-A plastic board eyelets;102- transverse direction scales;103- longitudinal directions scale;2-B types Plastics board;201-B plastic board eyelets;3- angle bar frames;4- split bolts;401- nuts;402- pads;5- Pvc pipe.
Embodiment
Embodiment of the present utility model is elaborated with reference to reference to accompanying drawing.
A kind of reference picture 1-3, experimental rig for being used to examine apparent mass of clear concrete is put together by four pieces of templates Both ends open cuboid container;One openend of the cuboid container is placed in the level ground for the plastic sheeting that paves; At least one piece has the longitudinal graduated scale 103 axially set in four pieces of templates, and the template is open positioned at another The part at end has the horizontal graduated scale 102 vertical with longitudinal graduated scale;In the present embodiment, longitudinal graduated scale 103, Horizontal graduated scale 102 is arranged on A pattern plates.
The cuboid container is built with clear-water concrete, and a vibrating head is inserted in the cuboid container to clear-water concrete Vibrated;The height of clear-water concrete is recorded by longitudinal graduated scale 103, is recorded by the horizontal graduated scale 102 The insertion position of the vibrating head;And insertion duration when vibrating head vibrates is recorded by a time set, vibrates and duration and pulls out Go out duration.
Described template is divided into two kinds of sizes, respectively A patterns plate 1 and Type B template 2, and A patterns plate 1 has 4 to drawing spiral shell Keyhole eye 101, is the intersection point of the trisection line of longitudinal and transverse axis, Type B template 2 has 2 split bolt eyelets 201, is the longitudinal axis four Upper and lower two in bisector and transverse axis center line intersection point;Split bolt eyelet aperture is 1.5cm-2cm;Will by split bolt 4 Two blocks of A pattern plates interfix, and two pieces of Type B templates interfix.The described diameter 1.3cm-1.8cm of split bolt 4, length It is divided into two kinds of 80cm and 50cm, prevents A patterns plate 1 and Type B template 2 from expanding.
Further, described angle bar frame 3 is made up of two angle steel and two split bolts 4, the angle steel for etc. corner Steel, length 80cm, length of side 4cm;Respectively there is a split bolt eyelet at the 3cm of angle steel two ends, aperture is 1.5cm-2cm;The angle steel Support 3 is individually fixed in the top, middle part and the position of bottom three of container front side, for fixing cuboid container, mortar leakage prevention.
Further, the described diameter 1.6cm-2.1cmcm of pvc pipe 5, length is divided into two kinds of 30cm and 60cm, the 30cm Long pvc pipe is enclosed on the split bolt of the 50cm inside container, and the pvc pipe 5 of the 60cm is enclosed on inside container On 80cm split bolt.
Above-mentioned experimental rig comprises the following steps in use:
The openend that the cuboid is housed is placed in outside the level ground for the plastic sheeting that paves, the cuboid container Side bottom surrounding is filled with sand, height 5cm-10cm, prevents bottom spillage;
By longitudinal graduated scale 103 in template inside cuboid container, the clear-water concrete height loaded every time is recorded;
Using vibrating head, described clear-water concrete is vibrated;
By the horizontal graduated scale 102 in cuboid container, the position of each vibrating head insertion is recorded;
By stopwatch, insertion duration when each vibrating head vibrates is recorded, vibrate duration and extraction duration.
By above-mentioned filling, end of vibrating, overlay film maintenance 2d after form removal, is observed and is calculated faced concrete surface Number of bubbles and area.
Embodiment 1
Clear-water concrete is loaded into experimental rig in two times, every time filling height 45cm, every layer is evenly distributed 3 and shakes a little, Each time of vibration shaken a little is 5-10s;
Embodiment 2
Clear-water concrete is loaded into experimental rig in two times, every time filling height 45cm, every layer is evenly distributed 3 and shakes a little, Each time of vibration shaken a little is 10-20s;
Embodiment 3
Clear-water concrete is loaded into experimental rig in two times, every time filling height 45cm, every layer is evenly distributed 3 and shakes a little, Each time of vibration shaken a little is 20-30s;
Embodiment 4
Clear-water concrete is loaded into experimental rig in two times, every time filling height 45cm, every layer is evenly distributed 6 and shakes a little, Each time of vibration shaken a little is 20-30s;
Embodiment 5
Clear-water concrete is loaded into experimental rig in two times, every time filling height 45cm, every layer is evenly distributed 9 and shakes a little, Each time of vibration shaken a little is 20-30s;
Embodiment 6
Clear-water concrete is loaded into experimental rig in three times, every time filling height 30cm, every layer is evenly distributed 9 and shakes a little, Each time of vibration shaken a little is 20-30s;
Numbering Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Embodiment 5 Embodiment 6
Stomata number 127 95 71 55 28 12
It is described above, only the utility model preferably embodiment, but design concept of the present utility model is not This is confined to, any one skilled in the art utilizes this design in the technical scope that the utility model is disclosed The change of unsubstantiality is carried out to the utility model, belongs to invade the behavior of the utility model protection domain.

Claims (7)

1. a kind of experimental rig for being used to examine apparent mass of clear concrete, it is characterised in that including:By four pieces of template splits Both ends open cuboid container;One openend of the cuboid container, which is placed in, paves plastic sheeting flatly Face;At least one piece has the longitudinal graduated scale axially set in four pieces of templates, and the template is open positioned at another The part at end has the horizontal graduated scale vertical with longitudinal graduated scale;
The cuboid container is built with clear-water concrete, and a vibrating head inserts in the cuboid container and clear-water concrete is carried out Vibrate;The height of clear-water concrete is recorded by longitudinal graduated scale, the vibrating head is recorded by the horizontal graduated scale Insertion position;And by a time set record vibrating head vibrate when insertion duration, vibrate duration and extract duration.
2. a kind of experimental rig for being used to examine apparent mass of clear concrete according to claim 1, it is characterised in that: Described template includes two blocks of A patterns plates and two pieces of Type B templates.
3. a kind of experimental rig for being used to examine apparent mass of clear concrete according to claim 2, it is characterised in that: The A patterns plate has 4 split bolt eyelets, is the intersection point of the trisection line of longitudinal and transverse axis;Type B template has 2 split bolts Eyelet, is the top one and the bottom one in longitudinal axis quarterline and transverse axis center line intersection point.
4. a kind of experimental rig for being used to examine apparent mass of clear concrete according to claim 3, it is characterised in that: Also include the angle bar frame for being arranged at the cuboid container periphery;Described angle bar frame is by two angle steel and two to drawing spiral shell Bolt is constituted, and the angle steel is equal leg angle;Respectively there is a split bolt eyelet at angle steel two ends;The angle bar frame is individually fixed in appearance Top, middle part and the position of bottom three of device sidewall periphery, are housed, mortar leakage prevention for fixing cuboid.
5. a kind of experimental rig for being used to examine apparent mass of clear concrete according to claim 4, it is characterised in that: Described two blocks of A patterns plates and two pieces of Type B templates are fixed by split bolt respectively, wherein two blocks of A patterns plates pass through 4 Split bolt is fixed, and two pieces of Type B templates are fixed by two split bolts.
6. a kind of experimental rig for being used to examine apparent mass of clear concrete according to claim 5, it is characterised in that: Also include pvc pipe, described pvc pipe is sheathed on the split bolt outside the part in cuboid container.
7. a kind of experimental rig for being used to examine apparent mass of clear concrete according to any one of claim 1-6, It is characterized in that:The time set is stopwatch.
CN201720250637.5U 2017-03-15 2017-03-15 A kind of experimental rig for being used to examine apparent mass of clear concrete Expired - Fee Related CN206618755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720250637.5U CN206618755U (en) 2017-03-15 2017-03-15 A kind of experimental rig for being used to examine apparent mass of clear concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720250637.5U CN206618755U (en) 2017-03-15 2017-03-15 A kind of experimental rig for being used to examine apparent mass of clear concrete

Publications (1)

Publication Number Publication Date
CN206618755U true CN206618755U (en) 2017-11-07

Family

ID=60232561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720250637.5U Expired - Fee Related CN206618755U (en) 2017-03-15 2017-03-15 A kind of experimental rig for being used to examine apparent mass of clear concrete

Country Status (1)

Country Link
CN (1) CN206618755U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108426826A (en) * 2018-06-15 2018-08-21 中国电建集团成都勘测设计研究院有限公司 Experimental rig for concrete vibrating quality testing
CN109297785A (en) * 2018-12-04 2019-02-01 中交第三航务工程局有限公司 A kind of device and method for making clear-water concrete ocular estimate sample

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108426826A (en) * 2018-06-15 2018-08-21 中国电建集团成都勘测设计研究院有限公司 Experimental rig for concrete vibrating quality testing
CN109297785A (en) * 2018-12-04 2019-02-01 中交第三航务工程局有限公司 A kind of device and method for making clear-water concrete ocular estimate sample

Similar Documents

Publication Publication Date Title
CN206618755U (en) A kind of experimental rig for being used to examine apparent mass of clear concrete
CN105510558B (en) Trigger the simulation test device of karst collapse applied to simulation karst area Subway Vibration
CN203025185U (en) Foundation pit model test device
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN208621393U (en) A kind of concrete sample mold of adjustable dimension
CN107443566A (en) The preparation method of prefabricated constructional column formwork
CN105089184B (en) Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork
CN209179785U (en) A kind of new type formwork for Middle Wall of Multi-Arch Highway Tunnel concreting
CN107165411A (en) A kind of Constructional Col-umn Construction technique
CN102275221B (en) Concrete tube pile forming die and concrete tube pile forming method
CN208009273U (en) A kind of railroad bridge pier stud vertical reinforcement device for positioning and securing
CN206627344U (en) Concrete sample mould
CN210791388U (en) Cement product forming machine
CN208363609U (en) A kind of constructional column assembly type can have enough to meet the need aluminum alloy pattern plate
CN112326402A (en) Device and method for manufacturing cylindrical layered rock model
CN209504437U (en) A kind of splicing concrete mold of size adjustable
CN105155474B (en) Chute construction shaper and the construction method of chute
CN202656270U (en) Molding modeling mould for concrete prefabricated component
CN111321750B (en) Cushion-free raft independent foundation tool type concrete tire mold for inclined and uneven base layer
CN205333379U (en) Artifical preparation designability soil curing means
CN202528312U (en) Concrete tubular pile forming die
CN106985259A (en) A kind of foamed concrete mould of vibration compacting
CN204736297U (en) Cable duct apron prefab -form
CN206840402U (en) A kind of special discharge bucket of prefabricated highway earth shoulder shoulder protector plate
CN212372387U (en) Simple concrete prefabricated modular mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107

CF01 Termination of patent right due to non-payment of annual fee