CN206616939U - Water pressure test protecting wall - Google Patents

Water pressure test protecting wall Download PDF

Info

Publication number
CN206616939U
CN206616939U CN201720227244.2U CN201720227244U CN206616939U CN 206616939 U CN206616939 U CN 206616939U CN 201720227244 U CN201720227244 U CN 201720227244U CN 206616939 U CN206616939 U CN 206616939U
Authority
CN
China
Prior art keywords
steel
water pressure
pressure test
angle bar
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720227244.2U
Other languages
Chinese (zh)
Inventor
赵红兵
曾友林
马王哲
曾进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
United Engineers Ltd In China
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN201720227244.2U priority Critical patent/CN206616939U/en
Application granted granted Critical
Publication of CN206616939U publication Critical patent/CN206616939U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of water pressure test protecting wall, brick wall body including being arranged at hydrostatic test device periphery, plank is installed with the inside of the brick wall body, outside spacers are provided with multiple vertical steel columns, lower lateral channel-section steel and upper lateral channel-section steel are at least welded between two adjacent vertical steel columns, shoulder guard is welded on lower lateral channel-section steel and upper lateral channel-section steel lateral surface, welded with upper lateral angle bar the inner of steel bridging rod member, multiple steel connecting rods through its wall are interval with the bottom of brick wall body, welded with lower lateral angle bar the inner of steel connecting rod, welded with the vertical steel column outer end of steel connecting rod, plank is arranged between lower lateral angle bar and upper lateral angle bar.Water pressure test protecting wall of the present utility model, it is simple in construction and very firm, it can effectively stop the current of water pressure test ejection and more huge impact accidental in the water pressure test can be prevented, service life is long.

Description

Water pressure test protecting wall
Technical field
The utility model is related to the protective equipment of hydrostatic test, especially a kind of water pressure test protecting wall.
Background technology
The water pressure test is applied than wide in the industrial production, for example, boiler valve, pressure piping etc. some in high pressure , it is necessary to examine whether it has leakage under high pressure through the water pressure test after the completion of the part of lower work is processed.Applicant has obtained The utility model patent of the Patent No. 201520544010.1 of mandate, discloses one kind《Boiler valve hydrostatic test is filled Put》.
There is very big danger in the water pressure test.Because hydraulic pressure is larger(Generally 0.3-0.8MPa)If be tested Part is leaked, and High-Pressure Water will be sprayed at crack.For the safety of periphery personnel, this was accomplished by hydrostatic test week Setting protecting wall is enclosed, the High-Pressure Water sprayed to block from crack.
Utility model content
The purpose of this utility model is to provide a kind of water pressure test protecting wall, simple in construction and very firm, can be effective Stop the current that the water pressure test sprays, shock absorbing, it is to avoid brick wall body is damaged, and can prevent in the water pressure test it is accidental more For huge impact, it can also protect and be broken by extraneous living-article or hanging device, service life is long.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of water pressure test protecting wall, including the brick wall body of hydrostatic test device periphery is arranged at, the brick wall body It is the walls concrete layer for being embedded in underground below, plank is installed with the inside of brick wall body, between the outside of brick wall body It is welded on every the lower end provided with multiple vertical steel columns, the vertical steel column on steel built-in fitting, the steel built-in fitting is embedded in In built-in fitting concrete block, the built-in fitting concrete block is structure as a whole with walls concrete layer, and adjacent two are vertical Lower lateral channel-section steel and upper lateral channel-section steel are at least welded between steel column, shoulder guard is welded in the lower lateral channel-section steel and upper lateral On channel-section steel lateral surface, multiple steel bridging rod members are interval with the top of the brick wall body, steel bridges the outer end of rod member Welded with the vertical steel column, the inner of steel bridging rod member is welded with upper lateral angle bar, between the bottom of the brick wall body Welded every the inner and lower lateral angle bar provided with multiple steel connecting rods through its wall, the steel connecting rod, steel The outer end of connecting rod processed is welded with the vertical steel column, the bending edge of the lower lateral angle bar upward, the upper lateral angle bar Bending edge down, the plank is arranged between lower lateral angle bar and upper lateral angle bar.
Walls concrete bed course is arranged below in walls concrete layer, is arranged below in the built-in fitting concrete block Built-in fitting concrete cushion, the built-in fitting concrete cushion is structure as a whole with walls concrete bed course.
The plank is the plank Jing Guo preservative treatment.
The thickness of the brick wall body is 240mm, is highly 2000mm, and the thickness of the shoulder guard is 4mm, the wood The thickness of plate is 40mm.
On the brick wall body be provided with least one steel casement door, the thickness of steel door-plate used in the steel casement door be more than or Equal to 10mm.
Gutter is provided between the brick wall body and hydrostatic test device.
The beneficial effects of the utility model are compared with prior art:Due to using above-mentioned technical proposal, in brick wall body Inner side be installed with plank, the plank is arranged between lower lateral angle bar and upper lateral angle bar, the lower end of the vertical steel column It is welded on steel built-in fitting, lower lateral channel-section steel and upper lateral channel-section steel is at least welded between two adjacent vertical steel columns, protects Steel plate is welded on the lower lateral channel-section steel and upper lateral channel-section steel lateral surface, the outer end of steel bridging rod member and the vertical steel column Welding, the inner of steel bridging rod member is welded with upper lateral angle bar, and multiple pass through is interval with the bottom of the brick wall body The steel connecting rod of its wall, the inner and the lower lateral angle bar of the steel connecting rod are welded, outside steel connecting rod End is welded with the vertical steel column, the water pressure test protecting wall of this structure, each steel component firmly weld to be formed one it is whole Body, it is simple in construction and very firm;The plank of inner side can effectively stop the water pressure test spray current, shock absorbing, Avoid brick wall body damaged, and because being arranged between lower lateral angle bar and upper lateral angle bar, have left ground, thus will not Slowly corroded by damp ground;The shoulder guard in outside can prevent more huge impact accidental in the water pressure test, Brick wall body can be protected to be broken by extraneous living-article or hanging device, shoulder guard be arranged on outside completely with the moist ring in inner side Border isolates, and can effectively prevent its corrosion, increase the service life.
Further beneficial effect is:Walls concrete bed course is arranged below in walls concrete layer, described pre- Built-in fitting concrete cushion is arranged below in embedded part concrete block, and this structure can make it that the basis of brick wall body is more firm.Institute Plank is stated for plank Jing Guo preservative treatment, so can preferably waterproof, prevent rotten.Because the hydraulic pressure of this composite construction is tried Testing protecting wall has the effect of stronger apparatus with shock absorbing, so, it is sufficient that thickness of the shoulder guard is 4mm, greatly Save steel greatly.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 cutaway enlarged detail of the A portions at middle part;
Fig. 3 is Fig. 2 A1-A1 to cut-away illustration;
Fig. 4 is Fig. 2 A2-A2 to cut-away illustration.
Embodiment
In order that the technical solution of the utility model becomes apparent from, below in conjunction with accompanying drawing 1 to 4, the utility model is carried out Describe in detail.It should be appreciated that the embodiment described in this specification is just for the sake of explaining the utility model, and Be not configured to limit protection domain of the present utility model.
The utility model is a kind of water pressure test protecting wall, including is arranged at the brick wall body of the periphery of hydrostatic test device 0 1, it is the walls concrete layer 2 for being embedded in underground below the brick wall body 1, plank 4 is installed with the inner side of brick wall body 1, Multiple vertical steel columns 5 are provided with the outside spacers of brick wall body 1, the lower end of the vertical steel column 5 is welded on steel built-in fitting 51 On, the steel built-in fitting 51 is embedded in built-in fitting concrete block 2 ', and the built-in fitting concrete block 2 ' is mixed with the wall Solidifying soil layer 2 is structure as a whole, and lower lateral channel-section steel 6 and upper lateral channel-section steel 6 ' are at least welded between two adjacent vertical steel columns 5, is prevented Shield steel plate 7 is welded on the lower lateral channel-section steel 6 and the lateral surface of upper lateral channel-section steel 6 ', at the top interval of the brick wall body 1 Rod member 8 is bridged provided with multiple steels, the outer end of steel bridging rod member 8 is welded with the vertical steel column 5, steel bridging rod member 8 It is inner to be welded with upper lateral angle bar 9 ', multiple steels through its wall are interval with the bottom of the brick wall body 1 and are connected Rod member 8 ', the inner of the steel connecting rod 8 ' is welded with lower lateral angle bar 9, and the outer end of steel connecting rod 8 ' is erected with described Straight steel column 5 is welded, the bending edge of the lower lateral angle bar 9 upward, the bending edge of the upper lateral angle bar 9 ' down, the plank 4 are arranged between lower lateral angle bar 9 and upper lateral angle bar 9 '.
Preferably, walls concrete bed course 3 is arranged below in walls concrete layer 2, in the built-in fitting coagulation Built-in fitting concrete cushion 3 ' is arranged below in soil block 2 ', and the built-in fitting concrete cushion 3 ' is one with walls concrete bed course 3 Body structure.The plank 4 is the plank 4 Jing Guo preservative treatment, and the method for anticorrosion treatment of plank is a lot, for example《A kind of timber or The method of bamboo wood preservative treatment》Patent No. 201010198344.X.Preferably, the thickness of the brick wall body 1 is 240mm, Highly it is 2000mm;The thickness of the shoulder guard 7 is 4mm;The thickness of the plank 4 is 40mm.For easy access, in institute Brick wall body 1 is stated provided with least one steel casement door 10, the thickness of steel door-plate is more than or equal to used in the steel casement door 10 10mm.For draining, gutter 11 is provided between the brick wall body 1 and hydrostatic test device 0, the water in gutter flows into storage Pond, may be reused by filtration, purification.
In actual applications, the water pressure test protecting wall can surround rectangle, can also surround circular or other shapes Shape;When having wall around hydrostatic test device 0, can also accordingly it be transformed using existing wall.

Claims (6)

1. a kind of water pressure test protecting wall, including it is arranged at hydrostatic test device(0)The brick wall body of periphery(1), the masonry walls Body(1)Below be embedded in underground walls concrete layer(2), it is characterised in that:In brick wall body(1)Inner side be installed with Plank(4), in brick wall body(1)Outside spacers be provided with multiple vertical steel columns(5), the vertical steel column(5)Lower end welding In steel built-in fitting(51)On, the steel built-in fitting(51)It is embedded in built-in fitting concrete block(2’)Interior, the built-in fitting is mixed Solidifying soil block(2’)With walls concrete layer(2)It is structure as a whole, two adjacent vertical steel columns(5)Between be at least welded with down Portion's translot steel(6)With upper lateral channel-section steel(6’), shoulder guard(7)It is welded in the lower lateral channel-section steel(6)With upper lateral channel-section steel (6’)On lateral surface, in the brick wall body(1)Top be interval with multiple steels bridging rod members(8), steel bridging rod member (8)Outer end and the vertical steel column(5)Welding, steel bridging rod member(8)The inner with upper lateral angle bar(9’)Welding, in institute State brick wall body(1)Bottom be interval with multiple steel connecting rods through its wall(8’), the steel connecting rod (8’)The inner with lower lateral angle bar(9)Welding, steel connecting rod(8’)Outer end and the vertical steel column(5)Welding, institute State lower lateral angle bar(9)Bending edge upward, the upper lateral angle bar(9’)Bending edge down, the plank(4)It is arranged in Lower lateral angle bar(9)With upper lateral angle bar(9’)Between.
2. water pressure test protecting wall according to claim 1, it is characterised in that:In walls concrete layer(2)Below Provided with walls concrete bed course(3), in the built-in fitting concrete block(2’)Built-in fitting concrete cushion is arranged below(3’), institute State built-in fitting concrete cushion(3’)With walls concrete bed course(3)It is structure as a whole.
3. water pressure test protecting wall according to claim 1, it is characterised in that:;The plank(4)To pass through preservative treatment Plank(4).
4. the water pressure test protecting wall according to any claim in claims 1 to 3, it is characterised in that:It is described brick Wall(1)Thickness be 240mm, be highly 2000mm;The shoulder guard(7)Thickness be 4mm;The plank(4)Thickness Spend for 40mm.
5. the water pressure test protecting wall according to any claim in claims 1 to 3, it is characterised in that:In the brick Build a wall body(1)It is provided with least one steel casement door(10), the steel casement door(10)The thickness of used steel door-plate is more than or equal to 10mm。
6. the water pressure test protecting wall according to any claim in claims 1 to 3, it is characterised in that:In the brick Build a wall body(1)With hydrostatic test device(0)Between be provided with gutter(11).
CN201720227244.2U 2017-03-09 2017-03-09 Water pressure test protecting wall Withdrawn - After Issue CN206616939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720227244.2U CN206616939U (en) 2017-03-09 2017-03-09 Water pressure test protecting wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720227244.2U CN206616939U (en) 2017-03-09 2017-03-09 Water pressure test protecting wall

Publications (1)

Publication Number Publication Date
CN206616939U true CN206616939U (en) 2017-11-07

Family

ID=60232128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720227244.2U Withdrawn - After Issue CN206616939U (en) 2017-03-09 2017-03-09 Water pressure test protecting wall

Country Status (1)

Country Link
CN (1) CN206616939U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884572A (en) * 2017-03-09 2017-06-23 中国联合工程公司 Water pressure test protecting wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884572A (en) * 2017-03-09 2017-06-23 中国联合工程公司 Water pressure test protecting wall
CN106884572B (en) * 2017-03-09 2022-05-27 中国联合工程有限公司 Hydraulic test protective wall

Similar Documents

Publication Publication Date Title
CN204386197U (en) The horizontal protective platform of a kind of Super High alien invasion steel work
CN206616939U (en) Water pressure test protecting wall
CN207620476U (en) A kind of waveform soft steel shearing damper and frame column
CN208137139U (en) A kind of multistage energy consumption shock resistance shock isolating pedestal
KR101362746B1 (en) Cylindrical storage tank
CN206593812U (en) Water pressure test guard system
CN106840545A (en) Water pressure test guard system
CN106884572A (en) Water pressure test protecting wall
CN108396663A (en) Bridge pier prosthetic device based on light-duty prestressing force stainless steel sheath and restorative procedure
CN105926532A (en) Technology for constructing shoulder pole beam reversely-suspended bottom on abutment
CN207048356U (en) Building foundation pit construction safety barrier
CN105090677A (en) Leakage stoppage method for root leakage of storage tank
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN204529157U (en) Tower crane attached wall service platform
CN204435833U (en) Operation platform wall-attached supporting seat
CN107013049A (en) A kind of method that new faying face reinforces beam column class component
CN208395687U (en) Bridge pier prosthetic device based on light-duty prestressing force stainless steel sheath
CN106593449B (en) The vertical breakage borehole wall repairs multiplexed platform and its construction method
CN203716115U (en) Structural joint for stilling pool bottom plate of discharge structure
CN208105033U (en) A kind of modified shock resistance shock isolating pedestal
CN205000691U (en) Novel steel construction factory building that takes precautions against earthquakes
CN107448001A (en) Protect the Component composition of the self-contained structural system of timber structure beam column and its apply method
CN213014691U (en) Building steel structure with good waterproof effect
CN212452985U (en) Same-floor drainage prefabricated steel sleeve of integrated floor system
CN102926341A (en) Deep foundation fixed collision post system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: The city of Hangzhou city of Zhejiang Province, 310022 Stonebridge Road No. 338

Patentee after: United Engineers Ltd in China

Address before: The city of Hangzhou city of Zhejiang Province, 310022 Stonebridge Road No. 338

Patentee before: China Lianhe Engineering Co., Ltd., China

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171107

Effective date of abandoning: 20220527

AV01 Patent right actively abandoned

Granted publication date: 20171107

Effective date of abandoning: 20220527