CN206607875U - A kind of constructional column dustpan mouthful - Google Patents

A kind of constructional column dustpan mouthful Download PDF

Info

Publication number
CN206607875U
CN206607875U CN201720278236.0U CN201720278236U CN206607875U CN 206607875 U CN206607875 U CN 206607875U CN 201720278236 U CN201720278236 U CN 201720278236U CN 206607875 U CN206607875 U CN 206607875U
Authority
CN
China
Prior art keywords
plate
dustpan
plates
transverse
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720278236.0U
Other languages
Chinese (zh)
Inventor
韦棚藉
刘超
张志明
丁代兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201720278236.0U priority Critical patent/CN206607875U/en
Application granted granted Critical
Publication of CN206607875U publication Critical patent/CN206607875U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种构造柱簸箕口,包括两块固定板、两块第一连接板、插板及簸箕槽;每块固定板包括第一横向板、第二横向板及两侧分别连接所述第一横向板和第二横向板的第二连接板,每块第一连接板的两端均分别与所述两块第一横向板固定连接,每块固定板的第二横向板均设置有两块带孔耳板,所述簸箕槽包括槽体和两块第三连接板,所述每块第三连接板均设置有两个与所述耳板相对应的耳板孔,所述插板可抽插于所述两块第一横向板与构造柱模板形成的空隙。本实用新型结构简单,易于实现,能保证构造柱混凝土成型质量,不需要后期剔除簸箕口的混凝土,节约材料。

This utility model discloses a hopper-shaped opening for a structural column, comprising two fixed plates, two first connecting plates, an insert plate, and a hopper groove. Each fixed plate includes a first transverse plate, a second transverse plate, and second connecting plates on both sides respectively connecting the first and second transverse plates. Both ends of each first connecting plate are fixedly connected to the two first transverse plates. Each fixed plate's second transverse plate has two perforated ear plates. The hopper groove includes a groove body and two third connecting plates. Each third connecting plate has two ear plate holes corresponding to the ear plates. The insert plate can be inserted into the gap formed between the two first transverse plates and the structural column template. This utility model has a simple structure, is easy to implement, ensures the quality of the structural column concrete molding, eliminates the need for later removal of the concrete from the hopper opening, and saves materials.

Description

一种构造柱簸箕口A structure column dustpan mouth

技术领域technical field

本实用新型属于建筑二次结构施工领域,尤其涉及一种构造柱簸箕口。The utility model belongs to the field of building secondary structure construction, in particular to a construction column dustpan opening.

背景技术Background technique

在建筑工程施工中,在构造柱混凝土浇筑之前都是在构造柱顶部设置一个固定的簸箕口,混凝土通过簸箕口流入构造柱,混凝土成型后拆除簸箕口和剔掉簸箕口的混凝土。这种方法导致簸箕口混凝土的浪费,也浪费了劳动力,同时也会造成环境污染。In building construction, before the construction column concrete is poured, a fixed dustpan mouth is set at the top of the construction column, and the concrete flows into the construction column through the dustpan mouth, and the dustpan mouth is removed after the concrete is formed and the concrete of the dustpan mouth is removed. This method causes the waste of dustpan mouth concrete, also wasted labor force, also can cause environmental pollution simultaneously.

因此,需要对现有构造柱簸箕口进行改进,使其结构简单、方便使用、可重复利用,并且不会浪费混凝土,经济环保。Therefore, it is necessary to improve the dustpan mouth of the existing construction column to make it simple in structure, convenient to use, reusable, and not waste concrete, economical and environmentally friendly.

实用新型内容Utility model content

本实用新型为解决上述技术问题提供一种结构简单且循环利用率高的构造柱簸箕口。The utility model provides a construction post dustpan mouth with simple structure and high recycling rate for solving the above technical problems.

本实用新型所要解决的技术问题是通过以下技术方案来实现的:The technical problem to be solved by the utility model is achieved through the following technical solutions:

一种构造柱簸箕口,包括两块固定板、两块第一连接板、插板及簸箕槽;每块固定板包括第一横向板、第二横向板及两侧分别连接所述第一横向板和第二横向板的第二连接板,每块第一连接板的两端均分别与所述两块第一横向板固定连接,每块固定板的第二横向板均设置有两块带孔耳板,所述簸箕槽包括槽体和两块第三连接板,所述每块第三连接板均设置有两个与所述耳板相对应的耳板孔,所述插板可抽插于所述两块第一横向板与构造柱模板形成的空隙。A construction column dustpan mouth, comprising two fixing plates, two first connecting plates, an inserting plate and a dustpan groove; each fixing plate comprises a first transverse plate, a second transverse plate and two sides connected to the first transverse plate respectively plate and the second connecting plate of the second transverse plate, the two ends of each first connecting plate are respectively fixedly connected with the two first transverse plates, and the second transverse plate of each fixed plate is provided with two strips Ear plates with holes, the dustpan groove includes a tank body and two third connecting plates, each of the third connecting plates is provided with two ear plate holes corresponding to the ear plates, and the inserting plate can be withdrawn It is inserted into the gap formed by the two first transverse plates and the formwork of the structural column.

上述方案中,每块第二横向板上设置有多个定位孔。In the above solution, each second transverse plate is provided with a plurality of positioning holes.

上述方案中,所述耳板孔为长方形。In the above solution, the ear plate hole is rectangular.

上述方案中,所述构造柱簸箕口还包括固定件,所述固定件用于将耳板穿过所述耳板孔后锁住耳板从而固定所述簸箕槽。In the above solution, the dustpan opening of the construction column further includes a fixing part, and the fixing part is used to lock the ear plate after passing the ear plate through the ear plate hole, so as to fix the dustpan groove.

上述方案中,所述固定件为J型钢筋。In the above solution, the fixing member is a J-shaped steel bar.

上述方案中,所述插板为L形。In the above solution, the inserting board is L-shaped.

本实用新型的有益效果是:本实用新型的构造柱簸箕口,通过定位孔将两块固定板钉在构造柱模板上,带孔耳板穿过用钢板焊接成的簸箕槽的耳板孔,用J型钢筋将两者固定,插板在构造柱混凝土振捣密实后向上插入固定板与模板形成的空隙中将簸箕口内的混凝土与构造柱混凝土分开,卸下簸箕槽将混凝土倒出重新使用。本实用新型结构简单,易于实现,能保证构造柱混凝土成型质量,不需要后期剔除簸箕口的混凝土,节约材料。The beneficial effects of the utility model are: the construction column dustpan mouth of the utility model, two fixing plates are nailed on the construction column template through the positioning holes, the ear plates with holes pass through the ear plate holes of the dustpan groove welded by steel plates, Fix the two with J-shaped steel bars. After the concrete of the construction column is vibrated and compacted, the inserting plate is inserted upward into the gap formed by the fixing plate and the formwork to separate the concrete in the dustpan mouth from the concrete of the construction column. Remove the dustpan groove and pour out the concrete for reuse. . The utility model has a simple structure, is easy to realize, can ensure the quality of the concrete forming of the structural column, does not need to remove the concrete at the dustpan mouth in the later stage, and saves materials.

附图说明Description of drawings

图1为本实用新型的构造柱簸箕口结构示意图。Fig. 1 is a structural schematic diagram of the dustpan opening of the structural column of the present invention.

图2为图1中的两块固定板和两块第一连接板的结构示意图。Fig. 2 is a structural schematic diagram of the two fixing plates and the two first connecting plates in Fig. 1 .

图3为图1中的簸箕槽的结构示意图。Fig. 3 is a structural schematic diagram of the dustpan groove in Fig. 1 .

图4为图1中的固定板的局部放大图。FIG. 4 is a partially enlarged view of the fixing plate in FIG. 1 .

具体实施方式detailed description

如图1至图4所示,其为本实用新型实施例提供的一种构造柱簸箕口,包括两块固定板、两块第一连接板4、插板5及簸箕槽6。As shown in Figures 1 to 4, it is a construction column dustpan opening provided by the embodiment of the present invention, including two fixing plates, two first connecting plates 4, an inserting plate 5 and a dustpan groove 6.

每块固定板包括第一横向板1、第二横向板2及两侧分别连接第一横向板1和第二横向板2的第二连接板3。每块第一连接板4的两端均分别与两块第一横向板1固定连接,每块固定板的第二横向板2均设置有两块带孔耳板7。每块第二横向板2上设置有多个定位孔11。Each fixing plate includes a first transverse plate 1 , a second transverse plate 2 and a second connecting plate 3 connecting the first transverse plate 1 and the second transverse plate 2 on both sides respectively. Both ends of each first connecting plate 4 are respectively fixedly connected with two first transverse plates 1 , and the second transverse plate 2 of each fixed plate is provided with two ear plates 7 with holes. Each second transverse plate 2 is provided with a plurality of positioning holes 11 .

簸箕槽6包括槽体8和两块第三连接板9。每块第三连接板9均设置有两个与耳板7相对应的耳板孔10。在本实施例中,耳板孔10为长方形。The dustpan groove 6 includes a groove body 8 and two third connecting plates 9 . Each third connecting plate 9 is provided with two ear plate holes 10 corresponding to the ear plates 7 . In this embodiment, the ear plate hole 10 is rectangular.

插板5可抽插于两块第一横向板1与构造柱模板形成的空隙。在本实施例中,插板为L形。The inserting plate 5 can be inserted into the gap formed by the two first transverse plates 1 and the formwork of the structural column. In this embodiment, the board is L-shaped.

构造柱簸箕口还包括固定件12。固定件12用于将耳板7穿过耳板孔10后锁住耳板7从而固定所述簸箕槽6。在本实施例中,固定件12为J型钢筋。耳板孔10设孔的大小与J型钢筋的大小一致。The dustpan opening of the construction column also includes a fixing part 12 . The fixing part 12 is used for locking the ear plate 7 after passing the ear plate 7 through the ear plate hole 10 so as to fix the dustpan groove 6 . In this embodiment, the fixing member 12 is a J-shaped steel bar. Ear plate hole 10 establishes the size of the hole to be consistent with the size of the J-shaped steel bar.

在本实施例中,两块固定板和两块第一连接板4焊接形成的整体通过钉子穿过定位孔11钉在构造柱模板顶部,带孔耳板7穿过耳板孔10通过J型钢筋12固定在一起,当混凝土振捣密实后,向上插入L型插板5,取下簸箕槽6,倒出里面的混凝土。In this embodiment, the whole formed by welding the two fixing plates and the two first connecting plates 4 is nailed to the top of the construction column formwork through the positioning holes 11 through the nails, and the ear plates 7 with holes pass through the ear plate holes 10 through the J-shaped Reinforcement bar 12 is fixed together, and after concrete vibrates densely, inserts L-shaped flashboard 5 upwards, takes off dustpan groove 6, pours out the concrete inside.

Claims (6)

1. a kind of constructional column dustpan mouthful, it is characterised in that including two pieces of fixed plates, two piece of first connecting plate, plate and dustpan groove; Every piece of fixed plate includes the first transverse plate, the second transverse plate and both sides and connects first transverse plate and the second transverse plate respectively Second connecting plate, the two ends of every piece of first connecting plate are respectively fixedly connected with two piece of first transverse plate, every piece of fixed plate The second transverse plate be provided with two pieces of otic placodes with holes, the dustpan groove includes cell body and two piece of the 3rd connecting plate, described every piece 3rd connecting plate is provided with two lug plate holes corresponding with the otic placode, and the plate can pull and push horizontal in described two piece first To plate and the space of construction column template formation.
2. constructional column dustpan mouthful as claimed in claim 1, it is characterised in that be provided with multiple positioning on every piece of second transverse plate Hole.
3. constructional column dustpan mouthful as claimed in claim 1, it is characterised in that the lug plate holes are rectangle.
4. constructional column dustpan mouthful as claimed in claim 1, it is characterised in that the constructional column dustpan mouth also includes fixture, institute Stating fixture is used for otic placode through the lug plate holes finger lock otic placode so as to the fixed dustpan groove.
5. constructional column dustpan mouthful as claimed in claim 4, it is characterised in that the fixture is J section steel muscle.
6. constructional column dustpan mouthful as claimed in claim 1, it is characterised in that the plate is L-shaped.
CN201720278236.0U 2017-03-21 2017-03-21 A kind of constructional column dustpan mouthful Expired - Fee Related CN206607875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720278236.0U CN206607875U (en) 2017-03-21 2017-03-21 A kind of constructional column dustpan mouthful

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720278236.0U CN206607875U (en) 2017-03-21 2017-03-21 A kind of constructional column dustpan mouthful

Publications (1)

Publication Number Publication Date
CN206607875U true CN206607875U (en) 2017-11-03

Family

ID=60165460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720278236.0U Expired - Fee Related CN206607875U (en) 2017-03-21 2017-03-21 A kind of constructional column dustpan mouthful

Country Status (1)

Country Link
CN (1) CN206607875U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724674A (en) * 2017-12-04 2018-02-23 上海宝冶集团有限公司 A kind of constructional column pours bell-mouth structure of air and its construction method
CN108678371A (en) * 2018-06-27 2018-10-19 中建四局第五建筑工程有限公司 One kind can turnover type constructional column feeding port
CN108798004A (en) * 2018-06-28 2018-11-13 中国建筑局(集团)有限公司 Exempt from to pick constructional column of chisel and pour template subassembly
CN109723215A (en) * 2017-10-31 2019-05-07 上海宝冶集团有限公司 Constructional column finished product dustpan mouth construction method
CN111441589A (en) * 2020-04-01 2020-07-24 中建四局第六建设有限公司 Secondary pouring concrete combined launder
CN112431417A (en) * 2019-08-25 2021-03-02 河北建设集团股份有限公司 Constructional column concrete design pouring device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723215A (en) * 2017-10-31 2019-05-07 上海宝冶集团有限公司 Constructional column finished product dustpan mouth construction method
CN107724674A (en) * 2017-12-04 2018-02-23 上海宝冶集团有限公司 A kind of constructional column pours bell-mouth structure of air and its construction method
CN108678371A (en) * 2018-06-27 2018-10-19 中建四局第五建筑工程有限公司 One kind can turnover type constructional column feeding port
CN108798004A (en) * 2018-06-28 2018-11-13 中国建筑局(集团)有限公司 Exempt from to pick constructional column of chisel and pour template subassembly
CN112431417A (en) * 2019-08-25 2021-03-02 河北建设集团股份有限公司 Constructional column concrete design pouring device
CN111441589A (en) * 2020-04-01 2020-07-24 中建四局第六建设有限公司 Secondary pouring concrete combined launder

Similar Documents

Publication Publication Date Title
CN205259600U (en) Template is pour to high -rise building constructional column
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN203603466U (en) Improved simple constructional column pouring funnel
CN105525750A (en) Construction method of door lintel and aluminum alloy door lintel formwork
CN105569333A (en) Construction formwork of cantilever layer outer wall preformed hole, and construction method
CN202644992U (en) Movable die for reserving hole in box body or wellhead for building
CN203603467U (en) Simple pouring hopper of constructional column
CN105178593B (en) Fill the mold method and structure of wall construction post
CN217782883U (en) Inclined plane concrete placement device
CN211622610U (en) Sizing constructional column dustpan opening device
CN205444903U (en) Shear force wall wind -tunnel bush board
CN207685853U (en) Anti-floating is exempted to tear type concrete equipment basis hole to be provided template open
CN207863468U (en) A kind of concrete beam cast mold
CN205857707U (en) Stair step constructing device
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN206784941U (en) The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate
CN205238239U (en) Concrete test die convenient for demoulding
CN205777476U (en) One is collapsible recycles keyslot formwork
CN204402018U (en) Steel formwork for staged concrete construction
CN204225480U (en) Building frame construction post beam boundary section pulls and pushes plate device
CN203603559U (en) Funnel inclined-wall lining combined steel plate capable of being used as formwork
CN215702615U (en) Can dismantle reuse's fixed fastener of mould reinforcing bar
CN210508401U (en) Pull rod assembly for building shuttering
CN209425797U (en) A kind of reinforcing bar fixed plate for concrete tubular pile production
CN206110424U (en) Floor convenient to dismantle template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

CF01 Termination of patent right due to non-payment of annual fee