CN206784941U - The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate - Google Patents
The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate Download PDFInfo
- Publication number
- CN206784941U CN206784941U CN201720466408.7U CN201720466408U CN206784941U CN 206784941 U CN206784941 U CN 206784941U CN 201720466408 U CN201720466408 U CN 201720466408U CN 206784941 U CN206784941 U CN 206784941U
- Authority
- CN
- China
- Prior art keywords
- pulling
- piece
- sleeve pipe
- construction
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate, including pulling-on piece, pulling-on piece sleeve pipe, inner template and exterior sheathing, pulling-on piece bushing outer surface sets at least one waling along its length, pulling-on piece bushing outer surface is provided with some cross reinforcings along short transverse, and cross reinforcing and waling form criss-cross construction;The both sides on pulling-on piece surface are respectively arranged with the sphere projection in pulling-on piece sleeve pipe, and the sphere projection of pulling-on piece both sides is symmetrical arranged on pulling-on piece, and sphere projection is located at the medium position of pulling-on piece in the height direction.The both sides on pulling-on piece surface are respectively arranged with the ribs on the outside of lock hole.The utility model have it is convenient and swift, more effortlessly take out pulling-on piece and lock hole is also kept intact after pulling-on piece is used for multiple times, it is ensured that inner template and exterior sheathing spacing keep constant, and the thickness of wall body uniformity after pouring is more preferable.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction wall construction aluminum alloy pattern plate is with quick detachable
Pulling-on piece location structure.
Background technology
Patent No. 201320045608.7 disclose it is a kind of be used to build disposal wallboard pulling-on piece on aluminum alloy pattern plate, it is this
Pulling-on piece is being poured into wall, and the part to be fractureed outside v-notch is also thrown away as building waste, and this pulling-on piece is in wall
Dosage is huge during pouring construction, due to that can not reuse, virtually also increases construction cost.Patent No.
201420434166.X discloses the assembling structure of a kind of building template and pulling-on piece component, and the pulling-on piece sleeve pipe used is poured into wall
In vivo, pulling-on piece therein is can to rush in pulling-on piece sleeve pipe to extract out, is repeatedly used, but this structure is in actual mechanical process
Following defect be present:Pulling-on piece sleeve pipe is thin-wall part, and in casting concrete, jolt ramming and process of setting are carried out to concrete mortar
In, can oppress pulling-on piece sleeve pipe makes pulling-on piece internal surface of sleeve pipe be tight contacted between with pulling-on piece surface, when dismantling template and extracting pulling-on piece out
It could be extracted out with larger strength, which adds the labor intensity of worker, although recycling reduces construction cost,
Many workers are unwilling to do this extra work.In addition, the lock hole on pulling-on piece is inserted after latch in vibrations concreting
During to bear larger power, the meeting of the lock hole of pulling-on piece after a number of uses supports big, i.e., the lock hole on pulling-on piece by latch
Size along its length is more than the size in height, thus has influence on inner template and the direct distance of exterior sheathing, pours
The thickness of wall is also uneven.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided it is a kind of it is reasonable in design, can be conveniently and efficiently
Pulling-on piece is extracted out out of pulling-on piece sleeve pipe and avoids lock hole from accepting the construction wall construction aluminum alloy pattern plate for the situation generation that is stretched with easily
Dismantle pulling-on piece location structure.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Construction wall construction aluminum alloy pattern plate is with easily
Pulling-on piece location structure, including pulling-on piece, pulling-on piece sleeve pipe, inner template and exterior sheathing are dismantled, pulling-on piece and pulling-on piece sleeve pipe are in flat strip
Shape structure, inserting hole is correspondingly offered between inner template and exterior sheathing, pulling-on piece is plugged in inserting hole, and pulling-on piece sleeve pipe is enclosed on pulling-on piece
Go up and be located between inner template and exterior sheathing, the length of pulling-on piece sleeve pipe is equal to the thickness of interior wall, and offering two on pulling-on piece uses
In the lock hole for plugging latch restriction inner template and exterior sheathing spacing, pulling-on piece bushing outer surface sets at least one along its length
Waling, pulling-on piece bushing outer surface are provided with some cross reinforcings along short transverse, and cross reinforcing and longitudinal direction add
Strengthening tendons forms criss-cross construction;The both sides on pulling-on piece surface are respectively arranged with the sphere projection in pulling-on piece sleeve pipe, pulling-on piece two
The sphere projection of side is symmetrical arranged on pulling-on piece, and sphere projection is located at the medium position of pulling-on piece in the height direction.
The both sides on pulling-on piece surface are respectively arranged with the ribs on the outside of lock hole, and the thickness of ribs is dashed forward less than sphere
The thickness risen, the upper edge and lower edge of ribs flush with lock hole top and bottom respectively.
The both sides on pulling-on piece surface are respectively arranged with the anti-slip veins positioned at pulling-on piece one end.
Using above-mentioned technical proposal, due to setting vertical and horizontal reinforcement in the outer surface of pulling-on piece sleeve pipe, so make drawing
The bearing strength of piece sleeve pipe greatly improves, and avoids pressing from both sides pulling-on piece internal surface of sleeve pipe during the casting concrete between inner template and exterior sheathing
Piece surface is strained at, and is difficult to extract pulling-on piece out, the concrete for also functioning to and pouring in addition is securely joined with the effect being integrated;Enter one
Step ground, the utility model set sphere projection on pulling-on piece surface, are that sphere projection can support after contingency pulling-on piece sleeve pipe is extruded
Pulling-on piece sleeve pipe, when outwards extracting pulling-on piece out, due to being contacted between sphere projection and pulling-on piece sleeve pipe for point, frictional force also can be smaller,
It so also more can effortlessly extract pulling-on piece out.Pulling-on piece sleeve pipe, waling and cross reinforcing can use the system of plastics one
Into pulling-on piece sleeve pipe is expendable consumed product, is embedded in wall, and cost is also very low.
Because latch is inserted into lock hole, exterior sheathing and inner template outwards can oppress lock hole, ribs by latch
Setting, add thickness of the pulling-on piece on the outside of lock hole, enhance the durability of lock hole, lock hole can be used for multiple times
It also will not in the longitudinal direction expand afterwards, so that the distance between inner template and exterior sheathing keep constant, pour back wall
Thickness is also uniform.
The thickness of ribs is less than the thickness of sphere projection, is so easy to ribs to follow sphere projection to pass through pulling-on piece set
Pipe, avoids blocking ribs and can not taking out.
When outwards extracting pulling-on piece out after pouring, latch is taken out out of lock hole, the hand-held a pair of tongs of worker clamps anti-skidding
Pulling-on piece one end at line, outwards slightly can firmly extract pulling-on piece out, and anti-slip veins play the phenomenon for preventing pliers clamping from skidding and occurred.
It can make exterior wall that there is gap to produce infiltration due to reserving pulling-on piece sleeve pipe in exterior wall, therefore the utility model is tried one's best
Suitable for the construction operation of inner wall.
In summary, the utility model have it is convenient and swift, more effortlessly take out and pulling-on piece and pulling-on piece be used for multiple times
Lock hole is also kept intact afterwards, it is ensured that inner template and exterior sheathing spacing keep constant, and the thickness of wall body uniformity after pouring is more preferable.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic surface of pulling-on piece sleeve pipe in the utility model;
Fig. 3 is A-A sectional views in Fig. 1;
Fig. 4 is B-B sectional views in Fig. 1.
Embodiment
As Figure 1-Figure 4, the construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate of the present utility model, including
Pulling-on piece 1, pulling-on piece sleeve pipe 2, inner template 3 and exterior sheathing 4, pulling-on piece 1 and pulling-on piece sleeve pipe 2 are in flat strip structure, the He of inner template 3
Inserting hole is correspondingly offered between exterior sheathing 4, pulling-on piece 1 is plugged in inserting hole, and pulling-on piece sleeve pipe 2 is enclosed on pulling-on piece 1 and positioned at interior
Between template 3 and exterior sheathing 4, the length of pulling-on piece sleeve pipe 2 is equal to the thickness of interior wall, and offering two on pulling-on piece 1 is used to plug
Latch limits the lock hole 5 of inner template 3 and the spacing of exterior sheathing 4, and the outer surface of pulling-on piece sleeve pipe 2 sets at least one to indulge along its length
To reinforcement 6, the outer surface of pulling-on piece sleeve pipe 2 is provided with some cross reinforcings 7, cross reinforcing 7 and longitudinal direction along short transverse
Reinforcement 6 forms criss-cross construction;The both sides on the surface of pulling-on piece 1 are respectively arranged with the sphere projection 8 in pulling-on piece sleeve pipe 2,
The sphere projection 8 of the both sides of pulling-on piece 1 is symmetrical arranged on pulling-on piece 1, and sphere projection 8 is located at the middle position of pulling-on piece 1 in the height direction
Put.
The both sides on the surface of pulling-on piece 1 are respectively arranged with the ribs 10 positioned at the outside of lock hole 5, and the thickness of ribs 10 is less than
The thickness of sphere projection 8, the upper edge and lower edge of ribs 10 flush with the top and bottom of lock hole 5 respectively.
The both sides on the surface of pulling-on piece 1 are respectively arranged with the anti-slip veins 9 positioned at the one end of pulling-on piece 1.
Due to setting vertical and horizontal reinforcement 7 in the outer surface of pulling-on piece sleeve pipe 2, so make the pressure-bearing of pulling-on piece sleeve pipe 2 strong
Degree greatly improves, and avoids making the inwall of pulling-on piece sleeve pipe 2 clamp the table of pulling-on piece 1 during the casting concrete between inner template 3 and exterior sheathing 4
Face, and be difficult to extract pulling-on piece 1 out, the concrete for also functioning to and pouring in addition is securely joined with the effect being integrated;Further, originally
Utility model sets sphere projection 8 on the surface of pulling-on piece 1, is that sphere projection 8 can support drawing after contingency pulling-on piece sleeve pipe 2 is extruded
Piece sleeve pipe 2, when outwards extracting pulling-on piece 1 out, due to being contacted between sphere projection 8 and pulling-on piece sleeve pipe 2 for point, frictional force also can be compared with
It is small, it so also more can effortlessly extract pulling-on piece 1 out.Pulling-on piece sleeve pipe 2, waling 6 and cross reinforcing 7 can use plastics
It is made into integration, pulling-on piece sleeve pipe 2 is expendable consumed product, is embedded in wall, and cost is also very low.
Because latch is inserted into lock hole 5, exterior sheathing 4 and inner template 3 outwards can oppress lock hole 5 by latch, add
The setting of strong rib 10, thickness of the pulling-on piece 1 in the outside of lock hole 5 is added, the durability of lock hole 5 is enhanced, lock hole 5 can be made
It will not also expand in the longitudinal direction after a number of uses, so that the distance between inner template 3 and exterior sheathing 4 keep constant,
The thickness for pouring back wall is also uniform.
The thickness of ribs 10 is less than the thickness of sphere projection, is so easy to ribs 10 to follow sphere projection 8 to pass through drawing
Piece sleeve pipe 2, avoid blocking ribs 10 and can not taking out.
When pouring rear outwards extraction pulling-on piece 1, latch is taken out from lock hole 5 is interior, the hand-held a pair of tongs of worker clamps anti-
One end of pulling-on piece 1 at sliding line 9, outwards slightly can firmly extract pulling-on piece 1 out, and anti-slip veins 9 play the phenomenon for preventing that pliers clamping from skidding
Occur.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc.
Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality
With the protection domain of new technique scheme.
Claims (3)
- The quick detachable pulling-on piece location structure of aluminum alloy pattern plate 1. construction wall is constructed, including pulling-on piece, pulling-on piece sleeve pipe, inner template and external mold Plate, pulling-on piece and pulling-on piece sleeve pipe are in flat strip structure, inserting hole are correspondingly offered between inner template and exterior sheathing, pulling-on piece is inserted It is located in inserting hole, pulling-on piece sleeve pipe is enclosed on pulling-on piece and between inner template and exterior sheathing, and the length of pulling-on piece sleeve pipe is equal to interior The thickness of wall, two are offered on pulling-on piece and is used to plug the lock holes that latch limits inner template and exterior sheathing spacing, its feature It is:Pulling-on piece bushing outer surface sets at least one waling along its length, and pulling-on piece bushing outer surface is along short transverse Some cross reinforcings are provided with, cross reinforcing and waling form criss-cross construction;The both sides on pulling-on piece surface The sphere projection being respectively arranged with pulling-on piece sleeve pipe, the sphere projection of pulling-on piece both sides are symmetrical arranged on pulling-on piece, and sphere is dashed forward Play the medium position for being located at pulling-on piece in the height direction.
- The quick detachable pulling-on piece location structure of aluminum alloy pattern plate 2. construction wall according to claim 1 is constructed, it is characterised in that:Draw The both sides on piece surface are respectively arranged with the ribs on the outside of lock hole, and the thickness of ribs is less than the thickness of sphere projection, The upper edge and lower edge of ribs flush with lock hole top and bottom respectively.
- The quick detachable pulling-on piece location structure of aluminum alloy pattern plate 3. construction wall according to claim 1 is constructed, it is characterised in that:Draw The both sides on piece surface are respectively arranged with the anti-slip veins positioned at pulling-on piece one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720466408.7U CN206784941U (en) | 2017-04-28 | 2017-04-28 | The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720466408.7U CN206784941U (en) | 2017-04-28 | 2017-04-28 | The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784941U true CN206784941U (en) | 2017-12-22 |
Family
ID=60709997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720466408.7U Expired - Fee Related CN206784941U (en) | 2017-04-28 | 2017-04-28 | The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784941U (en) |
-
2017
- 2017-04-28 CN CN201720466408.7U patent/CN206784941U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631706B (en) | One kind exempts from form removal concrete column and its construction method | |
CN206753064U (en) | A kind of aluminum alloy mould plate pull-tab system | |
CN103556819A (en) | Construction method for reserving constructional column holes in beam plate | |
CN103243909A (en) | Quickly-clamped concrete pouring device | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN206784941U (en) | The construction wall construction quick detachable pulling-on piece location structure of aluminum alloy pattern plate | |
CN206844636U (en) | Wall and the cast-in-place aluminum alloy pattern plate support system of superstructure | |
CN105041340A (en) | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering | |
CN209649032U (en) | A kind of bearing platform prefabrication concrete mould plate structure | |
CN104878756B (en) | Sand-filling hollow structure based cast-in-place special-shaped pile construction method | |
CN102031774A (en) | V-shaped pile-slab | |
CN207526118U (en) | For pre-buried and closure unwrapping wire hole unwrapping wire punch die | |
CN206189449U (en) | Soleplate with lead integrated plank sheathing system of wall | |
CN205669210U (en) | Steel building concrete cup-shaped foundation inner bore die carrier | |
CN107984599A (en) | The versatility of pre-cast building mould blocks up slurry part | |
CN204941567U (en) | A kind of structure accelerating construction of tunnel vault pouring concrete speed | |
CN213390464U (en) | Gutter inlet forming tool | |
CN206000154U (en) | A kind of building pours uses template | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab | |
CN108442698B (en) | Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve | |
CN202689554U (en) | Concrete wall form positioning and supporting device | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN201915635U (en) | Form erecting device free of bar planting for brickwork construction | |
CN207077584U (en) | Cross celluar concrete stake template | |
CN206616588U (en) | A kind of anti-piping lane casing core pulling mould that caves in of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 461300 Industrial Agglomeration Zone, Fugou County, Zhoukou City, Henan Province Patentee after: Henan Xiangzhong Technology Co.,Ltd. Address before: 461300 Fugou County Industrial Park, Zhoukou City, Henan Province, No. 6 Factory Building of Fugou County Machinery Industry Park on the West Side of Line S102 Patentee before: HENAN DING ALUMINUM ENVIRONMENTAL PROTECTION BUILDING MATERIAL CO.,LTD. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |