CN109723215A - Constructional column finished product dustpan mouth construction method - Google Patents
Constructional column finished product dustpan mouth construction method Download PDFInfo
- Publication number
- CN109723215A CN109723215A CN201711040990.1A CN201711040990A CN109723215A CN 109723215 A CN109723215 A CN 109723215A CN 201711040990 A CN201711040990 A CN 201711040990A CN 109723215 A CN109723215 A CN 109723215A
- Authority
- CN
- China
- Prior art keywords
- finished product
- concrete
- constructional column
- dustpan mouth
- dustpan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to a kind of constructional column finished product dustpan mouth construction methods, including step 1: production dustpan mouth finished product stainless steel mold;Two: setting up constructional column formwork reinforcement system;Three: the template checkpost of dustpan mouth reserved opening position surrounding on constructional column side form is entered in template card slot;Four: constructional column self structure being subjected to cutting with dustpan mouth concrete gore along template groove position by cutting plate and is separated;Five: dustpan mouth finished product stainless steel mold is taken away with concrete gore;Six: dustpan mouth concrete gore and finished product stainless steel mold are demoulded;Seven: cleaning finished product stainless steel mold;The present invention is after the completion of constructional column concreting, dustpan mouth concrete gore is separated with pillar structure, after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore, eliminate subsequent dustpan mouth concrete gore cuts construction.
Description
Technical field
The present invention relates to a kind of dustpan mouth construction methods, specifically constructional column finished product dustpan mouth construction method.
Background technique
With the rapid development of building enterprise, every construction technology is mature, and enterprise is to construction quality, progress, benefit
It is required that also higher;Constructional column dustpan mouth is generally formed with constructional column self form reinforcement system together, in this way in constructional column coagulation
After the completion of soil pours, need just carry out dustpan mouth coagulation after all removing template when concrete strength reaches demoulding condition
Native gore cuts construction, and concrete strength is high at this time, and dustpan mouth concrete gore is difficult to cut, due to constructional column
Quantity is more, cuts heavy workload and high labor cost.If worker cuts not carefully, it also will affect constructional column apparent mass, lead
Cause cuts quality and is unable to get guarantee.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of constructional column finished product dustpan mouth construction method is provided, solves structure
Making the triangular concrete block later period after the completion of column dustpan mouth pours cuts problem.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of constructional column finished product dustpan mouth construction method, it is characterised in that it includes the following steps:
Step 1: production dustpan mouth finished product stainless steel mold;The stainless steel mold includes cutting plate and template card slot, and the cutting plate is set to mould
Crimping is arranged at board slot top, cutting plate top;Template card slot side top is oblique to being externally provided with dustpan slot;
Step 2: constructional column formwork reinforcement system is set up;
Step 3: the template checkpost of dustpan mouth reserved opening position surrounding on constructional column side form is entered in template card slot;
Step 4: after the completion of constructional column concreting, by cutting plate along template groove position by constructional column self structure with winnow with a dustpan
Dustpan mouth concrete gore carries out cutting separation;
Step 5: after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore;
Step 6: dustpan mouth concrete gore is demoulded with finished product stainless steel mold;
Step 7: cleaning finished product stainless steel mold;And by concrete gore concentrate stack maintenance, be used as later period wall at the top of with
The finished product concrete corner block noggin piece of mouth after between main structure.
The constructional column finished product dustpan mouth construction method, it is characterised in that: the cutting plate is stainless steel cutting plate, thickness
For 1.5mm.
The constructional column finished product dustpan mouth construction method, it is characterised in that: the template card slot is stainless steel mold board
Slot, with a thickness of 1mm.
The constructional column finished product dustpan mouth construction method, it is characterised in that: the dustpan slot and template card slot outside
Between angle be 135 °.
The beneficial effects of the present invention are: after the completion of constructional column concreting, by dustpan mouth concrete gore with
Pillar structure separates, and after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore,
Eliminate subsequent dustpan mouth concrete gore cuts construction.
The present invention can be repeated several times and be used in turn using customization dustpan mouth finished product stainless steel mold, a set of stainless steel mold, can
Save the cost;Subsequent dustpan mouth concrete gore can also be saved simultaneously cuts process, can not only save labour cost, also
Construction efficiency is improved, construction speed is accelerated;Cutting for dustpan mouth concrete gore is avoided to make an uproar caused by construction
Sound, dust pollution;Constructional column self structure cutting is carried out with dustpan mouth concrete gore with stainless steel cutting plate to separate,
Section is smooth, straight, damage constructional column self structure will not because of subsequent secondary construction, improves construction quality;
The dustpan mouth concrete gore cut off is formed using stainless steel mold, and apparent mass is preferable, is concentrated after stacking maintenance,
It can be used as the finished product concrete corner block noggin piece at the top of subsequent wall mouth rear between main structure;Both green has been reached
The requirement of environmental protection construction, and escapable cost expense.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the overlook direction schematic diagram of dustpan mouth finished product stainless steel mold.
Fig. 3 be in Fig. 2 1-1 to sectional view.
Specific embodiment
As shown in Figs. 1-3: a kind of constructional column finished product dustpan mouth construction method, it includes the following steps:
Step 1: production dustpan mouth finished product stainless steel mold 1;The stainless steel mold includes cutting plate 11 and template card slot 12, the cutting plate
Set on template card slot top, there is crimping 13 at the top of cutting plate;The cutting plate is stainless steel cutting plate, with a thickness of 1.5mm;The template
Card slot is Stainless Molding Board card slot, with a thickness of 1mm;Template card slot side top is oblique to being externally provided with dustpan slot 14;Institute
The angle stated between on the outside of dustpan slot and template card slot is 135 °;
Step 2: constructional column formwork reinforcement system is set up;Including constructional column 3 and the reinforced concrete structured beam in portion disposed thereon 4;
Step 3: the template checkpost of dustpan mouth reserved opening position surrounding on constructional column side form is entered in template card slot;
Step 4: after the completion of constructional column concreting, by cutting plate along template groove position by constructional column self structure with winnow with a dustpan
Dustpan mouth concrete gore 2 carries out cutting separation;
Step 5: after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore;
Step 6: dustpan mouth concrete gore is demoulded with finished product stainless steel mold;
Step 7: cleaning finished product stainless steel mold;And by concrete gore concentrate stack maintenance, be used as later period wall at the top of with
The finished product concrete corner block noggin piece of mouth after between main structure.
Dustpan mouth finished product stainless steel mold is customized according to the size of constructional column, then by finished product stainless steel mold along template slot
It sets to be mounted on plain form 5 and reserve dustpan mouth openings position and forms complete constructional column formwork reinforcement system, column coagulation to be constructed
After the completion of soil pours, by stainless steel cutting plate along cutting plate groove position by constructional column self structure and dustpan mouth concrete triangle
Block carries out cutting separation, and after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore, saves
That has removed subsequent dustpan mouth concrete gore cuts construction.
Claims (4)
1. a kind of constructional column finished product dustpan mouth construction method, it is characterised in that it includes the following steps:
Step 1: production dustpan mouth finished product stainless steel mold;The stainless steel mold includes cutting plate and template card slot, and the cutting plate is set to mould
Crimping is arranged at board slot top, cutting plate top;Template card slot side top is oblique to being externally provided with dustpan slot;
Step 2: constructional column formwork reinforcement system is set up;
Step 3: the template checkpost of dustpan mouth reserved opening position surrounding on constructional column side form is entered in template card slot;
Step 4: after the completion of constructional column concreting, by cutting plate along template groove position by constructional column self structure with winnow with a dustpan
Dustpan mouth concrete gore carries out cutting separation;
Step 5: after concrete initial set, dustpan mouth finished product stainless steel mold is taken away together with concrete gore;
Step 6: dustpan mouth concrete gore is demoulded with finished product stainless steel mold;
Step 7: cleaning finished product stainless steel mold;And by concrete gore concentrate stack maintenance, be used as later period wall at the top of with
The finished product concrete corner block noggin piece of mouth after between main structure.
2. constructional column finished product dustpan mouth construction method according to claim 1, it is characterised in that: the cutting plate is stainless steel
Cutting plate, with a thickness of 1.5mm.
3. constructional column finished product dustpan mouth construction method according to claim 1, it is characterised in that: the template card slot is not
Become rusty steel form card slot, with a thickness of 1mm.
4. constructional column finished product dustpan mouth construction method according to claim 1, it is characterised in that: the dustpan slot and template
Angle between on the outside of card slot is 135 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711040990.1A CN109723215A (en) | 2017-10-31 | 2017-10-31 | Constructional column finished product dustpan mouth construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711040990.1A CN109723215A (en) | 2017-10-31 | 2017-10-31 | Constructional column finished product dustpan mouth construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109723215A true CN109723215A (en) | 2019-05-07 |
Family
ID=66293068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711040990.1A Pending CN109723215A (en) | 2017-10-31 | 2017-10-31 | Constructional column finished product dustpan mouth construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109723215A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963431A (en) * | 2015-07-17 | 2015-10-07 | 南通德源建设工程科技有限公司 | Corner structural column construction method |
CN204850448U (en) * | 2015-08-27 | 2015-12-09 | 中交第一公路工程局有限公司 | Qualities of concrete shaping of constructional column top are improved new tool formula dustpan template |
CN206329035U (en) * | 2016-12-29 | 2017-07-14 | 中国建筑第二工程局有限公司 | Can discharging dustpan mouth template system at the top of a kind of constructional column |
CN206607875U (en) * | 2017-03-21 | 2017-11-03 | 中建三局第一建设工程有限责任公司 | A kind of constructional column dustpan mouthful |
-
2017
- 2017-10-31 CN CN201711040990.1A patent/CN109723215A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963431A (en) * | 2015-07-17 | 2015-10-07 | 南通德源建设工程科技有限公司 | Corner structural column construction method |
CN204850448U (en) * | 2015-08-27 | 2015-12-09 | 中交第一公路工程局有限公司 | Qualities of concrete shaping of constructional column top are improved new tool formula dustpan template |
CN206329035U (en) * | 2016-12-29 | 2017-07-14 | 中国建筑第二工程局有限公司 | Can discharging dustpan mouth template system at the top of a kind of constructional column |
CN206607875U (en) * | 2017-03-21 | 2017-11-03 | 中建三局第一建设工程有限责任公司 | A kind of constructional column dustpan mouthful |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203247600U (en) | Equipment foundation bolt preformed hole die | |
CN202100002U (en) | Stair formalization die | |
CN103737718A (en) | Prefabricated reinforced concrete hollow column template and making method thereof | |
CN203924669U (en) | A kind of precast concrete scaffold base and making mould thereof | |
CN109723215A (en) | Constructional column finished product dustpan mouth construction method | |
CN203066099U (en) | Combined steel formwork used for cup foundation construction | |
CN207997396U (en) | One kind exempting from formwork constructional column shaper | |
CN201824459U (en) | Automatic green brick separating mould | |
CN206468004U (en) | A kind of quick template of stair | |
CN207812999U (en) | Digital alloy steel framework plastic formwork | |
CN210013471U (en) | Stair formwork structure for multi-story and high-rise buildings | |
CN208502251U (en) | A kind of assembly type step type pump line mouth can formwork | |
CN209224259U (en) | Turnover type concrete precast block makes mold | |
CN102116082B (en) | Moulding board for building purposes | |
CN203905458U (en) | Hollow porous truss flat template | |
CN205637579U (en) | Beam slab post -cast strip template mechanism | |
CN218748409U (en) | Device for manufacturing concrete floor thickness control block | |
CN219886918U (en) | Double-ring template system for pouring concrete side wall in turntable foundation pit of logistics conveying line | |
CN216516896U (en) | Closed cyclic utilization's unwrapping wire hole mould | |
CN217751922U (en) | High accuracy track roof beam mould convenient to drawing of patterns | |
CN110026530B (en) | Method for drawing casting mold | |
CN217557650U (en) | Detachable superimposed sheet post-cast strip hangs mould instrument | |
CN202509518U (en) | Structure for pouring column foundation cup rabbet | |
CN217168924U (en) | Bridge sidewalk plate prefabricated formwork | |
CN211548092U (en) | Splicing I-steel plastic box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190507 |
|
RJ01 | Rejection of invention patent application after publication |