CN206607268U - Swinging support refers to vertical shaft scrap steel preheating system - Google Patents
Swinging support refers to vertical shaft scrap steel preheating system Download PDFInfo
- Publication number
- CN206607268U CN206607268U CN201720233482.4U CN201720233482U CN206607268U CN 206607268 U CN206607268 U CN 206607268U CN 201720233482 U CN201720233482 U CN 201720233482U CN 206607268 U CN206607268 U CN 206607268U
- Authority
- CN
- China
- Prior art keywords
- preheating
- furnace
- vertical shaft
- scrap steel
- electric furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Furnace Details (AREA)
Abstract
Refer to vertical shaft scrap steel preheating system the utility model discloses a kind of swinging support, including:Column;Turning arm, the middle part of the turning arm is mounted in the upper end of the column by a rotating device;Vertical shaft preheating furnace, vertical shaft preheating furnace is 2 and is separately fixed at the two ends of the turning arm, meanwhile, vertical shaft preheating furnace has preheating cavity penetrating up and down, and the bottom of preheating cavity is equipped with open-and-close mechanism;Electric furnace, the electric furnace has the heating chamber of upper opening, and the electric furnace has discharge flue;Heating kiln, the heating kiln has the furnace chamber of upper opening;And, the electric furnace and the heating kiln are respectively positioned on the avris of the column, and the upper opening of the heating chamber and the lower openings of preheating cavity match, and the upper opening of furnace chamber and the lower openings of preheating cavity match;The furnace chamber connects the discharge flue by fume inlet passage.The utility model has the advantages that:Combination property is preferable.
Description
Technical field
The present invention relates to smelting equipment technical field, vertical shaft scrap steel preheating system is referred to more particularly, to a kind of swinging support.
Background technology
Steel is the maximum structural material and yield highest functional material of mankind's consumption, and steel industry is the pillar of China
Industry.With the rapid growth of steel usage amount, the generation of steel scrap is also in sustainable growth situation.Steel scrap can be obtained in converter
A certain amount of digestion, and most steel scrap needs to be handled in electric furnace.Electric arc furnaces is the height produced using electrode arc
Temperature carrys out the electric furnace of melting ore and metal, compared to converter producing, electric arc furnaces have high energy consumption, duration of heat length, production kind by
Limit, the shortcomings of production cost is high.If electric arc furnaces can be improved to enter the initial temperature of stove steel scrap will to greatly save cost higher
Power consumption, shortens the heat simultaneously, is improved the production capacity of electric arc furnaces.Therefore, there is scrap steel preheating technology energy-conservation to drop
The significance of consumption.
Existing scrap steel preheating technology slave unit structure type is divided, and can be divided into two kinds of monoblock type and separate type.Monoblock type
It is combined together for pre-heating device with electric furnace body, forms overall, or directly by the use of electric furnace body as scrap steel preheating equipment,
So as to enable the high-temp waste gas of electric furnace sufficiently to recycle.Separate structure is that preheating furnace is separated with electric furnace body, is leaned on
Outer heat supply can be heated first to steel scrap, and steel scrap is reached to be put into electric furnace with special equipment after certain temperature and melted using electric energy
Change and smelt.
The mode that monoblock type scrap steel preheating equipment couples with electric furnace can be divided into several ways, mainly have shaft furnace electric arc oven process,
Double type direct current electric arc furnace and continuous charging electric arc furnaces.The maximum feature of foregoing several ways is can to make full use of the high temperature furnace of electric furnace
Gas, energy-conservation is realized directly to improve the thermal efficiency of electric furnace.Shaft furnace electric arc oven process is to set one above the half of bell of electric furnace
Individual preheating shaft furnace, is preheated while electric furnace smelting using its high-temp waste gas to steel scrap, and is continuously added to the steel scrap of preheating
In electric furnace, but due to the EGT in electric furnace in periodically and it is uncontrollable, often occur lower floor's steel scrap temperature it is too high and
Bonding index arm makes the accident that steel scrap can not normally fall, and the unexpected slump of steel scrap also occurs and the accident of broken Electrode is pounded so that be raw
Production is not sufficiently stable.Moreover, shaft furnace electric furnace process equipment is different from common electric furnace, common electric furnace can not be served as in production and is used, cost
It is higher, produce dumb.Double type electric furnace is that another stove utilizes its waste gas to scrap steel preheating while a stove is smelted, and is given up
Steel temperature can reach 500 degree, but the investment of twin furnace shell direct current electric arc furnace is big, and floor space is big, and the utilization rate of electric furnace is low, and preheating
That electric furnace can only also preheat the first batch furnace charge of the electric furnace.Continuous charging electric arc furnaces principal mode is CONSTEEL electricity
Stove, such a waste steel for electric furnace preheating temperature is low, and mean temperature is only 200 degree or so, and electric furnace exhaust gas utilization rate is low, waste gas environmental protection
Problem is difficult to solve.Therefore, although monoblock type scrap steel preheating technical energy saving effect is obvious, but due to pre-heating device and electric furnace
Body of heater is combined together, and influence factor is more in process of construction, and larger transformation need to be carried out to electric furnace, and construction period length simultaneously influences
Production.In order to make full use of high-temperature flue gas to preheat steel scrap, also need to carry out the sealing of bell and set up fume extractor, invest
It is larger.
Separate type scrap steel preheating system pre-heating device is separated with electric furnace body, is preheated and is separated with fusing smelting, is easy to tissue
Production, scrap steel preheating amount and heating-up temperature are easily controlled, the utilization rate in outer energy supply source is high, capacity utilization is high, can be given full play to
Capacity of equipment, it can respectively build, not influence the production of former electric furnace, and scrap build small investment, instant effect.However, separate type is useless
Steel pre-heating system can not utilize the high-temperature flue gas of electric furnace, and complete outer heat supply can be preheated to steel scrap, then will be useless after heating
Steel carries out fusing smelting in electric furnace using electric energy, so energy-saving effect decreases compared with monolithic construction.
The content of the invention
Refer to vertical shaft scrap steel preheating system it is an object of the invention to provide a kind of swinging support, it has combination property preferably
Feature.
The technical solution adopted in the present invention is:Swinging support refers to vertical shaft scrap steel preheating system, and the swinging support refers to perpendicular
Well scrap steel preheating system includes:
Column;
Turning arm, the middle part of the turning arm is mounted in the upper end of the column by a rotating device;
Vertical shaft preheating furnace, vertical shaft preheating furnace is 2 and is separately fixed at the two ends of the turning arm, meanwhile, vertical shaft preheating furnace
With preheating cavity penetrating up and down, the bottom of preheating cavity is equipped with open-and-close mechanism;
Electric furnace, the electric furnace has the heating chamber of upper opening, and the electric furnace has discharge flue;
Heating kiln, the heating kiln has the furnace chamber of upper opening;And
The electric furnace and the heating kiln are respectively positioned on the avris of the column, and upper opening and the bottom of preheating cavity of the heating chamber
Opening matches, and the upper opening of furnace chamber and the lower openings of preheating cavity match;
The furnace chamber connects the discharge flue by fume inlet passage.
The vertical shaft preheating furnace is fixed on the end of turning arm by lowering or hoisting gear.
Removed provided with a liftable exhausting surface that the top of horizontal plane where the vertical shaft preheating furnace is located at the furnace chamber
Dirt device, ventilation and dust removal device has the lower openings that the upper opening with preheating cavity matches.
The electric furnace and heating kiln are located at 0 ° and 270 ° phases of avris of the column respectively.
The heating kiln is connected with auxiliary thermal source.
The open-and-close mechanism, which includes referring to, to be held in the palm, and is referred to and is hinged in the middle part of support on the fulcrum at preheating cavity lower openings edge,
Meanwhile, the outer end for referring to support is connected with retractor device.
The fulcrum is connected to the lower openings edge of preheating cavity by a damping device.
The top of horizontal plane is provided with loading hopper where the vertical shaft preheating furnace.
Advantage for present invention is:Combination property is preferable.The swinging support of the present invention refers to vertical shaft scrap steel preheating system
The characteristics of making full use of the high-temperature furnace gas of electric furnace with monoblock type scrap steel preheating equipment, has separate type scrap steel preheating equipment again
Production, the equipment investment be easily controlled using flexible, pre- heat and heating-up temperature, not influenceed former electric furnace are few, the characteristics of instant effect.
That is, the advantage of two kinds of scrap steel preheating equipment of monoblock type and separate type is combined, performance is preferable.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples:
Fig. 1 is that the swinging support of embodiments of the invention refers to the top view of vertical shaft scrap steel preheating system(Charging and preheating
When);
Fig. 2 is Fig. 1 A-A direction views;
Fig. 3 is Fig. 2 B-B direction views;
Fig. 4 is Fig. 2 C portions enlarged drawing;
Fig. 5 is that the swinging support of embodiments of the invention refers to the top view of vertical shaft scrap steel preheating system(During smelting);
Fig. 6 is Fig. 5 D-D direction views.
In figure:
10th, column;
20th, turning arm, 21, rotating device;
30th, vertical shaft preheating furnace, 31, preheating cavity, 32, open-and-close mechanism, 321, fulcrum, 3211, damping device, 322, refer to support,
323rd, retractor device;
40th, electric furnace, 41, heating chamber, 42, lid, 43, discharge flue;
50th, heating kiln, 51, furnace chamber, 52, auxiliary thermal source, 53, fume inlet passage;
60th, ventilation and dust removal device;
70th, loading hopper;
80th, lowering or hoisting gear.
Embodiment
Embodiment, as shown in Fig. 1 to Fig. 6:Swinging support refers to vertical shaft scrap steel preheating system, including:Column 10, turning arm
20th, the part such as vertical shaft preheating furnace 30, electric furnace 40, heating kiln 50.
Specifically:
The column 10 can be that hold-down support can be also provided with foundation of civil work, foundation of civil work.
The middle part of the turning arm 20 is mounted in the upper end of the column 10 by a rotating device 21, or, the rotating device 21
On the hold-down support for being arranged at foregoing foundation of civil work.That is, under the drive of the rotating device 21, the turning arm 20 can be in a water
360 ° of progress rotates freely in plane.The rotating device 21 can be that the belt gear either gear that motor drives is passed
Motivation structure.
Vertical shaft preheating furnace 30 is 2 and is separately fixed at the two ends of the turning arm 20.Meanwhile, vertical shaft preheating furnace 30 has upper
Under penetrating preheating cavity 31, the bottom of preheating cavity 31 is equipped with open-and-close mechanism 32.That is, open-and-close mechanism 32 can be to the preheating cavity 31
Lower openings closed or opened.Due to being used to add steel scrap etc. in preheating cavity 31 with raw material large-sized enough, and
Preheating cavity 31 needs heat to pass through, so the closing of the lower openings of 32 pairs of preheating cavities 31 of open-and-close mechanism is not complete envelope
Close, as long as can then raw material is not fallen out and heat can be by raw material formation frame state.
The electric furnace 40 has the heating chamber 41 of upper opening, and the electric furnace 40 has discharge flue 43.Certainly, the electric furnace 40
Necessarily it is furnished with retractable lid 42.The lid 42 can be cap, and the discharge flue 43 can be located on the lid 42.
The heating kiln 50 has the furnace chamber 51 of upper opening.
More specifically:
The electric furnace 40 and the heating kiln 50 are respectively positioned on the avris of the column 10, and upper opening and the preheating of the heating chamber 41
The lower openings of chamber 31 match, and the upper opening of furnace chamber 51 and the lower openings of preheating cavity 31 match.That is, with the turning arm
20 rotation, preheating cavity 31 can be located at the surface of the electric furnace 40 can dock the heating so as to the lower openings of preheating cavity 31
The upper opening of chamber 41;With the turning arm 20 continuation rotate, preheating cavity 31 can be located at the heating kiln 50 surface from
And the lower openings of preheating cavity 31 can dock the upper opening of the furnace chamber 51.
The furnace chamber 51 connects the discharge flue 43 by fume inlet passage 53.That is, the furnace chamber 51 make use of the remaining of the electric furnace 40
Heat.When the electric furnace 40 lid 42 be cap, and the discharge flue 43 be located at the lid 42 on when, the He of fume inlet passage 53
The discharge flue 43 can be connected by way of docking.That is, when the lid 42 is covered in the heating chamber 41 of the electric furnace 40,
The fume inlet passage 53 is connected with the discharge flue 43;, should when the lid 42 rotates and when leaving in the heating chamber 41 of the electric furnace 40
Fume inlet passage 53 and the discharge flue 43 disconnect.
Optimization:
Vertical shaft preheating furnace 30 is fixed on the end of turning arm 20 so as to which vertical shaft preheating furnace 30 is respectively provided with by lowering or hoisting gear 80
Certain lifting travel.In this way, after the decline of vertical shaft preheating furnace 30, it is ensured that preheating cavity 31 can be real with furnace chamber 51 or heating chamber 41
Now preferably docking.
Removed provided with a liftable exhausting surface that the top of the place horizontal plane of vertical shaft preheating furnace 30 is located at the furnace chamber 51
Dirt device 60, ventilation and dust removal device 60 has the lower openings that the upper opening with preheating cavity 31 matches.That is, ventilation and dust removal device
60 align corresponding preheating cavity 31 moves down the upper opening that kinetic energy enough preferably docks corresponding preheating cavity 31 backward.
The electric furnace 40 and heating kiln 50 are located at 0 ° and 270 ° phases of avris of the column 10 respectively.In the present embodiment, to revolve
The direction of rotation of pivoted arm 20 is as forward direction, so that when the electric furnace 40 is set as 0 ° of phase, the heating kiln 50 is located at 270 ° of phases.
The heating kiln 50 is connected with auxiliary thermal source 52.Auxiliary thermal source 52 can be coal gas, heavy oil etc., certainly, be not limited only to
This.That is, the heating kiln 50 can introduce external heat source.
Continue to optimize:
Foregoing open-and-close mechanism 32 can take a variety of common modes.Such as, open-and-close mechanism 32 includes referring to support 322, refers to support
322 middle part is hinged on the fulcrum 321 at the lower openings edge of preheating cavity 31, meanwhile, the outer end for referring to support 322 is connected with and stretched
Compression apparatus 323, retractor device 323 can be cylinder or hydraulic cylinder.That is, after retractor device 323 stretches, the inner energy of support 322 is referred to
Enough lower openings of the generally horizontal shape then to preheating cavity 31 are closed to accept raw scrap material, or, refer to the interior of support 322
End can move down in general vertical shape then preheating cavity 31 lower openings completely open wide be easy to raw material to fall.It is foregoing to refer to support
322 grade parts need to be furnished with water-cooled cooling structure.
Fulcrum 321 can be connected to the lower openings edge of preheating cavity 31 by a damping device 3211.So, it is to avoid steel scrap
Raw material can smash finger support 322 when loading in corresponding preheating cavity 31.
In addition:
Loading hopper 70 is preferably provided with above the place horizontal plane of vertical shaft preheating furnace 30, for adding steel scrap into preheating cavity 31
Raw material.
The application method and action process of the present invention(For purposes of illustration only, 3 stations will be set as around column, it is respectively
0 ° of phase have electric furnace smelt station, the feeding station with loading hopper of 90 ° of phases, 270 ° of phases with heating kiln
Preheating station.Meanwhile, 2 vertical shaft preheating furnaces are respectively designated as A vertical shafts preheating furnace and B vertical shaft preheating furnaces):
1st, A vertical shafts preheating furnace is rotated to feeding station, and loading hopper in the preheating cavity of the A vertical shaft preheating furnaces to feeding.Now,
The open-and-close mechanism of the preheating cavity of the A vertical shaft preheating furnaces is closed, and lowering or hoisting gear makes A vertical shafts preheating furnace be in of a relatively high position, B
Vertical shaft preheating furnace is located at preheating station.
2nd, A vertical shafts preheating furnace is rotated to preheating station, and lowering or hoisting gear makes A vertical shafts preheating furnace be in relatively low position, A
The preheating cavity and heating chamber of vertical shaft preheating furnace achieve a butt joint, and ventilation and dust removal device also decline dock the A vertical shaft preheating furnaces it is pre-
Hot chamber.Then, ventilation and dust removal device exhausting, not only carries out environmental protection treatment, and the flue gas for discharging the heating chamber of electric furnace to waste gas
Furnace chamber, preheating cavity is sequentially entered to heat steel scrap.When flue gas heat is not enough, it is possible to use auxiliary thermal source is heated.
Now, B vertical shafts preheating furnace, which is rotated to feeding station, carries out charging operation.
3rd, after the completion of the scrap steel preheating in A vertical shafts preheating furnace, rotation is to station is smelted, and the bell of electric furnace is opened, and A vertical shafts
The open-and-close mechanism of preheating furnace is opened, and steel scrap, which is fallen into heating chamber, to be smelted.
4th, continue to rotate to charging station in A vertical shafts preheating furnace and fed, B vertical shaft preheating furnaces are rotated to preheating station pair
Steel scrap in its preheating cavity is preheated.
5th, above step circulation is carried out.
In summary, swinging support of the invention refers to vertical shaft scrap steel preheating system, and there is monoblock type scrap steel preheating equipment can fill
The characteristics of dividing the high-temperature furnace gas using electric furnace, again there is separate type scrap steel preheating equipment to use flexible, pre- heat and heating-up temperature
Production, the equipment investment be easily controlled, not influenceed former electric furnace are few, the characteristics of instant effect.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize
Equivalent structure or equivalent flow conversion that description of the invention and accompanying drawing content are made, or directly or indirectly it is used in other correlations
Technical field, be included within the scope of the present invention.
Claims (8)
1. swinging support refers to vertical shaft scrap steel preheating system, it is characterised in that:The swinging support refers to vertical shaft scrap steel preheating system bag
Include:
Column(10);
Turning arm(20), the turning arm(20)Middle part pass through a rotating device(21)Mounted in the column(10)Upper end;
Vertical shaft preheating furnace(30), vertical shaft preheating furnace(30)For 2 and it is separately fixed at the turning arm(20)Two ends, meanwhile, erect
Well preheating furnace(30)With preheating cavity penetrating up and down(31), preheating cavity(31)Bottom be equipped with open-and-close mechanism(32);
Electric furnace(40), the electric furnace(40)Heating chamber with upper opening(41), and the electric furnace(40)With discharge flue(43);
Heating kiln(50), the heating kiln(50)Furnace chamber with upper opening(51);And
The electric furnace(40)With the heating kiln(50)It is respectively positioned on the column(10)Avris, and the heating chamber(41)Upper opening and
Preheating cavity(31)Lower openings match, furnace chamber(51)Upper opening and preheating cavity(31)Lower openings match;
The furnace chamber(51)Connected by fume inlet passage(53)The discharge flue(43).
2. swinging support according to claim 1 refers to vertical shaft scrap steel preheating system, it is characterised in that:The vertical shaft preheating furnace
(30)Pass through lowering or hoisting gear(80)It is fixed on turning arm(20)End.
3. swinging support according to claim 1 refers to vertical shaft scrap steel preheating system, it is characterised in that:The vertical shaft preheating furnace
(30)The top of place horizontal plane is located at the furnace chamber(51)Surface be provided with a liftable ventilation and dust removal device(60), exhausting
Dust arrester(60)Have and preheating cavity(31)Upper opening match lower openings.
4. swinging support according to claim 1 refers to vertical shaft scrap steel preheating system, it is characterised in that:The electric furnace(40)With
Heating kiln(50)It is located at the column respectively(10)0 ° and 270 ° phases of avris.
5. swinging support according to claim 1 refers to vertical shaft scrap steel preheating system, it is characterised in that:The heating kiln(50)
It is connected with auxiliary thermal source(52).
6. swinging support according to claim 1 refers to vertical shaft scrap steel preheating system, it is characterised in that:The open-and-close mechanism
(32)Including referring to support(322), refer to support(322)Middle part be hinged at positioned at preheating cavity(31)The fulcrum at lower openings edge(321)
On, meanwhile, refer to support(322)Outer end be connected with retractor device(323).
7. swinging support according to claim 6 refers to vertical shaft scrap steel preheating system, it is characterised in that:The fulcrum(321)
Pass through a damping device(3211)It is connected to preheating cavity(31)Lower openings edge.
8. swinging support according to any one of claim 1 to 7 refers to vertical shaft scrap steel preheating system, it is characterised in that:Institute
State vertical shaft preheating furnace(30)The top of place horizontal plane is provided with loading hopper(70).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720233482.4U CN206607268U (en) | 2017-03-11 | 2017-03-11 | Swinging support refers to vertical shaft scrap steel preheating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720233482.4U CN206607268U (en) | 2017-03-11 | 2017-03-11 | Swinging support refers to vertical shaft scrap steel preheating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206607268U true CN206607268U (en) | 2017-11-03 |
Family
ID=60166486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720233482.4U Expired - Fee Related CN206607268U (en) | 2017-03-11 | 2017-03-11 | Swinging support refers to vertical shaft scrap steel preheating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206607268U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108413775A (en) * | 2017-03-11 | 2018-08-17 | 张昌剑 | Swinging support refers to vertical shaft scrap steel preheating system |
-
2017
- 2017-03-11 CN CN201720233482.4U patent/CN206607268U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108413775A (en) * | 2017-03-11 | 2018-08-17 | 张昌剑 | Swinging support refers to vertical shaft scrap steel preheating system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2906510Y (en) | Horizontal continuous-charging scrap preheating device for electric arc steel smelting furnace | |
WO2017071312A1 (en) | Steel scrap preheating-type electric arc furnace and method for improving heating cold area of side wall charging electric arc furnace | |
CN104928484B (en) | A kind of copper smelting slag processes devices and methods therefor | |
CN206607268U (en) | Swinging support refers to vertical shaft scrap steel preheating system | |
CN108624739B (en) | Steelmaking equipment and smelting method for steelmaking by using scrap steel | |
CN202081153U (en) | Reaction unit for nonferrous metal recovery | |
CN106381403B (en) | A kind of joint smelting process of blister copper | |
CN102798287B (en) | Roasting rotary furnace | |
CN107478059A (en) | A kind of automation equipment of swing sweetening process of being quenched for metal | |
CN201569284U (en) | Electric heating metal melting furnace | |
CN201276588Y (en) | Environment friendly energy-saving reducing smelting furnace for secondary metal | |
CN206037688U (en) | Melt flame furnace of thick copper | |
CN108413775A (en) | Swinging support refers to vertical shaft scrap steel preheating system | |
CN212247103U (en) | Improved heat accumulating type coal-based reduction device | |
CN101280358B (en) | Reducing smelting furnace for regenerating metals | |
CN201093859Y (en) | High-efficiency energy-saving environment protection smelting furnace | |
CN1042841C (en) | Pipe type thermal method magnesium-smelting production technology and equipment | |
CN2405174Y (en) | Equipment for preheating waste steel using flue gas from vertical kiln-electric furnace combination | |
CN113310314A (en) | Metallurgical furnace provided with pre-reduction charging barrel | |
CN102191386B (en) | Reaction device of non-ferrous metal recycling | |
CN201277805Y (en) | Returning type multiple hearth rotary kiln | |
CN205352044U (en) | Molten lead converter crucible movement system | |
CN111922327B (en) | High-efficient be built by contract and roast package ware | |
CN217737879U (en) | Aluminum scrap recovery smelting device | |
CN210570034U (en) | Scrap iron preheating device based on flue gas waste heat of electric furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171103 Termination date: 20190311 |
|
CF01 | Termination of patent right due to non-payment of annual fee |