CN206599790U - A kind of assembled main transformer foundation - Google Patents

A kind of assembled main transformer foundation Download PDF

Info

Publication number
CN206599790U
CN206599790U CN201720257132.1U CN201720257132U CN206599790U CN 206599790 U CN206599790 U CN 206599790U CN 201720257132 U CN201720257132 U CN 201720257132U CN 206599790 U CN206599790 U CN 206599790U
Authority
CN
China
Prior art keywords
plug division
chute
camber beam
main transformer
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720257132.1U
Other languages
Chinese (zh)
Inventor
郭后二
张天忠
曾海兵
李昆梅
林森
郑秀云
丁波
汪晓光
王喜君
李林
李坤
郝百川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201720257132.1U priority Critical patent/CN206599790U/en
Application granted granted Critical
Publication of CN206599790U publication Critical patent/CN206599790U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model is related to main transformer foundation technical field, be for existing main transformer foundation construct inconvenience, cycle length, it is of poor quality and offer a kind of assembled main transformer foundation, main transformer foundation is divided into 2 kinds of element factories prefabricated, and in-site installation, improve efficiency of construction, construction quality is ensure that, construction costs is reduced.The scheme of use is directly to be integrally formed bottom plate by mould in factory and by mould be integrally formed camber beam in factory, the lower end of described camber beam is provided with the first plug division and the second plug division extended downwardly, provided with the first chute and the second chute inserted respectively for the first plug division and the second plug division on bottom plate, and the plug division of camber beam lower end can be slided along track length direction in its corresponding chute, each plug division of camber beam is inserted into the chute of bottom plate and adjusted after good position and is fastenedly connected both by pouring into binder materials.

Description

A kind of assembled main transformer foundation
Technical field
The utility model belongs to main transformer foundation technical field, more particularly to it is a kind of can assembled in situ formula main transformer foundation.
Background technology
Guo Wang companies require to build intelligence, environmental protection, assembled transformer station in recent years, it is desirable to which mould is unified in transformer station's construction of structures Number, prefabrication, assembled in situ.Current 2016 editions《35 ~ 110kV intelligent substation modularization construction figure universal designs》With And the pilot assembled transforming plant main transformer basis run still employs traditional cast-in-situ steel reinforced concrete rigid foundation.It is i.e. live Formwork is poured.Because main transformer foundation shape particularity, whole foundation working process is cumbersome, cycle length and easily there are quality problems. Specific construction order is as follows:First step formwork pours sole plate, and second step reserves the joint bar of bottom plate and buttress, and the 3rd step is waited The freezing period of bottom plate, the 4th step pours buttress.Could form removal until the age of concrete.
Above-mentioned traditional main transformer foundation weaknesses analysis are as follows:
1. construction technology is cumbersome, the construction period is long;
2. easily there is pitted skin or the mould phenomenon that rises occurs with back plate connections in buttress;
3. buttress upper table surface evenness is it is difficult to ensure that within 3mm;
4. main transformer foundation size is larger, belong to mass concrete, the heat of hydration is larger, because of the presence of temperature stress, basis It is internal micro-crack, influence underlying strength and durability easily occur.
Utility model content
The purpose of this utility model be for existing main transformer foundation construct inconvenience, cycle length, it is of poor quality and offer one It is prefabricated kind main transformer foundation to be divided into 2 kinds of element factories, and in-site installation, improves efficiency of construction, it is ensured that construction quality, reduces Construction costs.
To achieve these goals, technical solution adopted in the utility model is:
A kind of assembled main transformer foundation, is included in factory and passes through mould by the integrally formed bottom plate of mould and in factory Has integrally formed camber beam, the lower end of described camber beam is provided with the first plug division and the second plug division extended downwardly, in bottom plate It is provided with the first chute and the second chute inserted respectively for the first plug division and the second plug division, and the plug division of camber beam lower end Can be in its corresponding chute along the slip of track length direction, each plug division of camber beam is inserted into the chute of bottom plate and regulated Both are fastenedly connected by pouring into binder materials behind position.
The bottom that described camber beam lower end is inserted into groove is plane, and the inner surface of the groove of bottom plate is plane.
Described camber beam includes the pillar for the crossbeam and support beam being be arranged in parallel with bottom plate, and crossbeam is prefabricated with pillar Component, and be integral type structure.
The upper end opening portion width of the chute of described bottom plate is greater than the width of chute bottom, each grafting of camber beam lower end Portion is located at the centre position of chute.
The beneficial effects of the utility model:The utility model realizes main transformer foundation prefabrication, and assembled in situ is improved Site operation efficiency and construction quality, while reducing construction costs.The utility model is skillfully constructed, and realizes main transformer foundation work Factory is prefabricated, assembled in situization construction.Efficiency of construction, construction quality are increased substantially compared with traditional cast in situs main transformer foundation Relatively reliable, highly versatile can arbitrarily adjust the distance between camber beam, while reducing construction costs.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
The utility model is described further with reference to embodiment.
Embodiment
A kind of assembled main transformer foundation as shown in Figure 1, the present embodiment is included in factory and passes through the integrally formed bottom of mould Plate 1 and in factory by the integrally formed camber beam 2 of mould, the lower end of described camber beam is provided with the first grafting extended downwardly The plug division 22 of portion 21 and second, provided with the He of the first chute 11 inserted respectively for the first plug division and the second plug division on bottom plate Second chute 12, and camber beam lower end plug division can in its corresponding chute along track length direction slide, camber beam it is each Plug division is inserted into the chute of bottom plate and adjusted by pouring into binder materials after good position, and binder materials typically refers to concrete, Both are fastenedly connected.In order that camber beam directly can be stood on the chute of bottom plate in assembling, described camber beam lower end is inserted Bottom design into groove is plane, and the inner surface of the groove of bottom plate is plane, and both are put into rear bow beam and directly stood on bottom plate, Do not need so any tool support to be just in the milk, further improve efficiency of assembling.Described camber beam includes parallel with bottom plate The crossbeam of setting and the pillar of support beam, crossbeam and pillar are prefabricated components, and are integral type structure.Described bottom plate The upper end opening portion width of chute is greater than the width of chute bottom, and each plug division of camber beam lower end is located at the interposition of chute Put.Chute global shape is reverse trapezoid shape structure, and the effect is in order that follow-up grouting can fill to obtain more consolidation.Really Protect construction quality.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, it is in the art common on the premise of the utility model spirit and scope are not departed from Technical staff simple change and replace all be within protection domain of the present utility model.

Claims (4)

1. a kind of assembled main transformer foundation, it is characterised in that:It is included in factory by the integrally formed bottom plate of mould and in work Factory is provided with the first plug division extended downwardly and the second grafting by the integrally formed camber beam of mould, the lower end of described camber beam Portion, provided with the first chute and the second chute inserted respectively for the first plug division and the second plug division on bottom plate, and under camber beam The plug division at end can be in its corresponding chute along the slip of track length direction, and each plug division of camber beam is inserted into the cunning of bottom plate Both are fastenedly connected by groove and adjust after good position by pouring into binder materials.
2. a kind of assembled main transformer foundation according to claim 1, it is characterised in that:Described camber beam lower end is inserted into groove In bottom be plane, and the groove of bottom plate inner surface be plane.
3. a kind of assembled main transformer foundation according to claim 1, it is characterised in that:Described camber beam includes flat with bottom plate Crossbeam and the pillar of support beam that row is set, crossbeam and pillar are prefabricated components, and are integral type structure.
4. a kind of assembled main transformer foundation according to claim 1, it is characterised in that:The upper end of the chute of described bottom plate Opening portion width is greater than the width of chute bottom, and each plug division of camber beam lower end is located at the centre position of chute.
CN201720257132.1U 2017-03-16 2017-03-16 A kind of assembled main transformer foundation Active CN206599790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720257132.1U CN206599790U (en) 2017-03-16 2017-03-16 A kind of assembled main transformer foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720257132.1U CN206599790U (en) 2017-03-16 2017-03-16 A kind of assembled main transformer foundation

Publications (1)

Publication Number Publication Date
CN206599790U true CN206599790U (en) 2017-10-31

Family

ID=60145516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720257132.1U Active CN206599790U (en) 2017-03-16 2017-03-16 A kind of assembled main transformer foundation

Country Status (1)

Country Link
CN (1) CN206599790U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254885A (en) * 2017-03-16 2017-10-17 安徽华电工程咨询设计有限公司 A kind of assembled main transformer foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254885A (en) * 2017-03-16 2017-10-17 安徽华电工程咨询设计有限公司 A kind of assembled main transformer foundation

Similar Documents

Publication Publication Date Title
CN203654997U (en) Integrally preformed bay window structure
CN201933646U (en) Section steel connecting node of precast shear wall
CN205976072U (en) Assembly type structure wall body and prefabricated concrete structure
CN203200656U (en) Light corrugated steel-high strength reactive powder concrete combined bridge deck slab
CN206599790U (en) A kind of assembled main transformer foundation
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN103669336A (en) Geothermal air conditioner preformed pile
CN207277614U (en) A kind of assembled steel plate concrete combined shear wall flat shape piecing connection structure
CN208201918U (en) Assembled corrugated steel Combined concrete list storehouse pipe gallery
CN209779560U (en) Steel formwork for irrigation and water conservancy concrete channel
CN206986918U (en) A kind of asymmetric template for blower fan crab-bolt foundation grouting
CN107254885A (en) A kind of assembled main transformer foundation
CN201144287Y (en) PPH acidic bath and potcher
CN107891511B (en) Separated prefabricated bay window die
CN2905894Y (en) Concrete prefabricated groove
CN203050090U (en) Combined type U-groove section bar of building aluminum alloy formwork
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN203429885U (en) Circular-hole web box-shaped steel reinforced concrete composite flat beam
CN104179351B (en) A kind of high-durability arrangement of reinforcement formula permanent formwork, concrete structure member and design, manufacture method
CN209556080U (en) One kind can have enough to meet the need precast concrete gutter
CN209384485U (en) It is a kind of for pouring the building gypsum diaphragm capsule of floor
CN203097285U (en) Wedge opening mold for reserved pipeline opening
CN203440990U (en) Toothed web box-type steel and concrete composite flat beam
CN207003738U (en) A kind of prefabricated steel faced wall with stirrup
CN208034952U (en) A kind of PC production lines cement strike-off stick

Legal Events