CN206599364U - The lifting device of net frame ball - Google Patents

The lifting device of net frame ball Download PDF

Info

Publication number
CN206599364U
CN206599364U CN201720266351.6U CN201720266351U CN206599364U CN 206599364 U CN206599364 U CN 206599364U CN 201720266351 U CN201720266351 U CN 201720266351U CN 206599364 U CN206599364 U CN 206599364U
Authority
CN
China
Prior art keywords
semicircular ring
net frame
lifting device
holes
type end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720266351.6U
Other languages
Chinese (zh)
Inventor
王闯
陈世明
马文博
安加强
周垚臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720266351.6U priority Critical patent/CN206599364U/en
Application granted granted Critical
Publication of CN206599364U publication Critical patent/CN206599364U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of lifting device of net frame ball, including an annulus, the annulus is connected and composed by the first semicircular ring and the second semicircular ring, and the position that first semicircular ring is connected with second semicircular ring forms a connecting node;First semicircular ring is provided with two the first holes, two first holes and is equipped with the first lifting rope;Second semicircular ring is provided with two the second holes, two second holes and is equipped with the second lifting rope.U-shaped end and a type end is respectively adopted in the end of the first semicircular ring and the second semicircular ring at connecting node, and is connected the U-shaped end and type end pivot joint by bolt, a type end is rotated around bolt in U-shaped end, facilitates the dismounting and installation of lifting device.

Description

The lifting device of net frame ball
Technical field
The utility model is related to a kind of erecting by overhang, and in particular to a kind of lifting device of net frame ball.
Background technology
Many buildings are welded using rack and need to use substantial amounts of welding in spherical structure, rack welding spherical structure at present Ball, the solder sphere is net frame ball.During practice of construction, not only lifting amount is very big for net frame ball, and due to Shape issue, hoisting difficulty is also big, and along with the high-quality requirement of construction, thus the positioning precision of the net frame ball will Ask also higher, and do not have a preferable instrument at this stage, lifting work that is convenient, securely achieving net frame ball.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of lifting device of net frame ball, simple and convenient, The high efficiency of application solutions net frame ball, high-quality lifting.
To realize above-mentioned technique effect, the utility model discloses a kind of lifting device of net frame ball, including a circle Ring, the annulus is connected and composed by the first semicircular ring and the second semicircular ring, and the both ends of first semicircular ring are respectively with described The both ends of two semicircular rings connect and form connecting node;First semicircular ring is provided with two the first holes, this two first The first lifting rope is equipped with hole;Second semicircular ring is equipped with second provided with two the second holes, in two second holes and hung Rope.
The improvement of the lifting device of the utility model net frame ball is that the both ends of first semicircular ring are respectively U-shaped end, the both ends of second semicircular ring are respectively a type end, and the type end is plugged in the U-shaped end, and described second Two U-shaped ends of semicircular ring are connected with two 1 type ends of first semicircular ring by bolt pivot joint respectively, and form the connection Node.
The utility model net frame ball lifting device further improvement is that, the both ends of first semicircular ring Respectively U-shaped end and a type end, the two ends of second semicircular ring are respectively a type end and U-shaped end, second semicircular ring One type end is plugged in the U-shaped end of first semicircular ring, and the U-shaped end of first semicircular ring and second semicircular ring A type end by bolt be pivotally connected connection form the connecting node;One type end of first semicircular ring is plugged in described second In the U-shaped end of semicircular ring, and the U-shaped end of second semicircular ring and a type end of first semicircular ring are pivotally connected by bolt Connection forms the connecting node.
The utility model net frame ball lifting device further improvement is that, in the annulus by the U-shaped end Connected with the type end at the connecting node position to be formed, be formed with a recess towards circle ring center.
The utility model net frame ball lifting device further improvement is that, described two first holes and described two Individual second hole is set in qually spaced on the annulus.
The utility model net frame ball lifting device further improvement is that, the two end portions of first lifting rope It is not fixed in described two first holes of first semicircular ring;The both ends of second lifting rope are separately fixed at described In described two second holes of two semicircular rings.
The lifting device of the utility model net frame ball is made using steel plate materialses, and it is by the first semicircular ring and Two semicircular rings connect and compose a complete circle, after net frame ball is placed in the complete circle, can completely contact, make rack Situations such as rocking, roll is not present with ball.In use, because lifting device connecting node is to be pivotally connected the U connected by bolt Type end and a type end, therefore a connecting node of the lifting device can be only dismantled, the rotation by another connecting node is complete The installation and dismounting of the lifting device into net frame ball hoisting process.
Brief description of the drawings
Fig. 1 is the top view of the lifting device of the utility model net frame ball;
Fig. 2 is the schematic elevation view of the connecting node of the lifting device of the utility model net frame ball;
Fig. 3 is the top view of the connecting node of the lifting device of the utility model net frame ball;
Schematic diagram when Fig. 4 uses for the lifting device of the utility model net frame ball.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is described in further detail to the utility model.
As shown in fig.1, the lifting device of the utility model net frame ball, including an annulus 10, the annulus 10 is by One semicircular ring 12 and the second semicircular ring 14 are connected and composed, the both ends of first semicircular ring 12 respectively with second semicircular ring 14 both ends connection, and form connecting node 15;First semicircular ring 12 is provided with two the first holes 120, this two the The first lifting rope 20 is equipped with one hole 120;Second semicircular ring 14 is provided with two the second holes 140, this two the second holes 140 Inside it is equipped with the second lifting rope 30.The erectings by overhang such as first lifting rope 20 and second lifting rope 30 and crane hook are connected, from And lift net frame ball and the utility model lifting device to required position.To ensure that the utility model lifting device exists Stability in hoisting process, it is preferred that first hole 120 is symmetrical arranged with second hole 140, two the first holes 120 Equidistantly it is located at two the second holes 140 on annulus 10, i.e., the distance between two neighboring first hole 120 and two neighboring second The distance between hole 140, and the first hole 120 are equal with the distance between adjacent second holes 140, it is preferable that connecting node 15 Middle position between the adjacent hole 140 of first hole 120 and second.
As shown in figure 1, the both ends of the first lifting rope 20 of the utility model lifting device are separately fixed at two the first holes In 120, the both ends of the second lifting rope 30 are installed in two the second holes 140 respectively.It is preferred that to further enhance lifting The stability of process, the first lifting rope 20 being installed in the first hole 120 is equal to fixed fill in the stretched length of vertical direction It is located at stretched length of the second lifting rope 30 in the second hole 140 in vertical direction.
With reference to Fig. 1 to Fig. 4, in the present embodiment, the both ends of first semicircular ring 12 are respectively U-shaped end 122, described The both ends of second semicircular ring 14 are respectively a type end 142, and the type end 142 is plugged in the adjacent U-shaped end 122, and And the U-shaped end 122 and the adjacent type end 142 are connected by the pivot joint of bolt 40, thus U-shaped end 122, a type end 142 with And bolt 40 constitutes connecting node 15.
In other embodiments, the both ends of first semicircular ring 12 also can be respectively U-shaped end and a type end, described The both ends of two semicircular rings 14 are also respectively U-shaped end and a type end, and a type end of second semicircular ring 14 is plugged in described the In the U-shaped end of one semicircular ring 12, the U-shaped end of first semicircular ring 12 and a type end of second semicircular ring 14 pass through bolt 40 pivot joints connect and form connecting node 15;One type end of first semicircular ring 12 is plugged in the U of second semicircular ring 14 In type end, the U-shaped end of second semicircular ring 14 is connected simultaneously with a type end of first semicircular ring 12 by the pivot joint of bolt 40 Form connecting node 15.
As shown in Figure 1 and Figure 4, it is preferred that to prevent the change in the height of connecting node 15 and treating hoisting grid ball 50 come in contact, unstable when causing net frame ball 50 to lift, therefore the width at the U-shaped end 122 and the type end 142 Less than the width of the annulus 10, so as to connect what is formed by the U-shaped end 122 and the type end 142 in the annulus 10 At the position of connecting node 15, a recess 16 towards the center of annulus 10, i.e., described U-shaped end 122 and the type end 142 are formed with The inner side of the connecting node 15 of composition is formed with a recess 16 towards the center of annulus 10 with the inner side of annulus 10.
With reference to Fig. 1 to Fig. 4, when hoisting grid is with ball 50, at the connecting node 15 of the utility model lifting device Bolt 40 takes out, and the utility model lifting device is split as the first semicircular ring 12 and the second semicircular ring 14, then by this practicality The first semicircular ring 12 and the second semicircular ring 14 of novel hanging tool are positioned over the bottom for treating hoisting grid ball 50, in the net First semicircular ring 12 of the utility model lifting device and the second semicircular ring 14 are spliced at the bottom position of frame ball 50 Annulus 10, and be fastenedly connected by bolt 40, the first lifting rope 20 and the second lifting rope 30 are connected with crane hook afterwards, slowly carry Rise, in lifting process, net frame ball 50 is fixed in annulus 10.It is noted that the lifting rope of the utility model lifting device first 20 and second lifting rope 30 vertical direction stretch height fixed more than net frame ball 50 in annulus 10 when the net frame The overhead height of ball 50.
Lifted after net frame ball 50 to required position, the net frame ball 50 is fallen surely, due to connecting node 15 By the way of U-shaped end and type end pivot joint connection, so that during the dismounting of the utility model lifting device, it is only necessary to which any of which is connected Connect the bolt 40 at node 15 to take out, the type end at another connecting node 15 can rotate around bolt 40 in U-shaped end, thus, First semicircular ring 12 and the second semicircular ring 14 do not remove horizontal rotation at connecting node 15 at this, from the bottom of net frame ball 50 Taking-up, completes the dismounting of the utility model lifting device, and according to the lifting of the next net frame ball of above-mentioned steps progress Work.
In lifting, before the lifting of net frame ball or net frame ball fall it is steady after, i.e. the peace of the utility model lifting device Installation and dismantling are removed, and taking apart for one connecting node of selection can be needed according to practical operation, or taken apart while two connecting nodes.
The utility model lifting device is formed by welding using steel plate, simple in construction, easy to use, passes through reasonable Mechanics Calculation Ensure the security of hoisting process;In hoisting process, the first semicircular ring and the second semicircular ring connect and compose whole annulus, and by net Frame is fixed in the annulus with ball, is not in the phenomenon such as to rock, roll;Using the connecting node at U-shaped end and a type end, make Used time, which only dismantles a connecting node, can complete the installation and dismounting of lifting device, save the time, improve net frame ball Lift efficiency.

Claims (6)

1. a kind of lifting device of net frame ball, it is characterised in that:Including an annulus, the annulus is by the first semicircular ring and second Semicircular ring is connected and composed, and the both ends of the both ends of first semicircular ring respectively with second semicircular ring are connected and the company of being formed Connect node;First semicircular ring is provided with two the first holes, two first holes and is equipped with the first lifting rope;Described the second half Annulus is provided with two the second holes, two second holes and is equipped with the second lifting rope.
2. the lifting device of net frame ball according to claim 1, it is characterised in that:The two ends of first semicircular ring Portion is respectively U-shaped end, and the both ends of second semicircular ring are respectively a type end, and the type end is plugged in the U-shaped end, Two U-shaped ends of second semicircular ring are connected with two 1 type ends of first semicircular ring by bolt pivot joint respectively, and are formed The connecting node.
3. the lifting device of net frame ball according to claim 1, it is characterised in that:The two ends of first semicircular ring Portion is respectively U-shaped end and a type end, and the two ends of second semicircular ring are respectively a type end and U-shaped end, second semicircular ring A type end be plugged in the U-shaped end of first semicircular ring, and the U-shaped end of first semicircular ring and second semicircle One type end of ring is pivotally connected connection by bolt and forms the connecting node;One type end of first semicircular ring is plugged in described In the U-shaped end of two semicircular rings, and the U-shaped end of second semicircular ring and a type end of first semicircular ring pass through bolt pivot Connect to form the connecting node in succession.
4. the lifting device of the net frame ball according to Claims 2 or 3, it is characterised in that:In the annulus by the U Type end and the type end are connected at the connecting node position to be formed, and are formed with a recess towards circle ring center.
5. the lifting device of net frame ball according to claim 1, it is characterised in that:Described two first holes and described Two the second holes are set in qually spaced on the annulus.
6. the lifting device of net frame ball according to claim 5, it is characterised in that:The both ends of first lifting rope It is separately fixed in described two first holes of first semicircular ring;The both ends of second lifting rope are separately fixed at described In described two second holes of second semicircular ring.
CN201720266351.6U 2017-03-17 2017-03-17 The lifting device of net frame ball Expired - Fee Related CN206599364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720266351.6U CN206599364U (en) 2017-03-17 2017-03-17 The lifting device of net frame ball

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720266351.6U CN206599364U (en) 2017-03-17 2017-03-17 The lifting device of net frame ball

Publications (1)

Publication Number Publication Date
CN206599364U true CN206599364U (en) 2017-10-31

Family

ID=60145443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720266351.6U Expired - Fee Related CN206599364U (en) 2017-03-17 2017-03-17 The lifting device of net frame ball

Country Status (1)

Country Link
CN (1) CN206599364U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106927354A (en) * 2017-03-17 2017-07-07 中国建筑第八工程局有限公司 The lifting device and its hanging method of net frame ball

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106927354A (en) * 2017-03-17 2017-07-07 中国建筑第八工程局有限公司 The lifting device and its hanging method of net frame ball

Similar Documents

Publication Publication Date Title
CN108862045B (en) Special-shaped steel truss girder rod piece turning device and method for turning over rod piece
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN107268969A (en) A kind of scaffold structure for work high above the ground
CN101434366A (en) Hoisting tool and hoisting method for column component
CN103241652A (en) Overturning process of heavy equipment
CN201301173Y (en) Auxiliary lifting appliance for large-sized component
CN206599364U (en) The lifting device of net frame ball
CN106927354A (en) The lifting device and its hanging method of net frame ball
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN201334770Y (en) Wall-attached supporting seat
CN203889888U (en) Steel plate hoisting clamp
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN204778321U (en) Reinforcement cage hoisting device
CN207759922U (en) Large span suspender
CN210658056U (en) Bridge steel stand hoist and mount device of turning
CN205034985U (en) Tower crane lifting hook anti -falling device
CN204454225U (en) A kind of welded structure of solid drawn pipe is without moment of flexure support beam
CN207713240U (en) A kind of magnetic force boom hoisting suitable for different size steel plates
CN203664947U (en) Tower-type cargo boom transitional joint splicing welding tool
CN203065046U (en) Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower
CN205590183U (en) Tower machine standard festival welding frock
CN206550391U (en) A kind of electric drill auxiliary support apparatus
CN205935720U (en) Steel truss frame that slides
CN204960280U (en) But integral hoisting and used repeatedly's scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

CF01 Termination of patent right due to non-payment of annual fee