CN107268969A - A kind of scaffold structure for work high above the ground - Google Patents

A kind of scaffold structure for work high above the ground Download PDF

Info

Publication number
CN107268969A
CN107268969A CN201710515426.4A CN201710515426A CN107268969A CN 107268969 A CN107268969 A CN 107268969A CN 201710515426 A CN201710515426 A CN 201710515426A CN 107268969 A CN107268969 A CN 107268969A
Authority
CN
China
Prior art keywords
support bar
transverse support
sleeve
high above
work high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710515426.4A
Other languages
Chinese (zh)
Other versions
CN107268969B (en
Inventor
聂意江
蒋荣波
金新华
荣冠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201710515426.4A priority Critical patent/CN107268969B/en
Publication of CN107268969A publication Critical patent/CN107268969A/en
Application granted granted Critical
Publication of CN107268969B publication Critical patent/CN107268969B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a kind of scaffold structure for work high above the ground, it is related to construction engineering technical field, including track post, movable sleeve, transverse support bar, inclined support bar, operation platform and elevating mechanism, the present invention supports work zone using single rail post as support member, that is transverse support bar and operation platform, simplify the structure of scaffold, and transverse support bar can be moved up and down under the driving of elevating mechanism, improve the flexibility of operation, simultaneously, operation platform can also carry out lateral rotation, it is adapted to the construction operation of orthogonal two metopes, expand operating area, overall structure is simple, simple operation.

Description

A kind of scaffold structure for work high above the ground
Technical field
The present invention relates to construction engineering technical field, and in particular to a kind of scaffold structure for work high above the ground.
Background technology
With continuing to develop for China's economic society, infrastructure construction is as very important during national development One ring.Nowadays real estate industry flourishes, and high buildings and large mansions continuously emerge like the mushrooms after rain, and also constantly break a record. The decoration of exterior wall of flooring belongs to a kind of common work high above the ground mode, existing form of construction work be typically all build scaffold or Using the form of hanging basket, former mode builds cumbersome, and cost is higher, latter approach, and construction area is small, it is necessary to repeatedly move Position, efficiency is low, and stability is poor.Therefore develop a kind of efficient work high above the ground scaffold and seem particularly urgent.
Chinese Patent Application No. is that CN201410394257.X discloses a kind of collapsible scaffold of building iron structure, including by The support body of more than one group of support group composition, includes first support plate, second support plate and a connecting plate, institute per pack support group The two ends for stating first support plate and second support plate offer a bayonet socket, and each bayonet socket medial surface offers a through hole, even Fishplate bar is arranged in the bayonet socket, and positioned at connecting plate just to being provided with bearing pin at lead to the hole site, the bottom of the support body is provided with a bottom plate, The bottom of the first support plate is provided with the first groove, and the upper surface of the second support plate is provided with the second groove, each supporting plate Two bottom sides offer the first jack, be just provided with the second jack to the bottom base panel of the first jack, the first jack and the One support bar is set in two jacks.The present invention is simple in construction, by stair-stepping shape, the conveniently adjusted height in construction, Different height selects different sections, and flexibility is high, and foldable transportation, occupies little space, convenient transportation.But this kind is applied Movements and postures of actors structure may be only available for low latitude operation, and the scope of application is small, and narrow space, builder's inconvenient activity.
Chinese Patent Application No. is that CN201210034582.6 also discloses that a kind of movable scaffold.The new shifting Dynamic formula scaffold includes the guiding mechanism and the head tree on guiding mechanism being arranged on building keel;The master Workbench is installed on column.The invention also discloses a kind of construction method based on above-mentioned movable scaffold.Should Invention have it is lightweight, be convenient to mount and dismount, it is safe, can flexibly move, can quickly adjust the angle of workbench and building roof The advantages of spending, it is adaptable to all kinds of building roof constructions.It is more inconvenient and right but this kind of scaffold is when carrying out transverse shifting In orthogonal two metopes, it can not realize that two sides is constructed respectively.
The content of the invention
It is an object of the invention to provide a kind of scaffold structure for work high above the ground, to solve to cause in the prior art Above-mentioned multinomial defect.
A kind of scaffold structure for work high above the ground, including track post, movable sleeve, transverse support bar, inclined support bar, apply Work platform and elevating mechanism, the movable sleeve are socketed on track post, and movable sleeve includes upper movable sleeve and lower movable sleeve, upper work The side of dynamic set is connected with transverse support bar, and the side of lower movable sleeve is hinged with inclined support bar, the other end and the horizontal stroke of inclined support bar It is hinged to support bar, the transverse support bar is provided with slide rail, the bottom of the operation platform is provided with the walking coordinated with slide rail Mechanism, operation platform is surrounded by fence, and the two ends of transverse support bar are connected to drawstring one and drawstring two, the He of drawstring one Drawstring two is connected with elevating mechanism, and the outer end of the transverse support bar is provided with bolt hole, the axis and cross-brace of bolt hole The lateral surface of bar is vertical.
It is preferred that, the elevating mechanism includes sleeve, fixed pulley group and stop flange, and the stop flange is fixed on track The top of post, sleeve is socketed on track post and is connected by pivoting support with stop flange, the fixed pulley group have above and below two Group and the side for being separately mounted to sleeve, fixed pulley group include a pair of fixed pulleys being coaxially disposed.
It is preferred that, the walking mechanism includes anchor ear and roller, and the roller is rotatably connected in anchor ear.
It is preferred that, the transverse support bar is tuning fork-like, and the slide rail is located on the furcation in transverse support bar.
It is preferred that, it is provided with inside and outside the operation platform on horizontal round bar, horizontal round bar and is socketed with protection dress Put, the inner end of protection device is connected with limiting plate.
It is preferred that, the protection device includes sleeve pipe, scissor structure and protection network, and the scissor structure has two and difference Installed in the two ends of sleeve pipe, the protection network is connected between sleeve pipe and two scissor structures.
It is preferred that, the outer end of the horizontal round bar is threaded with capping.
It is preferred that, it is to have hawser to be provided with inside and outside the transverse support bar on link, link.
The advantage of the invention is that:
(1) work zone, i.e. transverse support bar and operation platform are supported as support member using single rail post, The structure of scaffold is simplified, and transverse support bar can be moved up and down under the driving of elevating mechanism, improve the flexible of operation Property;
(2) connected between transverse support bar and track post using movable sleeve, transverse support bar can be changed as needed Direction, when particularly to orthogonal two metope operations, can switch to any wall at any time by rotating transverse support bar Face, realizes that a scaffold is constructed two metopes in batches, improves operating efficiency, and apply without row arrangement another set again The movements and postures of actors, save cost;
(3) landing and guide mechanism using fixed pulley group as drawstring one and drawstring two, landing process is steady, operation letter It is single, easily buying and the realization of required equipment;
(4) transverse support bar uses tuning fork-like, and the walking of operation platform is more steady, improves the safety system of construction Number;
(5) protection device set in the side of operation platform can protect the security that workmen operates, and protection Device convenient disassembly, in addition, the scissor structure used in protection device, protection network can be packed up and deployed as needed;
(6) in order to realize that the metope bigger to lateral separation is constructed in the present invention, by the outer of transverse support bar End sets bolt hole, it is possible to use connecting plate is assembled two scaffolds, expands its job area.
Brief description of the drawings
Fig. 1 is the front view of embodiment 1 in the present invention.
Fig. 2 is the cross-sectional view of the junction of walking structure and slide rail in the present invention.
Fig. 3 is the side view of fixed pulley group in the present invention.
Fig. 4 is transverse support bar and the top view after operation platform assembling in the embodiment of the present invention 1.
Fig. 5 is the top view of operation platform in the embodiment of the present invention 2.
Fig. 6 is the front view of operation platform in the embodiment of the present invention 2.
The connection diagram of transverse support bar after Fig. 7 assembles for two neighboring scaffold in the present invention.
Wherein, movable sleeve under 1- tracks post, the upper movable sleeves of 2-, 3-, 4- transverse support bars, 5- inclined support bars, 6- constructions are flat Platform, 7- slide rails, 8- fences, 9- drawstrings one, 10- drawstrings two, 11- sleeves, 12- fixed pulley groups, 121- fixed pulleys, the spacing methods of 13- Orchid, 14- pivoting supports, 15- anchor ears, 16- rollers, 17- transverse direction round bars, 18- limiting plates, 19- sleeve pipes, 20- scissor structures, 21- Protection network, 22- cappings, 23- bolts hole, 24- links, 25- hawsers.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, is expanded on further the present invention.
Embodiment 1
As shown in Figures 1 to 4, a kind of scaffold structure for work high above the ground, including track post 1, laterally movable sleeve, branch Strut 4, inclined support bar 5, operation platform 6 and elevating mechanism, the movable sleeve are socketed on track post 1, and movable sleeve includes upper Movable sleeve 2 and lower movable sleeve 3, the side of upper movable sleeve 2 are connected with transverse support bar 4, the side of lower movable sleeve 3 and inclined support bar 5 are hinged, and the other end and the transverse support bar 4 of inclined support bar 5 are hinged, and inclined support bar 5 is used to be supported transverse support bar 4, Stable effect is played, the transverse support bar 4 is provided with slide rail 7, and the bottom of the operation platform 6 is provided with to be coordinated with slide rail 7 Walking mechanism, operation platform 6 is surrounded by fence 8, and the two ends of transverse support bar 4 are connected to drawstring 1 and drawstring 2 10, drawstring 1 and drawstring 2 10 are connected with elevating mechanism.
In the present embodiment, the elevating mechanism includes sleeve 11, fixed pulley group 12 and stop flange 13, the spacing method Orchid 13 is fixed on the top of track post 1, and sleeve 11 is socketed on track post 1 and connected by pivoting support 14 with stop flange 13 Connect, the fixed pulley group 12 have above and below two groups and be separately mounted to the side of sleeve 11, fixed pulley group 12 is coaxially set including a pair The fixed pulley 121 put.Drawstring 1 and drawstring 2 10 are wrapped in fixed pulley group 12 side by side, and the other end is connected with winch, by twisting The rotation of car, adjusts the length of drawstring, and then realizes moving up and down for transverse support bar 4.
In the present embodiment, the walking mechanism includes anchor ear 15 and roller 16, and the roller 16 is rotatably connected on anchor ear In 15.Operation platform 6 will not be rocked by together with 7 armfuls of anchor ear 15 and slide rail, recycled roller 16 to move left and right, realized The adjustment of the operating area of operation platform 6.
In the present embodiment, the transverse support bar 4 is tuning fork-like, the bifurcated that the slide rail 7 is located in transverse support bar 4 In portion.The walking of operation platform 6 is more steady, improves the safety coefficient of construction
Embodiment 2
As shown in Figures 1 to 6, a kind of scaffold structure for work high above the ground, including track post 1, laterally movable sleeve, branch Strut 4, inclined support bar 5, operation platform 6 and elevating mechanism, the movable sleeve are socketed on track post 1, and movable sleeve includes upper Movable sleeve 2 and lower movable sleeve 3, the side of upper movable sleeve 2 are connected with transverse support bar 4, the side of lower movable sleeve 3 and inclined support bar 5 are hinged, and the other end and the transverse support bar 4 of inclined support bar 5 are hinged, and inclined support bar 5 is used to be supported transverse support bar 4, Stable effect is played, the transverse support bar 4 is provided with slide rail 7, and the bottom of the operation platform 6 is provided with to be coordinated with slide rail 7 Walking mechanism, operation platform 6 is surrounded by fence 8, and the two ends of transverse support bar 4 are connected to drawstring 1 and drawstring 2 10, drawstring 1 and drawstring 2 10 are connected with elevating mechanism.
In the present embodiment, the elevating mechanism includes sleeve 11, fixed pulley group 12 and stop flange 13, the spacing method Orchid 13 is fixed on the top of track post 1, and sleeve 11 is socketed on track post 1 and connected by pivoting support 14 with stop flange 13 Connect, the fixed pulley group 12 have above and below two groups and be separately mounted to the side of sleeve 11, fixed pulley group 12 is coaxially set including a pair The fixed pulley 121 put.Drawstring 1 and drawstring 2 10 are wrapped in fixed pulley group 12 side by side, and the other end is connected with winch, by twisting The rotation of car, adjusts the length of drawstring, and then realizes moving up and down for transverse support bar 4.
In the present embodiment, the walking mechanism includes anchor ear 15 and roller 16, and the roller 16 is rotatably connected on anchor ear In 15.Operation platform 6 will not be rocked by together with 7 armfuls of anchor ear 15 and slide rail, recycled roller 16 to move left and right, realized The adjustment of the operating area of operation platform 6.
In the present embodiment, the transverse support bar 4 is tuning fork-like, the bifurcated that the slide rail 7 is located in transverse support bar 4 In portion.The walking of operation platform 6 is more steady, improves the safety coefficient of construction
In the present embodiment, it is provided with horizontal round bar 17, horizontal round bar 17 and covers inside and outside the operation platform 6 Protection device is connected to, the inner end of protection device is connected with limiting plate 18, and the protection device includes sleeve pipe 19, the and of scissor structure 20 Protection network 21, the scissor structure 20 has two and is separately mounted to the two ends of sleeve pipe 19, and the protection network 21 is connected to sleeve pipe Between 19 and two scissor structures 20.Protection device can protect the security that workmen operates, and protection device dismounting side Just, in addition, the scissor structure 20 used in protection device, protection network 21 can be packed up and deployed as needed.
In the present embodiment, the outer end of the horizontal round bar 17 is threaded with capping 22, after sleeve pipe 19 is installed, can profit The outer end of horizontal round bar 17 is sealed with capping 22, sleeve pipe 19 carried out spacing, it is to avoid it occurs transverse shifting.
Embodiment 3
As shown in Figures 1 to 7, a kind of scaffold structure for work high above the ground, including track post 1, laterally movable sleeve, branch Strut 4, inclined support bar 5, operation platform 6 and elevating mechanism, the movable sleeve are socketed on track post 1, and movable sleeve includes upper Movable sleeve 2 and lower movable sleeve 3, the side of upper movable sleeve 2 are connected with transverse support bar 4, the side of lower movable sleeve 3 and inclined support bar 5 are hinged, and the other end and the transverse support bar 4 of inclined support bar 5 are hinged, and inclined support bar 5 is used to be supported transverse support bar 4, Stable effect is played, the transverse support bar 4 is provided with slide rail 7, and the bottom of the operation platform 6 is provided with to be coordinated with slide rail 7 Walking mechanism, operation platform 6 is surrounded by fence 8, and the two ends of transverse support bar 4 are connected to drawstring 1 and drawstring 2 10, drawstring 1 and drawstring 2 10 are connected with elevating mechanism.
In the present embodiment, the elevating mechanism includes sleeve 11, fixed pulley group 12 and stop flange 13, the spacing method Orchid 13 is fixed on the top of track post 1, and sleeve 11 is socketed on track post 1 and connected by pivoting support 14 with stop flange 13 Connect, the fixed pulley group 12 have above and below two groups and be separately mounted to the side of sleeve 11, fixed pulley group 12 is coaxially set including a pair The fixed pulley 121 put.Drawstring 1 and drawstring 2 10 are wrapped in fixed pulley group 12 side by side, and the other end is connected with winch, by twisting The rotation of car, adjusts the length of drawstring, and then realizes moving up and down for transverse support bar 4.
In the present embodiment, the walking mechanism includes anchor ear 15 and roller 16, and the roller 16 is rotatably connected on anchor ear In 15.Operation platform 6 will not be rocked by together with 7 armfuls of anchor ear 15 and slide rail, recycled roller 16 to move left and right, realized The adjustment of the operating area of operation platform 6.
In the present embodiment, the transverse support bar 4 is tuning fork-like, the bifurcated that the slide rail 7 is located in transverse support bar 4 In portion.The walking of operation platform 6 is more steady, improves the safety coefficient of construction
In the present embodiment, it is provided with horizontal round bar 17, horizontal round bar 17 and covers inside and outside the operation platform 6 Protection device is connected to, the inner end of protection device is connected with limiting plate 18, and the protection device includes sleeve pipe 19, the and of scissor structure 20 Protection network 21, the scissor structure 20 has two and is separately mounted to the two ends of sleeve pipe 19, and the protection network 21 is connected to sleeve pipe Between 19 and two scissor structures 20.Protection device can protect the security that workmen operates, and protection device dismounting side Just, in addition, the scissor structure 20 used in protection device, protection network 21 can be packed up and deployed as needed.
In the present embodiment, the outer end of the horizontal round bar 17 is threaded with capping 22, after sleeve pipe 19 is installed, can profit The outer end of horizontal round bar 17 is sealed with capping 22, sleeve pipe 19 carried out spacing, it is to avoid it occurs transverse shifting.
In the present embodiment, the outer end of the transverse support bar 4 is provided with bolt hole 23, and the axis of bolt hole 23 is with laterally propping up The lateral surface of strut 4 is vertical.Constructed in the metope bigger to lateral separation, by being set in the outer end of transverse support bar 4 Bolt hole 23, it is possible to use connecting plate is assembled two scaffolds, expands its job area.
In addition, it is to have hawser 25 to be provided with inside and outside the transverse support bar 4 on link 24, link 24.Utilize Hawser 25 can pull to transverse support bar 4 at the metope for needing to construct, moreover it is possible to be fixed, prevent it from rotating skew.
As known by the technical knowledge, the present invention can be by the embodiment party of other essence or essential feature without departing from its spirit Case is realized.Therefore, embodiment disclosed above, for each side, is all merely illustrative, and is not only.Institute Have within the scope of the present invention or be included in the invention in the change being equal in the scope of the present invention.

Claims (8)

1. a kind of scaffold structure for work high above the ground, it is characterised in that including track post (1), movable sleeve, transverse support bar (4), inclined support bar (5), operation platform (6) and elevating mechanism, the movable sleeve are socketed on track post (1), movable sleeve bag Movable sleeve (2) and lower movable sleeve (3) are included, the side of upper movable sleeve (2) is connected with transverse support bar (4), lower movable sleeve (3) Side is hinged with inclined support bar (5), and the other end and the transverse support bar (4) of inclined support bar (5) are hinged, the transverse support bar (4) slide rail (7) is provided with, the bottom of the operation platform (6) is provided with the walking mechanism coordinated with slide rail (7), operation platform (6) Be surrounded by fence (8), the two ends of transverse support bar (4) are connected to drawstring one (9) and drawstring two (10), drawstring one (9) it is connected with drawstring two (10) with elevating mechanism, the outer end of the transverse support bar (4) is provided with bolt hole (23), bolt hole (23) axis is vertical with the lateral surface of transverse support bar (4).
2. a kind of scaffold structure for work high above the ground according to claim 1, it is characterised in that:The elevating mechanism Including sleeve (11), fixed pulley group (12) and stop flange (13), the stop flange (13) is fixed on the upper of track post (1) Portion, sleeve (11) is socketed on track post (1) and is connected by pivoting support (14) with stop flange (13), the fixed pulley group (12) two groups and the sides of sleeve (11) is separately mounted to above and below having, fixed pulley group (12) includes a pair of fixed pulleys being coaxially disposed (121)。
3. a kind of scaffold structure for work high above the ground according to claim 1, it is characterised in that:The walking mechanism Including anchor ear (15) and roller (16), the roller (16) is rotatably connected in anchor ear (15).
4. a kind of scaffold structure for work high above the ground according to claim 3, it is characterised in that:The cross-brace Bar (4) is tuning fork-like, and the slide rail (7) is located on the furcation in transverse support bar (4).
5. a kind of scaffold structure for work high above the ground according to claim 1, it is characterised in that:The operation platform (6) it is provided with inside and outside on horizontal round bar (17), horizontal round bar (17) and is socketed with protection device, the inner end of protection device It is connected with limiting plate (18).
6. a kind of scaffold structure for work high above the ground according to claim 5, it is characterised in that:The protection device Including sleeve pipe (19), scissor structure (20) and protection network (21), the scissor structure (20) has two and is separately mounted to sleeve pipe (19) two ends, the protection network (21) is connected between sleeve pipe (19) and two scissor structures (20).
7. a kind of scaffold structure for work high above the ground according to claim 5, it is characterised in that:The horizontal round bar (17) outer end is threaded with capping (22).
8. the scaffold structure for work high above the ground according to any one of claim 1-7, it is characterised in that:The horizontal stroke It is to have hawser (25) to be provided with inside and outside to support bar (4) on link (24), link (24).
CN201710515426.4A 2017-06-29 2017-06-29 A kind of scaffold structure for high altitude operation Active CN107268969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710515426.4A CN107268969B (en) 2017-06-29 2017-06-29 A kind of scaffold structure for high altitude operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710515426.4A CN107268969B (en) 2017-06-29 2017-06-29 A kind of scaffold structure for high altitude operation

Publications (2)

Publication Number Publication Date
CN107268969A true CN107268969A (en) 2017-10-20
CN107268969B CN107268969B (en) 2019-02-01

Family

ID=60070549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710515426.4A Active CN107268969B (en) 2017-06-29 2017-06-29 A kind of scaffold structure for high altitude operation

Country Status (1)

Country Link
CN (1) CN107268969B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108147337A (en) * 2017-12-25 2018-06-12 郑州国知网络技术有限公司 A kind of gardens special-purpose ladder based on pulley blocks
CN108547438A (en) * 2018-05-07 2018-09-18 天元建设集团有限公司 A kind of lifting type support and its construction method
CN108843009A (en) * 2018-04-16 2018-11-20 东莞市朝立建筑工程有限公司 A kind of hanging basket for building
CN109441082A (en) * 2018-12-24 2019-03-08 蒿振侠 A kind of spiral shell supports composite truss platform
CN109441083A (en) * 2018-12-24 2019-03-08 蒿振侠 A kind of wedge knot composite truss platform
CN111441568A (en) * 2020-04-08 2020-07-24 台州宏丰建设有限公司 Hanging basket for high-altitude operation in building engineering
CN111906922A (en) * 2020-08-19 2020-11-10 龙建路桥股份有限公司 A portable web reinforcement device for processing of prefabricated box girder
CN113137050A (en) * 2021-04-14 2021-07-20 方远建设集团股份有限公司 Construction method of walking type operation platform for steel structure truss high-altitude construction
CN110552496B (en) * 2019-09-09 2021-11-26 中国一冶集团有限公司 Movable auxiliary corridor operating platform
CN116005932A (en) * 2022-12-03 2023-04-25 莱芜方圆建设集团有限公司 Construction platform for house building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2193401Y (en) * 1993-05-17 1995-03-29 周魁刚 Light elevating scaffold unit
CN2575219Y (en) * 2002-11-02 2003-09-24 陈定国 Device for connecting pipes of scaffold
CN101748885A (en) * 2010-02-11 2010-06-23 重庆盈丰升机械设备有限公司 Anti-falling device of attached lifting scaffold
CN103556811A (en) * 2013-10-14 2014-02-05 鞍山钢铁集团公司 Operating umbrella fastener used in limited space and use method thereof
CN105050935A (en) * 2013-03-15 2015-11-11 霍华德.M.钦 Weather maintenance system for offshore wind turbine maintenance program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2193401Y (en) * 1993-05-17 1995-03-29 周魁刚 Light elevating scaffold unit
CN2575219Y (en) * 2002-11-02 2003-09-24 陈定国 Device for connecting pipes of scaffold
CN101748885A (en) * 2010-02-11 2010-06-23 重庆盈丰升机械设备有限公司 Anti-falling device of attached lifting scaffold
CN105050935A (en) * 2013-03-15 2015-11-11 霍华德.M.钦 Weather maintenance system for offshore wind turbine maintenance program
CN103556811A (en) * 2013-10-14 2014-02-05 鞍山钢铁集团公司 Operating umbrella fastener used in limited space and use method thereof

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108147337B (en) * 2017-12-25 2020-10-02 江西四季景观建设有限公司 Special ladder in gardens based on assembly pulley
CN108147337A (en) * 2017-12-25 2018-06-12 郑州国知网络技术有限公司 A kind of gardens special-purpose ladder based on pulley blocks
CN108843009A (en) * 2018-04-16 2018-11-20 东莞市朝立建筑工程有限公司 A kind of hanging basket for building
CN108547438A (en) * 2018-05-07 2018-09-18 天元建设集团有限公司 A kind of lifting type support and its construction method
CN108547438B (en) * 2018-05-07 2023-06-02 天元建设集团有限公司 Lifting support and construction method thereof
CN109441083B (en) * 2018-12-24 2022-03-08 福州鼓楼纹英建筑工程有限责任公司 Wedge-junction truss type combined platform
CN109441083A (en) * 2018-12-24 2019-03-08 蒿振侠 A kind of wedge knot composite truss platform
CN109441082A (en) * 2018-12-24 2019-03-08 蒿振侠 A kind of spiral shell supports composite truss platform
CN110552496B (en) * 2019-09-09 2021-11-26 中国一冶集团有限公司 Movable auxiliary corridor operating platform
CN111441568A (en) * 2020-04-08 2020-07-24 台州宏丰建设有限公司 Hanging basket for high-altitude operation in building engineering
CN111441568B (en) * 2020-04-08 2021-07-27 台州宏丰建设有限公司 Hanging basket for high-altitude operation in building engineering
CN111906922A (en) * 2020-08-19 2020-11-10 龙建路桥股份有限公司 A portable web reinforcement device for processing of prefabricated box girder
CN111906922B (en) * 2020-08-19 2021-08-13 龙建路桥股份有限公司 A portable web reinforcement device for processing of prefabricated box girder
CN113137050A (en) * 2021-04-14 2021-07-20 方远建设集团股份有限公司 Construction method of walking type operation platform for steel structure truss high-altitude construction
CN113137050B (en) * 2021-04-14 2022-06-17 方远建设集团股份有限公司 Construction method of walking type operation platform for steel structure truss high-altitude construction
CN116005932A (en) * 2022-12-03 2023-04-25 莱芜方圆建设集团有限公司 Construction platform for house building

Also Published As

Publication number Publication date
CN107268969B (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN107268969A (en) A kind of scaffold structure for work high above the ground
CA2703803C (en) Land rig
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN205133081U (en) Novel hanging flower basket system
CN103342318A (en) Lifting device for steel truss inspection trolley working platform and installation method thereof
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN102615407B (en) Lift platform with moving wings
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN205820800U (en) The hydraulic lift without scaffold building template frame can be realized
CN104060813A (en) Construction device and method for large-span steel girder frame connection platform
CN103821339B (en) Operation platform modular unit and operation platform thereof
CN104912339B (en) Long-distance multi-span welding H-section steel roof beam installation method
CN210767825U (en) Turnover formwork construction system
CN113651225A (en) Welding hanger for high-altitude installation of large pipeline and use method
CN202170231U (en) Mobile pulling bar
CN207209829U (en) A kind of oil tank transport, installation integrated apparatus
CN206088904U (en) Guide tracked lift of guide rail detachable
CN104763165B (en) A kind of cement bunker top Elements of Space Grid Truss supporting construction
CN202517181U (en) Double-vane walking lifting platform
CN215254417U (en) Safety scaffold for building engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant