CN206593118U - A kind of Boiler Cinder Surveying cleaning plant - Google Patents

A kind of Boiler Cinder Surveying cleaning plant Download PDF

Info

Publication number
CN206593118U
CN206593118U CN201720012728.5U CN201720012728U CN206593118U CN 206593118 U CN206593118 U CN 206593118U CN 201720012728 U CN201720012728 U CN 201720012728U CN 206593118 U CN206593118 U CN 206593118U
Authority
CN
China
Prior art keywords
housing
fixed
sedimentation basin
rotating bar
lift shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720012728.5U
Other languages
Chinese (zh)
Inventor
孙全熙
孙全忠
孙真
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720012728.5U priority Critical patent/CN206593118U/en
Application granted granted Critical
Publication of CN206593118U publication Critical patent/CN206593118U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Shovels (AREA)

Abstract

The utility model discloses a kind of Boiler Cinder Surveying cleaning plant, plate is placed including shovel slag device and first, the upper end of the first placement plate is sequentially provided with sedimentation basin and crush cell, the upper end of the sedimentation basin is provided tiltedly with housing, the side wall of the housing is provided with bearing, run through in the housing and be provided with lift shaft, the upper end of the lift shaft sequentially passes through bearing and housing and extends to the top of housing, the lower section of the housing is provided with opening, the lower end of the lift shaft runs through opening and extends to the inside of sedimentation basin, winding is provided with lifting blade in the lift shaft, the upper end of the lift shaft is fixed with first gear, the second drive device is fixed with the lateral wall of the housing.In the utility model, the processing of cinder can be carried out automatically by shoveling slag device, sedimentation basin can realize the simple wetting of cinder, and crush cell realizes the crushing of cinder, can directly carry out utilization again, save manpower and materials, it is simple to operate, it is adapted to promote.

Description

A kind of Boiler Cinder Surveying cleaning plant
Technical field
The utility model is related to cleaning plant technical field, more particularly to a kind of Boiler Cinder Surveying cleaning plant.
Background technology
In modern industry activity, people produce hot water and steam using boiler, and the life as people provides required The heat energy wanted, but boiler can produce substantial amounts of cinder, it is necessary to be cleared up during use, existing cinder cleaning side Formula, is exactly merely to be shoveled cinder to conveying arrangement by manpower, and time-consuming and laborious, efficiency is not also high, therefore, for the above Problem, we devise a kind of new slag that can shovel coal automatically, and are transported, and can pulverize into ickings directly for its secondary profit Device, old-fashioned cinder manner of cleaning up is replaced with this, to meet the life requirement of people.
Utility model content
The purpose of this utility model is that, in order to solve shortcoming present in prior art, and a kind of Boiler Cinder Surveying proposed is clear Manage device.
To achieve these goals, the utility model employs following technical scheme:
A kind of Boiler Cinder Surveying cleaning plant, including shovel slag device and first place plate, it is described first place plate upper end according to Secondary to be provided with sedimentation basin and crush cell, the upper end of the sedimentation basin is provided tiltedly with housing, and the side wall of the housing is provided with bearing, institute State to run through in housing and be provided with lift shaft, the upper end of the lift shaft sequentially passes through bearing and housing and extends to the top of housing, The lower section of the housing is provided with opening, and the lower end of the lift shaft runs through opening and extends to the inside of sedimentation basin, the lifting Winding is provided with lifting blade on axle, and the upper end of the lift shaft, which is fixed with first gear, the lateral wall of the housing, to be fixed with Second gear, the second gear and first gear are fixed with second drive device, the output shaft of second drive device Connected by transmission belt, side wall of the housing close to upper end is provided with the second discharge nozzle, and second discharge nozzle is away from housing One end be located at the top of crush cell, the first rotating bar is provided with the crush cell, the two ends of first rotating bar are run through The side wall of crush cell, the both sides of the crush cell are equipped with first driving means, and the output shaft of first driving means and first Rotating bar is fixedly connected, and first rotating bar is provided with several disks, and the edge annular spread of the disk has some Individual through hole, the edge of the disk is fixed with fix bar, and fix bar sequentially passes through the through hole on each disk, the fix bar Crushing blade is provided with, and crushing blade is arranged between two disks of arbitrary neighborhood, the crush cell is away from sedimentation basin One side bottom is provided with the first discharge nozzle.
Preferably, the shovel slag device includes the second placement plate, and the described second lower end for placing plate is provided with running gear, institute The upper end side for stating the second placement plate is provided with fixed seat, and the upper end of the fixed seat is fixed with the 3rd drive device, the described 3rd It is fixed with the output shaft of drive device in the second rotating bar, second rotating bar and is fixed with four the second shovel boards, described Side of two shovel boards away from the second rotating bar is fixed with the first shovel board.
Preferably, the first driving means, the second drive device and the 3rd drive device are motor.
Preferably, the running gear is universal wheel.
Preferably, the tapered structure of the first shovel board.
In the utility model, control running gear is moved to slag device is shoveled in cinder heap so that the 3rd drive device is opened Beginning work, drives the second rotating bar to start to rotate, and then rotated while realizing the first shovel board and the second shovel board, the first shovel board Pyramidal structure, realize quickly shovel slag activity progress, cinder can be shoveled between two the second shovel boards, now by first Place the correct position that the device on plate is moved to shovel slag device side so that while shovel board is rotated, any two shovel board it Between cinder just fall into sedimentation basin, a small amount of water realizes the slight wetting of cinder in sedimentation basin, now cause second drive Move device to start working, therefore second gear starts to rotate, drive first gear to start to rotate by transmission belt, and then drive is carried Lifting shaft is rotated, and lifting blade also begins to rotate, while lifting blade is rotated so that the cinder after wetting is moved to lifting blade Above and as the rotation of lifting blade is transported to the second discharge nozzle, and then fall into crush cell, now cause two first drives Dynamic device is started working, and the first rotating bar is disc-rotated, while disk rotational, and fix bar, crushing blade are started simultaneously at Rotation work, realizes the crushing of cinder in crush cell, and is discharged by the first discharge nozzle, and the secondary profit of ickings directly can be achieved With.In the utility model, the processing of cinder can be carried out automatically by shoveling slag device, sedimentation basin can realize the simple wetting of cinder, Crush cell realizes the crushing of cinder, can directly carry out utilization again, save manpower and materials, simple to operate, is adapted to push away Extensively.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of Boiler Cinder Surveying cleaning plant structural representation;
Fig. 2 be the utility model proposes a kind of Boiler Cinder Surveying cleaning plant shovel slag device side view.
In figure:1 first placement plate, 2 first discharge nozzles, 3 running gears, 4 first driving means, 5 first rotating bars, 6 are consolidated Fixed pole, 7 transmission belts, 8 disks, 9 crushing blades, 10 crush cells, 11 second discharge nozzles, 12 bearings, 13 first gears, 14 precipitations Pond, 15 lifting blades, 16 lift shafts, 17 housings, 18 second drive devices, 19 second gears, 20 first shovel boards, 21 second shovels Plate is placed in plate, 22 second rotating bars, 23 the 3rd drive devices, 24 second.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.
Reference picture 1-2, a kind of Boiler Cinder Surveying cleaning plant, including shovel slag device and first place plate 1, and shovel slag device is carried out Slag of shoveling coal is movable, and the upper end of the first placement plate 1 is sequentially provided with sedimentation basin 14 and crush cell 10, and sedimentation basin 14 carries out the transport of cinder With slight wetting, the device that the upper end of sedimentation basin 14 is provided tiltedly with housing 17, housing 17 realizes the transport of cinder, housing 17 Side wall is provided with bearing 12, realizes and runs through in the rotation of lift shaft 16, housing 17 provided with lift shaft 16, lift shaft 16 drives lifting Blade 15 rotates, and the upper end of lift shaft 16 sequentially passes through bearing 12 and housing 17 and the top for extending to housing 17, housing 17 Lower section is provided with opening, is easy to by lift shaft 16, the lower end of lift shaft 16 runs through opening and extends to the inside of sedimentation basin 14, side Just cinder is moved on lifting blade 15, and winding is provided with lifting blade 15 in lift shaft 16, and the upper end of lift shaft 16 is fixed with the One gear 13, drives lift shaft 16 and lifting blade 15 to rotate, the second drive device 18, band is fixed with the lateral wall of housing 17 Dynamic second gear 19 is rotated, and second gear 19 is fixed with the output shaft of the second drive device 18, and second gear 19 drives first Gear 13 is rotated, and second gear 19 and first gear 13 are connected by transmission belt 7, housing 17 close to upper end side wall provided with the Two discharge nozzles 11, the cinder after transport and after slight wetting is by entering in crush cell 10 herein, and the second discharge nozzle 11 is away from shell One end of body 17 is located at the top of crush cell 10, is easy to cinder to be directly entered in crush cell 10 and is crushed, is set in crush cell 10 There is the first rotating bar 5, the first rotating bar 5 drives disk 8 to rotate, the side wall of crush cell 10 is run through at the two ends of the first rotating bar 5, The rotation for realizing the first rotating bar 5 is fixed, and the both sides of crush cell 10 are equipped with first driving means 4, realize the first rotation The rotation of bar 5, and the output shaft of first driving means 4 is fixedly connected with the first rotating bar 5, the first rotating bar 5 is provided with some Individual disk 8, drives fix bar 6 to rotate, and the edge annular spread of disk 8 has several through holes, fixes fix bar 6, disk 8 Edge is fixed with fix bar 6, drives crushing blade 9 to rotate and crushed, and fix bar 6 is sequentially passed through on each disk 8 Through hole, fix bar 6 realizes the crushing of cinder provided with crushing blade 9, and crushing blade 9 is arranged on two circles of arbitrary neighborhood Between disk 8, a side bottom of the crush cell 10 away from sedimentation basin 14 is provided with the first discharge nozzle 2, realizes the output of the cinder after crushing.
In the utility model, shovel slag device includes second and places plate 24, and the second lower end for placing plate 24 is provided with running gear 3, the movement of shovel slag device is realized, the second upper end side for placing plate 24 is provided with fixed seat, fixes the 3rd drive device 23, Gu The upper end of reservation is fixed with the 3rd drive device 23, drives the second rotating bar 22 to rotate, on the output shaft of the 3rd drive device 23 The second rotating bar 22 is fixed with, drives the second shovel board 21 and the first shovel board 20 to be rotated, is realized in shovel slag, the second rotating bar 22 Four the second shovel boards 21 are fixed with, side of second shovel board 21 away from the second rotating bar 22 is fixed with the first shovel board 20, and first drives Dynamic device 4, the second drive device 18 and the 3rd drive device 23 are motor, and running gear 3 is universal wheel, realizes whole dress The movement for the manual control put, the tapered structure of the first shovel board 20 is easy to shovel slag.
In the utility model, control running gear 3 is moved to slag device is shoveled in cinder heap so that the 3rd drive device 23 Start working, drive the second rotating bar 22 to start to rotate, and then rotated while realizing the first shovel board 20 and the second shovel board 21, The pyramidal structure of first shovel board 20, realizes the progress of quickly shovel slag activity, cinder can be shoveled to two the second shovel boards 21 it Between, the first device placed on plate 1 is now moved to the correct position of shovel slag device side so that while shovel board is rotated, Cinder between any two shovel board is just fallen into sedimentation basin 14, and a small amount of water realizes the slight profit of cinder in sedimentation basin It is wet, now the second drive device 18 is started working, therefore second gear 19 starts to rotate, and first is driven by transmission belt 7 Gear 13 starts to rotate, and then drives lift shaft 16 to rotate, and lifting blade 15 also begins to rotate, and it is same that lifting blade 15 is rotated When so that the cinder after wetting is moved on lifting blade 15 and as the rotation of lifting blade 15 is transported to the second discharge nozzle 11 Place, and then fall into crush cell 10, now two first driving means 4 are started working, the first rotating bar 5 drives disk 8 Rotate, while disk 8 is rotated, fix bar 6, crushing blade 9 start simultaneously at rotation work, realize cinder in crush cell 10 Crush, and discharged by the first discharge nozzle 2, the secondary utilization of ickings directly can be achieved.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model is disclosed, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (5)

1. a kind of Boiler Cinder Surveying cleaning plant, including shovel slag device and first place plate (1), it is characterised in that described first puts The upper end for putting plate (1) is sequentially provided with sedimentation basin (14) and crush cell (10), and the upper end of the sedimentation basin (14) is provided tiltedly with housing (17), the side wall of the housing (17), which is provided with bearing (12), the housing (17) to run through, is provided with lift shaft (16), described to carry The upper end of lifting shaft (16) sequentially passes through bearing (12) and housing (17) and the top for extending to housing (17), the housing (17) Lower section is provided with opening, and the lower end of the lift shaft (16) runs through opening and extends to the inside of sedimentation basin (14), the lift shaft (16) winding is provided with lifting blade (15) on, and the upper end of the lift shaft (16) is fixed with first gear (13), the housing (17) it is fixed with lateral wall on the second drive device (18), the output shaft of second drive device (18) and is fixed with second Gear (19), the second gear (19) and first gear (13) are connected by transmission belt (7), and the housing (17) is close to upper end Side wall be provided with the second discharge nozzle (11), second discharge nozzle (11) away from housing (17) one end be located at crush cell (10) Top, the first rotating bar (5) is provided with the crush cell (10), crush cell is run through at the two ends of first rotating bar (5) (10) side wall, the both sides of the crush cell (10) are equipped with first driving means (4), and the output of first driving means (4) Axle is fixedly connected with the first rotating bar (5), and first rotating bar (5) is provided with several disks (8), the disk (8) Edge annular spread has several through holes, and the edge of the disk (8) is fixed with fix bar (6), and fix bar (6) is passed through successively The through hole on each disk (8) is worn, the fix bar (6) is arranged on arbitrarily provided with crushing blade (9), and crushing blade (9) Between two adjacent disks (8), a side bottom of the crush cell (10) away from sedimentation basin (14) is provided with the first discharge nozzle (2)。
2. a kind of Boiler Cinder Surveying cleaning plant according to claim 1, it is characterised in that the shovel slag device includes second Plate (24) is placed, the described second lower end for placing plate (24) is provided with running gear (3), and described second places the upper end one of plate (24) Side is provided with fixed seat, and the upper end of the fixed seat is fixed with the 3rd drive device (23), the 3rd drive device (23) it is defeated It is fixed with shaft on the second rotating bar (22), second rotating bar (22) and is fixed with four the second shovel boards (21), described Side of two shovel boards (21) away from the second rotating bar (22) is fixed with the first shovel board (20).
3. a kind of Boiler Cinder Surveying cleaning plant according to claim 1, it is characterised in that the first driving means (4), Second drive device (18) and the 3rd drive device (23) are motor.
4. a kind of Boiler Cinder Surveying cleaning plant according to claim 2, it is characterised in that the running gear (3) is ten thousand To wheel.
5. a kind of Boiler Cinder Surveying cleaning plant according to claim 2, it is characterised in that first shovel board (20) is in cone Shape structure.
CN201720012728.5U 2017-01-06 2017-01-06 A kind of Boiler Cinder Surveying cleaning plant Expired - Fee Related CN206593118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720012728.5U CN206593118U (en) 2017-01-06 2017-01-06 A kind of Boiler Cinder Surveying cleaning plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720012728.5U CN206593118U (en) 2017-01-06 2017-01-06 A kind of Boiler Cinder Surveying cleaning plant

Publications (1)

Publication Number Publication Date
CN206593118U true CN206593118U (en) 2017-10-27

Family

ID=60128034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720012728.5U Expired - Fee Related CN206593118U (en) 2017-01-06 2017-01-06 A kind of Boiler Cinder Surveying cleaning plant

Country Status (1)

Country Link
CN (1) CN206593118U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413423A (en) * 2018-02-01 2018-08-17 河南高盛企业管理咨询有限公司 A kind of dry slag efficient process equipment of electric boiler
CN111408168A (en) * 2020-05-18 2020-07-14 张丽 Sedimentation tank cleaning equipment for sewage treatment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413423A (en) * 2018-02-01 2018-08-17 河南高盛企业管理咨询有限公司 A kind of dry slag efficient process equipment of electric boiler
CN111408168A (en) * 2020-05-18 2020-07-14 张丽 Sedimentation tank cleaning equipment for sewage treatment

Similar Documents

Publication Publication Date Title
CN205700742U (en) The coal pulverizer with multiple reducing mechanism a kind of in power plant
CN204448236U (en) Building material promotes pulverizes drying process device
CN206593118U (en) A kind of Boiler Cinder Surveying cleaning plant
CN105214792B (en) A kind of sectional curve type lifting rib liner plate
WO2020237603A1 (en) Construction solid waste disposal device
CN209438733U (en) It is a kind of can be to the industrial chemicals grinding device that dust is collected
CN204460991U (en) A kind of bearing drying device
CN211099403U (en) Colliery rubbing crusher with dust removal function
CN205536995U (en) Seed drying device
CN204599302U (en) The novel fodder twin shaft grinding processing equipment of multi-angle oblique
CN207040288U (en) A kind of automatic feed straw crusher
CN213739236U (en) Compost fermentation device
CN205128165U (en) Novel vertical wheeled compound sand washer
CN111990069B (en) Reducing mechanism is used to agricultural
CN108738715A (en) A kind of agricultural machinery straw millstone
CN210752912U (en) Garbage crushing device for garbage disposal
CN210709434U (en) Sludge transportation equipment
CN204392864U (en) Dry land wheat harvesting drying process device
CN209576849U (en) A kind of efficient grinding device
CN108236996A (en) Construction vertical environment-friendly pulverizer
CN208340813U (en) A kind of stalk processing pulverizer being more energy-saving and environmentally friendly
CN205517964U (en) Agricultural raw materials rubbing crusher
CN207290377U (en) A kind of cotton stalk raw material chopper used for shaving board
CN206285790U (en) A kind of continuous type vertical beater tub
CN206380640U (en) A kind of vegetables hydro-peening clearing and drying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

Termination date: 20200106

CF01 Termination of patent right due to non-payment of annual fee