CN206591431U CN201720063112.0U CN201720063112U CN206591431U CN 206591431 U CN206591431 U CN 206591431U CN 201720063112 U CN201720063112 U CN 201720063112U CN 206591431 U CN206591431 U CN 206591431U
Authority
CN
China
Prior art keywords
bridge
cantilever
job platform
girder truss
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720063112.0U
Other languages
Chinese (zh)
Inventor
章勇
章兵
杨弋
董桂生
李建军
常潇
章潇逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Rui Fu Technology Co Ltd
Original Assignee
Hunan Rui Fu Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Rui Fu Technology Co Ltd filed Critical Hunan Rui Fu Technology Co Ltd
Priority to CN201720063112.0U priority Critical patent/CN206591431U/en
Application granted granted Critical
Publication of CN206591431U publication Critical patent/CN206591431U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of Multifunction working platform, including:It is slidably supported in the trackless dolly group on bridge floor, cantilever girder truss mechanism is fixedly connected with trackless dolly group, cantilever girder truss mechanism includes the cantilever girder truss assembly that is fixedly connected with trackless dolly group, and cantilever girder truss assembly is connected with faces the counterweight column frame mechanism tumbled sky side for preventing Multifunction working platform towards bridge.Cantilever girder truss assembly is also associated with job platform mechanism, job platform mechanism includes being connected with the cantilever end of cantilever girder truss assembly and positioned at the job platform truss assembly of bridge side, job platform truss assembly is connected with the main job platform for Construction of Supporting personnel's operation, and main job platform is horizontally disposed and the lower section of bridge is extended to by the side of bridge.Multifunction working platform of the present utility model can expand workmen to installation exercise working ranges such as the maintenance, maintenance, brushing of bridge, and improve operating efficiency and constructing operation security simultaneously.

Description

Multifunction working platform
Technical field
The utility model is related to road, field of bridge construction, especially, is related to a kind of Multifunction working platform.
Background technology
Bridge inspection vehicle, is a kind of special equipment of maintenance and preventive inspection operation suitable for large and medium-sized bridge, main It is that support operating personnel is worked with carrying out the installation exercises such as comprehensively maintenance, maintenance, brushing to each structure of bridge to want function, is bridge Safety beam provides safeguard.In the prior art, each structure of bridge is overhauled frequently with bridge inspection vehicle support operating personnel, tieed up The installation exercise work such as shield, brushing.The installation exercise such as overhauled, safeguarded, being brushed to each structure of bridge using bridge inspection vehicle During work, because the basket of work loaded area of bridge inspection vehicle is small, bearing capacity is weak, therefore several operation people can only be accommodated simultaneously Member's construction operation, therefore detection range is small, the positions such as bridge bottom plate, web, the edge of a wing can only be overhauled in single span, safeguarded, The work of the installation exercises such as brushing, while also causing operating efficiency and operational security low, therefore is not suitable for large-scale Oversea bridge Construction operation;In addition, bridge inspection vehicle cost is high, and it is expensive, cause construction cost high when using.
Utility model content
The utility model provides a kind of Multifunction working platform, with the detection model existed when solving and using bridge inspection vehicle Enclose small, operating efficiency and security is low, construction cost is high technical problem.
The technical solution adopted in the utility model is as follows:
A kind of Multifunction working platform, it is slidably supported in carrying out related work to bridge on bridge for Construction of Supporting personnel Industry, Multifunction working platform includes:It is slidably supported to be fixedly connected in the trackless dolly group on the bridge floor of bridge, trackless dolly group There is cantilever girder truss mechanism, the cantilever girder truss that cantilever girder truss mechanism includes being fixedly connected with trackless dolly group is total It is connected with into, cantilever girder truss assembly and faces the counterweight column frame machine tumbled sky side for preventing Multifunction working platform towards bridge Structure;Cantilever girder truss assembly is also associated with job platform mechanism, and job platform mechanism includes and cantilever girder truss assembly Cantilever end is connected and positioned at the job platform truss assembly of bridge side, and job platform truss assembly is connected with for Construction of Supporting The main job platform of personnel's operation, main job platform is horizontally disposed and the lower section of bridge is extended to by the side of bridge.
Further, job platform truss assembly include vertical beam component, vertical beam component be vertically arranged at the side of bridge and Its top is fixedly connected with the cantilever end of cantilever girder truss assembly;The bottom of vertical beam component is connected with perpendicular intersecting two Being provided between root connecting cross beam, two connecting cross beams is used to connect both main job platforms.
Further, job platform mechanism also includes being used to prevent the workmen being located on main job platform from dropping out main work The multiaspect guardrail component of industry platform, multiaspect guardrail component is connected with vertical beam component and two connecting cross beams respectively, and multiaspect guardrail Component joins end to end successively to be enclosed outside main job platform;Being provided between each guardrail component and main job platform is used to connect both And for the auxiliary job platform of workmen's operation.
Further, cantilever girder truss assembly is in frame type, and it includes two pieces of cantilever main beam members being oppositely arranged, two Provided with polylith for connecting both girder connecting elements between block cantilever main beam member;Counterweight column frame mechanism away from bridge with facing The girder connecting elements of empty side is fixedly connected.
Further, cantilever main beam member includes the cantilever master that horizontally disposed and end is extended in the space of bridge side Beam;Job platform mechanism is fixedly connected with the cantilever end of two cantilever girders of two pieces of cantilever main beam members.
Further, cantilever girder truss mechanism is also climbed to cantilever girder purlin including multi rack for the workmen on bridge Ladder stand at the top of frame assembly, each frame ladder stand is fixedly connected on the top of cantilever girder truss assembly and towards the bridge floor of bridge Extension.
Further, counterweight column frame mechanism includes the counterweight column frame assembly in frame type, counterweight column frame assembly and remote bridge The girder connecting elements that beam faces sky side is fixedly connected;Balancing weight is provided with counterweight column frame assembly.
Further, trackless dolly group includes being divided into four trackless dollies at four drift angles of square frame, cantilever girder Truss assembly is connected on four trackless dollies simultaneously, and each trackless dolly includes:It is connected with below vehicle frame, vehicle frame many Group roller group, traffic direction of multigroup roller group along trackless dolly sets gradually and is connected, and every group of roller group is included along vertical nothing Multiple rollers that the traffic direction of rail dolly sets gradually and is connected;The top of vehicle frame is provided with to be connected with one of which roller group To drive the actuator that all rollers in this group of roller group are rolled.
The utility model has the advantages that:
Multifunction working platform of the present utility model includes cantilever girder truss mechanism, and cantilever girder truss mechanism includes outstanding Arm girder truss assembly, the cantilever end of cantilever girder truss assembly is connected with job platform truss assembly, and job platform truss is total Into the main job platform being connected with for Construction of Supporting personnel's operation, the main job platform is horizontally disposed and is prolonged by the side of bridge The lower section of bridge is extended, each structure of bridge is entered so as to can support workmen using Multifunction working platform of the present utility model The installation exercise work such as row maintenance, maintenance, brushing, and Multifunction working platform of the present utility model is simple in construction, it is easy to build, Dismounting;Main job platform checks the hanging basket of car compared to existing highway bridge, and its Area of bearing is big, bearing capacity strong, can carry many simultaneously Name workmen, so as to expand workmen to installation exercise working ranges such as the maintenance, maintenance, brushing of bridge, and simultaneously Improve operating efficiency and constructing operation security;Multifunction working platform Construction of Supporting personnel's operation of the present utility model is built, By hanging basket Construction of Supporting personnel's operation of bridge inspection vehicle in compared with prior art, due to the letter of Multifunction working platform structure Singly, it is easy to build, so as to reduce to a certain extent because of the increased construction cost using bridge inspection vehicle.
In addition to objects, features and advantages described above, the utility model also has other purposes, feature and excellent Point.Below with reference to figure, the utility model is described in further detail.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing further understanding to of the present utility model, of the present utility model Schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is the space structure schematic diagram of the Multifunction working platform of the utility model preferred embodiment;
Fig. 2 is the main structure diagram that Multifunction working platform builds when on bridge in Fig. 1;
Fig. 3 is the structural representation for being used in Fig. 1 build the main pedal of main job platform;
Fig. 4 is the structural representation of several guardrail components in Fig. 1;
Fig. 5 is the structural representation for being used in Fig. 1 build the auxiliary pedal of auxiliary job platform;
Fig. 6 is the structural representation of cantilever main beam member in Fig. 1;
Fig. 7 is the structural representation of connecting cross beam in Fig. 1;
Fig. 8 is the structural representation of counterweight column frame assembly in Fig. 1;
Fig. 9 is the structural representation of trackless dolly in Fig. 1.
Marginal data
10th, bridge;20th, cantilever girder truss mechanism;21st, cantilever girder truss assembly;211st, cantilever main beam member;212、 Girder connecting elements;23rd, ladder stand;30th, counterweight column frame mechanism;31st, counterweight column frame assembly;40th, job platform mechanism;41st, make Industry platform truss assembly;411st, vertical beam component;412nd, connecting cross beam;42nd, main job platform;421st, main pedal;43rd, guardrail structure Part;44th, auxiliary job platform;441st, auxiliary pedal;50th, trackless dolly;51st, vehicle frame;52nd, roller group;53rd, actuator.
Embodiment
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, but the utility model can be by right It is required that the multitude of different ways for limiting and covering is implemented.
Referring to Figures 1 and 2, preferred embodiment of the present utility model provides a kind of Multifunction working platform, slidably supported In carrying out related operation to bridge 10 on bridge 10 for Construction of Supporting personnel, Multifunction working platform includes:It is slidably supported In being fixedly connected with cantilever girder truss mechanism 20, cantilever master in the trackless dolly group on the bridge floor of bridge 10, trackless dolly group Beam truss mechanism 20 includes the cantilever girder truss assembly 21 being fixedly connected with trackless dolly group, and cantilever girder truss assembly 21 connects It is connected to and faces the counterweight column frame mechanism 30 tumbled sky side for preventing Multifunction working platform towards bridge 10.Cantilever girder truss is total Job platform mechanism 40 is also associated with into 21, job platform mechanism 40 includes being connected with the cantilever end of cantilever girder truss assembly 21 And positioned at the job platform truss assembly 41 of the side of bridge 10, job platform truss assembly 41 is connected with for Construction of Supporting personnel The main job platform 42 of operation, main job platform 42 is horizontally disposed and the lower section of bridge 10 is extended to by the side of bridge 10.This The Multifunction working platform of utility model includes cantilever girder truss mechanism 20, and cantilever girder truss mechanism 20 includes cantilever girder Truss assembly 21, the cantilever end of cantilever girder truss assembly 21 is connected with job platform truss assembly 41, and job platform truss is total Main job platform 42 for Construction of Supporting personnel's operation is connected with into 41, the main job platform 42 is horizontally disposed and by bridge 10 Side extend to the lower section of bridge 10, so as to can support workmen to bridge using Multifunction working platform of the present utility model Each structure of beam 10 such as is overhauled, safeguarded, being brushed at installation exercise work, and the Multifunction working platform structure of the present utility model letter It is single, it is easy to build, dismantle;Main job platform 42 checks the hanging basket of car compared to existing highway bridge, and its Area of bearing is big, bearing capacity By force, several workmens can be carried simultaneously, so as to expand workmen to installation exercises such as the maintenance, maintenance, brushing of bridge Working range, and operating efficiency and constructing operation security are improved simultaneously;Build Multifunction working platform branch of the present utility model Support workmen's operation, compared with prior art in by hanging basket Construction of Supporting personnel's operation of bridge inspection vehicle, due to multi-functional Job platform is simple in construction, be easy to build, so as to reduce to a certain extent because of the increased construction using bridge inspection vehicle Cost.
Alternatively, as shown in Figure 2 and Figure 7, job platform truss assembly 41 includes vertical beam component 411, and vertical beam component 411 is erected The straight side and its top for being arranged at bridge 10 is fixedly connected with the cantilever end of cantilever girder truss assembly 21.The utility model has In body embodiment, vertical beam component 411 includes being provided between the connection vertical beam that two opposed verticals are set, two connection vertical beams and is used for Both connecting elements of connection.The bottom of vertical beam component 411 is connected with perpendicular two intersecting connecting cross beams 412, two Being provided between connecting cross beam 412 is used to connect both main job platforms 42.In the utility model specific embodiment, such as Fig. 1 and Shown in Fig. 3, main job platform 42 is assembled by polylith main pedal 421 as shown in Figure 3.
Preferably, as shown in Fig. 2 to prevent from outwards dropping out main work during the workmen's operation being located on main job platform 42 In industry platform 42, the utility model preferred embodiment, job platform mechanism 40 also includes being used to prevent from being located at main job platform 42 On workmen drop out the multiaspect guardrail component 43 of main job platform 42, structure such as accompanying drawing Fig. 4 institutes of multiaspect guardrail component 43 Show, in other embodiments, the structure of multiaspect guardrail component 43 can be the same or different, multiaspect guardrail component 43 respectively with Vertical beam component 411 is connected with two connecting cross beams 412, and multiaspect guardrail component 43 joins end to end enclose located at main job platform successively Outside 42.Further, being provided between each guardrail component 43 and main job platform 42 is used to connect both and supplies workmen's operation Auxiliary job platform 44.In the utility model specific embodiment, as shown in Figure 2 and Figure 5, auxiliary job platform 44 is by polylith such as Fig. 5 Shown auxiliary pedal 441 is assembled.By being provided for both connections between each guardrail component 43 and main job platform 42 And for the auxiliary job platform 44 of workmen's operation, can further increase the Area of bearing of Multifunction working platform, so as to enter one Step expands detection of the workmen to bridge, boundary of works area, improves operating efficiency and constructing operation security.
Alternatively, as shown in Figure 2 and Figure 6, cantilever girder truss assembly 21 is in frame type, and it includes two pieces be oppositely arranged Provided with polylith for connecting both girder connecting elements 212 between cantilever main beam member 211, two pieces of cantilever main beam members 211. Counterweight column frame mechanism 30 is fixedly connected with facing the girder connecting elements 212 of sky side away from bridge 10.
Further, as shown in Figure 2 and Figure 6, cantilever main beam member 211 includes being horizontally disposed with and end extends to bridge 10 Cantilever girder in the space of side.Two cantilever girders of job platform mechanism 40 and two pieces of cantilever main beam members 211 it is outstanding Arm end is fixedly connected.
Preferably, as depicted in figs. 1 and 2, climb to the top of cantilever girder truss assembly 21 and carry out for ease of workmen In operation, the utility model preferred embodiment, cantilever girder truss mechanism 20 also includes multi rack for the workmen on bridge 10 Climb to the ladder stand 23 at the top of cantilever girder truss assembly 21, each frame ladder stand 23 is fixedly connected on cantilever girder truss assembly 21 top and towards bridge 10 bridge floor extend.
Alternatively, as shown in Fig. 2 counterweight column frame mechanism 30 includes the counterweight column frame assembly 31 in frame type, counterweight column frame The structure of assembly 31 is as shown in accompanying drawing Fig. 8, and counterweight column frame assembly 31 is consolidated with facing the girder connecting elements 212 of sky side away from bridge 10 Fixed connection.Balancing weight (not shown) is provided with counterweight column frame assembly 31.
Alternatively, as shown in Figure 2 and Figure 9, trackless dolly group includes being divided into four tracklesses at four drift angles of square frame Dolly 50, cantilever girder truss assembly 21 is connected on two trackless dollies 50 simultaneously, and each trackless dolly 50 includes:Vehicle frame 51, the lower section of vehicle frame 51 is connected with multigroup roller group 52, and traffic direction of multigroup roller group 52 along trackless dolly 50 is set successively Put and be connected, every group of roller group 52 includes the multiple rollers for setting gradually and being connected along the traffic direction of vertical trackless dolly 50. The top of vehicle frame 51, which is provided with, is connected what is rolled to drive all rollers in this group of roller group 52 with one of which roller group 52 Actuator 53.In the utility model specific embodiment, as shown in figure 9, actuator 53 is motor, Multifunction working platform bag Two groups of trackless dolly groups are included, bearing of trend of two groups of trackless dolly groups along bridge 10 is arranged at intervals, and every group of trackless dolly group includes Two trackless dollies 50 being oppositely arranged, each trackless dolly 50 includes vehicle frame 51, and the lower section of vehicle frame 51 is connected with two groups Roller group 52, glide direction of two groups of roller groups 52 along trackless dolly 50 is arranged at intervals, and every group of roller group 52 is included along vertical nothing Three rollers that the traffic direction of rail dolly 50 sets gradually and is connected.
Referring to Figures 1 and 2, preferred embodiment of the present utility model additionally provides a kind of Multifunction working platform construction party Method, for constructing Multifunction working platform described above, construction method specifically includes following steps:
S1:Trackless dolly group is constructed on the bridge floor of the bridge 10 of Multifunction working platform to be built.
S2:Cantilever girder truss mechanism 20 is built in trackless dolly group and is built on cantilever girder truss mechanism 20 and is matched somebody with somebody Weight column frame mechanism 30.
S3:Job platform mechanism 40 is built on cantilever girder truss mechanism 20.
The Multifunction working platform construction method constructing operation of the present utility model for being used to construct Multifunction working platform Simply, using construction method of the present utility model can rapid build go out Multifunction working platform, for Construction of Supporting personnel make Industry, compared to bridge inspection vehicle is used, the Multifunction working platform constructed using construction method of the present utility model is simple in construction, It is easy to build, dismantles;Area of bearing is big, several workmens can be carried simultaneously, so as to expand inspection of the workmen to bridge Survey, boundary of works area, and operating efficiency is improved, while improving constructing operation security, and it can reduce to a certain extent because using Bridge inspection vehicle and increased construction cost.
Alternatively, cantilever girder truss mechanism 20 and the structure on cantilever girder truss mechanism 20 are built in trackless dolly group Build counterweight column frame mechanism 30 and specifically include following steps:
S201:Go out cantilever girder truss assembly 21, counterweight column frame assembly 31 in bridge floor over-assemble.
S202:Cantilever girder truss assembly 21 is assembled in trackless dolly group.
S203:On the side wall that counterweight column frame assembly 31 is assembled to cantilever girder truss assembly 21;
S204:Balancing weight is placed in counterweight column frame assembly 31.
Specifically, cantilever girder truss mechanism 20 and the structure on cantilever girder truss mechanism 20 are built in trackless dolly group Counterweight column frame mechanism 30 is built to specifically include:Cantilever girder truss assembly is assembled with I-steel and connecting rod first on bridge floor 21st, counterweight column frame assembly 31, the structure that cantilever girder truss assembly 21 is assembled is as shown in accompanying drawing Fig. 2, counterweight column frame assembly 31 The structure assembled is as shown in accompanying drawing Fig. 8;Then the cantilever girder truss assembly 21 assembled is assembled to trackless dolly group again On;Then the counterweight column frame assembly 31 assembled is assembled on the side wall of cantilever girder truss assembly 21;Finally by balancing weight It is placed in counterweight column frame assembly 31, so as to complete the structure of cantilever girder truss mechanism 20 and on cantilever girder truss mechanism 20 Build counterweight column frame mechanism 30.
Preferably, it is additionally included in bridge floor when bridge floor over-assemble goes out cantilever girder truss assembly 21, counterweight column frame assembly 31 Over-assemble goes out multi rack ladder stand 23, and the structure of ladder stand 23 is as shown in accompanying drawing Fig. 2.
Further, step S205 is also included after balancing weight is placed in counterweight column frame assembly 31:By multi rack ladder stand 23 It is separately assembled to the top of cantilever girder truss assembly 21.
Job platform mechanism 40 is built on cantilever girder truss mechanism 20 and specifically includes following steps:
S301:Go out vertical beam component 411, two connecting cross beams 412, for the main job platform 42 of component in bridge floor over-assemble The main pedal 421 of polylith.
S302:The top of vertical beam component 411 is fixedly connected with the cantilever end of cantilever girder truss mechanism 20.
S303:Two connecting cross beams 412 are connected in the lower horizontal of vertical beam component 411.
S304:The main pedal 421 of polylith is laid between two connecting cross beams 412 to construct main job platform 42.
Specifically, job platform mechanism 40 is built on cantilever girder truss mechanism 20 to specifically include:First on bridge floor Assemble vertical beam component 411, two connecting cross beams 412, the main pedals 421 of polylith for the main job platform 42 of component, this practicality In new specific embodiment, as shown in Fig. 2 vertical beam component 411 includes the connection vertical beam that two opposed verticals are set, two connections Being provided between vertical beam is used to connect both connecting elements, and the structure of main pedal 421 is as shown in accompanying drawing Fig. 3;Then by vertical beam structure The top of part 411 is fixedly connected with the cantilever end of cantilever girder truss mechanism 20;Then connect in the lower horizontal of vertical beam component 411 Two connecting cross beams 412 are connect, the structure of connecting cross beam 412 is as shown in accompanying drawing Fig. 7;Finally spread between two connecting cross beams 412 If the main pedal 421 of polylith is to construct main job platform 42.
Preferably, vertical beam component 411, two connecting cross beams 412 are gone out, for building main job platform 42 in bridge floor over-assemble Polylith main pedal 421 when also include:Go out multiaspect guardrail component 43 and for building auxiliary job platform 44 in bridge floor over-assemble The auxiliary pedal 441 of polylith, the structure of the guardrail component 43 assembled is as shown in accompanying drawing Fig. 4, structure such as accompanying drawing Fig. 5 of auxiliary pedal 441 It is shown.
Further, the main pedal 421 of polylith is laid between two connecting cross beams 412 to construct after main job platform 42 Also include step:
S305:Multiaspect guardrail component 43 is joined end to end successively and is installed in the periphery of main job platform 42;
S306:Auxiliary pedal 441 is laid between guardrail component 43 and main job platform 42 and is located at guardrail component to construct Auxiliary job platform 44 between 43 and main job platform 42.
Specifically, the main pedal 421 of polylith is laid between two connecting cross beams 412 to construct after main job platform 42 also Including:Multiaspect guardrail component 43 is joined end to end successively first and is installed in the periphery of main job platform 42;Then again in guardrail structure Auxiliary pedal 441 is laid between part 43 and main job platform 42 and is located at constructing between guardrail component 43 and main job platform 42 Auxiliary job platform 44.By the auxiliary job platform that both connections are provided between each guardrail component 43 and main job platform 42 44, can further increase the Area of bearing of Multifunction working platform so that further expand workmen to the detection of bridge, apply Work scope, improves operating efficiency and constructing operation security.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (8)

1. a kind of Multifunction working platform, it is characterised in that it is slidably supported on bridge (10) for Construction of Supporting personnel couple The bridge (10) carries out related operation, and the Multifunction working platform includes:
It is slidably supported in being fixedly connected with cantilever in the trackless dolly group on the bridge floor of the bridge (10), the trackless dolly group Girder truss mechanism (20), the cantilever girder truss mechanism (20) includes the cantilever master being fixedly connected with the trackless dolly group Beam truss assembly (21), the cantilever girder truss assembly (21) is connected with for preventing the Multifunction working platform towards described Bridge (10) faces the counterweight column frame mechanism (30) tumbled sky side;
The cantilever girder truss assembly (21) is also associated with job platform mechanism (40), and the job platform mechanism (40) includes The job platform truss for being connected with the cantilever end of the cantilever girder truss assembly (21) and being located at the bridge (10) side is total Into (41), the job platform truss assembly (41) is connected with the main job platform (42) for Construction of Supporting personnel's operation, institute State the lower section that main job platform (42) is horizontally disposed with and the bridge (10) are extended to by the side of the bridge (10).
2. Multifunction working platform according to claim 1, it is characterised in that
The job platform truss assembly (41) includes vertical beam component (411), and the vertical beam component (411) is vertically arranged at described The side and its top of bridge (10) are fixedly connected with the cantilever end of the cantilever girder truss assembly (21);
The bottom of the vertical beam component (411) is connected with perpendicular two intersecting connecting cross beams (412), two connections Being provided between crossbeam (412) is used to connect both main job platforms (42).
3. Multifunction working platform according to claim 2, it is characterised in that
The job platform mechanism (40) also includes being used to prevent the workmen being located on the main job platform (42) from dropping out The multiaspect guardrail component (43) of the main job platform (42), guardrail component (43) described in multiaspect respectively with the vertical beam component (411) it is connected with two connecting cross beams (412), and guardrail component described in multiaspect (43) joins end to end enclose located at described successively Main job platform (42) is outside;
Being provided between each guardrail component (43) and the main job platform (42) is used to be connected both and makees for workmen The auxiliary job platform (44) of industry.
4. Multifunction working platform according to claim 1, it is characterised in that
The cantilever girder truss assembly (21) is in frame type, and it includes two pieces of cantilever main beam members (211) being oppositely arranged, two Provided with polylith for connecting both girder connecting elements (212) between cantilever main beam member (211) described in block;
Counterweight column frame mechanism (30) and the fixed company of the girder connecting elements (212) for facing sky side away from the bridge (10) Connect.
5. Multifunction working platform according to claim 4, it is characterised in that
The cantilever main beam member (211) includes horizontally disposed and end and extends to hanging in the space of the bridge (10) side Arm girder;
The job platform mechanism (40) and the cantilever end of two cantilever girders of two pieces of cantilever main beam members (211) It is fixedly connected.
6. Multifunction working platform according to claim 1, it is characterised in that
The cantilever girder truss mechanism (20) also includes multi rack and climbed for the workmen on the bridge (10) to described outstanding Ladder stand (23) at the top of arm girder truss assembly (21), ladder stand (23) is fixedly connected on the cantilever girder purlin described in each frame The top of frame assembly (21) and towards the bridge (10) bridge floor extend.
7. Multifunction working platform according to claim 4, it is characterised in that
Counterweight column frame mechanism (30) include in frame type counterweight column frame assembly (31), the counterweight column frame assembly (31) with The girder connecting elements (212) for facing sky side away from the bridge (10) is fixedly connected;
Balancing weight is provided with the counterweight column frame assembly (31).
8. Multifunction working platform according to claim 1, it is characterised in that
The trackless dolly group includes being divided into four trackless dollies (50) at four drift angles of square frame, the cantilever girder purlin Frame assembly (21) is while be connected on four trackless dollies (50), and each described trackless dolly (50) includes:
Multigroup roller group (52), multigroup roller group (52) edge are connected with below vehicle frame (51), the vehicle frame (51) The traffic direction of the trackless dolly (50) sets gradually and is connected, and roller group (52) described in every group is included along the vertical trackless Multiple rollers that the traffic direction of dolly (50) sets gradually and is connected;
The top of the vehicle frame (51) is provided with to be connected to drive the group roller group with roller group described in one of which (52) (52) actuator (53) that all rollers in are rolled.
CN201720063112.0U 2017-01-18 2017-01-18 Multifunction working platform Expired - Fee Related CN206591431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720063112.0U CN206591431U (en) 2017-01-18 2017-01-18 Multifunction working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720063112.0U CN206591431U (en) 2017-01-18 2017-01-18 Multifunction working platform

Publications (1)

Publication Number Publication Date
CN206591431U true CN206591431U (en) 2017-10-27

Family

ID=60127419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720063112.0U Expired - Fee Related CN206591431U (en) 2017-01-18 2017-01-18 Multifunction working platform

Country Status (1)

Country Link
CN (1) CN206591431U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638299A (en) * 2017-01-18 2017-05-10 湖南瑞涪科技实业有限公司 Multifunctional operation platform and construction method
CN109577199A (en) * 2018-11-07 2019-04-05 同济大学 A kind of bridge lateral prestressed stretch-draw rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638299A (en) * 2017-01-18 2017-05-10 湖南瑞涪科技实业有限公司 Multifunctional operation platform and construction method
CN109577199A (en) * 2018-11-07 2019-04-05 同济大学 A kind of bridge lateral prestressed stretch-draw rack

Similar Documents

Publication Publication Date Title
CN106638299B (en) Multifunction working platform and construction method
CN206591432U (en) Pipe installing job platform
CN106894342A (en) Pipe installing job platform and construction method
CN102108788A (en) Method for constructing hanging in the air large-span support
CN106759845A (en) A kind of construction method of Steel corridor
CN206591431U (en) Multifunction working platform
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN105839907A (en) Suspension type steel platform scaffold foundation and method for mounting same
Hirakawa et al. Performance-based design of 300 m vertical city
CN201714051U (en) High altitude operation hanging frame
CN208563924U (en) A kind of assembled combination operation frame
CN103321438A (en) Large cantilever unit type protective canopy suitable for high-rise building construction
CN106121252B (en) A kind of hydraulic stepping is from climbing material transfering device and method
CN202016792U (en) Integral elevator
JP3179447U (en) Temporary scaffolding design support system
CN214302807U (en) Attached lifting scaffold supported by specially-made stand columns
CN211338598U (en) Ring rail hoisting device for installing high-rise curtain wall
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
Melkumyan et al. Application of base isolation to multifunctional multistory buildings in Yerevan, Armenia
Melkumyan et al. Structural Concept and Analysis of a 17‐Story Multifunctional Residential Complex with and without Seismic Isolation System
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
Lu et al. Research and practice of response control for tall buildings in mainland China
CN111395731A (en) Hanging cage and method for implementing overhead steel beam connection operation by using hanging cage
Weng et al. Application of energy dissipation technology to C-category frame structure of school buildings for seismic retrofit of increasing precautionary intensity
Bansal et al. Pushover analysis of multistorey buildings having flat slab and grid slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

Termination date: 20210118