CN206583880U - A kind of movable testing room - Google Patents

A kind of movable testing room Download PDF

Info

Publication number
CN206583880U
CN206583880U CN201720028044.4U CN201720028044U CN206583880U CN 206583880 U CN206583880 U CN 206583880U CN 201720028044 U CN201720028044 U CN 201720028044U CN 206583880 U CN206583880 U CN 206583880U
Authority
CN
China
Prior art keywords
laboratory
room
chassis
arc
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720028044.4U
Other languages
Chinese (zh)
Inventor
李洋
刘纪伟
安小龙
李晶晶
杨扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Branch Group inspection and Certification Co., Ltd.
Original Assignee
Jiangsu TRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu TRI filed Critical Jiangsu TRI
Priority to CN201720028044.4U priority Critical patent/CN206583880U/en
Application granted granted Critical
Publication of CN206583880U publication Critical patent/CN206583880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a kind of movable testing room, for the testing inspection in construction process, it is characterised in that including chassis, the walking mechanism on the chassis;It is arranged on the laboratory on the chassis;On the chassis, and for driving the walking mechanism to drive the driver's cabin of the chassis movement;It is arranged on the test detecting equipment for being used for that testing inspection is carried out to the sample in construction process in the laboratory;Being arranged on is used for the energy supplying system that the energy is provided for the test detecting equipment in the laboratory;Being arranged on is used for the water system that water is provided for the testing inspection in the laboratory.The movable testing room that the utility model is provided, the testing inspection cycle is short, and detection efficiency is high, and testing result is accurate.

Description

A kind of movable testing room
Technical field
The utility model is related to engineering Inspection Technique field, more particularly to a kind of movable testing room.
Background technology
To ensure the entity quality of the infrastructure projects such as highway, water transport, municipal administration, current construction unit is in engineering construction Cheng Zhong, can often introduce third party testing agency, and engineering is detected with raw material, semi-finished product, finished product etc..
Common program is that on the basis of construction, supervisor's detection are qualified, the is reported and submitted by unit in charge of construction or supervisor Tripartite testing agency is detected that sample is delivered to laboratory by testing agency after often sampling at the scene, then sample is examined Survey.
But, the more or less meeting of transportation one side causes damage to cause result distortion to sample, on the other hand It can lose time, schedule delays are less efficient, especially for the Northwest's Subgrade Compaction greatly developed in recent years, grey agent Amount, raw material are marched into the arena detection etc., are such as transported laboratory back and are detected again, can inevitably face haul distance remote, detection cycle length, Efficiency is low, result distortion the problems such as.
And the conventional detection laboratory for building at the construction field (site) temporarily, input is both needed to when building and removing certain Cost, and relevant unit of the laboratory attention degree often built temporarily not enough, can cause experimental enviroment be difficult to meet experiment It is required that, cause testing result distortion, be that engineering entity quality hides some dangers for.
Therefore, the inaccurate of testing result in the prior art caused by long range sample presentation how is solved, is ability Field technique personnel's urgent problem to be solved.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of movable testing room, and the testing inspection cycle is short, detection effect Rate is high, and testing result is accurate.
The technical scheme that the utility model solves technical problem is as follows:
A kind of movable testing room, for the testing inspection in construction process, it is characterised in that including chassis,
Walking mechanism on the chassis;
It is arranged on the laboratory on the chassis;
On the chassis, and for driving the walking mechanism to drive the driver's cabin of the chassis movement;
Being arranged in the laboratory is used to set the testing inspection that the sample in construction process carries out testing inspection It is standby;
Being arranged on is used for the energy supplying system that the energy is provided for the test detecting equipment in the laboratory;
Being arranged on is used for the water system that water is provided for the testing inspection in the laboratory.
Preferably, the energy supplying system includes generating equipment and energy storage device, the generating equipment and the energy storage device Electrical connection, the energy storage device is electrically connected with the test detecting equipment, or the generating equipment is examined with the experiment Measurement equipment is electrically connected.
Preferably, the generating equipment be fuel electric generating apparatus and/or device of solar generating,
The device of solar generating includes, the arc of lighting plate at the top of the laboratory, the arc of lighting plate with it is described Energy storage device is electrically connected;
The fuel electric generating apparatus is arranged in the laboratory.
Preferably, the arc of lighting plate is arranged at the top of the laboratory specifically, being provided with the top of the laboratory Shelve, the arc of lighting plate is hinged with the mounting bracket, and the arc of lighting plate can be overturn on the mounting bracket, be installed described First support member is installed, first support member is used to support the arc of lighting plate, to cause the arc of lighting plate in level on frame Face is tilted.
Preferably, the adjustable in length of first support member.
Preferably, the second support member is additionally provided with the top of the laboratory, it is fixed on second support member to connect Support bar is connected to, the one end of the support bar away from second support member is fixedly connected with the edge at the top of the laboratory, Covering mechanism is provided with the support bar, the covering mechanism is used to cover the device of solar generating.
Preferably, the covering mechanism includes roller shutter, and the tubulose of roller shutter described in scrolling is used on the support bar Motor, the guide rail being oriented to for the scrolling to the roller shutter, and protective cover, the tube shaped electric machine are arranged on the protection In cover.
Preferably, in addition to monitoring system, the monitoring system includes, video camera, place in the laboratory Device and display are managed, the video camera is wiredly and/or wirelessly connected with the processor, the display and the processor Connection, for showing the image information or video information that are gathered described in the video camera.
Preferably, in addition in the laboratory, for the alignment system positioned to the laboratory.
Preferably, the laboratory at least includes connecing specimen chamber, mechanics room, live room, the room that gathers materials, fog room, chemical analysis One kind in room.
Movable testing room provided by the utility model, because including chassis, the walking mechanism on chassis is tested Room is arranged on chassis, and the driver's cabin for driving walking mechanism to drive chassis movement is provided with chassis, and in laboratory The test detecting equipment for carrying out testing inspection to the sample in construction process is inside provided with, is provided with laboratory Energy supplying system and water system, under this structure, walking mechanism are driven by driver's cabin so that chassis is moved, so that setting The laboratory put on chassis moves together, when in construction process, laboratory being moved into job site, work as needs When carrying out project test detection, the project detected required for job site can in time be detected, therefore, with prior art Compare, it is to avoid the situation of testing result distortion in the prior art caused by long range sample presentation occurs, and shortens In the cycle of testing inspection, improve the efficiency of detection.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the movable testing room that the present embodiment is provided;
Fig. 2 is the internal structure schematic diagram of laboratory in the present embodiment;
Fig. 3 is the right view for the movable testing room that the present embodiment is provided;
Fig. 4 be the present embodiment provide arc of lighting plate be in heeling condition when movable testing room right view;
Fig. 5 is the top view of laboratory in the present embodiment;
Fig. 6 is the schematic diagram of device of solar generating in the present embodiment;
Fig. 7 is the partial schematic diagram of monitoring system in the present embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Please as shown in Figures 1 to 7, the utility model embodiment provides a kind of movable testing room, for construction process In testing inspection, including chassis 1, installed in the One On The Chassis walking mechanism 2, is arranged on the laboratory 3 on chassis, is arranged on On chassis 1, and the driver's cabin 4 for driving walking mechanism 2 to drive chassis 1 to move, being arranged in laboratory 3 is used to apply engineering Sample during work carries out the test detecting equipment of testing inspection, and being arranged in laboratory 3 is used to carry for test detecting equipment The energy supplying system 5 in energy supply source, and it is arranged on the water system 6 in laboratory 3 for providing water for testing inspection.
The movable testing room that the utility model embodiment is provided, it is mainly used in the experiment inspection in construction process Survey, be provided with because laboratory 3 is mounted on chassis 1, and on chassis 1 for driving walking mechanism to drive chassis 1 to move Dynamic driver's cabin 4, and be provided with laboratory 3 for the experiment inspection to the sample progress testing inspection in construction process Measurement equipment, is provided with energy supplying system 5 and water system in laboratory 3, under this structure, and vehicle with walking machine is driven by driver's cabin 4 Structure 2 so that chassis 1 is moved, is moved together so that being arranged on the One On The Chassis laboratory 3, when in construction process, energy It is enough that laboratory 3 is moved to job site, can be to being detected required for job site when needing to carry out project test detection Project detected in time, therefore, it is to avoid the situation of the testing result distortion caused by long range sample presentation occurs so that Testing inspection result in construction process is more accurate, it is ensured that the quality of engineering, and shortens the cycle of testing inspection, Improve the efficiency of detection.
It should be noted that the walking mechanism 2 in the utility model embodiment is road wheel system, chassis 1 can be used Automobile chassis can also use engineering chassis.
Laboratory 3 is provided with the door 37 being in communication with the outside and the window being in communication with the outside 38.
Wherein, being arranged on the One On The Chassis laboratory 3 includes connecing specimen chamber 31, mechanics room 32, live room 33, the room 34 that gathers materials, supports Protect room 35, chemical analysis room 36.Certainly, according to the need for actually detected, one of which or a variety of can be set.
Multiple detection functional compartments that laboratory 3 in the present embodiment is kept apart by container by dividing plate are constituted.
Wherein, set up inside live room 33, the room 34 that gathers materials, fog room 35, four side walls of chemical analysis room 36 and top plate Heat-insulation layer and decorative layer, it is possible to increase the heat-insulating property of above-mentioned four Room.
Wherein, specimen chamber 31, mechanics room 32, live room 33, the room 34 that gathers materials, fog room 35, chemical analysis room 36 is connect to pass through Door is set to connect, and each room is placed with the water pipe connected with water system, and the circuit being electrically connected with energy supplying system, with Ensure the application of the normal water power of each functional compartments.
Wherein, it is provided with window 38 on mechanics room 32, live room 33, the room 34 that gathers materials, the side wall of chemical analysis room 36, it is ensured that The ventilation of each functional compartments.
Connecing in specimen chamber 31 in the present embodiment, is provided with sample registration area and file cabinet, sample registration area provided with tables and chairs and Computer apparatus, is used, file cabinet is deposited for data for use in sample registration and other offices.
Universal testing machine, pressure testing machine, air-conditioning and header tank are provided with mechanics room 32.Universal testing machine is used to detect steel The mechanical property of muscle and its weldment, timely to detect whether its mechanical property meets in the entering of reinforcing steel bar or at the construction field (site) It is required that, if being unsatisfactory for requiring, processing of withdrawing from the arena can be required in time, Prior Control can be preferably carried out;Pressure testing machine is used to detect The compression strength of cement concrete test specimen;Air-conditioning is used for adjusting force room experimental enviroment, to ensure to meet test requirements document;Header tank For a Rectangular Water Trough, and water pump being installed, being supplied water using will pass through pipeline as each functional compartments.
Instruction case is provided with live room 33, can be used to put reisilometer, cover protectometer, filling according to actual conditions The conventional field detection test apparatus such as sand cylinder, theodolite, steel ruler, slide measure, to be detected in time to engineering entity.
Gathering materials, room 34 is interior to be set provided with a whole set of collection material screen, sieve shaker, baking oven, sand equivalent instrument, gill shape instrument, balance, air-conditioning etc. It is standby, marched into the arena and gathering materials for job site is detected to treat.
Heat-insulation layer, waterproof vapor barrier layer are set up in the partition wall of fog room 35 and top successively, and it is indoor provided with temperature and humidity controller, Humidifier and stainless steel frame, temperature and humidity controller, humidifier control maintenance indoor temperature and humidity, stainless steel frame are used to put concrete Test specimen, is timely conserved after being stripped so as to the test specimen for making or extracting at the construction field (site) under defined humiture, with Ensure the accuracy of testing result.
Provided with assay balance, cement/lime titration outfit, mortar, air-conditioning and graduated cylinder, volumetric flask etc. in chemical analysis room 36 Segment glass vessel, are detected in time for use in lime, cement/lime dosage etc., so as in time to underproof stone Ash carries out processing of withdrawing from the arena, and position unqualified to cement/lime carries out adding ash processing again, ensured while detection cycle is shortened Engineering entity quality.
Energy supplying system 5 in the present embodiment includes generating equipment 51 and energy storage device 52, generating equipment 51 and energy storage device 52 electrical connections, energy storage device 51 is electrically connected with test detecting equipment, or the generating equipment 51 and the testing inspection Equipment is electrically connected.Generating equipment 51 is used to provide electric energy for the normal operation of test detecting equipment.Can be by generating equipment 51 directly with testing inspection is standby set electrical connection, i.e. test detecting equipment operation when, generating equipment 51 is run;Can certainly be Generating equipment 51 is connected with energy storage device 52, and produced electric energy is directly transferred to energy storage device 52 by generating equipment 51, is passed through The driving test detecting equipment of energy storage device 52 is operated, and energy storage sets 52 setting, can store the energy of process so that examination Test the working time extension of detection device.
Wherein, generating equipment 51 is particularly preferred as fuel electric generating apparatus 511 or device of solar generating 512, or simultaneously Using fuel electric generating apparatus 511 or device of solar generating 512.Wherein, device of solar generating 512 includes being arranged on laboratory The arc of lighting plate 513 at top, arc of lighting plate 513 is electrically connected with energy storage device 52;Fuel electric generating apparatus 511 is arranged in laboratory 3.
In the utility model embodiment, arc of lighting plate 513 is arranged on the top of laboratory 3 and is particularly preferred as, at the top of laboratory 3 Mounting bracket 61 is installed, arc of lighting plate 513 is hinged with mounting bracket 61, and arc of lighting plate 513 can be overturn on mounting bracket 61, installed First support member 71 is installed, the first support member 71 is used to support arc of lighting plate 513, to cause arc of lighting plate 513 in level on frame 61 Face is tilted.
Wherein, mounting bracket 61 is preferred to use cuboid framework.Arc of lighting plate 513 is hinged with one side at the top of cuboid framework, And arc of lighting plate 513 can be rotated relative to the side with being hinged at the top of cuboid framework.Cuboid framework is by stainless steel rectangular pipe It is welded.The length and width of cuboid framework top/bottom surface can be equal to or slightly less than the length and width of arc of lighting plate 513.
Wherein, the rectangular support frame that the first support member 71 is preferably welded using stainless steel rectangular pipe, and rectangle branch The width of support frame is less than the width of cuboid framework top/bottom surface.Wherein, the adjustable in length of the first support member 71, specifically, square Shape carriage base and the distance between top margin are adjustable, so as to realize the regulation to the angle of inclination of arc of lighting plate 513.
In the utility model embodiment, protection network is provided with the top of cuboid framework, the setting of protection network can be right Arc of lighting plate 513 shields.
In the utility model embodiment, the second support member 72 is additionally provided with the top of laboratory 3, in the second support member 72 On be fixedly connected with support bar 62, the edge at the one end of support bar 62 away from the second support member 72 and laboratory 3 top, which is fixed, to be connected Connect, covering mechanism 8 is provided with support bar 62, covering mechanism 8 is used to cover device of solar generating 512.
The setting of second support member 72 enables covering mechanism 8 to be obliquely installed, and covering mechanism 8 is matched somebody with somebody with the second support member 72 Conjunction can shield to arc of lighting plate 513, such as rain-proof.
Wherein, covering mechanism 8 includes roller shutter 81, and the tube shaped electric machine 82 of scrolling roller shutter 81 is used on support bar 62, The guide rail 83 being oriented to for the scrolling to roller shutter 81, and protective cover 84, tube shaped electric machine 82 are arranged in protective cover 84.When During sleety weather, start tube shaped electric machine 82, in the presence of tube shaped electric machine 82, under roller shutter 82 is under the guide effect of guide rail 83 Put, the top of whole laboratory 3 is covered, so as to be shielded to the arc of lighting plate 513 in the top of laboratory 3.
Certainly, as a preferred embodiment, the second support member 72 can be arranged on to the centre at the top of laboratory 3 Position, covering mechanism 8 is respectively provided with the both sides of the second support member 72.
In the utility model embodiment, the second support member 72 is preferred to use I-steel, and I-steel is provided with two, every Covering mechanism 8 is mounted on one I-steel.
Because the water proofing property of tube shaped electric machine 82 requires higher, in order to avoid rainwater causes to damage to tube shaped electric machine 82, this reality With new embodiment there is provided protective cover 84.
Because the roller shutter of covering mechanism 8 has constant weight, in order to avoid roller shutter 81 is due to being chronically under deadweight state Support bar 62 is additionally provided with caused damage, the utility model embodiment, the setting of support bar 62 can share roller shutter 81 Deadweight, improve roller shutter 81 service life.Wherein, support bar 62 is preferred to use stainless steel tube.
The movable testing room that the utility model embodiment is provided also includes monitoring system 9, and monitoring system 9 includes, is arranged on Video camera 91, processor 92 and display 93 in laboratory 3, video camera 91 are wiredly and/or wirelessly connected with processor 92, Display 93 is connected with processor 92, for showing image information or video information that video camera 91 is gathered.
Wherein, video camera 91 is arranged in each performance room in laboratory 3, and video camera 91 is by each functional compartments of laboratory 3 On working condition real-time Transmission to the processor 92 of Surveillance center, device is then shown to staff by display 93, so set Put, by display 93 it can be seen that the testing inspection situation of each functional compartments, preferably can avoid testing staff from not tested Just provide report or the phenomenon such as process of the test is lack of standardization, and conventional monitor video can be recalled at any time and checked, can play preferable Supervisory role.
The movable testing room that the utility model embodiment is provided also includes being arranged in laboratory 3, for entering to laboratory 3 The alignment system 10 of row positioning.
Wherein, alignment system 10 is preferred to use GPS positioning device, by GPS positioning device by the positional information of laboratory 3 On real-time Transmission to processor 92, device is then shown to staff by display 93, so that Surveillance center grasps movement in real time The positional information of laboratory.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or new using this practicality Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can in other embodiments be realized in the case where not departing from spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (10)

1. a kind of movable testing room, for the testing inspection in construction process, it is characterised in that including chassis(1),
Installed in the chassis(1)On walking mechanism(2);
It is arranged on the chassis(1)On laboratory(3);
Installed in the chassis(1)On, and for driving the walking mechanism(2)Drive the chassis(1)Mobile driver's cabin (4);
It is arranged on the laboratory(3)It is interior to be used to set the testing inspection that the sample in construction process carries out testing inspection It is standby;
It is arranged on the laboratory(3)The interior energy supplying system for being used to provide the energy for the test detecting equipment(5);
It is arranged on the laboratory(3)The interior water system for being used to provide water for the testing inspection(6).
2. movable testing room according to claim 1, it is characterised in that the energy supplying system(5)Including generating equipment (51)With energy storage device(52), the generating equipment(51)With the energy storage device(52)Electrical connection, the energy storage device (52)It is electrically connected with the test detecting equipment, or the generating equipment(51)Electrically connect with the test detecting equipment Connect.
3. movable testing room according to claim 2, it is characterised in that the generating equipment(51)For fuel electric generating apparatus (511)And/or device of solar generating(512),
The device of solar generating(512)Including installed in the laboratory(3)The arc of lighting plate at top(513), the arc of lighting Plate(513)With the energy storage device(52)Electrical connection;
The fuel electric generating apparatus(511)Installed in the laboratory(3)It is interior.
4. movable testing room according to claim 3, it is characterised in that the arc of lighting plate(513)Installed in the experiment Room(3)Top is specifically, in the laboratory(3)Top is provided with mounting bracket(61), the arc of lighting plate(513)Installed with described Frame(61)It is hinged, and the arc of lighting plate(513)Can be in the mounting bracket(61)Upper upset, in the mounting bracket(61)It is upper to install There is the first support member(71), first support member(71)For supporting the arc of lighting plate(513), to cause the arc of lighting plate (513)Tilt in the horizontal plane.
5. movable testing room according to claim 4, it is characterised in that first support member(71)Adjustable length Section.
6. movable testing room according to claim 3, it is characterised in that in the laboratory(3)Top be additionally provided with Second support member(72), in second support member(72)On be fixedly connected with support bar(62), the support bar(62)It is remote Second support member(72)One end and the laboratory(3)The edge at top is fixedly connected, in the support bar(62)On It is provided with covering mechanism(8), the covering mechanism(8)For covering the device of solar generating(512).
7. movable testing room according to claim 6, it is characterised in that the covering mechanism(8)Including roller shutter(81), peace Mounted in the support bar(62)The upper tube shaped electric machine for roller shutter described in scrolling(82), for the roller shutter(81)Scrolling enter The guide rail that row is oriented to(83), and protective cover(84), the tube shaped electric machine(82)It is arranged on the protective cover(84)It is interior.
8. movable testing room according to claim 1, it is characterised in that also including monitoring system(9), the monitoring system (9)Including installed in the laboratory(3)Interior video camera(91), processor(92)And display(93), the video camera (91)With the processor(92)Wiredly and/or wirelessly connect, the display(93)With the processor(92)Connection, is used for Show the video camera(91)The image information or video information of collection.
9. movable testing room according to claim 1, it is characterised in that also including installed in the laboratory(3)It is interior, use In to the laboratory(3)The alignment system positioned(10).
10. movable testing room according to claim 1, it is characterised in that the laboratory(3)At least include connecing specimen chamber (31), mechanics room(32), live room(33), gather materials room(34), fog room(35), chemical analysis room(36)In one kind.
CN201720028044.4U 2017-01-11 2017-01-11 A kind of movable testing room Active CN206583880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720028044.4U CN206583880U (en) 2017-01-11 2017-01-11 A kind of movable testing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720028044.4U CN206583880U (en) 2017-01-11 2017-01-11 A kind of movable testing room

Publications (1)

Publication Number Publication Date
CN206583880U true CN206583880U (en) 2017-10-24

Family

ID=60109543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720028044.4U Active CN206583880U (en) 2017-01-11 2017-01-11 A kind of movable testing room

Country Status (1)

Country Link
CN (1) CN206583880U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108437182A (en) * 2018-05-04 2018-08-24 湖北省建筑科学研究设计院 Mobile fog room and its application method
CN108562726A (en) * 2018-05-04 2018-09-21 湖北省建筑科学研究设计院 Mobile measuring station and its application method
CN114485775A (en) * 2021-12-17 2022-05-13 国网江苏省电力工程咨询有限公司 Ultra-high voltage engineering panoramic intelligent material inspection movable laboratory

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108437182A (en) * 2018-05-04 2018-08-24 湖北省建筑科学研究设计院 Mobile fog room and its application method
CN108562726A (en) * 2018-05-04 2018-09-21 湖北省建筑科学研究设计院 Mobile measuring station and its application method
CN114485775A (en) * 2021-12-17 2022-05-13 国网江苏省电力工程咨询有限公司 Ultra-high voltage engineering panoramic intelligent material inspection movable laboratory

Similar Documents

Publication Publication Date Title
US20210310960A1 (en) Construction inspection robotic system and method thereof
CN206583880U (en) A kind of movable testing room
CN109658802B (en) Comprehensive pipe gallery fire experiment platform system and experiment method
CN207067019U (en) A kind of engineering construction Crack Detection unmanned plane
CN202634550U (en) Plant image collection apparatus
CN107796331A (en) Soil surface form monitoring device based on push-broom type LiDAR, the monitoring of soil surface form and data analysing method
CN205317238U (en) Ceramic tile testing machine
CN106840710A (en) Tyre noise test device and tyre noise data collecting system
CN107643072A (en) A kind of bridge construction line style real-time monitoring device and method
CN110824143A (en) Biological reinforcement inspection combined test device and test method thereof
CN206862919U (en) A kind of wind energy infra-red inspection instrument
CN110453578A (en) A kind of urban road detection robot system
CN204832077U (en) Humiture adjustable concrete shrinkage test box
CN207528732U (en) A kind of mobile laboratory
CN207332327U (en) A kind of strip thickness control device
CN206990398U (en) A kind of dust measurement equipment for quick detection
CN112213799A (en) Tandem type precipitation monitoring station and corresponding monitoring method
CN110412252A (en) A kind of solar radiation performance test apparatus and test method for concrete
CN206127886U (en) Bridge disease intelligent video detecting system
CN113029891B (en) Demonstration device for water permeability of reaction permeable brick
CN216433272U (en) Bridge temperature detection device
CN218211158U (en) Wall detection device for construction
CN116170564B (en) Method for acquiring reinforced bar image of core tube floor slab in top mold construction
CN205280012U (en) Many function detecting device of vehicle
CN209446794U (en) A kind of equipment for meteorological gradient observation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Xiankun Lu Jianye Jiangxinzhou District of Nanjing City, Jiangsu Province, No. 1 210019

Patentee after: Suzhou Branch Group inspection and Certification Co., Ltd.

Address before: 2200 No. 211112 Jiangsu city of Nanjing province Jiangning Science Park integrity Avenue

Patentee before: Jiangsu TRI