CN206580511U - Multifunctional construction operation platform for pipe rack - Google Patents

Multifunctional construction operation platform for pipe rack Download PDF

Info

Publication number
CN206580511U
CN206580511U CN201720096772.9U CN201720096772U CN206580511U CN 206580511 U CN206580511 U CN 206580511U CN 201720096772 U CN201720096772 U CN 201720096772U CN 206580511 U CN206580511 U CN 206580511U
Authority
CN
China
Prior art keywords
support
underframe
pipeline
supporting leg
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720096772.9U
Other languages
Chinese (zh)
Inventor
周大伟
薛刚
曾庆江
侯维
于鹏
汤春晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction First Bureau Group Installation Engineering Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201720096772.9U priority Critical patent/CN206580511U/en
Application granted granted Critical
Publication of CN206580511U publication Critical patent/CN206580511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A multifunctional construction operation platform for a pipe gallery comprises a supporting underframe, an operation table adjustably connected to the upper surface of the supporting underframe, a pair of jacking supports adjustably connected to two ends of the operation table, a pipeline jacking device arranged on the jacking supports, a platform hand-operated lifting device arranged between the supporting underframe and the operation table and a pipeline lifting device arranged in the supporting underframe; the pipeline jacking device comprises a jack tightly jacked on the jacking support and a pipe bracket connected to the top surface of the jacking support; the pipeline lifting device comprises a pipeline hand-operated lifting device arranged between a pair of sides of the top surface of the supporting underframe, a hanging beam connected with the pipeline hand-operated lifting device and sliding hangers connected to two sides of the hanging beam at intervals in a sliding manner. The utility model provides a traditional piping lane interior piping erection heavy and complicated, take one's place difficulty, inefficiency and problem with high costs.

Description

A kind of multi-functional construction operation platform of piping lane
Technical field
The utility model is related to piping lane construction field, particularly a kind of multi-functional construction operation platform of piping lane.
Background technology
With widely using for piping lane, piping lane interior conduit installation question gradually causes the concern of people, piping lane interior conduit peace Holding position variation, and piping lane narrow space is not easy to pipeline connection, needs to take when different parts, the pipeline connection of different height If different operating platforms, pipeline connection difficulty was not only added but also had added the workload of workman, needed again after the completion of pipeline connection Will top of support riser road is to install conduit saddle one by one, work complicated and inconvenient construction, therefore is badly in need of a kind of for piping lane interior conduit The device of installation, reduction difficulty of construction, accelerating construction progress.
Utility model content
The purpose of this utility model is to provide a kind of multi-functional construction operation platform of piping lane, to solve traditional piping lane interior conduit The problem of installing difficult, low efficiency complicated, in place and high cost.
To achieve the above object, the utility model is adopted the following technical scheme that:A kind of multi-functional construction operation platform of piping lane, Including support underframe, adjustable it is connected to support underframe operation above platform, adjustable a pair of jacking for being connected to operating desk two ends Support, the pipeline jacking apparatus being arranged on lifting-up support, the hand lifting dress of the platform being arranged between support underframe and operating desk Put and be arranged on the pipe riser in support underframe;The pipeline jacking apparatus is very heavy on lifting-up support including holding out against Push up and be connected to the conduit saddle of lifting-up support top surface;The pipe riser includes being arranged between the offside of support underframe top surface one Pipeline manual lifting device, the suspension crossbeam and interval sliding that are connected with pipeline manual lifting device are connected to suspension crossbeam two The slip suspension member of side.
It is preferred that, the support underframe is welded by square steel, including underframe supporting leg, is connected to adjacent underframe supporting leg top Between horizon bar and the bracing piece that is connected between horizon bar and underframe supporting leg;The underframe supporting leg bottom surface level connection joint has connection Connection inner tube is plugged with sleeve pipe, the connection sleeve pipe, the outer end of the connection inner tube is vertically connected with auxiliary support bar;Institute The bottom surface for stating connection sleeve pipe is connected with roller.
It is preferred that, the platform manual lifting device is arranged between another offside of support underframe top surface, including is arranged on branch The support screw at support underframe horizon bar two ends, the active for setting contiguous block in the middle of horizon bar, being arranged between two contiguous blocks enter Power worm screw, the driven power of the entering worm screw being connected to through contiguous block between support screw and it is connected to and actively enters power worm screw outer end Rocking handle.
It is preferred that, the pipeline manual lifting device, which includes being arranged between the offside horizon bar of support underframe one, actively enters power Screw rod and it is connected to the crank for actively entering power screw rod outer end;The two ends for actively entering power screw rod and hanging screw mandrel engagement connect Connect and support is in the support groove on the inside of horizon bar.
It is preferred that, it is described to slide pulley that suspension member includes being slidably connected with suspension crossbeam, be connected to the company of pulley outer face Fishplate bar and the collar for being connected to connecting plate corner;Worn on the collar and be connected to fake.
It is preferred that, the operating desk includes platform legs and landing slab;Platform legs upper end described in one is adjacent provided with hook In platform legs cup is hung with by buckling.
It is preferred that, the platform legs are plugged in underframe supporting leg and the supporting leg size of the two is adapted.
It is preferred that, the lifting-up support is arranged in pairs, and lifting-up support described in each pair includes support supporting leg and is connected to support Push rod between supporting leg top.
It is preferred that, the support supporting leg is plugged in platform legs and the supporting leg size of the two is adapted.
It is preferred that, the upper surface of the conduit saddle is arc, and its radian is consistent with institute support pipeline outer wall radian.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model patent procedure is simple, and mobile flexible, economical and energy saving is adapted to a variety of height, diversified forms pipeline Auxiliary connection and jacking, effectively increase piping lane interior conduit and operating efficiency in place be installed.
1st, pipeline butt is facilitated using the utility model, is easy to best angle welding, beneficial to appearance of weld is realized, welding is difficult Degree is substantially reduced, and throat depth can be made uniform, aesthetics lifting.
2nd, a variety of functions can be realized using a platform using the utility model, can not only realizes the connection of pipeline, The conveying that cable transfer device realizes cable can also be set up on the operational platform, it is adaptable to the connection of various pipelines and defeated in piping lane Send.
3rd, the workload that operating platform is set up is reduced using the utility model, realizes two pipelines and work simultaneously, subtract Lack the set-up time, improved operating efficiency, reduce construction costs.
4th, pipeline jack-up is added into conduit saddle without erection bracket jack one by one, can be jointly made with two construction operation platforms With the direct jacking of pipeline completed will be welded to requiring to add conduit saddle behind position, workload is reduced, operating efficiency is improved.
The utility model can be widely applied in pipe-line system.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is dimensional structure diagram of the present utility model.
Fig. 2 is the cross-sectional view after Fig. 1 is splitted along A-A sections.
Fig. 3 is positive facade structural representation of the present utility model.
Fig. 4 is side elevation structural representation of the present utility model.
Reference:1- support underframes, 2- operating desks, 3- lifting-up supports, 4- jack, 5- conduit saddles, 6- pipelines Manual lifting device, 7- platforms manual lifting device, 8- suspension crossbeam, 9- slide suspension member, 10- hooks, 11- cups, 12- rollers, 13- auxiliary support bars.
Embodiment
Embodiment is referring to shown in Fig. 1 to Fig. 4, a kind of multi-functional construction operation platform of piping lane, including support underframe 1, adjustable It is connected to the operation above platform 2 of support underframe 1, adjustable a pair of lifting-up support 3 for being connected to the two ends of operating desk 2, is arranged on top Pipeline jacking apparatus on ascending branch frame 3, the platform manual lifting device 7 being arranged between support underframe 1 and operating desk 2 and it is arranged on Pipe riser in support underframe 1;The pipeline jacking apparatus includes holding out against the jack 4 on lifting-up support 3 and connected It is connected on the conduit saddle 5 of the top surface of lifting-up support 3;The pipe riser includes the pipe being arranged between the offside of 1 top surface of support underframe one Road manual lifting device 6, the suspension crossbeam 8 and interval sliding that are connected with pipeline manual lifting device 6 are connected to suspension crossbeam 8 The slip suspension member 9 of both sides, the upper surface of the conduit saddle is arc, and its radian is consistent with institute support pipeline outer wall radian.
The support underframe 1 is welded by square steel, including underframe supporting leg, the water that is connected between adjacent underframe supporting leg top Flat bar and the bracing piece being connected between horizon bar and underframe supporting leg;The underframe supporting leg bottom surface level connection joint has connection sleeve pipe, Connection inner tube is plugged with the connection sleeve pipe, the outer end of the connection inner tube is vertically connected with auxiliary support bar 13;It is described The bottom surface of connection sleeve pipe is connected with roller 12;The operating desk 2 includes platform legs and landing slab;Platform legs upper end described in one Provided with hook, cup 11 is hung with by buckling on adjacent platforms supporting leg, cup is the tube electrode for putting welding rod;To jaws equipment, Welding equipment, hot melting equipment can be placed on operating desk 2 in order to the connection of pipeline;Cable transfer equipment can also be placed in operating desk 2 On to realize the long distance delivery of different height cable;The platform legs are plugged in underframe supporting leg and the supporting leg of the two is big It is small to be adapted;The lifting-up support 3 is arranged in pairs, and lifting-up support described in each pair includes support supporting leg and is connected to support supporting leg top Push rod between end;The support supporting leg is plugged in platform legs and the supporting leg size of the two is adapted.
The platform manual lifting device is arranged between another offside of the top surface of support underframe 1, including is arranged on support underframe 1 The support screw at horizon bar two ends, contiguous block in the middle of horizon bar is set, be arranged on two contiguous blocks between actively enter power worm screw, The driven power of entering worm screw and being connected to through between contiguous block is connected to support screw actively enters the rocking handle of power worm screw outer end.
The pipeline manual lifting device 6, which includes being arranged between the offside horizon bar of support underframe 1 one, actively enters power screw rod And it is connected to the crank for actively entering power screw rod outer end;The two ends for actively entering power screw rod and hanging screw mandrel engagement connection, And support is in the support groove on the inside of horizon bar;It is described slide suspension member 9 include with suspension crossbeam 8 be slidably connected pulley, be connected Pulley outer face connecting plate and be connected to the collar in connecting plate corner;The rope for being connected to connecting pipe is worn on the collar Circle.
It can realize that especially three piping lanes are multi-functional by the utility model for the pipeline connection in piping lane small space Construction operation platform is used in conjunction with and middle operating platform as master operating station can reach optimum efficiency, can be entered when being applied in combination Row group to, connection, jacking, be adapted to different height pipeline connection and two pipelines operate simultaneously, both reduced and taken, tear operation open Platform also reduces labor strength, so as to improve operating efficiency and reduce construction costs.For the conveying of piping lane inner cable Cable transfer equipment can be placed on this operating platform so as to realize the machinery conveying of cable, reduce the workload and work of workman Make intensity.
Work progress of the present utility model:During pipeline construction, two operating platforms are arranged side by side, by two pipes to be connected Road is respectively by the jacking apparatus jacking on two operating platforms to requiring height, and end connects, and welds two pipelines, leads to simultaneously Cross lifting device and two pipelines to be connected are promoted to requirement height, and end by the lifting device on two operating platforms respectively Connect, and weld two pipelines, constructed while realizing different height pipeline.

Claims (10)

1. a kind of multi-functional construction operation platform of piping lane, it is characterised in that:Including support underframe(1), it is adjustable be connected to support bottom Frame(1)Operation above platform(2), adjustable be connected to operating desk(2)A pair of the lifting-up support at two ends(3), be arranged on jacking branch Frame(3)On pipeline jacking apparatus, be arranged on support underframe(1)And operating desk(2)Between platform manual lifting device(7)With set Put in support underframe(1)Interior pipe riser;
The pipeline jacking apparatus includes holding out against in lifting-up support(3)On jack(4)Be connected to lifting-up support(3)Top surface Conduit saddle(5);
The pipe riser includes being arranged on support underframe(1)Pipeline manual lifting device between the offside of top surface one(6)And Pipeline manual lifting device(6)The suspension crossbeam of connection(8)And interval sliding is connected to suspension crossbeam(8)The slip of both sides is hung Part(9).
2. the multi-functional construction operation platform of piping lane according to claim 1, it is characterised in that:The support underframe(1)By Square steel is welded, including underframe supporting leg, the horizon bar that is connected between adjacent underframe supporting leg top and be connected to horizon bar and Bracing piece between underframe supporting leg;
The underframe supporting leg bottom surface level connection joint, which has, is plugged with connection inner tube, the connection in connection sleeve pipe, the connection sleeve pipe The outer end of inner tube is vertically connected with auxiliary support bar(13);
The bottom surface of the connection sleeve pipe is connected with roller(12).
3. the multi-functional construction operation platform of piping lane according to claim 1, it is characterised in that:The hand lifting dress of platform Put and be arranged on support underframe(1)Between another offside of top surface, including it is arranged on support underframe(1)The support screw at horizon bar two ends, Contiguous block in the middle of horizon bar is set, actively entering power worm screw, being connected to support through contiguous block between two contiguous blocks is arranged on The driven power of entering worm screw between screw mandrel and it is connected to the rocking handle for actively entering power worm screw outer end.
4. the multi-functional construction operation platform of piping lane according to claim 1, it is characterised in that:The hand lifting dress of pipeline Put(6)Including being arranged between the offside horizon bar of support underframe 1 one actively to enter power screw rod and be connected to actively to enter outside power screw rod The crank of end;
The two ends for actively entering power screw rod are connected with hanging screw mandrel engagement and support is in the support groove on the inside of horizon bar.
5. the multi-functional construction operation platform of piping lane according to claim 1, it is characterised in that:The slip suspension member(9)Bag Include and suspension crossbeam(8)The pulley that is slidably connected, it is connected to the connecting plate of pulley outer face and is connected to connecting plate corner The collar;
Worn on the collar and be connected to fake.
6. the multi-functional construction operation platform of piping lane according to claim any one of 1-5, it is characterised in that:The operating desk (2)Including platform legs and landing slab;
Platform legs upper end described in one is provided with hook(10), cup is hung with by buckling on adjacent platforms supporting leg(11).
7. the multi-functional construction operation platform of piping lane according to claim 6, it is characterised in that:The platform legs are plugged on Underframe supporting leg is interior and the supporting leg size of the two is adapted.
8. the multi-functional construction operation platform of piping lane according to claim 7, it is characterised in that:The lifting-up support(3)Into To setting, lifting-up support described in each pair includes support supporting leg and the push rod being connected between support supporting leg top.
9. the multi-functional construction operation platform of piping lane according to claim 8, it is characterised in that:The support supporting leg is plugged on Platform legs are interior and the supporting leg size of the two is adapted.
10. the multi-functional construction operation platform of piping lane according to claim 1, it is characterised in that:The upper surface of the conduit saddle For arc, its radian is consistent with institute support pipeline outer wall radian.
CN201720096772.9U 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack Expired - Fee Related CN206580511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720096772.9U CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720096772.9U CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Publications (1)

Publication Number Publication Date
CN206580511U true CN206580511U (en) 2017-10-24

Family

ID=60110375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720096772.9U Expired - Fee Related CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Country Status (1)

Country Link
CN (1) CN206580511U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482940A (en) * 2018-04-17 2018-09-04 陕西建工安装集团有限公司 A kind of pipeline mounting device and installation method
CN109264311A (en) * 2018-09-10 2019-01-25 中铁二十局集团路桥工程有限公司 Pipeline delivery vehicle
CN110844821A (en) * 2019-11-23 2020-02-28 施伟 Multifunctional construction operation platform for comprehensive pipe rack
CN112722734A (en) * 2020-12-28 2021-04-30 中建八局第三建设有限公司 Method for transporting heavy steel pipes with large calibers in pipe gallery
CN113232702A (en) * 2021-04-15 2021-08-10 中国华冶科工集团有限公司 Pipeline transportation installation vehicle in pipe gallery
CN115592345A (en) * 2022-10-24 2023-01-13 中国水利水电第七工程局有限公司(Cn) Self-leveling type steel pipe welding auxiliary support

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482940A (en) * 2018-04-17 2018-09-04 陕西建工安装集团有限公司 A kind of pipeline mounting device and installation method
CN108482940B (en) * 2018-04-17 2023-11-14 陕西建工安装集团有限公司 Pipeline conveying and installing device and method
CN109264311A (en) * 2018-09-10 2019-01-25 中铁二十局集团路桥工程有限公司 Pipeline delivery vehicle
CN110844821A (en) * 2019-11-23 2020-02-28 施伟 Multifunctional construction operation platform for comprehensive pipe rack
CN112722734A (en) * 2020-12-28 2021-04-30 中建八局第三建设有限公司 Method for transporting heavy steel pipes with large calibers in pipe gallery
CN113232702A (en) * 2021-04-15 2021-08-10 中国华冶科工集团有限公司 Pipeline transportation installation vehicle in pipe gallery
CN115592345A (en) * 2022-10-24 2023-01-13 中国水利水电第七工程局有限公司(Cn) Self-leveling type steel pipe welding auxiliary support

Similar Documents

Publication Publication Date Title
CN206580511U (en) Multifunctional construction operation platform for pipe rack
CN102581443A (en) Welding device for straight seam single-side welding and double-side forming of conical steel pipes
CN207309299U (en) A kind of tubular workpiece butt welding tool fixture
CN209163819U (en) A kind of working top iron of soil pressing balance pipe jacking machine
CN203701597U (en) Outer wall formwork supporting and bearing device
CN217291172U (en) Steel pipeline butt joint adjusting device
CN205888340U (en) Circulating pipe way submerged arc welding auxiliary device
CN210890408U (en) Tunnel wind water pipe freely removes support
CN205000653U (en) Concrete pump pipe fixing device
CN206998116U (en) A kind of ship stern post welding equipment device
CN203726077U (en) Multi-caliber internal aligning device
CN106346393B (en) A kind of diesel engine flywheel fixture
CN206200022U (en) A kind of upper panel assembly of veneer reeling machine auxiliary
CN207379675U (en) A kind of multistation hydraulic press
CN207277869U (en) Brick arch certificate builds mould by laying bricks or stones
CN213269985U (en) Quick transportation and installation trolley for attached pipeline of inner side wall of narrow tunnel
CN217205436U (en) Quick positioner of pipe culvert pipe coupling
CN205636752U (en) Shoring of trench prestressing force axle power ware mounting structure
CN205116757U (en) Girder steel conveyer that slides
CN104806012A (en) Large-scale high-altitude bearing cantilever beam device and construction method thereof
CN105484139B (en) Brick paving machine supplies brick device
CN206859703U (en) Thermal power plant side coal bunker steel coal hopper hoisting slide mechanism in place
CN209699703U (en) A kind of direct-buried thermal insulation pipe group set, foaming, lifting unified platform system
CN215316728U (en) Pipeline welding and pipe aligning device
CN204609297U (en) Large-scale high-altitude load-bearing Cantilever Beams device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024