CN206580511U - Multifunctional construction operation platform for pipe rack - Google Patents

Multifunctional construction operation platform for pipe rack Download PDF

Info

Publication number
CN206580511U
CN206580511U CN201720096772.9U CN201720096772U CN206580511U CN 206580511 U CN206580511 U CN 206580511U CN 201720096772 U CN201720096772 U CN 201720096772U CN 206580511 U CN206580511 U CN 206580511U
Authority
CN
China
Prior art keywords
platform
legs
operation platform
pipe
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720096772.9U
Other languages
Chinese (zh)
Inventor
周大伟
薛刚
曾庆江
侯维
于鹏
汤春晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction First Bureau Group Installation Engineering Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201720096772.9U priority Critical patent/CN206580511U/en
Application granted granted Critical
Publication of CN206580511U publication Critical patent/CN206580511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

一种管廊多功能施工操作平台,包括支撑底架、可调连接在支撑底架上面的操作台、可调连接在操作台两端的一对的顶升支架、设置在顶升支架上的管道顶升装置、设置在支撑底架和操作台间的平台手摇升降装置和设置在支撑底架内的管道提升装置;所述管道顶升装置包括顶紧在顶升支架上的千斤顶和连接在顶升支架顶面的管托;所述管道提升装置包括设置在支撑底架顶面一对侧间的管道手摇升降装置、与管道手摇升降装置连接的悬挂横梁以及间隔滑动连接在悬挂横梁两侧的滑动挂件。本实用新型解决了传统管廊内管道安装繁复、就位困难、效率低和成本高的问题。

A multi-functional construction operation platform for a pipe gallery, comprising a supporting base, an operating table adjustable and connected to the supporting base, a pair of jacking brackets adjustable and connected to both ends of the operating table, and a pipe set on the lifting bracket The jacking device, the platform manual lifting device arranged between the support chassis and the operating platform, and the pipeline lifting device arranged in the support chassis; the pipeline jacking device includes a jack tightly connected to the jacking bracket and The pipe support on the top surface of the jacking bracket; the pipeline lifting device includes a pipeline hand-operated lifting device arranged between a pair of sides of the top surface of the supporting chassis, a suspension beam connected with the pipeline hand-operated lifting device, and an interval sliding connection between the suspension beam Sliding hangers on both sides. The utility model solves the problems of complicated pipeline installation, difficulty in positioning, low efficiency and high cost in the traditional pipeline gallery.

Description

一种管廊多功能施工操作平台A multifunctional construction operation platform for pipe gallery

技术领域technical field

本实用新型涉及管廊施工领域,特别是一种管廊多功能施工操作平台。The utility model relates to the field of pipe gallery construction, in particular to a multifunctional construction operation platform for pipe gallery.

背景技术Background technique

随着管廊的广泛使用,管廊内管道安装问题逐渐引起人们的关注,管廊内管道安装位置多样化,而管廊空间狭小不便于管道连接,不同部位、不同高度的管道连接时需要搭设不同的操作平台,既增加了管道连接难度又增加了工人的工作量,管道连接完成后又需要逐个支架顶升管道以便安装管托,工作繁复且不便施工,因此急需一种用于管廊内管道安装的装置,降低施工难度、加快施工进度。With the widespread use of the pipe gallery, the installation of pipes in the pipe gallery has gradually attracted people's attention. The installation positions of the pipes in the pipe gallery are diversified, and the space of the pipe gallery is small and inconvenient for pipeline connection. Pipes of different parts and heights need to be erected when connecting Different operating platforms not only increase the difficulty of pipeline connection but also increase the workload of workers. After the pipeline connection is completed, the pipeline needs to be lifted one by one to install the pipe support. The work is complicated and inconvenient for construction. Therefore, there is an urgent need for a The device for pipeline installation reduces the difficulty of construction and speeds up the construction progress.

实用新型内容Utility model content

本实用新型的目的是提供一种管廊多功能施工操作平台,要解决传统管廊内管道安装繁复、就位困难、效率低和成本高的问题。The purpose of the utility model is to provide a multifunctional construction operation platform for a pipe gallery, which solves the problems of complicated installation of pipes in the traditional pipe gallery, difficulty in positioning, low efficiency and high cost.

为实现上述目的,本实用新型采用如下技术方案:一种管廊多功能施工操作平台,包括支撑底架、可调连接在支撑底架上面的操作台、可调连接在操作台两端的一对的顶升支架、设置在顶升支架上的管道顶升装置、设置在支撑底架和操作台间的平台手摇升降装置和设置在支撑底架内的管道提升装置;所述管道顶升装置包括顶紧在顶升支架上的千斤顶和连接在顶升支架顶面的管托;所述管道提升装置包括设置在支撑底架顶面一对侧间的管道手摇升降装置、与管道手摇升降装置连接的悬挂横梁以及间隔滑动连接在悬挂横梁两侧的滑动挂件。In order to achieve the above purpose, the utility model adopts the following technical scheme: a multi-functional construction operation platform for a pipe gallery, including a supporting base, an operating table that is adjustable and connected to the supporting base, and a pair of The jacking bracket, the pipeline jacking device arranged on the jacking bracket, the platform manual lifting device arranged between the support chassis and the operating platform, and the pipeline lifting device arranged in the support chassis; the pipeline jacking device It includes a jack fastened on the jacking bracket and a pipe holder connected to the top surface of the jacking bracket; the pipeline lifting device includes a pipeline manual lifting device arranged between a pair of sides of the top surface of the support chassis, and a pipeline manual lifting device. The suspension beam connected with the lifting device and the sliding pendant which are slidably connected to both sides of the suspension beam at intervals.

优选的,所述支撑底架由方钢焊接而成,包括底架支腿、连接在相邻底架支腿顶端间的水平杆以及连接在水平杆和底架支腿间的加强杆;所述底架支腿底面水平连接有连接套管,所述连接套管内插接有连接内管,所述连接内管的外端部垂直连接有辅助支撑杆;所述连接套管的底面连接有滚轮。Preferably, the supporting chassis is welded by square steel, including chassis legs, horizontal rods connected between the top ends of adjacent chassis legs, and reinforcing rods connected between the horizontal rods and the chassis legs; The bottom surface of the leg of the underframe is horizontally connected with a connecting sleeve, the connecting sleeve is inserted with a connecting inner tube, and the outer end of the connecting inner tube is vertically connected with an auxiliary support rod; the bottom surface of the connecting sleeve is connected with a scroll wheel.

优选的,所述平台手摇升降装置设置在支撑底架顶面另一对侧间,包括设置在支撑底架水平杆两端的支撑丝杆、设置水平杆中间的连接块、设置在两连接块之间的主动入力蜗杆、穿过连接块连接在支撑丝杆间的从动入力蜗杆以及连接在主动入力蜗杆外端部的摇柄。Preferably, the platform manual lifting device is arranged between the other opposite side of the top surface of the supporting chassis, including supporting screw rods arranged at both ends of the horizontal bar of the supporting chassis, a connecting block arranged in the middle of the horizontal bar, and a connecting block arranged between the two connecting blocks. The active input worm between them, the driven input worm connected between the supporting screw rods through the connection block, and the rocker connected to the outer end of the active input worm.

优选的,所述管道手摇升降装置包括设置在支撑底架一对侧水平杆间的主动入力螺杆以及连接在主动入力螺杆外端部的摇把;所述主动入力螺杆的两端和吊挂丝杆啮合连接、且承托在水平杆内侧的承托槽内。Preferably, the pipeline manual lifting device includes an active input screw arranged between a pair of side horizontal bars of the support chassis and a crank handle connected to the outer end of the active input screw; the two ends of the active input screw and the hanging The threaded rod is meshed and connected and supported in the supporting groove inside the horizontal rod.

优选的,所述滑动挂件包括与悬挂横梁滑动连接的滑轮、连接在滑轮外端面的连接板以及连接在连接板角部的套环;所述套环上穿接有绳圈。Preferably, the sliding hanger includes a pulley slidably connected to the suspension beam, a connecting plate connected to the outer end surface of the pulley, and a collar connected to the corner of the connecting plate; a loop is passed through the collar.

优选的,所述操作台包括平台支腿和平台板;一所述平台支腿上端设有挂钩,相邻平台支腿上通过挂扣挂有挂筒。Preferably, the operating platform includes platform legs and a platform board; a hook is provided on the upper end of one of the platform legs, and a hanging cylinder is hung on the adjacent platform legs through hooks.

优选的,所述平台支腿插接在底架支腿内、且二者的支腿大小相适应。Preferably, the platform outriggers are plugged into the underframe outriggers, and the two outriggers are compatible in size.

优选的,所述顶升支架成对设置,每对所述顶升支架包括支架支腿和连接在支架支腿顶端间的顶杆。Preferably, the jacking brackets are arranged in pairs, and each pair of jacking brackets includes bracket legs and a push rod connected between the top ends of the bracket legs.

优选的,所述支架支腿插接在平台支腿内、且二者的支腿大小相适应。Preferably, the legs of the bracket are plugged into the legs of the platform, and the sizes of the legs of the two are compatible.

优选的,所述管托的上表面为弧形,其弧度与所承托管道外壁弧度一致。Preferably, the upper surface of the tube support is arc-shaped, and its arc is consistent with the arc of the outer wall of the supported tube.

与现有技术相比本实用新型具有以下特点和有益效果:Compared with the prior art, the utility model has the following characteristics and beneficial effects:

本实用新型专利操作简单,移动灵活,经济节能,适应于多种高度、多种形式管道的辅助连接及顶升,有效提高了管廊内管道安装就位的工作效率。The utility model patent is simple in operation, flexible in movement, economical and energy-saving, suitable for auxiliary connection and jacking of various heights and various forms of pipelines, and effectively improves the work efficiency of pipeline installation in the pipeline gallery.

1、采用本实用新型方便管道对口,便于最佳角度施焊,利于实现焊缝成型,焊接难度大大降低,可使焊缝厚度均匀,美观度提升。1. The utility model is adopted to facilitate the matching of pipelines, facilitate welding at an optimal angle, facilitate the formation of weld seams, greatly reduce the difficulty of welding, make the thickness of weld seams uniform, and improve the appearance.

2、采用本实用新型可以利用一个平台实现多种功能,不仅可以实现管道的连接,还可以在操作平台上架设电缆输送器实现电缆的输送,适用于管廊内各种管线的连接及输送。2. The utility model can use one platform to realize multiple functions, not only can realize the connection of pipelines, but also can set up a cable conveyor on the operation platform to realize the transmission of cables, which is suitable for the connection and transportation of various pipelines in the pipe gallery.

3、采用本实用新型减少了操作平台搭设的工作量,实现了两根管道同时工作,减少了安装时间,提高了工作效率,降低工程造价。3. Adopting the utility model reduces the workload of setting up the operation platform, realizes the simultaneous operation of two pipelines, reduces the installation time, improves the work efficiency, and reduces the construction cost.

4、无需逐一架设支架用千斤顶将管道顶起加管托,可用两个施工操作平台共同作用将焊接完成的管道直接顶升至要求位置后加管托,减少了工作量,提高了工作效率。4. It is not necessary to set up supports one by one and use jacks to lift the pipes and add pipe supports. Two construction operation platforms can be used to directly lift the welded pipes to the required position and then add pipe supports, which reduces the workload and improves work efficiency.

本实用新型可广泛应用于管道系统中。The utility model can be widely used in pipeline systems.

附图说明Description of drawings

下面结合附图对本实用新型做进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

图1是本实用新型的立体结构示意图。Fig. 1 is the three-dimensional structure schematic diagram of the present utility model.

图2是图1沿A-A断面剖开后的剖面结构示意图。Fig. 2 is a schematic diagram of the cross-sectional structure of Fig. 1 cut along the A-A section.

图3是本实用新型的正立面结构示意图。Fig. 3 is a schematic view of the facade structure of the utility model.

图4是本实用新型的侧立面结构示意图。Fig. 4 is a schematic diagram of the side elevation structure of the utility model.

附图标记:1-支撑底架、2-操作台、3-顶升支架、4-千斤顶、5-管托、6-管道手摇升降装置、7-平台手摇升降装置、8-悬挂横梁、9-滑动挂件、10-挂钩、11-挂筒、12-滚轮、13-辅助支撑杆。Reference signs: 1-supporting chassis, 2-operating platform, 3-jacking bracket, 4-jack, 5-pipe holder, 6-pipeline manual lifting device, 7-platform manual lifting device, 8-suspension beam , 9-sliding pendant, 10-hook, 11-hanging tube, 12-roller, 13-auxiliary support rod.

具体实施方式detailed description

实施例参见图1至图4所示,一种管廊多功能施工操作平台,包括支撑底架1、可调连接在支撑底架1上面的操作台2、可调连接在操作台2两端的一对的顶升支架3、设置在顶升支架3上的管道顶升装置、设置在支撑底架1和操作台2间的平台手摇升降装置7和设置在支撑底架1内的管道提升装置;所述管道顶升装置包括顶紧在顶升支架3上的千斤顶4和连接在顶升支架3顶面的管托5;所述管道提升装置包括设置在支撑底架1顶面一对侧间的管道手摇升降装置6、与管道手摇升降装置6连接的悬挂横梁8以及间隔滑动连接在悬挂横梁8两侧的滑动挂件9,所述管托的上表面为弧形,其弧度与所承托管道外壁弧度一致。Referring to the embodiment shown in Figures 1 to 4, a multifunctional construction operation platform for a pipe gallery includes a support base 1, an operation table 2 that is adjustable and connected to the support base 1, and an adjustable connection to both ends of the operation table 2. A pair of jacking brackets 3, a pipe jacking device arranged on the jacking bracket 3, a platform manual lifting device 7 arranged between the supporting chassis 1 and the operating platform 2, and a pipeline lifting device arranged in the supporting chassis 1 device; the pipeline jacking device includes a jack 4 fastened on the jacking bracket 3 and a pipe support 5 connected to the top surface of the jacking bracket 3; the pipeline lifting device includes a pair of The pipeline manual lifting device 6 between the sides, the suspension beam 8 connected with the pipeline manual lifting device 6, and the sliding pendants 9 that are slidably connected to the suspension beam 8 both sides at intervals, the upper surface of the pipe support is arc-shaped, and its arc Consistent with the radian of the outer wall of the supported pipe.

所述支撑底架1由方钢焊接而成,包括底架支腿、连接在相邻底架支腿顶端间的水平杆以及连接在水平杆和底架支腿间的加强杆;所述底架支腿底面水平连接有连接套管,所述连接套管内插接有连接内管,所述连接内管的外端部垂直连接有辅助支撑杆13;所述连接套管的底面连接有滚轮12;所述操作台2包括平台支腿和平台板;一所述平台支腿上端设有挂钩,相邻平台支腿上通过挂扣挂有挂筒11,挂筒是用来放焊条的焊条筒;对口设备、焊接设备、热熔设备可置于操作台2上以便于管线的连接;电缆输送设备也可置于操作台2上以实现不同高度电缆的长距离输送;所述平台支腿插接在底架支腿内、且二者的支腿大小相适应;所述顶升支架3成对设置,每对所述顶升支架包括支架支腿和连接在支架支腿顶端间的顶杆;所述支架支腿插接在平台支腿内、且二者的支腿大小相适应。The support chassis 1 is welded by square steel, including chassis legs, horizontal rods connected between the top ends of adjacent chassis legs, and reinforcing rods connected between the horizontal rods and the chassis legs; The bottom surface of the support leg is horizontally connected with a connecting sleeve, the connecting sleeve is plugged with a connecting inner tube, and the outer end of the connecting inner tube is vertically connected with an auxiliary support rod 13; the bottom surface of the connecting sleeve is connected with a roller 12. The console 2 includes platform legs and a platform plate; a hook is provided at the upper end of one of the platform legs, and a hanging tube 11 is hung on the adjacent platform leg through a hook, and the hanging tube is used to place welding rods Drum; counterpart equipment, welding equipment, and hot-melt equipment can be placed on the console 2 to facilitate the connection of pipelines; cable delivery equipment can also be placed on the console 2 to achieve long-distance transmission of cables of different heights; the platform legs Inserted in the legs of the underframe, and the size of the legs of the two is compatible; the jacking brackets 3 are arranged in pairs, and each pair of the jacking brackets includes a bracket leg and a top that is connected between the top ends of the bracket legs. Rod; the legs of the bracket are plugged into the legs of the platform, and the sizes of the legs of the two are compatible.

所述平台手摇升降装置设置在支撑底架1顶面另一对侧间,包括设置在支撑底架1水平杆两端的支撑丝杆、设置水平杆中间的连接块、设置在两连接块之间的主动入力蜗杆、穿过连接块连接在支撑丝杆间的从动入力蜗杆以及连接在主动入力蜗杆外端部的摇柄。The platform manual lifting device is arranged between the other opposite side of the top surface of the support chassis 1, including support screw rods arranged at both ends of the horizontal bar of the support chassis 1, a connecting block arranged in the middle of the horizontal bar, and a connecting block arranged between the two connecting blocks. The active input worm between them, the driven input worm connected between the supporting screw rods through the connection block, and the rocker connected to the outer end of the active input worm.

所述管道手摇升降装置6包括设置在支撑底架1一对侧水平杆间的主动入力螺杆以及连接在主动入力螺杆外端部的摇把;所述主动入力螺杆的两端和吊挂丝杆啮合连接、且承托在水平杆内侧的承托槽内;所述滑动挂件9包括与悬挂横梁8滑动连接的滑轮、连接在滑轮外端面的连接板以及连接在连接板角部的套环;所述套环上穿接有连接管道的绳圈。The pipeline manual lifting device 6 includes an active input screw rod arranged between a pair of side horizontal bars of the support chassis 1 and a crank handle connected to the outer end of the active input screw rod; the two ends of the active input screw rod and the hanging wire The rods are engaged and connected and supported in the supporting grooves inside the horizontal rods; the sliding hanger 9 includes a pulley that is slidingly connected to the suspension beam 8, a connecting plate connected to the outer end surface of the pulley, and a collar connected to the corner of the connecting plate ; The ring is pierced with a loop connecting the pipeline.

对于管廊狭小空间内的管线连接可通过本实用新型实现,尤其是三个管廊多功能施工操作平台共同使用而中间的操作平台作为主操作台可达到最佳效果,组合使用时可进行组对、连接、顶升,可以适应不同高度管线连接和两根管道同时操作,既减少了搭、拆操作平台也降低了工人劳动强度,从而提高工作效率并降低工程造价。对于管廊内电缆输送也可以将电缆输送设备置于本操作平台上从而实现电缆的机械输送,减少工人的工作量和工作强度。The pipeline connection in the narrow space of the pipe gallery can be realized by the utility model, especially the multi-functional construction operation platform of the three pipe gallery is used together and the middle operation platform can be used as the main operation platform to achieve the best effect, and it can be assembled when used in combination Alignment, connection, and jacking can adapt to the connection of pipelines of different heights and the simultaneous operation of two pipelines, which not only reduces the construction and dismantling of operating platforms, but also reduces the labor intensity of workers, thereby improving work efficiency and reducing project costs. For the cable transportation in the pipe gallery, the cable transportation equipment can also be placed on the operating platform to realize the mechanical transportation of the cables and reduce the workload and intensity of the workers.

本实用新型的施工过程:管道施工时,将两台操作平台并排设置,将待连接的两管道分别通过两操作平台上的顶升装置顶升至要求高度,且端部相接,并焊接两管道,同时通过提升装置将待连接的两管道分别通过两操作平台上的提升装置提升至要求高度,且端部相接,并焊接两管道,实现不同高度管道的同时施工。The construction process of the utility model: during pipeline construction, two operating platforms are arranged side by side, and the two pipelines to be connected are lifted to the required height through the jacking devices on the two operating platforms respectively, and the ends are connected, and the two pipelines are welded. At the same time, the two pipelines to be connected are lifted to the required height by the lifting device on the two operating platforms respectively, and the ends are connected, and the two pipelines are welded to realize the simultaneous construction of pipelines of different heights.

Claims (10)

1.一种管廊多功能施工操作平台,其特征在于:包括支撑底架(1)、可调连接在支撑底架(1)上面的操作台(2)、可调连接在操作台(2)两端的一对的顶升支架(3)、设置在顶升支架(3)上的管道顶升装置、设置在支撑底架(1)和操作台(2)间的平台手摇升降装置(7)和设置在支撑底架(1)内的管道提升装置;1. A multi-functional construction operation platform for a pipe gallery, characterized in that it includes a support chassis (1), an operation platform (2) that is adjustable and connected to the support chassis (1), and an adjustable connection to the operation platform (2). ) at both ends of a pair of jacking brackets (3), the pipe jacking device set on the jacking bracket (3), the platform manual lifting device set between the support base (1) and the operating table (2) ( 7) and the pipe lifting device arranged in the support chassis (1); 所述管道顶升装置包括顶紧在顶升支架(3)上的千斤顶(4)和连接在顶升支架(3)顶面的管托(5);The pipe jacking device includes a jack (4) fastened on the jacking bracket (3) and a pipe holder (5) connected to the top surface of the jacking bracket (3); 所述管道提升装置包括设置在支撑底架(1)顶面一对侧间的管道手摇升降装置(6)、与管道手摇升降装置(6)连接的悬挂横梁(8)以及间隔滑动连接在悬挂横梁(8)两侧的滑动挂件(9)。The pipeline lifting device includes a pipeline manual lifting device (6) arranged between a pair of sides of the top surface of the supporting chassis (1), a suspension beam (8) connected to the pipeline manual lifting device (6), and a sliding connection at intervals Sliding pendants (9) on both sides of the suspension beam (8). 2.根据权利要求1所述的管廊多功能施工操作平台,其特征在于:所述支撑底架(1)由方钢焊接而成,包括底架支腿、连接在相邻底架支腿顶端间的水平杆以及连接在水平杆和底架支腿间的加强杆;2. The multifunctional construction operation platform for pipe gallery according to claim 1, characterized in that: the supporting chassis (1) is welded by square steel, including the legs of the chassis, connected to the legs of the adjacent chassis Horizontal rods between the top ends and reinforcing rods connected between the horizontal rods and the legs of the chassis; 所述底架支腿底面水平连接有连接套管,所述连接套管内插接有连接内管,所述连接内管的外端部垂直连接有辅助支撑杆(13);The bottom surface of the legs of the underframe is horizontally connected with a connecting sleeve, the connecting sleeve is plugged with a connecting inner tube, and the outer end of the connecting inner tube is vertically connected with an auxiliary support rod (13); 所述连接套管的底面连接有滚轮(12)。Rollers (12) are connected to the bottom surface of the connecting sleeve. 3.根据权利要求1所述的管廊多功能施工操作平台,其特征在于:所述平台手摇升降装置设置在支撑底架(1)顶面另一对侧间,包括设置在支撑底架(1)水平杆两端的支撑丝杆、设置水平杆中间的连接块、设置在两连接块之间的主动入力蜗杆、穿过连接块连接在支撑丝杆间的从动入力蜗杆以及连接在主动入力蜗杆外端部的摇柄。3. The multifunctional construction operation platform for pipe gallery according to claim 1, characterized in that: the platform manual lifting device is set between the other side of the top surface of the support chassis (1), including the support chassis (1) (1) The supporting screw rods at both ends of the horizontal rod, the connecting block set in the middle of the horizontal rod, the active input worm installed between the two connecting blocks, the driven input worm connected between the supporting screw rods through the connecting block, and the driven input worm connected to the active Enter the rocker at the outer end of the worm. 4.根据权利要求1所述的管廊多功能施工操作平台,其特征在于:所述管道手摇升降装置(6)包括设置在支撑底架1一对侧水平杆间的主动入力螺杆以及连接在主动入力螺杆外端部的摇把;4. The multifunctional construction operation platform for pipe gallery according to claim 1, characterized in that: the pipe manual lifting device (6) includes an active input screw arranged between a pair of side horizontal bars of the support chassis 1 and a connecting The crank handle at the outer end of the active input screw; 所述主动入力螺杆的两端和吊挂丝杆啮合连接、且承托在水平杆内侧的承托槽内。The two ends of the active input screw are meshed with the hanging screw and are supported in the supporting groove inside the horizontal rod. 5.根据权利要求1所述的管廊多功能施工操作平台,其特征在于:所述滑动挂件(9)包括与悬挂横梁(8)滑动连接的滑轮、连接在滑轮外端面的连接板以及连接在连接板角部的套环;5. The multifunctional construction operation platform for pipe gallery according to claim 1, characterized in that: the sliding pendant (9) includes a pulley slidingly connected to the suspension beam (8), a connecting plate connected to the outer end surface of the pulley and a connecting plate Collars at the corners of the connecting plates; 所述套环上穿接有绳圈。A loop is threaded through the collar. 6.根据权利要求1-5任一项所述的管廊多功能施工操作平台,其特征在于:所述操作台(2)包括平台支腿和平台板;6. The multifunctional construction operation platform for pipe gallery according to any one of claims 1-5, characterized in that: the operation platform (2) includes platform legs and platform boards; 一所述平台支腿上端设有挂钩(10),相邻平台支腿上通过挂扣挂有挂筒(11)。A hook (10) is provided on the upper end of the platform leg, and a hanging tube (11) is hung on the adjacent platform leg through a hook. 7.根据权利要求6所述的管廊多功能施工操作平台,其特征在于:所述平台支腿插接在底架支腿内、且二者的支腿大小相适应。7. The multifunctional construction operation platform for pipe gallery according to claim 6, characterized in that: the platform legs are plugged into the underframe legs, and the sizes of the legs are compatible. 8.根据权利要求7所述的管廊多功能施工操作平台,其特征在于:所述顶升支架(3)成对设置,每对所述顶升支架包括支架支腿和连接在支架支腿顶端间的顶杆。8. The multifunctional construction operation platform for pipe gallery according to claim 7, characterized in that: the jacking brackets (3) are arranged in pairs, and each pair of jacking brackets includes bracket legs and is connected to the bracket legs The ejector pin between the top ends. 9.根据权利要求8所述的管廊多功能施工操作平台,其特征在于:所述支架支腿插接在平台支腿内、且二者的支腿大小相适应。9. The multifunctional construction operation platform for pipe gallery according to claim 8, characterized in that: the legs of the support are plugged into the legs of the platform, and the sizes of the legs of the two are compatible. 10.根据权利要求1所述的管廊多功能施工操作平台,其特征在于:所述管托的上表面为弧形,其弧度与所承托管道外壁弧度一致。10. The multifunctional construction operation platform for pipe gallery according to claim 1, characterized in that: the upper surface of the pipe support is arc-shaped, and its arc is consistent with the arc of the outer wall of the supported pipe.
CN201720096772.9U 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack Expired - Fee Related CN206580511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720096772.9U CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720096772.9U CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Publications (1)

Publication Number Publication Date
CN206580511U true CN206580511U (en) 2017-10-24

Family

ID=60110375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720096772.9U Expired - Fee Related CN206580511U (en) 2017-01-25 2017-01-25 Multifunctional construction operation platform for pipe rack

Country Status (1)

Country Link
CN (1) CN206580511U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482940A (en) * 2018-04-17 2018-09-04 陕西建工安装集团有限公司 A kind of pipeline mounting device and installation method
CN109264311A (en) * 2018-09-10 2019-01-25 中铁二十局集团路桥工程有限公司 Pipeline delivery vehicle
CN110844821A (en) * 2019-11-23 2020-02-28 施伟 A multifunctional construction operation platform for a comprehensive pipe gallery
CN112722734A (en) * 2020-12-28 2021-04-30 中建八局第三建设有限公司 Method for transporting heavy steel pipes with large calibers in pipe gallery
CN113232702A (en) * 2021-04-15 2021-08-10 中国华冶科工集团有限公司 Pipeline transportation installation vehicle in pipe gallery
CN115592345A (en) * 2022-10-24 2023-01-13 中国水利水电第七工程局有限公司(Cn) A self-leveling steel pipe welding auxiliary support
CN118666141A (en) * 2024-07-23 2024-09-20 中建二局安装工程有限公司 Pipe gallery large pipeline lifting device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482940A (en) * 2018-04-17 2018-09-04 陕西建工安装集团有限公司 A kind of pipeline mounting device and installation method
CN108482940B (en) * 2018-04-17 2023-11-14 陕西建工安装集团有限公司 Pipeline conveying and installing device and method
CN109264311A (en) * 2018-09-10 2019-01-25 中铁二十局集团路桥工程有限公司 Pipeline delivery vehicle
CN110844821A (en) * 2019-11-23 2020-02-28 施伟 A multifunctional construction operation platform for a comprehensive pipe gallery
CN112722734A (en) * 2020-12-28 2021-04-30 中建八局第三建设有限公司 Method for transporting heavy steel pipes with large calibers in pipe gallery
CN113232702A (en) * 2021-04-15 2021-08-10 中国华冶科工集团有限公司 Pipeline transportation installation vehicle in pipe gallery
CN115592345A (en) * 2022-10-24 2023-01-13 中国水利水电第七工程局有限公司(Cn) A self-leveling steel pipe welding auxiliary support
CN115592345B (en) * 2022-10-24 2025-01-10 中国水利水电第七工程局有限公司 A self-leveling steel pipe welding auxiliary bracket
CN118666141A (en) * 2024-07-23 2024-09-20 中建二局安装工程有限公司 Pipe gallery large pipeline lifting device

Similar Documents

Publication Publication Date Title
CN206580511U (en) Multifunctional construction operation platform for pipe rack
CN105195642B (en) A kind of bar bending system
CN205527156U (en) Elevator well frame structure infinitely continues convenient to on -site Assembly and installation
CN202089680U (en) Automatic lifting hook
CN216382841U (en) Pipeline strutting arrangement for construction
CN206494685U (en) A kind of pipeline lifting apparatus
CN110844821B (en) A multifunctional construction operation platform for a comprehensive pipe gallery
CN204126257U (en) Integral mobile formwork for straight wall concrete pouring
CN202897908U (en) Filter Element Lifting Device
CN203846780U (en) Semi-automatic lifting type operating platform device
CN106043386A (en) Efficient conveying device for building equipment
CN207367556U (en) A kind of multi-functional article of furniture publicity auxiliary device
CN105967073B (en) A new type of agricultural lifting equipment
CN203451153U (en) Column-type lifting rack
CN201372167Y (en) Foldable movable lifting type hanging bracket of pipeline beveling machine
CN203367888U (en) Wire unwinding device for building
CN218028747U (en) An auxiliary support device for decoration and decoration
CN109138495A (en) System and construction method are lifted in a kind of construction of eminence pipe string
CN206203712U (en) Moveable pneumatic rubbish hangs
CN207597836U (en) Jib drilling bracket
CN205257821U (en) Movable hoisting equipment
CN206188205U (en) Hoist device is used in prefabricated piping lane upset
CN207749810U (en) A kind of Novel moveable scaffold
CN204369522U (en) A kind of device coordinating fork truck Rapid pipe installation
CN205134923U (en) Adjustable distance of encorbelmenting hang mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

CF01 Termination of patent right due to non-payment of annual fee