CN110844821A CN201911160290.5A CN201911160290A CN110844821A CN 110844821 A CN110844821 A CN 110844821A CN 201911160290 A CN201911160290 A CN 201911160290A CN 110844821 A CN110844821 A CN 110844821A
Authority
CN
China
Prior art keywords
plate
operating platform
vertical plate
supporting vertical
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911160290.5A
Other languages
Chinese (zh)
Other versions
CN110844821B (en
Inventor
施伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911160290.5A priority Critical patent/CN110844821B/en
Publication of CN110844821A publication Critical patent/CN110844821A/en
Application granted granted Critical
Publication of CN110844821B publication Critical patent/CN110844821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention relates to the field of pipe gallery construction, and particularly discloses a multifunctional construction operating platform for a comprehensive pipe gallery, which comprises a first turning plate, a second turning plate, a first supporting vertical plate, a second supporting vertical plate and an operating platform; a sliding groove in the horizontal direction penetrates through the upper end of the first supporting vertical plate, a sliding rail in sliding fit with the sliding groove is fixed on the lower surface of the operating platform corresponding to the sliding groove, a horizontal insertion rod facing the second supporting vertical plate is fixed on the first supporting vertical plate, and an insertion hole in clearance fit with the insertion rod is penetrated through the second supporting vertical plate corresponding to the insertion rod; the manual pipeline lifting device is characterized in that a vertical jacking mechanism is fixed in the middle of the upper surface of the operating platform, and a manual pipeline lifting device is installed on the lower surface of the operating platform. According to the invention, the two turning plates are arranged, the operation platform is independent into two separable structures, and after the construction of the pipe gallery is finished, the two turning plates are outwards pulled, so that the operation platform can be quickly disassembled after the construction is finished, and the construction efficiency is improved.

Description

Multifunctional construction operation platform for comprehensive pipe rack
Technical Field
The invention relates to the field of pipe gallery construction, in particular to a multifunctional construction operating platform for a comprehensive pipe gallery.
Background
Along with the wide use of piping lane, the piping erection problem arouses people's concern gradually in the piping lane, piping erection position is diversified in the piping lane, and the narrow and small pipe connection of being not convenient for in piping lane space, different positions, different operation platform need be set up during the pipe connection of co-altitude, the pipe connection degree of difficulty has both been increased and workman's work load has been increased, need support jacking pipeline one by one after the pipe connection is accomplished so that the installation conduit saddle, work is complicated and inconvenient construction, consequently, an urgent need is a device for piping erection in the piping lane, reduce the construction degree of difficulty, accelerate the construction progress. The invention discloses a multifunctional construction operation platform for a pipe gallery, which is disclosed by Chinese patent (publication number: CN 206580511U), wherein the invention reduces the workload of erecting the operation platform, realizes the simultaneous operation of two pipelines, reduces the installation time, improves the working efficiency and reduces the construction cost. After the construction is finished, the device cannot be quickly disassembled from the pipe gallery, so that the construction progress is influenced; in addition, the pipe gallery below needs to be manually driven to be separated from the ground, and particularly, when the steel cable lifting rope is installed, a worker needs to lift the pipe gallery and then sleeve the steel cable lifting rope on the pipe gallery, so that the operation is difficult, and the use is not facilitated. Therefore, improvements are needed.
Disclosure of Invention
The invention aims to provide a multifunctional construction operating platform for a comprehensive pipe gallery, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a multifunctional construction operation platform for a comprehensive pipe gallery comprises a first turning plate, a second turning plate, a first supporting vertical plate, a second supporting vertical plate and an operation platform; the bottom parts of the first vehicle plate and the second vehicle plate are respectively provided with a roller, so that the first vehicle plate and the second vehicle plate can be independently pushed and pulled on the ground, and the vehicle is convenient to move, install and use; a vertical first supporting vertical plate is fixed on the upper surface of the first car plate, a vertical second supporting vertical plate parallel to the first supporting vertical plate is fixed on the upper surface of the second car plate, a horizontal operating platform is fixedly welded at the upper end of the second supporting vertical plate, the upper end of the second supporting vertical plate is positioned at one end of the operating platform, the other end of the operating platform extends outwards from the second car plate, the upper end of the first supporting vertical plate is flush with the lower surface of the operating platform, the lower surface of the operating platform is supported through the upper end of the first supporting vertical plate, and the first supporting vertical plate, the second supporting vertical plate and the operating platform form a gantry structure, so that the lifting of the pipe gallery is facilitated; the upper end of the first supporting vertical plate penetrates through a sliding groove in the horizontal direction, a sliding rail in sliding fit with the sliding groove is fixed on the lower surface of the operating platform corresponding to the sliding groove, the sliding rail horizontally extends into the sliding groove, and the end part of the operating platform is connected with the first supporting vertical plate, so that the operating platform is conveniently supported by the first supporting vertical plate, and the connection stability is improved; the first supporting vertical plate is fixedly provided with a horizontal insertion rod facing the second supporting vertical plate, an insertion hole in clearance fit with the insertion rod penetrates through the second supporting vertical plate corresponding to the insertion rod, the insertion rod penetrates through the second supporting vertical plate through the insertion hole, and the first supporting vertical plate and the second supporting vertical plate are connected through the insertion rod in a supporting mode, so that the supporting strength of the platform is improved; a vertical jacking mechanism is fixed in the middle of the upper surface of the operating platform, a pipe bracket for supporting the pipe gallery is fixed at the upper end of the jacking mechanism, and the pipe bracket is an arc-shaped plate with an upward opening and is convenient to contact with the pipe gallery; install the hand elevating gear of pipeline on the lower surface of operation panel, be provided with the crank on the hand elevating gear of pipeline, carry out hand lift through the crank, it has the cable wire lifting rope to hang on the hand elevating gear of pipeline, and the cable wire lifting rope suit makes the pipeline go up and down on the pipeline through the tractive of crank, after the installation will articulate the cable wire lifting rope take off from the hand elevating gear of pipeline can.
Further: the balancing weights can be detachably mounted on the first vehicle plate and the second vehicle plate, the weights at the bottoms of the first vehicle plate and the second vehicle plate are increased, and particularly on the second vehicle plate, the second vehicle plate is prevented from falling when standing alone, so that the independent first vehicle plate and the independent second vehicle plate can be safely moved.
Further: a plurality of inclined reinforcing ribs are fixedly connected between the operating platform and the second supporting vertical plate, a triangular stable supporting structure is formed between the operating platform and the second supporting vertical plate and the operating platform, the strength of the operating platform is improved, the operating platform can bear larger pressure, and the service life is prolonged.
Further: the chute is an inverted T-shaped structure.
Further: the insertion rod is provided with at least two.
Further: the jack is used for the jacking mechanism.
Further: equal fixed mounting has the ascending stripper plate of vertical side on the relative one side of first sweep, second sweep, the stripper plate is hollow structure, vertical slip is provided with the slider in the stripper plate, the upper end and the lower extreme of slider all are fixed with supporting spring, support the slider through supporting spring, make it keep at the intermediate position, the ascending slide of vertical side has been seted up on the lateral wall of stripper plate, fixed welding has the connecting block that passes the slide on the lateral wall of slider, the fixed jacking board in outer end of connecting block, the jacking board follows the slider and moves in vertical side.
Further: be provided with the arcwall face on two relative lateral walls of jacking board, with the piping lane contact back, lift the piping lane through the jacking board.
Compared with the prior art, the invention has the beneficial effects that: according to the invention, the two turning plates are arranged, the operation platform is independent into two separable structures, and after the construction of the pipe gallery is finished, the two turning plates are outwards pulled open, so that the operation platform can be quickly disassembled after the construction is finished, and the construction efficiency is improved; the jacking plate is arranged at the bottom, so that the installation of a steel cable lifting rope is facilitated in the lifting process of the pipe gallery, convenience is provided for construction, and the labor intensity of workers is reduced; the operation platform is safe and stable to use and convenient to operate.
Drawings
Fig. 1 is a three-dimensional structure schematic diagram of a multifunctional construction operation platform of a comprehensive pipe rack.
Fig. 2 is a main view structure schematic diagram of a multi-functional construction operation platform of utility tunnel.
Fig. 3 is a schematic diagram of the structure in the extrusion plate in the multifunctional construction operation platform of the comprehensive pipe gallery.
In the figure: 1-a first car plate, 2-a second car plate, 3-a first supporting vertical plate, 4-a second supporting vertical plate, 5-an operation table, 6-a jacking mechanism, 7-a pipe support, 8-a pipe hand-operated lifting device, 9-a steel rope sling, 10-a plug rod, 11-a plug hole, 12-a slide rail, 13-a slide groove, 14-an extrusion plate, 15-a jacking plate, 16-a slide way, 17-a supporting spring, 18-a slide block, 19-a balancing weight, 20-a roller, 21-a crank, 22-a reinforcing rib and 23-a connecting block.
Detailed Description
Example 1
Referring to the drawings, in the embodiment of the invention, a multifunctional construction operation platform for a comprehensive pipe gallery comprises a first car plate 1, a second car plate 2, a first supporting vertical plate 3, a second supporting vertical plate 4 and an operation platform 5; the bottom parts of the first vehicle plate 1 and the second vehicle plate 2 are respectively provided with a roller 20, so that the first vehicle plate 1 and the second vehicle plate 2 can be independently pushed and pulled on the ground, and the vehicle is convenient to move, install and use; be fixed with vertical first supporting riser 3 on the upper surface of first sweep 1, the last fixed surface of second sweep 2 has vertical second supporting riser 4 parallel with first supporting riser 3, and the upper end of second supporting riser 4 is fixed and is welded horizontally operation panel 5, and the upper end of second supporting riser 4 is located the one end of operation panel 5, and the other one end of operation panel 5 outwards stretches out from second sweep 2, the upper end of first supporting riser 3 and the lower surface parallel and level of operation panel 5, through the lower surface of the upper end supporting operation panel 5 of first supporting riser 3, second supporting riser 4, operation panel 5 form the longmen structure, are convenient for realize lifting by crane of piping lane.
In order to ensure the stability of the first vehicle plate 1 and the second vehicle plate 2, the counterweight blocks 19 can be detachably mounted on the first vehicle plate 1 and the second vehicle plate 2, the weight of the bottoms of the first vehicle plate 1 and the second vehicle plate 2 is increased, and particularly on the second vehicle plate 2, the second vehicle plate 2 is prevented from falling when standing alone, so that the independent first vehicle plate 1 and the independent second vehicle plate 2 can be safely moved. A plurality of inclined reinforcing ribs 22 are fixedly connected between the operating platform 5 and the second supporting vertical plate 4, a triangular stable supporting structure is formed between the operating platform 5 and the second supporting vertical plate 4 and between the operating platform 5 and the second supporting vertical plate 4, the strength of the operating platform 5 is improved, large pressure can be borne on the operating platform, and the service life is prolonged.
The upper end of the first supporting vertical plate 3 penetrates through a sliding groove 13 in the horizontal direction, the sliding groove 13 is of an inverted T-shaped structure, a sliding rail 12 in sliding fit with the sliding groove 13 is fixed on the lower surface of the operating platform 5 corresponding to the sliding groove 13, the sliding rail 12 horizontally extends into the sliding groove 13, and the end part of the operating platform 5 is connected with the first supporting vertical plate 3, so that the operating platform 5 is conveniently supported through the first supporting vertical plate 3, and the connection stability is improved; be fixed with the horizontally spliced pole 10 towards second support riser 4 on the first support riser 3, spliced pole 10 is provided with two at least, runs through on the second support riser 4 that spliced pole 10 corresponds have rather than clearance fit's spliced eye 11, and spliced pole 10 passes second support riser 4 through spliced eye 11, supports through spliced pole 10 and connects first support riser 3, second support riser 4, improves the support intensity of platform.
A vertical jacking mechanism 6 is fixed in the middle of the upper surface of the operating table 5, a pipe support 7 for supporting the pipe gallery is fixed at the upper end of the jacking mechanism 6, preferably, a jack is used for the jacking mechanism 6, and the pipe support 7 is an arc-shaped plate with an upward opening and is convenient to contact with the pipe gallery; install hand elevating gear 8 of pipeline on the lower surface of operation panel 5, be provided with crank 21 on the hand elevating gear 8 of pipeline, carry out hand lift through crank 21, it has cable wire lifting rope 9 to hang on hand elevating gear 8 of pipeline, and cable wire lifting rope 9 suit is on the pipeline, and the tractive through crank 21 makes the pipeline go up and down, and the cable wire lifting rope 9 that will articulate after the installation takes off from hand elevating gear 8 of pipeline can.
When in use, the first supporting vertical plate 3 and the second supporting vertical plate 4 are connected with the chute 13 structure and the inserting rod 10 is connected with the inserting hole 11 structure through the sliding rail 12 at the top, the device is moved to a pipe gallery to be connected, the pipe gallery above is supported through the pipe bracket 7, the jacking mechanism 6 is adjusted to enable the pipe gallery to be at a proper position, the pipe gallery below is hoisted through the pipe hand-operated lifting device 8, the pipe gallery is adjusted to be at a proper position through the pipe hand-operated lifting device 8, after the construction of the pipe gallery is finished, the pipe bracket 7 is put down from the pipe above, the steel cable hoisting rope 9 is taken down from the pipe gallery below, the first car plate 1 and the second car plate 2 are horizontally pulled outwards, the sliding rail 12 at the top of the first supporting vertical plate 3 and the second supporting vertical plate 4 is separated from the chute 13, the inserting rod 10 is separated from the inserting hole 11, the steel cable hoisting rope can be directly pulled outwards, the next construction operation is carried out, the operation, the construction of other parts of the pipe gallery is not influenced.
Example 2
On the basis of embodiment 1, extrusion plates 14 in the vertical direction are fixedly mounted on opposite sides of the first car plate 1 and the second car plate 2, the extrusion plates 14 are of a hollow structure, sliders 18 are vertically and slidably arranged in the extrusion plates 14, supporting springs 17 are fixed at upper ends and lower ends of the sliders 18, the sliders 18 are supported by the supporting springs 17 and are kept at the middle positions, vertical slide ways 16 are formed in the side walls of the extrusion plates 14, connecting blocks 23 penetrating the slide ways 16 are fixedly welded on the side walls of the sliders 18, jacking plates 15 are fixed at outer ends of the connecting blocks 23, the jacking plates 15 move in the vertical direction along with the sliders 18, arc-shaped surfaces are arranged on the opposite side walls of the two jacking plates 15, after contacting with a pipe gallery, the pipe gallery is lifted up through the jacking plates 15, so that a steel cable lifting rope 9 can be conveniently mounted to press the jacking plates 15 downwards to be located on the ground, can set up positioning bolt on stripper plate 14, the fastening makes jacking plate 15 keep in the below on the slider 18 of this position, lifts up the piping lane gently again, removes first sweep 1, second sweep 2 and makes jacking plate 15 stretch into the bottom of piping lane, supports the piping lane through jacking plate 15 and keeps breaking away from ground, facilitates for the installation of cable wire lifting rope 9.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. A multifunctional construction operation platform for a comprehensive pipe gallery comprises a first turning plate (1), a second turning plate (2), a first supporting vertical plate (3), a second supporting vertical plate (4) and an operation platform (5); the trolley is characterized in that rollers (20) are mounted at the bottoms of the first trolley plate (1) and the second trolley plate (2), a vertical first supporting vertical plate (3) is fixed on the upper surface of the first trolley plate (1), a vertical second supporting vertical plate (4) parallel to the first supporting vertical plate (3) is fixed on the upper surface of the second trolley plate (2), a horizontal operating platform (5) is fixedly welded at the upper end of the second supporting vertical plate (4), the upper end of the second supporting vertical plate (4) is located at one end of the operating platform (5), the other end of the operating platform (5) extends outwards from the second trolley plate (2), the upper end of the first supporting vertical plate (3) is flush with the lower surface of the operating platform (5), and the lower surface of the operating platform (5) is supported through the upper end of the first supporting vertical plate (3); the device is characterized in that a sliding groove (13) in the horizontal direction penetrates through the upper end of the first supporting vertical plate (3), a sliding rail (12) in sliding fit with the sliding groove (13) is fixed on the lower surface of the operating platform (5) corresponding to the sliding groove (13), and the sliding rail (12) horizontally extends into the sliding groove (13);
a horizontal plug-in rod (10) facing the second support vertical plate (4) is fixed on the first support vertical plate (3), a plug-in hole (11) in clearance fit with the plug-in rod (10) penetrates through the second support vertical plate (4) corresponding to the plug-in rod (10), and the plug-in rod (10) penetrates through the second support vertical plate (4) through the plug-in hole (11);
a vertical jacking mechanism (6) is fixed in the middle of the upper surface of the operating table (5), and a pipe support (7) for supporting a pipe gallery is fixed at the upper end of the jacking mechanism (6); the hand elevating gear of pipeline (8) is installed on the lower surface of operation panel (5), is provided with crank (21) on hand elevating gear of pipeline (8), has hung cable wire lifting rope (9) on hand elevating gear of pipeline (8).
2. The multifunctional construction operating platform for the comprehensive pipe rack according to claim 1, characterized in that: and the first vehicle plate (1) and the second vehicle plate (2) can be detachably provided with a balancing weight (19).
3. The multifunctional construction operating platform for the comprehensive pipe rack according to claim 1, characterized in that: a plurality of inclined reinforcing ribs (22) are fixedly connected between the operating platform (5) and the second supporting vertical plate (4).
4. The multifunctional construction operating platform for the comprehensive pipe rack according to claim 1, characterized in that: the sliding groove (13) is of an inverted T-shaped structure.
5. The multifunctional construction operating platform for the comprehensive pipe rack according to claim 1, characterized in that: at least two insertion rods (10) are arranged.
6. The multifunctional construction operating platform for the comprehensive pipe rack according to claim 1, characterized in that: the jacking mechanism (6) adopts a jack.
7. The multifunctional construction operating platform for the comprehensive pipe rack according to any one of claims 1 to 6, characterized in that: equal fixed mounting has ascending stripper plate (14) of vertical side on the relative one side of first sweep (1), second sweep (2), stripper plate (14) are hollow structure, vertical slip is provided with slider (18) in stripper plate (14), the upper end and the lower extreme of slider (18) all are fixed with supporting spring (17), the ascending slide of vertical side (16) have been seted up on the lateral wall of stripper plate (14), fixed welding has connecting block (23) that pass slide (16) on the lateral wall of slider (18), fixed jacking board (15) in the outer end of connecting block (23).
8. The multifunctional construction operating platform for the comprehensive pipe rack of claim 7, wherein: arc-shaped surfaces are arranged on the opposite side walls of the two jacking plates (15).
CN201911160290.5A 2019-11-23 2019-11-23 Multifunctional construction operation platform for comprehensive pipe rack Active CN110844821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911160290.5A CN110844821B (en) 2019-11-23 2019-11-23 Multifunctional construction operation platform for comprehensive pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911160290.5A CN110844821B (en) 2019-11-23 2019-11-23 Multifunctional construction operation platform for comprehensive pipe rack

Publications (2)

Publication Number Publication Date
CN110844821A true CN110844821A (en) 2020-02-28
CN110844821B CN110844821B (en) 2020-12-29

Family

ID=69603873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911160290.5A Active CN110844821B (en) 2019-11-23 2019-11-23 Multifunctional construction operation platform for comprehensive pipe rack

Country Status (1)

Country Link
CN (1) CN110844821B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863975A (en) * 2021-09-13 2021-12-31 中煤建工集团有限公司 Underground pipe gallery construction is with system of sliding
CN115110819A (en) * 2022-07-14 2022-09-27 源通重工集团有限公司 Stereo garage for commercial street

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH043798A (en) * 1990-04-19 1992-01-08 Taisei Corp Pipe extracting construction method for overpass
KR100840223B1 (en) * 2007-07-05 2008-06-23 한국가스공사 Utility pipe lifting apparatus and pipe painting method using thereof
CN201748034U (en) * 2010-08-19 2011-02-16 中国水电建设集团十五工程局有限公司 Support mobile device for quick installation of pipeline
CN206580511U (en) * 2017-01-25 2017-10-24 中建一局集团安装工程有限公司 A kind of multi-functional construction operation platform of piping lane
CN207959875U (en) * 2018-03-16 2018-10-12 陈衠 A kind of construction scaffold
CN208532071U (en) * 2018-06-07 2019-02-22 华北理工大学 A kind of construction site weight transfer device
CN209193460U (en) * 2018-09-14 2019-08-02 中建八局第一建设有限公司 A kind of movable lifting Large-size rebar cage weld job operating platform
CN110182700A (en) * 2019-05-31 2019-08-30 国家电网有限公司 GIS metal can dismantling device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH043798A (en) * 1990-04-19 1992-01-08 Taisei Corp Pipe extracting construction method for overpass
KR100840223B1 (en) * 2007-07-05 2008-06-23 한국가스공사 Utility pipe lifting apparatus and pipe painting method using thereof
CN201748034U (en) * 2010-08-19 2011-02-16 中国水电建设集团十五工程局有限公司 Support mobile device for quick installation of pipeline
CN206580511U (en) * 2017-01-25 2017-10-24 中建一局集团安装工程有限公司 A kind of multi-functional construction operation platform of piping lane
CN207959875U (en) * 2018-03-16 2018-10-12 陈衠 A kind of construction scaffold
CN208532071U (en) * 2018-06-07 2019-02-22 华北理工大学 A kind of construction site weight transfer device
CN209193460U (en) * 2018-09-14 2019-08-02 中建八局第一建设有限公司 A kind of movable lifting Large-size rebar cage weld job operating platform
CN110182700A (en) * 2019-05-31 2019-08-30 国家电网有限公司 GIS metal can dismantling device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863975A (en) * 2021-09-13 2021-12-31 中煤建工集团有限公司 Underground pipe gallery construction is with system of sliding
CN115110819A (en) * 2022-07-14 2022-09-27 源通重工集团有限公司 Stereo garage for commercial street
CN115110819B (en) * 2022-07-14 2023-12-19 源通重工集团有限公司 Stereo garage for commercial street

Also Published As

Publication number Publication date
CN110844821B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN202023360U (en) Hydraulic climbing die plate for building construction
CN103790114B (en) Hydraulic haulage and roller are walked the deck unit erection gantry and traveling method thereof that combine
CN104989094B (en) Installing method of walking hanging basket
CN110844821B (en) Multifunctional construction operation platform for comprehensive pipe rack
CN104632088B (en) Oil-well rig derrick set assembly/installation method
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN202689495U (en) Self-elevating chimney and water tower construction tower frame
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN205387439U (en) Mast hoisting accessory
CN105715028B (en) Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN207348480U (en) High-order structural glass erecting device
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN110388066B (en) Unit type curtain wall plate construction machine
CN101863423A (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN209906186U (en) Building template cross-floor transportation equipment
CN213326443U (en) Quick unloading platform
CN210829101U (en) Mine derrick
CN209260563U (en) A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN202689494U (en) Elevator shaft template support
CN201459602U (en) Equipment for bridge construction
CN219840342U (en) Movable lifting scaffold
CN214436024U (en) Auxiliary assembly is used in fire control pipeline installation
CN204737657U (en) A movable hoisting accessory for curtain installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant