CN206578953U - The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode - Google Patents
The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode Download PDFInfo
- Publication number
- CN206578953U CN206578953U CN201621043531.XU CN201621043531U CN206578953U CN 206578953 U CN206578953 U CN 206578953U CN 201621043531 U CN201621043531 U CN 201621043531U CN 206578953 U CN206578953 U CN 206578953U
- Authority
- CN
- China
- Prior art keywords
- size
- piping lane
- platform
- integrated piping
- digitlization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode of one kind, including:Prefabrication formula industrialization flow, digital moduleization splicing logistics platform mode, cross searching support bracket, variable adjusting module, supplementary module and rail wheel group.The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, it is characterised by, the appearance and size of the cross searching support bracket is existing city integrated piping lane full-size, existing production city pipe gallery is adjusted to the width for increasing variable adjusting module and uses platform, supplementary module changes maximum appearance and size as variable adjusting module size changes.Logistics platform bottom is fixed with 12 groups of rail wheel groups, has 8 groups of rail wheels to be fixed on cross searching frame, and 4 groups of rail wheels are fixed on supplementary module, and supplementary module upper rail wheel can change with size is adjusted to orbital position.
Description
Technical field
The utility model is related to a kind of prefabricated digitlization city integrated piping lane industrialization of multi-mode of mechanical field, municipal administration aspect
System logistics process platform.
Background technology
The city integrated piping lane production method in underground is also in the cast-in-place stage on domestic market, and prefabricated production method is just
It is in the starting stage.It is mainly used in railway, traffic, hydraulic engineering and Urban Underground municipal administration synthesis pipe gallery, cast-in-place concrete
Have the disadvantage that the construction operation time is long, it is cast-in-place during to scene requirement it is higher, when such as pouring underground water can trigger localized seepage,
Easily there is the influence of crack, especially weather to piping lane in cast-in-place piping lane, and expanding with heat and contract with cold greatly shortens the life-span of piping lane, also right
Follow-up maintenance produces huge expense.The development of industry is had influence on.In order to realize underground pipe gallery industrialization, knot
Close factory lines to have invented and can adjust the logistics platform used with piping lane size, the automated production of prefabricated piping lane can be achieved
Operation.
Utility model content
The utility model provides a kind of prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode,
Existing different size underground pipe gallery product operations on same streamline are can solve the problem that, unnecessary investment is reduced,
City integrated piping lane centralization production is realized, Assembling construction greatlys save human and material resources, financial resources.
Included based on the above-mentioned prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode:In cross
Heart support bracket, variable adjusting module, supplementary module and rail wheel group.
The appearance and size of wherein described cross searching support bracket is existing city integrated piping lane full-size, with increase
The width of variable adjusting module and be adjusted to existing production city pipe gallery and use platform, supplementary module is with variable adjustment
Module changes size and changes its maximum appearance and size.Logistics platform bottom is fixed with 12 groups of rail wheel groups, has 8 groups of rail wheels to consolidate
It is scheduled on cross searching frame, 4 groups of rail wheels are fixed on supplementary module, supplementary module upper rail wheel can change with size to be adjusted to
Orbital position.
Brief description of the drawings:
Fig. 1 is the prefabricated digitlization city integrated piping lane industrialization system logistics process platform structure of multi-mode of the utility model
Figure;
Fig. 2 is the city integrated piping lane industrialization system logistics process platform blast of the prefabricated digitlization multi-mode of the utility model
Formula top view;
Fig. 3 is the city integrated piping lane industrialization system logistics process platform blast of the prefabricated digitlization multi-mode of the utility model
Formula axonometric drawing.
Embodiment:
To make the city integrated piping lane industrialization system logistics process platform of the prefabricated digitlization multi-mode of the utility model more
Its clear structure, advantage are more to the prefabricated digitlization of the utility model below in conjunction with specific implementation method, and referring to the drawings
The city integrated piping lane industrialization system logistics process platform of pattern is further described.
It is the prefabricated digitlization city integrated piping lane industrialization system logistics work of multi-mode of the utility model shown in reference picture 1
Skill platform structure figure, including cross searching support bracket 1, supplementary module 2, variable adjusting module 3, variable adjusting module 4,
Rail wheel group 5, connecting key 6, fixing bolt component 7.
In the utility model implementation, as shown in Fig. 2 cross searching support bracket 1, supplementary module 2 and variable adjustment mould
Block 3 is to machine to be made again after welding, and top and bottom are welded with installing plate, are easy to city integrated piping lane mould to be fixedly mounted.
In the utility model, as shown in Fig. 2 between cross searching support bracket 1, supplementary module 2 and variable adjusting module 3
There is connecting key 6, practical fixing bolt component locking 7 after merging.
In the utility model, as shown in figure 1, rail wheel is fixed on logistics platform bottom, rail wheel and logistics platform
Between accompany rubber blanket, prevent there is foreign matter on track, cause logistics platform to shake.
In the utility model, such as Fig. 3, all modules all realize digitlization, and splicing is dismantled, stored, carrying time saving and energy saving.
From the above it can be seen that digitlization described in the utility model, modular city integrated piping lane industrialization
Whole piping lane production process, is completed the city integrated piping lane of automated production different model, makes underground comprehensive by system logistics platform
Closing piping lane realizes industrialization, centralization, quality controllableization.PROJECT TIME is substantially reduced compared to cast-in-place pattern, item is saved
The mesh time also equally saves substantial amounts of Project Cost, reduces potential safety hazard during site operation, underground pipe gallery product
Quality is achieved effective control.
Claims (5)
1. the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, is characterised by, including:Ten
Word center support bracket, variable adjusting module, supplementary module and rail wheel group.
2. according to claim 1, it is characterised in that the appearance and size of the cross searching support bracket is existing city
City's pipe gallery full-size, is adjusted to existing production city pipe gallery and uses with the width for increasing variable adjusting module
Platform, supplementary module changes maximum appearance and size as variable adjusting module size changes;Logistics platform bottom is fixed with 12
Group rail wheel group, has 8 groups of rail wheels to be fixed on cross searching frame, 4 groups of rail wheels are fixed on supplementary module, on supplementary module
Rail wheel can change with size is adjusted to orbital position.
3. according to claim 1, it is characterised in that the cross searching support bracket 1, supplementary module 2 and variable
There is connecting key 6 between adjusting module 3, practical fixing bolt component locking 7 after merging.
4. according to claim 2, it is characterised in that the rail wheel is fixed on logistics platform bottom, rail wheel with
Rubber blanket is accompanied between logistics platform, prevents there is foreign matter on track, causes logistics platform to shake.
5. the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, by adjusting supplementary module size
It can be used on the production any specification prefabricated digitlization city integrated piping lane industrialization system Tool and Die Technology platform of multi-mode
City integrated piping lane product.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621043531.XU CN206578953U (en) | 2016-09-08 | 2016-09-08 | The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621043531.XU CN206578953U (en) | 2016-09-08 | 2016-09-08 | The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206578953U true CN206578953U (en) | 2017-10-24 |
Family
ID=60107740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621043531.XU Expired - Fee Related CN206578953U (en) | 2016-09-08 | 2016-09-08 | The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206578953U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112417691A (en) * | 2020-11-24 | 2021-02-26 | 杭州迦智科技有限公司 | Prefabricated library position model establishing and layout method, robot control method, storage medium and processor |
-
2016
- 2016-09-08 CN CN201621043531.XU patent/CN206578953U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112417691A (en) * | 2020-11-24 | 2021-02-26 | 杭州迦智科技有限公司 | Prefabricated library position model establishing and layout method, robot control method, storage medium and processor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2869322Y (en) | Portal frame tunnel lining form trolley | |
CN107639719A (en) | Movable prefabricated box girder formwork system and box beam preparation method | |
CN203768814U (en) | High-pier minor-radius curve cast-in-situ box girder novel moving die carrier | |
CN104097253B (en) | Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system | |
CN107034989B (en) | A kind of prefabrication prefabricated components exempt to support installation method | |
CN203977309U (en) | A kind of shuttle type culvert linear steel form carrier | |
CN207161110U (en) | One kind construction open cut horseshoe shaped section tunnel roof self-travel type is mobile trolley used | |
CN109049315A (en) | A kind of prefabricated components production system | |
CN202658533U (en) | Movable formwork of curved bridge with variable width | |
CN102322028A (en) | Semi-automatic arch culvert construction template | |
CN103711067A (en) | Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof | |
CN203188113U (en) | Segmental precasting assembly structure in large bent cap | |
CN204803760U (en) | Letter zhi gang - concrete composite truss bridge construction support system | |
CN206578953U (en) | The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode | |
CN102660925A (en) | Moveable formwork for variable-width curved bridge | |
CN203248170U (en) | Lining trolley for secondary lining construction of pedestrian crosswalk | |
CN109317911A (en) | A kind of cross column welding production line | |
CN205839793U (en) | A kind of city integrated piping lane construction outside mould | |
CN204817843U (en) | Prefabricated utility tunnel's steel reinforcement cage processingequipment | |
CN103669193B (en) | A kind of laterally assembled Wavelike steel webplate combination T beam and construction method | |
CN201521115U (en) | Beam-column type bracket | |
CN109930627A (en) | A kind of municipal administration synthesis pipe gallery hydraulic template trolley and construction method | |
CN202208892U (en) | Semi-automatic arched culvert construction template | |
CN206663485U (en) | The prefabricated digitlization city integrated piping lane industrialization system integrated production line platform of multi-mode | |
CN206220973U (en) | For the self-propelled hydraulic formwork jumbo that Deep Foundation Pit of Metro Stations engineering top board is poured |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171024 Termination date: 20180908 |
|
CF01 | Termination of patent right due to non-payment of annual fee |