CN206578953U - The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode - Google Patents

The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode Download PDF

Info

Publication number
CN206578953U
CN206578953U CN201621043531.XU CN201621043531U CN206578953U CN 206578953 U CN206578953 U CN 206578953U CN 201621043531 U CN201621043531 U CN 201621043531U CN 206578953 U CN206578953 U CN 206578953U
Authority
CN
China
Prior art keywords
size
piping lane
platform
integrated piping
digitlization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621043531.XU
Other languages
Chinese (zh)
Inventor
周林国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
City Of Jilin Province Comprehensive Pipe Gallery Industry Engineering Co Ltd
Original Assignee
City Of Jilin Province Comprehensive Pipe Gallery Industry Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by City Of Jilin Province Comprehensive Pipe Gallery Industry Engineering Co Ltd filed Critical City Of Jilin Province Comprehensive Pipe Gallery Industry Engineering Co Ltd
Priority to CN201621043531.XU priority Critical patent/CN206578953U/en
Application granted granted Critical
Publication of CN206578953U publication Critical patent/CN206578953U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode of one kind, including:Prefabrication formula industrialization flow, digital moduleization splicing logistics platform mode, cross searching support bracket, variable adjusting module, supplementary module and rail wheel group.The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, it is characterised by, the appearance and size of the cross searching support bracket is existing city integrated piping lane full-size, existing production city pipe gallery is adjusted to the width for increasing variable adjusting module and uses platform, supplementary module changes maximum appearance and size as variable adjusting module size changes.Logistics platform bottom is fixed with 12 groups of rail wheel groups, has 8 groups of rail wheels to be fixed on cross searching frame, and 4 groups of rail wheels are fixed on supplementary module, and supplementary module upper rail wheel can change with size is adjusted to orbital position.

Description

The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode
Technical field
The utility model is related to a kind of prefabricated digitlization city integrated piping lane industrialization of multi-mode of mechanical field, municipal administration aspect System logistics process platform.
Background technology
The city integrated piping lane production method in underground is also in the cast-in-place stage on domestic market, and prefabricated production method is just It is in the starting stage.It is mainly used in railway, traffic, hydraulic engineering and Urban Underground municipal administration synthesis pipe gallery, cast-in-place concrete Have the disadvantage that the construction operation time is long, it is cast-in-place during to scene requirement it is higher, when such as pouring underground water can trigger localized seepage, Easily there is the influence of crack, especially weather to piping lane in cast-in-place piping lane, and expanding with heat and contract with cold greatly shortens the life-span of piping lane, also right Follow-up maintenance produces huge expense.The development of industry is had influence on.In order to realize underground pipe gallery industrialization, knot Close factory lines to have invented and can adjust the logistics platform used with piping lane size, the automated production of prefabricated piping lane can be achieved Operation.
Utility model content
The utility model provides a kind of prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, Existing different size underground pipe gallery product operations on same streamline are can solve the problem that, unnecessary investment is reduced, City integrated piping lane centralization production is realized, Assembling construction greatlys save human and material resources, financial resources.
Included based on the above-mentioned prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode:In cross Heart support bracket, variable adjusting module, supplementary module and rail wheel group.
The appearance and size of wherein described cross searching support bracket is existing city integrated piping lane full-size, with increase The width of variable adjusting module and be adjusted to existing production city pipe gallery and use platform, supplementary module is with variable adjustment Module changes size and changes its maximum appearance and size.Logistics platform bottom is fixed with 12 groups of rail wheel groups, has 8 groups of rail wheels to consolidate It is scheduled on cross searching frame, 4 groups of rail wheels are fixed on supplementary module, supplementary module upper rail wheel can change with size to be adjusted to Orbital position.
Brief description of the drawings:
Fig. 1 is the prefabricated digitlization city integrated piping lane industrialization system logistics process platform structure of multi-mode of the utility model Figure;
Fig. 2 is the city integrated piping lane industrialization system logistics process platform blast of the prefabricated digitlization multi-mode of the utility model Formula top view;
Fig. 3 is the city integrated piping lane industrialization system logistics process platform blast of the prefabricated digitlization multi-mode of the utility model Formula axonometric drawing.
Embodiment:
To make the city integrated piping lane industrialization system logistics process platform of the prefabricated digitlization multi-mode of the utility model more Its clear structure, advantage are more to the prefabricated digitlization of the utility model below in conjunction with specific implementation method, and referring to the drawings The city integrated piping lane industrialization system logistics process platform of pattern is further described.
It is the prefabricated digitlization city integrated piping lane industrialization system logistics work of multi-mode of the utility model shown in reference picture 1 Skill platform structure figure, including cross searching support bracket 1, supplementary module 2, variable adjusting module 3, variable adjusting module 4, Rail wheel group 5, connecting key 6, fixing bolt component 7.
In the utility model implementation, as shown in Fig. 2 cross searching support bracket 1, supplementary module 2 and variable adjustment mould Block 3 is to machine to be made again after welding, and top and bottom are welded with installing plate, are easy to city integrated piping lane mould to be fixedly mounted.
In the utility model, as shown in Fig. 2 between cross searching support bracket 1, supplementary module 2 and variable adjusting module 3 There is connecting key 6, practical fixing bolt component locking 7 after merging.
In the utility model, as shown in figure 1, rail wheel is fixed on logistics platform bottom, rail wheel and logistics platform Between accompany rubber blanket, prevent there is foreign matter on track, cause logistics platform to shake.
In the utility model, such as Fig. 3, all modules all realize digitlization, and splicing is dismantled, stored, carrying time saving and energy saving.
From the above it can be seen that digitlization described in the utility model, modular city integrated piping lane industrialization Whole piping lane production process, is completed the city integrated piping lane of automated production different model, makes underground comprehensive by system logistics platform Closing piping lane realizes industrialization, centralization, quality controllableization.PROJECT TIME is substantially reduced compared to cast-in-place pattern, item is saved The mesh time also equally saves substantial amounts of Project Cost, reduces potential safety hazard during site operation, underground pipe gallery product Quality is achieved effective control.

Claims (5)

1. the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, is characterised by, including:Ten Word center support bracket, variable adjusting module, supplementary module and rail wheel group.
2. according to claim 1, it is characterised in that the appearance and size of the cross searching support bracket is existing city City's pipe gallery full-size, is adjusted to existing production city pipe gallery and uses with the width for increasing variable adjusting module Platform, supplementary module changes maximum appearance and size as variable adjusting module size changes;Logistics platform bottom is fixed with 12 Group rail wheel group, has 8 groups of rail wheels to be fixed on cross searching frame, 4 groups of rail wheels are fixed on supplementary module, on supplementary module Rail wheel can change with size is adjusted to orbital position.
3. according to claim 1, it is characterised in that the cross searching support bracket 1, supplementary module 2 and variable There is connecting key 6 between adjusting module 3, practical fixing bolt component locking 7 after merging.
4. according to claim 2, it is characterised in that the rail wheel is fixed on logistics platform bottom, rail wheel with Rubber blanket is accompanied between logistics platform, prevents there is foreign matter on track, causes logistics platform to shake.
5. the prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode, by adjusting supplementary module size It can be used on the production any specification prefabricated digitlization city integrated piping lane industrialization system Tool and Die Technology platform of multi-mode City integrated piping lane product.
CN201621043531.XU 2016-09-08 2016-09-08 The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode Expired - Fee Related CN206578953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621043531.XU CN206578953U (en) 2016-09-08 2016-09-08 The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621043531.XU CN206578953U (en) 2016-09-08 2016-09-08 The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode

Publications (1)

Publication Number Publication Date
CN206578953U true CN206578953U (en) 2017-10-24

Family

ID=60107740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621043531.XU Expired - Fee Related CN206578953U (en) 2016-09-08 2016-09-08 The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode

Country Status (1)

Country Link
CN (1) CN206578953U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112417691A (en) * 2020-11-24 2021-02-26 杭州迦智科技有限公司 Prefabricated library position model establishing and layout method, robot control method, storage medium and processor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112417691A (en) * 2020-11-24 2021-02-26 杭州迦智科技有限公司 Prefabricated library position model establishing and layout method, robot control method, storage medium and processor

Similar Documents

Publication Publication Date Title
CN2869322Y (en) Portal frame tunnel lining form trolley
CN107639719A (en) Movable prefabricated box girder formwork system and box beam preparation method
CN203768814U (en) High-pier minor-radius curve cast-in-situ box girder novel moving die carrier
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN107034989B (en) A kind of prefabrication prefabricated components exempt to support installation method
CN203977309U (en) A kind of shuttle type culvert linear steel form carrier
CN207161110U (en) One kind construction open cut horseshoe shaped section tunnel roof self-travel type is mobile trolley used
CN109049315A (en) A kind of prefabricated components production system
CN202658533U (en) Movable formwork of curved bridge with variable width
CN102322028A (en) Semi-automatic arch culvert construction template
CN103711067A (en) Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof
CN203188113U (en) Segmental precasting assembly structure in large bent cap
CN204803760U (en) Letter zhi gang - concrete composite truss bridge construction support system
CN206578953U (en) The prefabricated digitlization city integrated piping lane industrialization system logistics process platform of multi-mode
CN102660925A (en) Moveable formwork for variable-width curved bridge
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN109317911A (en) A kind of cross column welding production line
CN205839793U (en) A kind of city integrated piping lane construction outside mould
CN204817843U (en) Prefabricated utility tunnel's steel reinforcement cage processingequipment
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN201521115U (en) Beam-column type bracket
CN109930627A (en) A kind of municipal administration synthesis pipe gallery hydraulic template trolley and construction method
CN202208892U (en) Semi-automatic arched culvert construction template
CN206663485U (en) The prefabricated digitlization city integrated piping lane industrialization system integrated production line platform of multi-mode
CN206220973U (en) For the self-propelled hydraulic formwork jumbo that Deep Foundation Pit of Metro Stations engineering top board is poured

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20180908

CF01 Termination of patent right due to non-payment of annual fee