CN206571467U - Pull rig fast assembling-disassembling cable trough - Google Patents
Pull rig fast assembling-disassembling cable trough Download PDFInfo
- Publication number
- CN206571467U CN206571467U CN201720177709.8U CN201720177709U CN206571467U CN 206571467 U CN206571467 U CN 206571467U CN 201720177709 U CN201720177709 U CN 201720177709U CN 206571467 U CN206571467 U CN 206571467U
- Authority
- CN
- China
- Prior art keywords
- chase
- altitude
- support frame
- cable
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Rig fast assembling-disassembling cable trough is pulled the utility model discloses one kind, it is included on power plant module and is installed with support frame I, the top of support frame I is hinged with the rear end of high-altitude chase II, the front end of high-altitude chase II is hinged with the rear end of high-altitude chase I, and the front end of high-altitude chase I is hinged with the beat ear mount on rig floor where host module;Transfer box is installed on host module drilling floor surface, cable is drawn from power plant module, sequentially passed through in high-altitude chase II and high-altitude chase I, access host module in the quick socket of transfer box, the connection corresponding with host module equipment again of the cable on transfer box;Support frame II is provided with power plant module, the medial surface of high-altitude chase I is forward to be provided with support frame III;Steel wire rope tensioning mechanism is provided between support frame III and high-altitude chase II and realizes that tensioning is fixed.Device of the present utility model, labor intensity is low, and operating efficiency is high, and moving time is short, cost is low.
Description
Technical field
The utility model belongs to petroleum drilling technology field, is related to one kind and pulls rig fast assembling-disassembling cable trough.
Background technology
With the large-scale tremendous development for pulling technology, the characteristic that rig is moved with its high modularization, rapid transporting is pulled,
Favored by users, it is especially fine in the few length and breadth of land desert area market prospects of transport limitation.Pull the main frame of rig
There is substantial amounts of cable connection between module and power plant module, how to realize the fast assembling-disassembling of these cables, it has also become influence is whole
The key that set rig is quickly migrated.
Conventional " Z " font folding tube trunking is primarily present following deficiency:1) when rig is moved every time, cable need to be torn open repeatedly
Solve, lay and fixed, labor intensity of operating staff is big, and inefficiency, the moving drilling machine cycle is long.2) chase lands paving
If when being matched in desert Environment, if cable is laid on ground, surface temperature is higher, accelerates cable skin aging, shorten
The service life of cable.3) during moving drilling machine, chase need to be transported individually, add delivery unit and cost.
Therefore, conventional " Z " font folding tube trunking can not meet the requirement of fast assembling-disassembling, be badly in need of a kind of dismounting side
Just, accordion cable frame simple in construction.
Utility model content
The purpose of this utility model is to provide one kind and pulls rig fast assembling-disassembling cable trough, solves electric in the prior art
Cable disassemble repeatedly cable skin aging acceleration, chase after laying, chase landing laying individually transport increase delivery unit and
The problem of cost.
The utility model is included in power the technical scheme adopted is that one kind pulls rig fast assembling-disassembling cable trough
Support frame I is installed with module, the top of support frame I is hinged with the rear end of high-altitude chase II, the front end of high-altitude chase II with
The rear end of high-altitude chase I is hinged, and the front end of high-altitude chase I is hinged with the beat ear mount on rig floor where host module;In main frame
Transfer box is installed, cable is drawn from power plant module, sequentially passes through high-altitude chase II and high-altitude chase on module drilling floor surface
I, in access host module in the quick socket of transfer box, the cable connection corresponding with host module equipment again on transfer box;
Support frame II is provided with power plant module, the medial surface of high-altitude chase I is forward to be provided with support frame III;In support frame
Steel wire rope tensioning mechanism is provided between III and high-altitude chase II and realizes that tensioning is fixed.
It is of the present utility model to pull rig fast assembling-disassembling cable trough, it is further characterized in that:
The structure of described steel wire rope tensioning mechanism is, including chain block, one end and the high-altitude chase of chain block
II hooks point connection, and one jiao of the other end and the tripod of chain block is hooked by a shackle to be connected, and the two of tripod base
Individual angle is connected by respective shackle with a steel wire rope respectively, and two steel wire ropes hook point with support frame III jointly and are connected.
Described beat ear mount is rotary shaft rotational structure, including as the bearing of main body, branch base rear end is fixedly installed
It is provided with and ships and resell on another market in a pair of ear mounts, the vertical through hole of bearing, ships and resell on another market and be provided with supporting latch segment.
Described high-altitude chase I is longitudinally provided with Cable hanger, and the longitudinal both sides of high-altitude chase I are provided with guardrail.
Operating desk is fixedly installed on described support frame I, operating desk is configured with hanging ladder.
The beneficial effects of the utility model are, when moving drilling machine, it is only necessary to disconnect and connecting from host module rig floor end transfer box
Cable is connect, cable trough is turned back to power plant module under crane auxiliary, with power plant module trailering transport, transfer box is with master
Machine module is transported together;Connection cable between host module and power plant module is not required to remove after disconnecting at rig floor end, saves
The time of cable is laid in dismounting, alleviates the labor intensity of operating personnel, reduces delivery unit and cost, shortens rig and remove
Family's time;The built on stilts design of cable trough, extends the service life of cable.
Brief description of the drawings
Fig. 1 is the utility model device in working state schematic representation;
Fig. 2 is the utility model device in low level installment state schematic diagram;
Fig. 3 is the utility model device in travel position schematic diagram;
Fig. 4 is the steel wire rope tensioning mechanism schematic diagram in the utility model device;
Fig. 5 is the beat ear mount front-view schematic diagram in the utility model device;
Fig. 6 is the beat ear mount schematic top plan view in the utility model device.
In figure, 1. host modules, 2. transfer boxes, 3. beat ear mounts, 4. Cable hangers, 5. high-altitude chases I, 6. high blank pipes
Wire casing II, 7. steel wire rope tensioning mechanisms, 8. operating desks, 9. support frames I, 10. hanging ladders, 11. power plant modules, 12. steel wire ropes, 13.
Tripod, 14. chain blocks, 15. shackles, 16. guardrails, 17. support frames II, 18. ship and resell on another market, 19. latch segments, 20. bearings, 21.
Ear mount, 22. support frames III.
Embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
Reference picture 1, Fig. 2, Fig. 3, structure of the present utility model are to be included on power plant module 11 to be installed with support frame
I 9, operating desk 8 is fixedly installed on support frame I 9, operating desk 8 is configured with hanging ladder 10, the top of support frame I 9 and high-altitude chase II
6 rear ends are hinged, and the front end of high-altitude chase II 6 is hinged with the rear end of high-altitude chase I 5, the front end of high-altitude chase I 5 and host module 1
Beat ear mount 3 on the rig floor of place is hinged;Transfer box 2 is installed on the drilling floor surface of host module 1, cable draws from power plant module 11
Go out, sequentially pass through in high-altitude chase II 6 and high-altitude chase I 5, access host module 1 in the quick socket of transfer box 2, turn
Connect the connection corresponding with host module 1 each equipment again of the other end is picked out on case 2 cable;
Support frame II 17 is provided with power plant module 11, the medial surface of high-altitude chase I 5 is forward to be provided with support frame III 22;
When high-altitude chase II 6 and high-altitude chase I 5 fold into minimum state, high-altitude chase II 6 passes through support with power plant module 11
Frame II 17 and support frame I 9 are supported, and high-altitude chase I 5 is supported with high-altitude chase II 6 by support frame III 22 and pin joint;
When high-altitude chase II 6 and high-altitude chase I 5 are opened to maximum rating, the front end of high-altitude chase I 5 and beat ear
Seat 3 is hinged realization support, now, steel wire rope tensioning mechanism 7 is provided between support frame III 22 and high-altitude chase II 6 and is realized
Tensioning is fixed;Articulated structure between high-altitude chase I 5 and high-altitude chase II 6 can compensate for host module 1 and power plant module 11
The deviation of front and rear positioning.
High-altitude chase I 5 is longitudinally provided with Cable hanger 4, and Cable hanger 4 is only used for storing from transfer box during moving drilling machine
The movable cable disconnected at 2;The longitudinal both sides of high-altitude chase I 5 are provided with guardrail 16, coordinate with Cable hanger 4 and realize to cable
Protection.
Transfer box 2 is installed on host module 1, when before moving drilling machine operating personnel can on rig floor directly cable is fast
Quick-break is opened, and is stored in the Cable hanger 4 on paramount blank pipe wire casing I 5.The danger of high-order homework is not present in whole operation process
Property, it is safe and reliable.
Reference picture 4, the structure of steel wire rope tensioning mechanism 7 is, including a chain block 14, one end of chain block 14 with
High-altitude chase II 6 hooks point connection, and 13 1 jiaos of the other end and the tripod of chain block 14 is hooked by a shackle 15 to be connected
Connect, two angles on the base of tripod 13 are connected by respective shackle 15 with a steel wire rope 12 respectively, two steel wire ropes 12 are total to
It is connected with point is hooked with support frame III 22;Operating personnel can adjust the tensioning degree of two steel wire ropes 12 by chain block 14.
Support frame I 9 can be fixed on power plant module 11 when rig is installed for the first time, the paving platform 8 and hanging ladder set thereon
10, facilitate operating personnel's operation steel wire rope tensioning mechanism 7, it is ensured that operating personnel's safety.
Reference picture 5, Fig. 6, beat ear mount 3 are rotary shaft rotational structure, including are used as the bearing 20 of main body, the rear end of bearing 20
It is fixedly installed in a pair of ear mounts 21, the vertical through hole of bearing 20 to be provided with and ships and resell on another market 18, shipping and reselling on another market 18 is provided with supporting latch segment 19,
18 ear mounts 21 because caused by being shaken when rig work that are used to preventing from shipping and reselling on another market of latch segment 19 are swung, and beat ear mount 3 can compensate for leading
Position error between machine module 1 and power plant module 11.
Operation principle of the present utility model is,
When the first low level of rig is assembled, by the utility model cable trough after ground configuration fixes cable, whole utilization
Crane is sling, and the rear end of high-altitude chase II 6 is hinged with advance mounted support frame I 9 on power plant module 11, by high-altitude pipeline
The front end of groove I 5 is hinged with the rig floor beat ear mount 3 on host module 1;Then the cable trough beat ear mount 3 drive under with master
The base integral lifting of machine module 1;Rig raising is installed in steel wire rope tensioning mechanism 7, regulation steel wire rope tensioning mechanism 7 afterwards in place
Chain block 14, two steel wire ropes 12 is tensioned simultaneously, it is ensured that high-altitude chase I 5 and high-altitude chase II 6 keep stable shape
State.
Before moving drilling machine, operator directly disconnects cable with transfer box 2 on rig floor, and folding and unfolding is to high blank pipe wire casing I 5
Cable hanger 4 in, then take the connection of the front end of high-altitude chase I 5 and beat ear mount 3 apart, high-order make is not present in the operational motion
The danger of industry, it is safe and reliable;Sling high-altitude chase I 5 and high-altitude chase II 6 using crane, by high-altitude chase I 5 with
High-altitude chase II 6 is folded on power plant module 11, and the cable trough is with the whole Transporting of power plant module 11;Transfer box 2 is with main frame mould
Block 1 is transported.
When rig moves to new well head, the connection procedure of the utility model cable trough and rig substructure is moving drilling machine disintegration
Inverse process.
Claims (5)
1. one kind pulls rig fast assembling-disassembling cable trough, it is characterised in that:It is included on power plant module (11) and is installed with
Support frame I (9), support frame I (9) top is hinged with high-altitude chase II (6) rear end, high-altitude chase II (6) front end and high-altitude
Chase I (5) rear end is hinged, and high-altitude chase I (5) front end is cut with scissors with the beat ear mount (3) on rig floor where host module (1)
Connect;Transfer box (2) is installed on host module (1) drilling floor surface, cable is drawn from power plant module (11), sequentially passes through high blank pipe
In wire casing II (6) and high-altitude chase I (5), access host module (1) in the quick socket of transfer box (2), on transfer box (2)
Cable again it is corresponding with host module (1) equipment connection;
Support frame II (17) is provided with power plant module (11), high-altitude chase I (5) medial surface is forward to be provided with support frame III
(22);Steel wire rope tensioning mechanism (7) is provided between support frame III (22) and high-altitude chase II (6) and realizes that tensioning is fixed.
2. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described steel wire tensioning
The structure of mechanism (7) is, including chain block (14), and one end and the high-altitude chase II (6) of chain block (14) hook point and connected
Connect, (13) one jiaos of the other end and the tripod of chain block (14) is hooked by a shackle (15) to be connected, tripod (13) bottom
Two angles on side are connected by respective shackle (15) with a steel wire rope (12) respectively, two steel wire ropes (12) jointly with support
Frame III (22) hooks point connection.
3. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described beat ear mount
(3) it is rotary shaft rotational structure, including as the bearing (20) of main body, bearing (20) rear end is fixedly installed a pair of ear mounts
(21) ship and resell on another market (18), are provided with the vertical through hole of bearing (20), ship and resell on another market (18) be provided with supporting latch segment (19).
4. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described high-altitude chase
I (5) are longitudinally provided with Cable hanger (4), and high-altitude chase I (5) longitudinal direction both sides are provided with guardrail (16).
5. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described support frame I (9)
On be fixedly installed operating desk (8), operating desk (8) is configured with hanging ladder (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177709.8U CN206571467U (en) | 2017-02-27 | 2017-02-27 | Pull rig fast assembling-disassembling cable trough |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177709.8U CN206571467U (en) | 2017-02-27 | 2017-02-27 | Pull rig fast assembling-disassembling cable trough |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206571467U true CN206571467U (en) | 2017-10-20 |
Family
ID=60058533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720177709.8U Active CN206571467U (en) | 2017-02-27 | 2017-02-27 | Pull rig fast assembling-disassembling cable trough |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206571467U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110467066A (en) * | 2019-07-30 | 2019-11-19 | 宝鸡石油机械有限责任公司 | One kind is whole to drag fortune drilling machine cable quickly retracting device |
-
2017
- 2017-02-27 CN CN201720177709.8U patent/CN206571467U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110467066A (en) * | 2019-07-30 | 2019-11-19 | 宝鸡石油机械有限责任公司 | One kind is whole to drag fortune drilling machine cable quickly retracting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9334668B2 (en) | Modular drilling rig system | |
ITTO20120414A1 (en) | HARVEST SYSTEM AND ASSEMBLY AND DISASSEMBLY METHOD. | |
US10577226B2 (en) | Tank car lifting apparatus | |
US20150014266A1 (en) | Revolving tower crane | |
CN204386487U (en) | A kind of derrick lifting oil cylinder is installed and retraction mechanism | |
CN206736700U (en) | mobile telescopic bridge | |
US7234896B2 (en) | Vertically folding service arm for a movable platform offshore drilling or servicing rig | |
CN110159322A (en) | A kind of clamping device and steel arch-shelf installation trolley for steel arch-shelf | |
CN206571467U (en) | Pull rig fast assembling-disassembling cable trough | |
CN109138897A (en) | Well head centralising device and with its well workover equip | |
NO20131640A1 (en) | handling System | |
CN204152426U (en) | A kind of quick removal of home rig of hydraulic cylinder raising | |
CN210419034U (en) | GIS metal can body assembly and disassembly tools | |
CN115504363B (en) | Special lifting appliance for lifting wind power generation blades | |
CN204625030U (en) | The portable integrated side of a ship hangs | |
CN207004415U (en) | Power equipment maintaining folding ladder | |
WO2017091142A1 (en) | Apparatus, system and method for recovering and/or installing conductor casing | |
CN115676648A (en) | Multifunctional underground maintenance vehicle | |
CN105178876B (en) | A kind of headframe | |
CN105178875B (en) | A kind of rapid traverse fast-assembling rig | |
CN210764090U (en) | Portable deep groove cable lifting device | |
CN210012511U (en) | Foldable deep groove cable lifting device | |
CN209067244U (en) | Multiple arch supporting trolley | |
CN208749374U (en) | A kind of excavation stand hangs translation mechanism | |
CN210048361U (en) | Deep groove cable lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210107 Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province Patentee after: Baoji Oilfield Machinery Co.,Ltd. Patentee after: CHINA NATIONAL PETROLEUM Corp. Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co., Ltd Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji Patentee before: Baoji Oilfield Machinery Co.,Ltd. |