CN206563568U - A kind of highway subgrade settlement observer - Google Patents

A kind of highway subgrade settlement observer Download PDF

Info

Publication number
CN206563568U
CN206563568U CN201720252534.2U CN201720252534U CN206563568U CN 206563568 U CN206563568 U CN 206563568U CN 201720252534 U CN201720252534 U CN 201720252534U CN 206563568 U CN206563568 U CN 206563568U
Authority
CN
China
Prior art keywords
deckle board
sleeve
pressing plate
road surface
carrying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720252534.2U
Other languages
Chinese (zh)
Inventor
刘亚伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720252534.2U priority Critical patent/CN206563568U/en
Application granted granted Critical
Publication of CN206563568U publication Critical patent/CN206563568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of highway subgrade settlement observer, including roadbed and concrete road surface, carrying deckle board is provided with the top of the roadbed, the inside of the carrying deckle board offers installation cavity, the carrying deckle board on the installation cavity top is fixedly installed fixes sleeve, the inside of the fixes sleeve from it is upper it is outer under be disposed with spring and connecting pole, the bottom of connecting pole is connected by bearing plate with pressing plate, the concrete road surface is located at the top of carrying deckle board, and the inside at concrete road surface two ends is fixedly installed undertaking sleeve.The utility model is by setting fixes sleeve, spring, connecting pole, bearing plate, pressing plate and weight block inside the installation cavity for carrying deckle board, it is used in conjunction with each other, when having reached that highway subgrade is settled, extruding compacting is carried out to highway subgrade, simultaneously, carrying deckle board is supported, so that concrete road surface is supported, and then the advantage played a role for road.

Description

A kind of highway subgrade settlement observer
Technical field
The utility model is related to road construction technical field, specially a kind of highway subgrade settlement observer.
Background technology
Highway subgrade settlement observer at this stage is constituted using some electrical equipments and other parts, and these electricity Gas element is embedded in the aqueous vapor influence inside the inside of highway, Hui Bei highways for a long time, causes measurement error big, seriously causes to lose Spirit, not only bad for prolonged monitoring and observation, also increases Road construction cost, and when roadbed is settled, it is impossible to The ability necessarily supported is played, is that road is played a role.
Utility model content
The purpose of this utility model is to provide a kind of highway subgrade settlement observer possess good highway subgrade prison Survey, so it is convenient long-term carry out highway subgrade settlement observation, it is and simple in construction, it is to avoid the increase of Road construction cost, moreover it is possible to It is enough that certain enabling capabilities, and then the advantage played a role for road, solution are played after highway subgrade is settled The highway subgrade settlement observer determined at this stage is constituted using some electrical equipments and other parts, and these are electrically first Part is embedded in the aqueous vapor influence inside the inside of highway, Hui Bei highways for a long time, causes measurement error big, seriously causes failure, Not only bad for prolonged monitoring and observation, also increase Road construction cost, and when roadbed is settled, it is impossible to play The ability necessarily supported, is the problem of road is played a role.
To achieve the above object, the utility model provides following technical scheme:A kind of highway subgrade settlement observer, bag Include and be provided with carrying deckle board at the top of roadbed and concrete road surface, the roadbed, the inside of the carrying deckle board offers installation cavity, The carrying deckle board on the installation cavity top is fixedly installed fixes sleeve, the inside of the fixes sleeve from it is upper it is outer under be disposed with Spring and connecting pole, the bottom of connecting pole are connected by bearing plate with pressing plate, and the concrete road surface is located at the top of carrying deckle board Portion, and the inside at concrete road surface two ends is fixedly installed undertaking sleeve, the undertaking sleeve is internally provided with observation bar, The top of the observation bar is provided with scale strip.
It is preferred that, the carrying deckle board is Jiong shape, and pressing plate is located at the inside of installation cavity, the size phase of pressing plate and installation cavity Adaptation.
It is preferred that, the fixes sleeve is equidistant to be fixedly installed on carrying deckle board inwall, and the pressing plate between fixes sleeve Top is fixedly installed weight block.
It is preferred that, the bottom of concrete road surface is run through in the bottom for accepting sleeve, and is fixed with the top of carrying deckle board Connection, the carrying deckle board offers fixing hole with accepting the junction of sleeve.
It is preferred that, the sleeve of accepting offers the mobile cavity being adapted with the junction of observation bar, the top of the observation bar Hold through undertaking sleeve, and extend to the top of concrete road surface, and the bottom of observation bar runs through undertaking sleeve and carries deckle board, And extend with being fixedly connected at the top of pressing plate, the pressing plate offers the fixing hole being adapted with observing the junction of bar.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model pass through set carrying deckle board installation cavity inside fixes sleeve, spring, connecting pole, bearing plate, Pressing plate and weight block, are used in conjunction with each other, when having reached that highway subgrade is settled, and carry out extruding compacting to highway subgrade, together When, carrying deckle board is supported, so as to be supported to concrete road surface, so for road play a role it is excellent Point, by setting observation bar to be connected with pressing plate, and observation bar is connected by accepting sleeve with the external world, the scale on observation bar top Bar, when having reached that highway subgrade is settled, observation bar is moved with pressing plate work, so as to be supervised to highway subgrade sedimentation Survey, meanwhile, it is clear to observe the advantage of subgrade settlement value, accept sleeve and carrying deckle board and concrete road by setting Face is fixedly connected, reached ensure carrying deckle board and accept sleeve stability advantage, by set carrying deckle board, installation cavity, Fixes sleeve, spring, connecting pole, bearing plate, pressing plate, weight block, undertaking sleeve, observation bar, mobile cavity and scale strip, whole dress Put simple in construction, it is convenient long-term carry out highway subgrade sedimentation and is observed, simultaneously, it is to avoid Road construction cost is increased excellent Point.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
In figure:1 roadbed, 2 concrete road surfaces, 3 carrying deckle boards, 4 installation cavitys, 5 fixes sleeves, 6 springs, 7 connecting poles, 8 are held Sleeve, 12 observation bars, 13 mobile cavities, 14 scale strips are accepted in fishplate bar, 9 pressing plates, 10 weight blocks, 11.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Referring to Fig. 1, a kind of highway subgrade settlement observer, including roadbed 1 and concrete road surface 2, the top of roadbed 1 Carrying deckle board 3 is provided with, the inside of the carrying deckle board 3 offers installation cavity 4, and the carrying deckle board 3 on the top of installation cavity 4 is fixedly installed Have fixes sleeve 5, the inside of the fixes sleeve 5 from it is upper it is outer under be disposed with spring 6 and connecting pole 7, the bottom of connecting pole 7 leads to Cross bearing plate 8 to be connected with pressing plate 9, carrying deckle board 3 is Jiong shape, and pressing plate 9 is located at the inside of installation cavity 4, pressing plate 9 and installation cavity 4 Size be adapted, fixes sleeve 5 is equidistant to be fixedly installed on the carrying inwall of deckle board 3, and the pressing plate 9 between fixes sleeve 5 is pushed up Portion is fixedly installed weight block 10, and concrete road surface 2 is located at the top of carrying deckle board 3, and the inside at the two ends of concrete road surface 2 is equal Undertaking sleeve 11 is fixedly installed, the bottom of concrete road surface 2 is run through in the bottom for accepting sleeve 11, and with carrying the top of deckle board 3 End is fixedly connected, and the carrying deckle board 3 offers fixing hole with accepting the junction of sleeve 11, accepts being internally provided with for sleeve 11 Bar 12 is observed, sleeve 11 is accepted with observing the junction of bar 12 and offers the mobile cavity 13 being adapted, the top of the observation bar 12 Through undertaking sleeve 11, and the top of concrete road surface 2 is extended to, and undertaking sleeve 11 and carrying are run through in the bottom of observation bar 12 Deckle board 3, and extend be fixedly connected with the top of pressing plate 9, the pressing plate 9 with observation bar 12 junction offer the fixation being adapted Hole, the top of the observation bar 12 is provided with scale strip 14, by set carry deckle board 3 installation cavity 4 inside fixes sleeve 5, Spring 6, connecting pole 7, bearing plate 8, pressing plate 9 and weight block 10, are used in conjunction with each other, when having reached that highway subgrade is settled, Extruding compacting is carried out to highway subgrade, meanwhile, carrying deckle board 3 is supported, so that concrete road surface is supported, and then The advantage played a role for road, by setting observation bar 12 to be connected with pressing plate 9, and observation bar 12 passes through bearing sleeve Cylinder 11 is connected with the external world, the scale strip 14 on observation bar 12 top, when having reached that highway subgrade is settled, and observation bar 12 is with pressing plate 9 work are moved, so that highway subgrade sedimentation is monitored, meanwhile, it is clear to observe the excellent of subgrade settlement value Point, by setting undertaking sleeve 11 to be fixedly connected with carrying deckle board 3 and concrete road surface 2, has reached guarantee carrying deckle board 3 and has held The advantage of female connector 11 stability of cylinder, by setting carrying deckle board 3, installation cavity 4, fixes sleeve 5, spring 6, connecting pole 7, bearing plate 8th, pressing plate 9, weight block 10, undertaking sleeve 11, observation bar 12, mobile cavity 13 and scale strip 14, whole device is simple in construction, convenient It is long-term carry out highway subgrade sedimentation and is observed, simultaneously, it is to avoid the increased advantage of Road construction cost.
In use, highway subgrade is settled, the spring 6 inside weight and fixes sleeve 5 that pressing plate 9 passes through weight block 10 Connecting pole 7 is promoted, pressing plate 9 is closely connected with roadbed 1, observation bar 12 is accepting sleeve 11 with the movement of pressing plate 9 Inside is moved, and scale strip 13 is moved down, simultaneously as fixes sleeve 5 is supported by the elastic force of spring 6, so that bearing frame Plate 3 is supported power, and then concrete road surface 2 is supported.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of highway subgrade settlement observer, including roadbed(1)And concrete road surface(2), it is characterised in that:The roadbed (1)Top be provided with carrying deckle board(3), the carrying deckle board(3)Inside offer installation cavity(4), the installation cavity(4)Top The carrying deckle board at end(3)It is fixedly installed fixes sleeve(5), the fixes sleeve(5)Inside from it is upper it is outer under be disposed with bullet Spring(6)And connecting pole(7), connecting pole(7)Bottom pass through bearing plate(8)With pressing plate(9)Connection, the concrete road surface(2) Positioned at carrying deckle board(3)Top, and concrete road surface(2)The inside at two ends is fixedly installed undertaking sleeve(11), it is described Accept sleeve(11)Be internally provided with observation bar(12), the observation bar(12)Top be provided with scale strip(14).
2. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that:The carrying deckle board(3) For Jiong shape, and pressing plate(9)Positioned at installation cavity(4)Inside, pressing plate(9)With installation cavity(4)Size be adapted.
3. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that:The fixes sleeve(5) It is equidistant to be fixedly installed on carrying deckle board(3)Inwall, and fixes sleeve(5)Between pressing plate(9)Top is fixedly installed weight Block(10).
4. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that:The undertaking sleeve(11) Bottom run through concrete road surface(2)Bottom, and with carrying deckle board(3)Top be fixedly connected, the carrying deckle board(3)With holding Female connector cylinder(11)Junction offer fixing hole.
5. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that:The undertaking sleeve(11) With observation bar(12)Junction offer the mobile cavity being adapted(13), the observation bar(12)Top through accept sleeve (11), and extend to concrete road surface(2)Top, and observation bar(12)Bottom through accept sleeve(11)With carrying deckle board (3), and extend and pressing plate(9)Top be fixedly connected, the pressing plate(9)With observation bar(12)Junction offer what is be adapted Fixing hole.
CN201720252534.2U 2017-03-15 2017-03-15 A kind of highway subgrade settlement observer Expired - Fee Related CN206563568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720252534.2U CN206563568U (en) 2017-03-15 2017-03-15 A kind of highway subgrade settlement observer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720252534.2U CN206563568U (en) 2017-03-15 2017-03-15 A kind of highway subgrade settlement observer

Publications (1)

Publication Number Publication Date
CN206563568U true CN206563568U (en) 2017-10-17

Family

ID=60032263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720252534.2U Expired - Fee Related CN206563568U (en) 2017-03-15 2017-03-15 A kind of highway subgrade settlement observer

Country Status (1)

Country Link
CN (1) CN206563568U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980078A (en) * 2020-07-29 2020-11-24 芜湖质达设计有限公司 Road and bridge that can rectify automatically subsides detection device for deformation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980078A (en) * 2020-07-29 2020-11-24 芜湖质达设计有限公司 Road and bridge that can rectify automatically subsides detection device for deformation

Similar Documents

Publication Publication Date Title
CN104883092B (en) Road-use cement-based material pressure power generation packaging structure
CN102299664A (en) Piezoelectric power generation device for urban road
CN103713203B (en) A kind of Miniature electric field sensor structure
CN204139530U (en) A kind of Novel pressure electric-type electricity-generating floor
CN102445639B (en) Split conductor ion flow space distribution measuring method and device
CN206563568U (en) A kind of highway subgrade settlement observer
CN203352105U (en) A wire arrangement mode converting rod
CN210164180U (en) Power generation floor structure based on artificial power
CN106972781B (en) Integrated piezoelectric transduction module and application thereof
CN201654191U (en) Three-phase synchronization tester of breaker
CN207032020U (en) A kind of intelligent basin-type support
CN103066883B (en) A kind of bridge shadow formula bituminous pavement energy collecting device
CN203049792U (en) Novel arched girder connecting component of multi-span greenhouse or single-body greenhouse
CN207542074U (en) A kind of compact capacitor installation structure
CN201149613Y (en) Door type skeleton tower for outdoor impact test site
CN202956483U (en) Power-on test tool
CN206004251U (en) A kind of novel cable ditch support
CN203632169U (en) Counter weight device for preventing galloping of power transmission line
CN210985498U (en) Cable bridge stand column mounting structure
CN205135075U (en) High -altitude area 500kV compact alternating current transmission line tower that dangles
CN203837809U (en) Differential-micro-change-capacitor-based type pole tower vibration monitoring device
CN202850566U (en) Connecting device of electric pole
CN207197497U (en) Settlement observation point detection device
CN203271222U (en) Utility pole with prefabricated holes
CN202940137U (en) Insulating operating rod provided with electroscope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171017

Termination date: 20180315

CF01 Termination of patent right due to non-payment of annual fee