CN201654191U - Three-phase synchronization tester of breaker - Google Patents

Three-phase synchronization tester of breaker Download PDF

Info

Publication number
CN201654191U
CN201654191U CN2010201783788U CN201020178378U CN201654191U CN 201654191 U CN201654191 U CN 201654191U CN 2010201783788 U CN2010201783788 U CN 2010201783788U CN 201020178378 U CN201020178378 U CN 201020178378U CN 201654191 U CN201654191 U CN 201654191U
Authority
CN
China
Prior art keywords
isolating switch
switch
breaker
pairs
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201783788U
Other languages
Chinese (zh)
Inventor
吴志芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Epoch Electric Manufacture Ltd Co Of Jiangsu Wisoft Softuare Co Ltd
Original Assignee
Epoch Electric Manufacture Ltd Co Of Jiangsu Wisoft Softuare Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Epoch Electric Manufacture Ltd Co Of Jiangsu Wisoft Softuare Co Ltd filed Critical Epoch Electric Manufacture Ltd Co Of Jiangsu Wisoft Softuare Co Ltd
Priority to CN2010201783788U priority Critical patent/CN201654191U/en
Application granted granted Critical
Publication of CN201654191U publication Critical patent/CN201654191U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a three-phase synchronization tester of a breaker, which is characterized by comprising three Led lamps (YD, LD and HD), three pairs of breaker connecting ends (1-6), a switch (QF) and a power supply (UC), wherein the three Led lamps (YD, LD and HD) are correspondingly connected with the three pairs of breaker connecting ends (1-6) one by one to form three subcircuits. The three subcircuits are connected in parallel to touch a first paralleling node (A) and a second paralleling node (B), the first paralleling node (A) is connected with one end of the power supply (UC) by the switch (QF), and the second paralleling node (B) is connected with the other end of the power supply (UC). The breaker connecting ends (1-6) are connected with three pairs of main contacts (CBL 1, CBL 2 and CBL 3) of a breaker to be tested. The three-phase synchronization tester of the breaker has the advantages of simple structure, small volume and low cost and is suitably arranged on the production workstation of the breaker, therefore can provide workers with the basis for adjusting the main contacts in the process of breaker assembling of the production workstation, and ensures the adjusting in place of switching-on-and-off synchronization of the breaker to a certain extent.

Description

Isolating switch three-phase synchronism tester
Technical field
The utility model relates to isolating switch three-phase synchronism tester, is exclusively used in the closing of test both opens device, separating brake synchronism.
Background technology
The closing of isolating switch, separating brake synchronism are very important parameters during isolating switch is produced, and GB GB1984 and JB/T3855 have made concrete requirement≤2ms to this, and must there be this test event in all isolating switch manufacturers when delivery test.
The production of existing isolating switch is to be assembled by rule of thumb by the workman earlier, again it is moved at last on the test station with the isolating switch tester go to test it comprise close, a series of mechanical property parameters of separating brake synchronism.When finding to close, when separating brake synchronism parameter does not meet standard, must be restored to the production station and go to adjust, the number of occurrence is more, can influence the production and the testing efficiency of product, and the running of obstruction streamline is smooth and easy.And the isolating switch tester is the comprehensive tester of all mechanical properties of test both opens device, can not be equipped with producing on the station, and reason has two: one, drop into more uneconomical, the 2nd, the isolating switch tester also need be equipped with power supply, takies the streamline space.
So a kind of test both opens device closes, the simple instrument of separating brake synchronism if can develop, be fit to each isolating switch manufacturer and on the production station, dispose, vast market prospect must be arranged.
Summary of the invention
The utility model purpose provides a kind of isolating switch three-phase synchronism tester, and the test both opens device closes on the production station to satisfy, the needs of separating brake synchronism.
For achieving the above object, the technical solution adopted in the utility model is: a kind of isolating switch three-phase synchronism tester, comprise three Led lamps, three pairs of isolating switch links, a switch and power supplys, three Led lamps and three pairs of isolating switch links connect one to one and constitute three road branch roads, this three road branch road is in parallel and picks out first, second two and tie-point, first and tie-point connect power supply one end through switch, second and tie-point connect the other end of power supply; Described three pairs of isolating switch links are for three pairs of main contactss that connect isolating switch to be tested.
Related content in the technique scheme is explained as follows:
1, in the such scheme, also can comprise an on-delay type time relay, the normally closed contact of this on-delay type time relay be serially connected in first and tie-point and switch between, and coil one end of the on-delay type time relay and the end that is connected with on-delay type time relay normally closed contact to described switch, the other end of the coil of the on-delay type time relay and to second tie-point also.The application of the on-delay type time relay is played the function of automatic outage, to avoid the unnecessary consumption of power supply.
2, in the such scheme, also can comprise six roots of sensation flexible circuit conductor, an end of every flexible circuit conductor is established plug, and the other end is established crocodile clip; Three pairs of isolating switch links are through the three pair main contactss of six roots of sensation flexible circuit conductor for connection isolating switch to be tested.
3, in the such scheme, described power supply is a rechargeable battery, also can charge to it by charger with this conveniently moving.
Principle of work of the present utility model is: the utility model is configurable to be produced on the station at isolating switch, and the workman can use the utility model test when the assembling isolating switch.During use, three pairs of main contactss of isolating switch to be tested are connected on three pairs of isolating switch links, even each main contacts of isolating switch is together in series with the Led lamp is corresponding, press the switch connection power supply then, this moment, its corresponding Led lamp can be lighted when each main contacts of isolating switch was closed with breaker closing to be tested.The workman adjusts corresponding site in the isolating switch by the light on and off order and the time interval of observing three Led lamps, thus dwindle as far as possible close, the separating brake time same period, with synchronism control within limits.
Effect of the present utility model is: the utility model is simple in structure, volume is little, cost is low, be suitable on isolating switch production station, disposing, thereby the foundation that can in the process of producing station assembling isolating switch, provide main contact to adjust to the workman, ensured to a certain extent that isolating switch closes, the adjusting to the right place of separating brake synchronism, produce coming and going between station and test station thereby reduce isolating switch, improve the production and the testing efficiency of isolating switch.
Description of drawings
Accompanying drawing 1 is the utility model embodiment electrical block diagram;
Accompanying drawing 2 is the utility model embodiment contour structures synoptic diagram.
In the above accompanying drawing: 1, isolating switch link; 2, isolating switch link; 3, isolating switch link; 4, isolating switch link; 5, isolating switch link; 6, isolating switch link; 7, flexible circuit conductor; 8, plug; 9, crocodile clip; YD, Led lamp; LD, Led lamp; HD, Led lamp; QF, switch; UC, power supply; A, first is tie-point also; B, second is tie-point also; CBL1, isolating switch main contacts; CBL2, isolating switch main contacts; CBL3, isolating switch main contacts; SJ, the on-delay type time relay.
Embodiment
Below in conjunction with drawings and Examples the utility model is further described:
Embodiment: shown in accompanying drawing 1, accompanying drawing 2:
A kind of isolating switch three-phase synchronism tester, one shell is arranged, circuit as shown in Figure 1 in the shell, comprise three Led lamp YD, LD, HD, three couples of isolating switch link 1-6, switch QF and power supply UC, three Led lamp YD, LD, HD and three couples of isolating switch link 1-6 connect one to one and constitute three road branch roads, this three road branch road is in parallel and picks out first, second two and tie-point A, B, first and tie-point A connect power supply UC one end through switch QF, second and tie-point B connect the other end of power supply UC.Also comprise an on-delay type time relay sj in the present embodiment circuit, the normally closed contact of this on-delay type time relay sj be serially connected in first and tie-point A and switch QF between, and coil one end of on-delay type time relay sj and the end that is connected with on-delay type time relay sj normally closed contact to described switch QF, the other end of the coil of on-delay type time relay sj and to the second tie-point B also.The preferable employing rechargeable battery of described power supply UC.
Shown in accompanying drawing 2, described three Led lamp YD, LD, HD are respectively yellowish green red trichromatism, and they observably are embedded on the panel of shell, and described three couples of isolating switch link 1-6 are socket, and they also are embedded on the panel of shell.Present embodiment also comprises six roots of sensation flexible circuit conductor 7, and an end of every flexible circuit conductor 7 is established plug 8, and the other end is established crocodile clip 9.Three pairs of isolating switch links are through three pair main contacts CBL1, CBL2s, the CBL3 of six roots of sensation flexible circuit conductor 7 for connection isolating switch to be tested.
Present embodiment is simple in structure, volume is little, cost is low, be suitable on isolating switch production station, disposing, during use, three couples of main contacts CBL1, CBL2, the CBL3 of isolating switch to be tested are connected on three couples of isolating switch link 1-6 through flexible circuit conductor 7, even each main contacts of isolating switch CBL1, CBL2, CBL3 with Led lamp YD, LD, HD are corresponding is together in series, press switch QF energized then, breaker closing to be tested, its corresponding Led lamp YD, LD, HD can light when each main contacts CBL1 of isolating switch, CBL2, CBL3 closure.The workman adjusts corresponding site in the isolating switch by the light on and off order and the time interval of observing three Led lamps, thus dwindle as far as possible close, the separating brake time same period, with synchronism control within limits.After the line bag energising of on-delay type time relay sj, when surpassing its setting-up time, the action of the normally closed contact of on-delay type time relay sj disconnects, and makes back level three tunnel parallel branches outage, reaches the function of automatic outage.
The foregoing description only is explanation technical conceive of the present utility model and characteristics, and its purpose is to allow the personage who is familiar with this technology can understand content of the present utility model and enforcement according to this, can not limit protection domain of the present utility model with this.All equivalences of being done according to the utility model spirit change or modify, and all should be encompassed within the protection domain of the present utility model.

Claims (4)

1. isolating switch three-phase synchronism tester, it is characterized in that: comprise three Led lamps (YD, LD, HD), three pairs of isolating switch links (1-6), a switch (QF) and power supply (UC), three Led lamps (YD, LD, HD) connect one to one with three pairs of isolating switch links (1-6) and constitute three road branch roads, this three road branch road is in parallel and picks out first, second two and tie-point (A, B), first and tie-point (A) connect power supply (UC) end through switch (QF), second and tie-point (B) connect the other end of power supply (UC); Described three pairs of isolating switch links (1-6) are for the three pairs of main contactss (CBL1, CBL2, CBL3) that connect isolating switch to be tested.
2. according to the described isolating switch three-phase of claim 1 synchronism tester, it is characterized in that: also comprise an on-delay type time relay (SJ), the normally closed contact of this on-delay type time relay (SJ) be serially connected in first and tie-point (A) and switch (QF) between, and coil one end of the on-delay type time relay (SJ) and the end that is connected with the on-delay type time relay (SJ) normally closed contact to described switch (QF), the other end of the coil of the on-delay type time relay (SJ) and to second tie-point (B) also.
3. according to the described isolating switch three-phase of claim 1 synchronism tester, it is characterized in that: also comprise six roots of sensation flexible circuit conductor (7), an end of every flexible circuit conductor (7) is established plug (8), and the other end is established crocodile clip (9); Three pairs of isolating switch links are through the three pair main contactss (CBL1, CBL2, CBL3) of six roots of sensation flexible circuit conductor (7) for connection isolating switch to be tested.
4. according to the described isolating switch three-phase of claim 1 synchronism tester, it is characterized in that: described power supply is a rechargeable battery.
CN2010201783788U 2010-04-23 2010-04-23 Three-phase synchronization tester of breaker Expired - Lifetime CN201654191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201783788U CN201654191U (en) 2010-04-23 2010-04-23 Three-phase synchronization tester of breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201783788U CN201654191U (en) 2010-04-23 2010-04-23 Three-phase synchronization tester of breaker

Publications (1)

Publication Number Publication Date
CN201654191U true CN201654191U (en) 2010-11-24

Family

ID=43119435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201783788U Expired - Lifetime CN201654191U (en) 2010-04-23 2010-04-23 Three-phase synchronization tester of breaker

Country Status (1)

Country Link
CN (1) CN201654191U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101833066A (en) * 2010-05-20 2010-09-15 刘昭利 Working state indicator of circuit breaker
CN104062580A (en) * 2014-07-03 2014-09-24 国网山西省电力公司晋城供电公司 Portable breaker three-phase open phase actuation time calibrator
CN105487005A (en) * 2015-12-04 2016-04-13 国家电网公司 Multifunctional non-all-phase relay calibrator
CN107462830A (en) * 2017-06-13 2017-12-12 国网湖南省电力公司 Intelligent micro-circuit breaker synchronism test method and device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101833066A (en) * 2010-05-20 2010-09-15 刘昭利 Working state indicator of circuit breaker
CN104062580A (en) * 2014-07-03 2014-09-24 国网山西省电力公司晋城供电公司 Portable breaker three-phase open phase actuation time calibrator
CN104062580B (en) * 2014-07-03 2016-08-17 国网山西省电力公司晋城供电公司 A kind of portable beaker three-phase non-three phase tester movement time
CN105487005A (en) * 2015-12-04 2016-04-13 国家电网公司 Multifunctional non-all-phase relay calibrator
CN105487005B (en) * 2015-12-04 2019-04-16 国家电网公司 A kind of multi-functional non-three phase relay checking instrument
CN107462830A (en) * 2017-06-13 2017-12-12 国网湖南省电力公司 Intelligent micro-circuit breaker synchronism test method and device
CN107462830B (en) * 2017-06-13 2019-11-08 国网湖南省电力公司 Intelligent micro-circuit breaker synchronism test method and device

Similar Documents

Publication Publication Date Title
CN201654191U (en) Three-phase synchronization tester of breaker
CN203955634U (en) A kind of high tension insulator electrification cleaning means
CN109301850A (en) A kind of novel energy-storing system experimental platform and working method
CN205823530U (en) A kind of dummy load for testing automobile ignition coil
CN106163061A (en) A kind of photovoltaic illumination control system based on ZigBee
CN202586386U (en) An inspection and maintenance and equalizing maintenance device of motive power battery pack
CN202650864U (en) Link bar working head
CN202886561U (en) Three-phase synchronization testing device for circuit breaker
CN205069704U (en) Modular lithium cell case
CN204857888U (en) Lithium ion battery organizes prosthetic devices
CN201000686Y (en) Demonstrator for simulating remote electric power transmission
CN204129188U (en) A kind of screening system of lithium ion battery
CN203927698U (en) Multifunctional magnetic-force high light working light
CN102545278A (en) Storage battery pack equalizing charging system
CN205157704U (en) A circuit mistake proofing meets alarm device for electrical haulage system
CN205489564U (en) Distributing type photovoltaic street lamp mechanism that is incorporated into power networks
CN201464624U (en) Electrical test universal device for non-standard PACK battery
CN204967403U (en) Scene complementation and many powers stand alone type utility system
CN103995201A (en) Wind power generation set islanding test device
CN205280914U (en) Aging testing system of LED lamp
CN204256087U (en) 2M line makes test kit
CN103219552A (en) Device for detection maintenance and balanced maintenance of power battery pack
CN206628687U (en) A kind of structure of charge power supply line
CN209441215U (en) A kind of charging battery of electric vehicle device and batter-charghing system
CN202679012U (en) Lithium battery pack repairing apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101124

CX01 Expiry of patent term