CN206554463U - A kind of mark post for wall surface spraying - Google Patents

A kind of mark post for wall surface spraying Download PDF

Info

Publication number
CN206554463U
CN206554463U CN201720114073.2U CN201720114073U CN206554463U CN 206554463 U CN206554463 U CN 206554463U CN 201720114073 U CN201720114073 U CN 201720114073U CN 206554463 U CN206554463 U CN 206554463U
Authority
CN
China
Prior art keywords
micelle
horizon bar
hole
rod section
spiro rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720114073.2U
Other languages
Chinese (zh)
Inventor
李铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Greenland Coating Engineering Co Ltd
Original Assignee
Guangxi Greenland Coating Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Greenland Coating Engineering Co Ltd filed Critical Guangxi Greenland Coating Engineering Co Ltd
Priority to CN201720114073.2U priority Critical patent/CN206554463U/en
Application granted granted Critical
Publication of CN206554463U publication Critical patent/CN206554463U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to mark post field, a kind of more particularly to mark post for wall surface spraying, including locking micelle, the locking micelle is fixed within the walls, also include horizon bar, set screw and adjustment micelle, the adjustment micelle is located at the left surface of the horizon bar, the inside of the horizon bar is the hollow structure provided with dividing plate, the horizon bar is provided with flat key type through hole, the adjustment micelle is provided with interior rice font through hole, the set screw wears the flat key type through hole and the interior rice font through hole, the horizon bar and the adjustment micelle are fixed on the locking micelle by the set screw.The utility model can significantly improve the accuracy of wall covering spraying, realize the strict control of paint thickness in spraying process, it is to avoid because caused by the deviation of wall the phenomenon of sprayed coating out-of-flatness generation, it is ensured that coating quality.

Description

A kind of mark post for wall surface spraying
【Technical field】
The utility model belongs to mark post field, more particularly to a kind of mark post for wall surface spraying.
【Background technology】
At present, in wall surface spraying work progress, mark post is used for the thickness for determining to be sprayed on the coating of metope, so that spraying Metope afterwards becomes smooth, beneficial to the smearing heat-insulation layer step subsequently carried out.But the existing mark post used was being used Cheng Zhong, often occurring causes sprayed coating out-of-flatness because of the deviation of wall, and coating quality is not high, and mark post often connects with metope Easily abrasion is touched, changes frequent, it is impossible to the problem of being used for a long time, is unfavorable for reducing cost.
【Utility model content】
The mark post that the utility model exists for prior art is simple in construction, and fixation is insecure, and can not be according to metope Deviation situation is adjusted, and then there is provided a kind of mark post for wall surface spraying the problem of cause sprayed coating out-of-flatness.
To solve the above problems, the technical scheme that the utility model is used is:A kind of mark post for wall surface spraying, bag Locking micelle is included, the locking micelle is fixed within the walls, in addition to horizon bar, set screw and adjustment micelle, the adjustment glue Grain is located at the left surface of the horizon bar, and the inside of the horizon bar is the hollow structure provided with dividing plate, and the horizon bar is provided with Flat key type through hole, the adjustment micelle is provided with interior rice font through hole, and the set screw wears the flat key type through hole and described The horizon bar and the adjustment micelle are fixed on the locking micelle by interior rice font through hole, the set screw.
Further, the set screw includes screw terminal and the first screw rod sequentially formed that stretches out from screw terminal Section, the second spiro rod section and the 3rd spiro rod section, the screw terminal are placed in the horizon bar, and the 3rd spiro rod section is fixed on institute State in locking micelle.
Further, screw thread, and the 3rd spiro rod section are equipped with first spiro rod section and the 3rd spiro rod section Screw thread the screw thread for being smaller than first spiro rod section spacing, second spiro rod section be polished rod.
Further, the material of the horizon bar is the hardness >=10HB material of aluminium alloy 6061.
Further, the material surface of the horizon bar passes through Passivation Treatment.
Further, the quantity of the flat key type through hole is 4-6.
Further, the color zinc of the electroplating surface of the set screw.
The utility model has the advantages that:
1. the horizon bar that the utility model is used have stablize the special formed structure of aluminium alloy, be easy to construction and can Recycling.On the one hand, the inside of horizon bar is the hollow structure provided with dividing plate, and the support frame in horizon bar makes horizon bar not It is easily deformed, and the material of aluminium alloy can resile to a greater degree, even if there is a small amount of bending, can also pass through pulling equipment Principle reparation is rolled with roller bearing, is easy to the recycling of horizon bar.On the other hand, the design of flat key type through hole makes water in horizon bar Flat bar in installing engineering, can lateral adjustments because positioning drilling when in the presence of different degrees of deviation, anchor is found when being easily installed Solid point, set screw fractures when same mounting hole internal cause is installed, and can also be replaced in hole and drill and anchor, Improve efficiency of construction.
2. the set screw that the utility model is used can depth be anchored in locking micelle in, make horizon bar and adjustment glue Grain is securely fastened to metope.The screw rod of set screw is divided into 3 different threaded portions, the screw thread of the 3rd spiro rod section in drill bit direction Spacing it is smaller, screw thread is closeer, be easy to depth be anchored in locking micelle in.Second spiro rod section of screw rod center section is not designed Screw thread, is primarily due to the length of embedment of this part in mortar, and smooth screw surface is easy to subsequently withdraw from screw rod.First spiral shell The spacing of the screw thread of bar segment is larger, and screw thread compares depth, is easy to support adjustment micelle and horizon bar, it is not easy to stripped thread mouthful, makes Adjustment micelle and horizon bar can be securely fastened to metope.
3. the mark post that the utility model is used can adjust horizon bar unification by set screw according to the situation of metope It is whole in approximately the same plane, with horizon bar control spraying after face of wall on same horizontal plane, so as to avoid spraying Face of wall will not cause the generation of the phenomenon of sprayed coating out-of-flatness because of the deviation of wall afterwards.
【Brief description of the drawings】
Fig. 1 is a kind of structural representation of mark post for wall surface spraying of the utility model embodiment;
Fig. 2 is the left view of the utility model embodiment horizon bar;
Fig. 3 is the front view of the utility model embodiment horizon bar;
Fig. 4 is the right view that the utility model embodiment adjusts micelle;
Fig. 5 is the front view that the utility model embodiment adjusts micelle;
During Fig. 6 in the utility model embodiment rice font through hole enlarged drawing;
Fig. 7 is the structural representation of the utility model embodiment set screw.
Main element symbol description:1st, horizon bar;2nd, set screw;3rd, micelle is adjusted;4th, flat key type through hole;5th, interior rice word Type through hole;6th, the 3rd spiro rod section;7th, the second spiro rod section;8th, the first spiro rod section;9th, screw terminal;10th, micelle is locked.
【Embodiment】
In a kind of better embodiment of the present utility model, as shown in figs. 1-7, in a kind of preferable reality of the present utility model Apply in mode, as shown in figs. 1-7, a kind of mark post for wall surface spraying, including micelle 10 is locked, the locking micelle 10 is fixed In within the walls, in addition to horizon bar 1, set screw 2 and adjustment micelle 3, the adjustment micelle 3 is located at the left side of the horizon bar 1 Face, the inside of the horizon bar 1 is the hollow structure provided with dividing plate, the design of hollow structure for solid aluminum alloy compared with It is economical and practical, be easily installed, be more convenient for adding nipple between horizon bar 1, be conducive to the connection between horizon bar 1.It is described Horizon bar 1 is provided with flat key type through hole 4, and the adjustment micelle 3 is provided with interior rice font through hole 5, and the set screw 2 wears described flat The horizon bar 1 and the adjustment micelle 3 are fixed on by of bonding through hole 4 and the interior rice font through hole 5, the set screw 2 On the locking micelle 10, the structure of the interior rice font through hole 5 is easy to twisting, the rice inwardly stretched when installing set screw 2 Word support slice can more block the screw thread in set screw 2, set screw 2 is not easy resilience loosening, be easy to set screw 2 Anchor and shore.
Further, the set screw 2 includes screw terminal 9 and the first spiral shell sequentially formed that stretches out from screw terminal 9 Bar segment 8, the second spiro rod section 7 and the 3rd spiro rod section 6, the screw terminal 9 are placed in the horizon bar 1, the 3rd spiro rod section 6 It is fixed in the locking micelle 10.The spiro rod section of the set screw 2 is divided into 3 different zones, in order to the regulation spiral shell Silk 2 is easily anchored.
Further, screw thread, and the 3rd screw rod are equipped with first spiro rod section 8 and the 3rd spiro rod section 6 The spacing of the screw thread for being smaller than first spiro rod section 8 of the screw thread of section 6.The flight pitch of 3rd spiro rod section 6 is smaller, Screw thread is closeer, is conducive to depth to be anchored in the locking micelle 10, second spiro rod section 7 is polished rod.
Further, the material of the horizon bar 1 is the hardness >=10HB material of aluminium alloy 6061.6061 aluminium alloys be through The high-quality aluminum alloy product of heat treatment pre-stretching technique productions, hardness >=10HB 6061 aluminium alloys carry out machine after being easy to deformation Tool is adjusted, and 6061 aluminium alloy magnesium, silicon alloy characteristic are more, and processing characteristics is splendid, Weldability is excellent, with good plating Property, after processing the features such as be unlikely to deform.
Further, the material surface of the horizon bar 1 passes through Passivation Treatment.Passivation Treatment can make the horizon bar 1 The inoxidizability on surface is improved, and further improves the service life of the horizon bar 1.
Further, the quantity of the flat key type through hole 4 is 4-6, it is preferable that the quantity of flat key type through hole 4 is 5. Study and find through the applicant, the setting of 5 flat key type through holes 4 can make because of cause specific when the drilling of single hole is inconvenient When, it can be installed by hole nearby, be easy to integral fastening horizon bar 1.4 spacing of each flat key type through hole≤60mm, in order to anchor Solid point is horizontally or vertically adjusted, so as to increase the support force of anchor point, compressive resistance and stretching resistance, reduces construction and installation hidden Suffer from.Many horizon bars 1 can also be docked or cut according to the actual conditions of wall, had docking or cutting nearby location When anchoring hole, regulation can be easily installed, it is convenient to construct, be also beneficial to save material, reduce capital fund.
Further, the color zinc of the electroplating surface of the set screw 2, electric zinc electroplating with iridescent yellow chromate conversion coating processing can improve the set screw 2 corrosion resistance, and then improve the service life of the set screw 2;The electric zinc electroplating with iridescent yellow chromate conversion coating is resistant to the examination of 24h neutral salt spray Test.
Operation principle of the present utility model is:After wall surface spraying first pass coating, according to construction requirement, anchoring is determined Point, the point is fixed on by locking micelle 10, and the right flank of the left surface of horizon bar 1 and adjustment micelle 3 is fitted, makes horizon bar 1 flat key type through hole 4 with adjustment micelle 3 interior rice font through hole 5 be connected, then by the 3rd spiro rod section 6 of set screw 2, Second spiro rod section 7 and the first spiro rod section 8 are passed through after flat key type through hole 4 and Nei meter fonts through hole 5, the 3rd spiro rod section 6 is screwed in lock In tight micelle 10, and then adjustment micelle 3 and horizon bar 1 are fixed on metope, then according to the situation of metope by adjusting spiral shell Silk 2 in approximately the same plane, then proceedes to the unified adjustment of horizon bar 1 to spray second time mortar paint, makes the thickness of mortar paint Degree reaches the position where the right flank of horizon bar 1, and whether the observation right flank of horizon bar 1 mutually maintains an equal level with spray-coating surface, so as to examine Whether the thickness for surveying sprayed coating is up to standard, and is repaired according to testing result, makes the thickness and level of the coating of spraying The right flank of bar 1 mutually maintains an equal level.
The horizon bar 1 that the utility model is used have stablizes the special formed structure of aluminium alloy, be easy to construction and can Recycling.On the one hand, the inside of horizon bar 1 is the hollow structure provided with dividing plate, and the support frame in horizon bar 1 makes horizon bar 1 does not allow yielding, and the material of aluminium alloy can resile to a greater degree, even if there is a small amount of bending, can also pass through traction Equipment rolls principle reparation with roller bearing, is easy to the recycling of horizon bar 1.On the other hand, flat key type through hole 4 in horizon bar 1 Design make horizon bar 1 in installing engineering, can lateral adjustments because positioning drilling when in the presence of different degrees of deviation, be easily installed When find anchor point, set screw 2 fractures when same mounting hole internal cause is installed, and can also replace brill in hole Hole is simultaneously anchored, and improves efficiency of construction.
The set screw 2 that the utility model is used can depth be anchored in locking micelle 10 in, make horizon bar 1 and adjustment Micelle 3 is securely fastened to metope.The screw rod of set screw 2 is divided into 3 different threaded portions, the 3rd spiro rod section 6 in drill bit direction Screw thread spacing it is smaller, screw thread is closeer, be easy to depth be anchored in locking micelle 10 in.Second spiro rod section of screw rod center section 7 do not design screw thread, are that smooth screw surface is easy to subsequently withdraw from screw rod because the length of embedment of this part is in mortar. The spacing of the screw thread of first spiro rod section 8 is larger, and screw thread compares depth, is easy to support adjustment micelle 3 and horizon bar 1, it is not easy to Stripped thread mouthful, enables adjustment micelle 3 and horizon bar 1 to be securely fastened to metope.
The mark post that the utility model is used can adjust the unification of horizon bar 1 by set screw 2 according to the situation of metope It is whole in approximately the same plane, with horizon bar 1 control spraying after face of wall on same horizontal plane, so as to avoid spraying Face of wall will not cause the generation of the phenomenon of sprayed coating out-of-flatness because of the deviation of wall afterwards.
Described above is to be directed to the detailed description of the preferable possible embodiments of the utility model, but embodiment is not limited to The equal change or modification completed under patent claim of the present utility model, the technical spirit suggested by all the utility model Change, all should belong to the utility model and cover the scope of the claims.

Claims (7)

1. a kind of mark post for wall surface spraying, including locking micelle, the locking micelle are fixed within the walls, it is characterised in that: Also include horizon bar, set screw and adjustment micelle, the adjustment micelle is located at the left surface of the horizon bar, the horizon bar Inside be the hollow structure provided with dividing plate, the horizon bar be provided with flat key type through hole, the adjustment micelle be provided with interior rice font Through hole, the set screw wears the flat key type through hole and the interior rice font through hole, and the set screw is by the level Bar and the adjustment micelle are fixed on the locking micelle.
2. a kind of mark post for wall surface spraying according to claim 1, it is characterised in that:The set screw includes spiral shell Silk head and stretch out from screw terminal the first spiro rod section sequentially formed, the second spiro rod section and the 3rd spiro rod section, the screw terminal It is placed in the horizon bar, the 3rd spiro rod section is fixed in the locking micelle.
3. a kind of mark post for wall surface spraying according to claim 2, it is characterised in that:First spiro rod section and institute State and screw thread is equipped with the 3rd spiro rod section, and the screw thread for being smaller than first spiro rod section of the screw thread of the 3rd spiro rod section Spacing, second spiro rod section be polished rod.
4. a kind of mark post for wall surface spraying according to claim 1, it is characterised in that:The material of the horizon bar is Hardness >=10HB the material of aluminium alloy 6061.
5. a kind of mark post for wall surface spraying according to claim 4, it is characterised in that:The material list of the horizon bar Passivation Treatment is passed through in face.
6. a kind of mark post for wall surface spraying according to claim 1, it is characterised in that:The number of the flat key type through hole Measure as 4-6.
7. a kind of mark post for wall surface spraying according to claim 1, it is characterised in that:The surface of the set screw Electric zinc electroplating with iridescent yellow chromate conversion coating.
CN201720114073.2U 2017-02-07 2017-02-07 A kind of mark post for wall surface spraying Active CN206554463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720114073.2U CN206554463U (en) 2017-02-07 2017-02-07 A kind of mark post for wall surface spraying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720114073.2U CN206554463U (en) 2017-02-07 2017-02-07 A kind of mark post for wall surface spraying

Publications (1)

Publication Number Publication Date
CN206554463U true CN206554463U (en) 2017-10-13

Family

ID=60010540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720114073.2U Active CN206554463U (en) 2017-02-07 2017-02-07 A kind of mark post for wall surface spraying

Country Status (1)

Country Link
CN (1) CN206554463U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836742A (en) * 2017-02-07 2017-06-13 广西绿地涂装工程有限公司 A kind of mark post for wall surface spraying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836742A (en) * 2017-02-07 2017-06-13 广西绿地涂装工程有限公司 A kind of mark post for wall surface spraying
CN106836742B (en) * 2017-02-07 2024-01-09 广西绿地涂装工程有限公司 A mark post for wall spraying

Similar Documents

Publication Publication Date Title
CN207552468U (en) Crust breaking cylinder side is lifted attachment device
CN206554463U (en) A kind of mark post for wall surface spraying
CN201534890U (en) Pure tin electroplating device
CN207314606U (en) A kind of building curtain wall
CN205971762U (en) A hydraulic pressure spiral top for boats and ships segmentation is supported
CN106836742A (en) A kind of mark post for wall surface spraying
CN105691554A (en) Buoy gear
CN202595296U (en) Adjustable crust breaking air cylinder for aluminum electrolytic bath
CN202644950U (en) Rebar punching device
CN104803278B (en) A kind of hanging apparatus and hanging method shown with angle
CN205753283U (en) A kind of line box fixing device
CN219710847U (en) Metal assembly part convenient to install and fix
CN211666060U (en) Keel adjusting device
CN206484467U (en) A kind of bridge-type spanner
CN105937042B (en) A kind of electronics copper foil manufacture device
CN206135325U (en) A girder for chute
CN208563964U (en) A kind of high-strength building formwork being easily installed
CN206707077U (en) Metal curtain wall with assembled hanging element
CN218135426U (en) Reamer for machining cabin door fine hole
CN210105619U (en) Metal door frame screw thread adjusting sleeve
CN215948620U (en) Spherical aluminum curtain wall main joist connecting device
CN217106231U (en) Datum line pay-off for building engineering
CN207952855U (en) A kind of adjustable plate for adjusting electrolytic bar position degree and straightness
CN108058784A (en) Ship equipment installation guide cone, installation and locating method and ship equipment pedestal
CN209649809U (en) A kind of digital decorating machine crossbeam regulating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Range pole used for wall face spraying

Effective date of registration: 20191205

Granted publication date: 20171013

Pledgee: Guangxi Xijiang financing Company limited by guarantee

Pledgor: GUANGXI GREENBELT HULL PAINTING PROJECT Co.,Ltd.

Registration number: Y2019450000026

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221125

Granted publication date: 20171013

Pledgee: Guangxi Xijiang financing Company limited by guarantee

Pledgor: GUANGXI GREENBELT HULL PAINTING PROJECT Co.,Ltd.

Registration number: Y2019450000026

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of pole for wall painting

Effective date of registration: 20221206

Granted publication date: 20171013

Pledgee: Guangxi Xijiang financing Company limited by guarantee

Pledgor: GUANGXI GREENBELT HULL PAINTING PROJECT Co.,Ltd.

Registration number: Y2022450000213

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231129

Granted publication date: 20171013

Pledgee: Guangxi Xijiang financing Company limited by guarantee

Pledgor: GUANGXI GREENBELT HULL PAINTING PROJECT Co.,Ltd.

Registration number: Y2022450000213

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A benchmark for wall spraying

Effective date of registration: 20231201

Granted publication date: 20171013

Pledgee: Guangxi Xijiang financing Company limited by guarantee

Pledgor: GUANGXI GREENBELT HULL PAINTING PROJECT Co.,Ltd.

Registration number: Y2023450000150

PE01 Entry into force of the registration of the contract for pledge of patent right