CN206545407U - A kind of prestressing steel strand reinforced concrete girder construction - Google Patents

A kind of prestressing steel strand reinforced concrete girder construction Download PDF

Info

Publication number
CN206545407U
CN206545407U CN201720091189.9U CN201720091189U CN206545407U CN 206545407 U CN206545407 U CN 206545407U CN 201720091189 U CN201720091189 U CN 201720091189U CN 206545407 U CN206545407 U CN 206545407U
Authority
CN
China
Prior art keywords
steel
concrete
beams
strand wires
steel strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720091189.9U
Other languages
Chinese (zh)
Inventor
叶香竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720091189.9U priority Critical patent/CN206545407U/en
Application granted granted Critical
Publication of CN206545407U publication Critical patent/CN206545407U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of prestressing steel strand reinforced concrete girder construction, it is characterized in that girder steel is provided below in beams of concrete, girder steel uses channel-section steel, the cage bar of beams of concrete is welded with girder steel, beams of concrete span centre position sets central bearing point steel strand wires, central bearing point steel strand wires are located in the middle part of beams of concrete section, the steel anchoring hoop coupled with central bearing point steel strand wires is arranged on 600~700mm positions above concrete floor, beams of concrete is respectively provided with side fulcrum steel strand wires along the position of span direction 1/4 and 3/4 position, side fulcrum steel strand wires are fixed on steel anchoring hoop through pre-punching and concrete floor preformed hole, the steel anchoring hoop coupled with side fulcrum steel strand wires is arranged on 300~400mm positions above concrete floor.

Description

A kind of prestressing steel strand reinforced concrete girder construction
Technical field
The utility model is related to a kind of prestressing steel strand reinforced concrete girder construction, it is adaptable to building field.
Background technology
When beams of concrete bearing capacity is inadequate, conventional method is utilized in beams of concrete bottom and reinforced using girder steel, this The method of kind is primarily present following shortcoming:The rigidity of girder steel and beams of concrete is different, in stressing conditions lower girder steel and concrete The deformation of beam is inconsistent, and girder steel and concrete floor are difficult to cooperate with load.Experiment shows when beams of concrete reaches destruction edge Girder steel load does not often reach 50%, and the bearing capacity of girder steel plays limited.
Utility model content
The utility model is to provide a kind of prestressing steel strand reinforced concrete girder construction, solves beams of concrete bearing capacity not Enough the problem of.
In order to improve bearing capacity performance degree of the girder steel in loading process, precompressed is employed to beams of concrete bottom concrete Technological means, due to beams of concrete, in stress, centre position occurs larger moment of flexure, and centre position beams of concrete is cut Tension phenomenon occurs in face bottom concrete, and being pulled open easily occurs when upper load constantly increases in the concrete of this position It is bad, therefore be necessary to set pre- pressure point in this position.Easily occur instead along the position of span direction 1/4 and 3/4 position in addition Curved, shearing can be very big, sets pre- pressure point that girder steel can be made to participate in stress as early as possible at this position, alleviate significantly beams of concrete by Power situation.
Girder steel is provided below in beams of concrete in the utility model, and girder steel uses channel-section steel, and cage bar and the girder steel of beams of concrete are welded Connect, beams of concrete span centre position sets central bearing point steel strand wires, central bearing point steel strand wires are located in the middle part of beams of concrete section, beams of concrete Pre-punching is set in the middle part of section, and a diameter of 35mm of pre-punching, a diameter of 32mm of central bearing point steel strand wires, central bearing point steel strand wires pass through pre- Perforation and concrete floor preformed hole are fixed on steel anchoring hoop, and a diameter of 35mm of concrete floor preformed hole is twisted with central bearing point steel The steel anchoring hoop of line connection is arranged on 600~700mm positions above concrete floor, in order to ensure steel anchors the company of hoop and brick wall Connect, steel anchors garter spring and arranged around brick wall, steel anchoring hoop cross sectional shape is square, the steel plate thickness of composition steel anchoring hoop for 15~ 18mm, width is 120~150mm;Beams of concrete is respectively provided with side fulcrum steel strand wires, side along the position of span direction 1/4 and 3/4 position Fulcrum steel strand wires are located in the middle part of beams of concrete section, and pre-punching, a diameter of 35mm of pre-punching, side are set in the middle part of beams of concrete section The a diameter of 32mm of fulcrum steel strand wires, side fulcrum steel strand wires are fixed on steel anchoring hoop through pre-punching and concrete floor preformed hole, The a diameter of 35mm of concrete floor preformed hole, the steel anchoring hoop coupled with side fulcrum steel strand wires is arranged on above concrete floor 300~400mm positions.
The utility model safe operation is reliable, and structural behaviour is good.
Brief description of the drawings
Fig. 1 prestressing steel strand reinforced concrete girder construction schematic diagrames.
Accompanying drawing mark:1st, girder steel, 2, central bearing point steel strand wires, 3, side fulcrum steel strand wires, 4, steel anchoring hoop, 5, beams of concrete, 6th, concrete floor, 7, brick wall.
Embodiment
The present embodiment is described in detail below in conjunction with accompanying drawing.
Girder steel 1 is provided below in beams of concrete 5 in the present embodiment, and girder steel 1 uses channel-section steel, cage bar and the girder steel 1 of beams of concrete 5 Welding, the span centre position of beams of concrete 5 sets central bearing point steel strand wires 2, and central bearing point steel strand wires 2 are located in the middle part of the section of beams of concrete 5, mix Pre-punching is set in the middle part of solidifying soil beam 5 section, a diameter of 35mm of pre-punching, a diameter of 32mm of central bearing point steel strand wires 2, central bearing point steel are twisted Line 2 is fixed on steel anchoring hoop 4, a diameter of 35mm of the preformed hole of concrete floor 6 through pre-punching and the preformed hole of concrete floor 6, The steel anchoring hoop 4 coupled with central bearing point steel strand wires 2 is arranged on the top 600mm positions of concrete floor 6, is bound round in order to ensure steel is anchored 4 and the connection of brick wall 7, steel anchoring hoop 4 is arranged around brick wall 7, and steel anchoring 4 cross sectional shapes of hoop are square, composition steel anchoring hoop 4 Steel plate thickness be 16mm, width is 130mm;Beams of concrete 5 is respectively provided with side fulcrum along the position of span direction 1/4 and 3/4 position Steel strand wires 3, side fulcrum steel strand wires 3 are located in the middle part of the section of beams of concrete 5, and pre-punching, pre-punching are set in the middle part of the section of beams of concrete 5 A diameter of 35mm, a diameter of 32mm of side fulcrum steel strand wires 3, side fulcrum steel strand wires 3 pass through pre-punching and the preformed hole of concrete floor 6 Steel anchoring hoop 4, a diameter of 35mm of the preformed hole of concrete floor 6 are fixed on, the steel anchoring hoop 4 coupled with side fulcrum steel strand wires 3 is set Put in the top 300mm positions of concrete floor 6.

Claims (1)

1. a kind of prestressing steel strand reinforced concrete girder construction, it is characterized in that girder steel is provided below in beams of concrete, girder steel is adopted With channel-section steel, cage bar and the girder steel of beams of concrete are welded, and beams of concrete span centre position sets central bearing point steel strand wires, central bearing point steel strand wires In the middle part of beams of concrete section, pre-punching, a diameter of 35mm of pre-punching, central bearing point steel strand wires are set in the middle part of beams of concrete section A diameter of 32mm, central bearing point steel strand wires are fixed on steel anchoring hoop, concrete floor through pre-punching and concrete floor preformed hole The a diameter of 35mm of preformed hole, the steel anchoring hoop coupled with central bearing point steel strand wires is arranged on above concrete floor 600~700mm Put, steel anchors garter spring and arranged around brick wall, steel anchoring hoop cross sectional shape is square, the steel plate thickness of composition steel anchoring hoop for 15~ 18mm, width is 120~150mm;Beams of concrete is respectively provided with side fulcrum steel strand wires, side along the position of span direction 1/4 and 3/4 position Fulcrum steel strand wires are located in the middle part of beams of concrete section, and pre-punching, a diameter of 35mm of pre-punching, side are set in the middle part of beams of concrete section The a diameter of 32mm of fulcrum steel strand wires, side fulcrum steel strand wires are fixed on steel anchoring hoop through pre-punching and concrete floor preformed hole, The a diameter of 35mm of concrete floor preformed hole, the steel anchoring hoop coupled with side fulcrum steel strand wires is arranged on above concrete floor 300~400mm positions.
CN201720091189.9U 2017-01-12 2017-01-12 A kind of prestressing steel strand reinforced concrete girder construction Expired - Fee Related CN206545407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720091189.9U CN206545407U (en) 2017-01-12 2017-01-12 A kind of prestressing steel strand reinforced concrete girder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720091189.9U CN206545407U (en) 2017-01-12 2017-01-12 A kind of prestressing steel strand reinforced concrete girder construction

Publications (1)

Publication Number Publication Date
CN206545407U true CN206545407U (en) 2017-10-10

Family

ID=59993052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720091189.9U Expired - Fee Related CN206545407U (en) 2017-01-12 2017-01-12 A kind of prestressing steel strand reinforced concrete girder construction

Country Status (1)

Country Link
CN (1) CN206545407U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639355A (en) * 2017-01-12 2017-05-10 叶香竹 Reinforced concrete beam structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639355A (en) * 2017-01-12 2017-05-10 叶香竹 Reinforced concrete beam structure

Similar Documents

Publication Publication Date Title
CN101818478B (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN208518202U (en) The prefabrication steel concrete compound tube of outsourcing reinforcing bar coagulation structure
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
US8220219B2 (en) Reinforcing assembly, and reinforced concrete structures using such assembly
CN109024221A (en) A kind of Novel steel combined box beam and its application method
CN206545407U (en) A kind of prestressing steel strand reinforced concrete girder construction
CN206545408U (en) A kind of prestress rope reinforced concrete girder construction
CN114855594A (en) Steel-concrete composite beam bridge shear connector and construction method thereof
CN202730755U (en) H-shaped support pile
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN204626777U (en) A kind of flexible shear structure connecting girder steel and concrete slab
CN203684457U (en) Light assembled shear wall structure
CN206438786U (en) A kind of pre-stressed strutses reinforced concrete girder construction
CN202031090U (en) Hollow prestressed concrete square pile
CN108222372B (en) Shear connector and manufacturing method thereof, and profile steel concrete column and pouring method thereof
CN103397721A (en) Steel plate precast concrete double-plate shear wall
CN114892499B (en) Prefabricated assembled steel-concrete composite girder bridge shearing-resistant connecting piece and construction method
CN216586129U (en) Prefabricated assembled steel and concrete composite beam adopting contact surface of reinforcing beam
CN206646521U (en) A kind of compound full Grouted bolt supporting construction of campshed
CN102852142B (en) A kind of pretensioned prestressing fender post
CN202247667U (en) Shearing connector structure for corrugated plate
CN203113320U (en) H-shaped supporting pile
CN203487665U (en) Steel plate precast concrete double-plate shear wall
CN211114417U (en) Novel steel-concrete composite beam structure of tensile shear
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010

Termination date: 20190112